HomeMy WebLinkAbout032326-05.1
BICYCLE ADVISORY STAFF REPORT 5.1
TO: Bicycle Advisory Commission March 23, 2026
SUBJECT: Bicycle Master Plan Update
BACKGROUND
The Town of Danville adopted its first Town-wide Bicycle Master Plan (BMP) on July 6,
2021, following a comprehensive two-year development process that incorporated
extensive community input. The BMP establishes a vision for enhancing bicycle
infrastructure, policies, and programs to create a safer, more connected, and accessible
network for cyclists of all ages and abilities. Key elements include infrastructure
recommendations outlined in Chapter 4 (Infrastructure Recommendations, pages 50-65),
which detail proposed corridor and spot improvements to address gaps in the existing
bicycle network, improve safety, and promote active transportation.
As referenced in the BMP, the plan's goals (Chapter 2, pages 12-17) emphasize creating a
connected bicycle network, prioritizing safety, encouraging ridership through education
and programs, and integrating bicycling with other modes of transportation.
Implementation is guided by Chapter 6 (Implementation Strategy, pages 76-97), which
includes project prioritization, cost estimates, and funding strategies. Since adoption, the
Town has made steady progress on these recommendations through CIP Project C-621,
focusing on engineering, encouragement, education, enforcement, and evaluation (the
"Five E's" detailed in Chapter 5, pages 66-75).
This report provides an update on the status of corridor and spot improvements based
on the latest project tracking data. It highlights completed projects, those scheduled for
completion in 2026, and those planned for 2027. All references to recommended facilities
align with the BMP's classifications (e.g., Class I Shared-Use Paths, Class IIB Buffered
Bicycle Lanes, etc.).
DISCUSSION
Progress on Corridor Improvements
The BMP identifies numerous corridor improvements to enhance connectivity along key
roadways and trails (detailed in Chapter 4, pages 52-55). As of March 2026, several
projects have been completed, with others in the Capital Improvement Program (CIP)
pipeline or planned for future years. Below is a summary categorized by completion
Bicycle Master Plan Update 2 March 23, 2026
status, projected 2026 activities, and 2027 plans.
Completed Corridor Improvements
The following projects have been fully implemented, contributing to improved bicycle
facilities in high-priority areas:
Street Start End Recommended Facility Completed Date
Camino Ramon Sycamore
Valley Rd Fostoria Way Class IIIB - Bicycle Boulevard (with
Green Sharrows) Summer 2024
San Ramon
Valley Blvd Hartz Way Sycamore
Valley Class IIB - Buffered Bicycle Lanes Summer 2025
San Ramon
Valley Blvd Podva Road Jewel Terrace Class IIB - Buffered Bicycle Lanes Summer 2025
These completions have added buffered lanes and boulevards, addressing safety
concerns at major intersections and aligning with BMP objectives for reducing vehicle-
bicycle conflicts.
Class IIB - buffered bike lanes on southbound San Ramon Valley Blvd near Podva Road
Corridor Improvements Scheduled for 2026
Projects with projected completion dates in 2026 are actively underway or in final
planning stages within the CIP:
Street Start End Recommended Facility Projected Date
Diablo Road Trail Fairway Drive Mt Diablo
Scenic Class I - Shared-Use Path 12/31/2026
Sycamore Valley
Road
San Ramon Valley
Blvd
Camino
Tassajara
Class IIB - Buffered Bicycle
Lanes Summer 2026
These efforts will focus on shared-use paths and buffered lanes to connect residential
areas with regional trails, supporting BMP goals for network expansion.
Bicycle Master Plan Update 3 March 23, 2026
Artist rendering of Diablo Road Trail to be completed along Diablo Road by the end of 2026
Improvements Planned for 2027
Staff will complete key bicycle connections within the Downtown corridor through the
implementation of Class III bikeways with shared lane markings (sharrows) along
targeted street segments to close existing gaps in the Downtown bicycle network. This
approach will improve route continuity and support safer, more intuitive bicycle travel
in constrained roadway environments. In addition, the Town will incorporate new
sharrow installations on select local streets as part of the FY27 CIP-610 paving project,
allowing bicycle route enhancements to be delivered efficiently in coordination with
scheduled pavement rehabilitation work.
Excerpts from the 2021 Bicycle Master Plan showing proposed corridor improvements
Notable not-planned corridors (e.g., Cow Creek Dr, Danville Blvd) remain under review
for potential future inclusion based on funding availability, future Capital Improvement
Project scheduling, and community feedback.
Progress on Spot Improvements
Spot improvements target specific intersections and locations for safety enhancements
(BMP Chapter 4, pages 56-65). Progress includes a mix of completed safety upgrades,
Bicycle Master Plan Update 4 March 23, 2026
ongoing CIP efforts, and planned installations.
Completed Spot Improvements
Completed spots have enhanced crossings with detection devices, lighting, and signage:
Street A Street B Recommendation Completed
Diablo Road Camino Tassajara Bike Boxes + Video Detection 2022
Diablo Road Hartz Avenue Video Detection 2025
Sycamore Valley
Road
I-680 On/Off
Ramps
Bicycle Intersection Crossings - Completed where
feasible 2022
Diablo Road Green Valley Road Bike Box + Video Detection 2022
Park and Ride Iron Horse Trail Iron Horse Trail Connection 2022
These have improved visibility and detection at high-traffic intersections.
Video Detection Upgrades at Spot Improvement Locations
Video detection systems will be installed at most traffic control signals along in town as
part of the ongoing CIP 634 - Smart Signals Project. The estimate for all phases of the project
is approximately $2,800,000.
Screenshot of NoTraffic Video Detection showing bicycle and vehicle detection in action
Supplemental grant funding will be used to infill remaining priority locations with video
detection cameras through 2027, further enhancing detection capabilities throughout the
network.
In addition, raised crosswalks will be constructed at three locations along the Iron Horse
Trail corridor to improve pedestrian and bicycle safety. CIP project C-607 is anticipated to
cost about $550,000 and improve the following locations:
Iron Horse Trail at El Capitan Drive
Iron Horse Trail at Greenbrook Drive
Iron Horse Trail at Paraiso Drive
Bicycle Master Plan Update 5 March 23, 2026
The following crossings received RRFB (Rectangular Rapid Flashing Beacons) installations
and improved lighting with construction completed in mid-March 2026 at an estimated
cost of $250,000:
Iron Horse Trail at Love Lane
Iron Horse Trail at Del Amigo Road
Iron Horse Trail at Linda Mesa Avenue
Iron Horse Trail at West Prospect Avenue
Iron Horse Trail at Hartford Road
These enhancements significantly increase visibility and driver yielding behavior at
popular trail crossing points, improving safety for cyclists, pedestrians, and equestrians
using the Iron Horse Trail.
Spot Improvements Planned for 2027
Notable remaining spot improvements identified in the Bicycle Master Plan are not
proposed for advancement in FY27, as current program funding is being strategically
focused on higher-priority corridor gap closures and projects that can be efficiently
delivered in coordination with scheduled Capital Improvement Program paving efforts.
Deferring these individual locations also allows additional time to evaluate updated safety
data, implementation feasibility, and community input to ensure future investments align
with overall network connectivity goals and available resources.
RECOMMENDATION
Staff recommends continued monitoring of project timelines, with updates to the
Committee. Funding pursuits (as outlined in BMP Chapter 6) will prioritize grants for 2026-
2027 projects.
Prepared by:
Allan Shields
Transportation Manager
Attachment: Corridor and Spot Improvement Matrix
CIP Start End Completed Date Infrastructure Prioritization
C055 Fairway Dr Mt Diablo Scenic Blvd/Avenida Nueva EOY 2026 Class I - Shared-Use Path 16
C600 Hartz Way Sycamore Valley Rd 7/1/2025 Class IIB - Buffered Bicycle Lanes 14
C600 Podva Rd Jewel Ter 7/1/2025 Class IIB - Buffered Bicycle Lanes 16.5
C601 Sycamore Valley Rd Fostoria Way 7/1/2024 Class IIIB - Bicycle Boulevard (w/ GB Sharrows)11
C635 San Ramon Valley Blvd Camino Tassajara 7/1/2025 Class IIB - Buffered Bicycle Lanes 17
C644/645 Sycamore Valley Rd Hansen Ln Class IIB - Buffered Bicycle Lanes 17
Magee Preserve SV Regional Open Space Unpaved Trail 4
Short Ridge Trail Old Blackhawk Rd Class III - Bicycle Route (w/ Sharrows)4
Shelterwood Ln Trail entrance Class III - Bicycle Route (w/ Sharrows)4
SV Regional Open Space N/A Unpaved Trail 5
El Capitan Dr Greenbrook Dr Class III - Bicycle Route (w/ Sharrows)5
Diablo Rd New Trail Class III - Bicycle Route (w/ Sharrows)5.5
El Capitan Dr Greenbrook Dr EOY 2026 Class I - Shared-Use Path 6
Diablo Rd (Alexan Riverwalk)Freitas Trail Class I - Shared-Use Path 6
La Gonda Bridge Danville Blvd Class II - Bicycle Lanes 6
La Gonda Way El Alamo Class II - Bicycle Lanes 6
MVHS Green Valley Rd Class II - Bicycle Lanes 6
El Alamo El Cerro Blvd Class III - Bicycle Route 6
Camino Tassajara Shelterwood Ln Class III - Bicycle Route 6
El Capitan Dr Greenbrook Dr Class I - Shared-Use Path 7
Greenbrook HOA N/A Class I - Shared-Use Path 7
Diablo Rd Blackhawk Rd Class I - Shared-Use Path 7
Sycamore Valley Park SV Regional Open Space Unpaved Trail 7
El Capitan Dr Sycamore Valley Rd Class I - Shared-Use Path 8
Laurelwood Dr Camino Tassajara Class III - Bicycle Route (w/ Sharrows)8
Linda Mesa Ave Prospect Ave Class III - Bicycle Route (w/ Sharrows)8
Greenbrook Dr St. Christopher Dr Class III - Bicycle Route (w/ Sharrows)8
El Cerro Blvd End Class IIIB - Bicycle Boulevard (w/ GB Sharrows)8
Greenbrook Dr Harlan Dr Class I - Shared-Use Path 9
Greenbrook Drive Van Patten Dr Class I - Shared-Use Path 9
Iron Horse Trail Macomber Road Class III - Bicycle Route (w/ Sharrows)9
Highbridge Ln Diablo Rd Class I - Shared-Use Path 10
Greenbrook Dr HOW Iron Horse Trail Class I - Shared-Use Path 11
Matadera Way Dustin Ln Class I - Shared-Use Path 11
Diablo Rd Diablo Rd Class I - Shared-Use Path 11
Iron Horse Trail Danville Blvd Class IIIB - Bicycle Boulevard (w/ GB Sharrows)11
Diablo Rd Trail Short Ridge Trail Class IIIB - Bicycle Boulevard (w/ GB Sharrows)11
Railroad Ave Sky Ter Class III - Bicycle Route (w/ Sharrows)12
Camino Ramon Greenbrook Dr Class IIIB - Bicycle Boulevard (w/ GB Sharrows)12
Prospect Ave Trailhead Class III - Bicycle Route (w/ Sharrows)13
Iron Horse Trail Hartz Ave Class III - Bicycle Route (w/ Sharrows)14
Danville Blvd Diablo Rd Class IIB - Buffered Bicycle Lanes 14.5
Del Amigo El Portal Class IIB - Buffered Bicycle Lanes 14.5
Camino Ramon Sycamore Valley Dr Class IIIB - Bicycle Boulevard (w/ GB Sharrows)16.5
CORRIDOR IMPROVEMENTS
CIP Start End Complete Infrastructure Prioritization
C055 Diablo Rd New trail EOY 2026 PHB + High Visibility Crosswalk + Improve Lighting 4
C055 Diablo Rd Fairway Dr EOY 2026 PHB + High Visibility Crosswalk + Improve Lighting 5.5
C055 Diablo Rd Clydesdale Dr Add lighting 7
C305 Iron Horse Trail Linda Mesa Ave 4/15/2026 RRFB + High visibility crosswalk + Improve lighting 10
C305 Iron Horse Trail West Prospect Ave 4/15/2026 RRFB + High visibility crosswalk + Improve lighting 11.5
C305 Iron Horse Trail Del Amigo Rd 4/15/2026 RRFB + High visibility crosswalk + Improve lighting 12
C305 Iron Horse Trail Love Ln 4/15/2026 RRFB + High visibility crosswalk + Improve lighting 13.5
C305 Iron Horse Trail Hartford Rd 4/15/2026 RRFB + High Visibility Raised Crosswalk + Improve Lighting 13.5
C600 Sycamore Valley Road San Ramon Valley Blvd 7/1/2025 Video detection device 10.5
C607 Iron Horse Trail El Capitan Dr 6/15/2026 Raised crosswalk 8.5
C607 Iron Horse Trail Paraiso Dr 6/15/2026 Raised crosswalk 10.5
C607 Iron Horse Trail Greenbrook Dr 6/15/2026 Raised crosswalk 10.5
C610 Front St Hartz Way 7/1/2025 Video detection device 11
C634 Railroad Ave Church St EOY 2026 Video detection device 4
C634 Green Valley Rd Blemer Rd / Cameo Drive EOY 2026 Video detection device 4
C634 Greenbrook Dr Sycamore Valley Rd EOY 2026 Video detection device 5.5
C634 Sycamore Valley Rd Brookside Dr EOY 2026 Video detection device 5.5
C634 Camino Tassajara Old Blackhawk Rd EOY 2026 Video detection device 7
C634 El Cerro Blvd La Gonda Way EOY 2026 Video detection device 7
C634 Camino Tassajara Tassajara Ranch Dr EOY 2026 Video detection device 7.5
C634 Camino Tassajara Sycamore Valley Rd EOY 2026 Video detection device 7.5
C634 Camino Ramon Greenbrook Dr EOY 2026 Video detection device 7.5
C634 Diablo Rd El Cerro Blvd - Ackerman Dr EOY 2026 Video detection device 7.5
C634 Diablo Rd Camino Tassajara 2022 Bike box + Video detection device 8.5
C634 Diablo Rd Hartz Ave 2025 Video detection device 8.5
C634 Diablo Rd Front St EOY 2026 Video detection device 9
C634 Diablo Rd West El Pintado EOY 2026 Video detection device 9
C634 Diablo Rd Matadera Way EOY 2026 Video detection device 9
C634 Crow Canyon Rd Tassajara Ranch Dr EOY 2026 Video detection device 10.5
C634 Sycamore Valley Rd Camino Ramon EOY 2026 Video detection device 11
C634 Hartz Way Hartz Ave EOY 2026 Video detection device 11
C634 San Ramon Valley Blvd Hartz Ave EOY 2026 Video detection device 11
C634 Danville Blvd El Cerro Blvd Bike box + Video detection device 11.5
C634 San Ramon Valley Blvd Railroad Ave 7/1/2025 Video detection device 13
C634 Hartz Ave Railroad Ave 7/1/2025 Video detection device 10.5
C634 C644 C645 Camino Tassajara Crow Canyon Rd EOY 2026 Video detection device 13.5
C635 Camino Tassajara Sycamore Valley Rd Bicycle intersection crossings 7.5
C635 Sycamore Valley Rd Camino Ramon/ Iron Horse Trail EOY 2026 Improve staging area + Protected Intersection 12.5
C644/C645 Camino Tassajara Crow Canyon Rd Protected intersection 11
Park & Ride Sycamore Valley Rd Bike Parking 2
Old Orchard Dr Freitas Trail Bicycle intersection crossings 4.5
La Gonda Way Bike Lanes 5
Blackhawk Rd Mt Diablo Scenic Blvd Bike box + Video detection device 6.5
Park & Ride Iron Horse Trail 2022 Iron Horse Trail Connection 7
Sycamore Valley Rd I-680 On/Off Ramps Bicycle intersection crossings 9.5
Love Lane Railroad Ave Bicycle intersection crossings 10
Diablo Rd Green Valley Rd 2022 Video detection device 10.5
Sycamore Valley Rd Iron Horse Trail Crossing Bridge overcrossing 12
Diablo Rd I-680 Overpass under lighting 12
Iron Horse Trail San Ramon Valley Blvd Raised crosswalk 14
SPOT IMPROVEMENTS