HomeMy WebLinkAbout030326-06.3
ADMINISTRATIVE STAFF REPORT 6.3
TO: Mayor and Town Council March 3, 2026
SUBJECT: Resolution No. 18-2026, awarding a construction contract for the 2025/26
Pavement Slurry Seal Project, CIP No. C-610J
BACKGROUND
This is the first construction project of the 2025/26 fiscal year as part of the Pavement
Management Program (CIP No. C-610J). The project will apply slurry seal surface
treatment to various streets throughout the Town. Slurry seal is a cost-effective
preventative maintenance technique designed to extend the life of existing pavements
by filling surface cracks and voids, providing a weather-tight seal, and adding texture
and uniform appearance to the street. A slurry seal will extend pavement life by
approximately five to seven years.
To determine those streets that will receive a slurry seal treatment, the Town, along
with all Bay Area cities and counties, uses StreetSaver, a pavement management
program developed by the Metropolitan Transportation Commission (MTC). The
software relies on a classification system known as Pavement Condition Index (PCI),
which ranges from 0 to 100. New streets start at 100 and decrease as they age. The
Town’s Pavement Management Program seeks to sustain an average overall PCI of 70
or better for Town streets using funding allocated annually. Streets eligible for slurry
seal treatment generally have PCIs in the range of 70 to 90.
Although the bulk of the work involves slurry seal treatment, this project also includes
dig-out repairs and crack sealing. Traffic striping and marking replacement will follow
the resurfacing work. A complete list of streets is shown in Attachment C.
DISCUSSION
Seven bids were received and opened on February 12, 2026. The lowest responsive
bidder was American Pavement Systems Inc. of Modesto, California at $1,766,273.46.
Bid results are summarized in Attachment D.
The work is scheduled to begin this fall and should be completed later this year,
assuming the weather is favorable.
Award of Contract for 2025/26 2 March 3, 2026
Pavement Slurry Seal Project
CIP No. C-610J
This project is considered maintenance and repair work and is therefore categorically
exempt from the requirements of the California Environmental Quality Act (CEQA)
according to Guidelines Section 15301 (Class 1).
PUBLIC CONTACT
Posting of the meeting agenda serves as notice to the general public. A standard Town
Capital Improvement sign will be placed at the various project sites. Adjacent property
owners will be notified in advance of the construction schedule.
FISCAL IMPACT
The low bid amount is $1,766,273.46, plus a 15% contingency of $264,941, which results
in a total construction budget of $2,031,214.46. Sufficient funds have been appropriated
in the Capital Improvement Program (Pavement Management Program) to cover these
costs.
RECOMMENDATION
Adopt Resolution No. 18-2026, awarding a construction contract for the 2025/26
Pavement Slurry Seal Project, CIP No. C-610J.
Prepared by:
Nader Salama, P.E.
Senior Civil Engineer
Reviewed by:
Diane J. Friedmann
Development Services Director
Attachments: A - Resolution No. 18-2026
B - CIP Page No. C-610
C - Candidate Street List
D – Bid Results Summary
RESOLUTION NO. 18-2026
AWARDING A CONSTRUCTION CONTRACT FOR THE 2025/26
PAVEMENT SLURRY SEAL PROJECT, CIP NO. C-610J
WHEREAS, the Danville Town Council has appropriated funding in the Capital
Improvement Program for the Pavement Management Program, CIP No. C-610J in the
2025/26 Capital Improvement Program; and
WHEREAS, the plans and specifications for the subject project have been reviewed and
approved by the City Engineer; and
WHEREAS, this project is categorically exempt from the requirements of the California
Environmental Quality Act, Section 15301, Class 1; and
WHEREAS, the City Clerk of this Town did, in open session on the 12th day of
February, 2026, publicly open and read aloud the sealed bids received as required by
law; and
WHEREAS, the lowest responsive bidder is American Pavement Systems, Inc. of
Modesto , California, and the City Engineer has recommended awarding a contract for
the project to said contractor; now, therefore, be it
RESOLVED, by the Danville Town Council, that the Town award the construction
contract for the 2025/26 Pavement Slurry Seal Project, CIP No. C-610J to American
Pavement Systems, Inc. of Modesto, California; and, be it further
RESOLVED, by the Danville Town Council, that the Town Manager be and hereby is
authorized to execute, on behalf of the Town, a written contract with American
Pavement Systems Inc for $1,766,273.46, and authorize use of a 15% construction
contingency of $264,941 for a total construction budget of $2,031,214.46 for work in
connection therewith, and the City Clerk is hereby directed to attest same and affix
thereto the official seal of the Town; and, be it further
RESOLVED, that staff shall within five (5) days of the adoption of this resolution,
transmit an Extract of Public Works contract award to the Department of Industrial
Relations, Division of Apprenticeship Standards, P.O. Box 420603, San Francisco, CA
94142. (Note: Should a finding of any discrepancy regarding this ratio of apprentices to
journeymen be made, the Town shall notify the Division of Apprenticeship Standards
of such findings.)
Docusign Envelope ID: 355F802B-798D-4394-B0D7-A3535D6C602F
ATTACHMENT A
PAGE 2 OF RESOLUTION NO. 18-2026
APPROVED by the Danville Town Council at a regular meeting on March 3, 2026, by
the following vote:
AYES:
NOES:
ABSTAINED:
ABSENT:
MAYOR
APPROVED AS TO FORM: ATTEST:
CITY ATTORNEY CITY CLERK
Docusign Envelope ID: 355F802B-798D-4394-B0D7-A3535D6C602F
CIP 109 • 2025–2026 Operating Budget & Capital Improvement Program
Projects
Pavement Management
CIP Project: C-610
Department/Division: Engineering
Type: Rehabilitate/Replacement Project
Status:
Completed Phases:
2024/25
◦Pavement overlay including resurfacing, asphalt concrete overlay,
ADA compliant sidewalk curb ramps, traffic striping in various
neighborhoods throughout Town
Future Phase:
2025/26
◦Pavement Slurry Seal
Description:
The Pavement Management Capital Improvement Project is an annual effort approved by the Town Council to
maintain the Town’s street system at a high level of service. A proactive approach to pavement maintenance
prevents more costly pavement repairs in the future. The program consists of two approaches: a proactive
approach that utilizes preventative maintenance methods such as Crack Seal, Slurry Seal and Rubberized Cape
Seal; and rehabilitation, which includes overlays and reconstruction that replace the pavement wearing surface.
The planned level of expenditures is aimed at sustaining a minimum overall pavement condition index (PCI) of 70
for Town streets.
Project Cost Estimate:
Prior Years 2025/26 2026/27 2027/28 2028/29 2029/30
Design/Plan Review $33,000 $0 $0 $0 $0 $0
Construction $20,543,316 $3,000,000 $2,900,000 $2,800,000 $2,800,000 $2,800,000
Inspection & Admin. $60,000 $0 $0 $0 $0 $0
Total Cost Estimate: $20,642,316 $3,000,000 $2,900,000 $2,800,000 $2,800,000 $2,800,000
Total Expenditure: $18,476,933
Unexpended as of 4/8/25: $2,165,383
Project Appropriation and Funding:
Prior Years 2025/26 2026/27 2027/28 2028/29 2029/30
CIP Gen Purpose Rev $8,208,915 $500,000 $250,000 $0 $0 $0
Gas Tax $4,970,000 $750,000 $750,000 $750,000 $750,000 $750,000
Grant $200,000 $0 $0 $0 $0 $0
Meas J Rtrn to Src $4,150,000 $550,000 $550,000 $550,000 $550,000 $550,000
Operating Reserve $100,000 $0 $0 $0 $0 $0
Solid Waste VIF $4,733,401 $1,200,000 $1,350,000 $1,500,000 $1,500,000 $1,500,000
Transfer to C-600 $1,200,000)$0 $0 $0 $0 $0
Transfer to C-601 ($520,000)$0 $0 $0 $0 $0
Total Funding: 20,642,316 $3,000,000 $2,900,000 $2,800,000 $2,800,000 $2,800,000
ATTACHMENT B
No. Road Name Beging Location End Location
1 ADOBE DR EL CERRO BLVD HIGHBRIDGE LN (WEST)
2 ALAMATOS DR DIABLO RD (EAST)DIABLO RD (WEST)
3 AMIGO RD ALAMATOS DR (WEST)DIABLO RD
4 ARROYO DR DIABLO RD ALAMATOS DR
5 BETTEN CT DIABLO RD END
6 BUENO CT ALAMATOS DR END
7 CAMINO CT ALAMATOS DR END
8 CONSTITUTION DR EL CERRO BLVD END
9 DIABLO CT ALAMATOS DR END
10 EL SOBRANTE DR ALAMATOS DR (EAST)ALAMATOS DR (WEST)
11 ENTERPRISE DR EL CERRO BLVD SOUTH END
12 HIGHBRIDGE CT HIGHBRIDGE LN END
13 HIGHBRIDGE LN ADOBE DR (WEST END)ADOBE DR (EAST END)
14 HIGHTREE CT WOODBINE LN END
15 HORNET CT HORNET DR END
16 HORNET DR ENTERPRISE DR END/PRIVATE ROAD
17 MERRIMAC CT MERRIMAC PL END
18 MERRIMAC PL ENTERPRISE DR END
19 MILLBROOK CT WOODBINE LN END
20 PEARTREE CT WOODBINE LN END
21 ROCKPORT CT ADOBE DR END
22 SIERRA VISTA PL ALAMATOS DR END
23 STANBRIDGE CT HIGHBRIDGE LN END
24 STONINGTON CT HIGHBRIDGE LN END
25 STOWBRIDGE CT HIGHBRIDGE LN END
26 WOODBINE LN ADOBE DR END
27 BELGIAN DR MAIDEN LN ROAN DR
28 CAMEO DR GREEN VALLEY RD PLAZA CIR
29 CERRO CT VERDE MESA DR END
30 CLYDESDALE DR BELGIAN DR DIABLO RD
31 DIABLO RD GREEN VALLEY RD AVENIDA NUEVA
32 FAIRWAY DR DIABLO RD CLYDESDALE DR
33 FELIZ CT MONTANA DR END
34 GELDING CT CLYDESDALE DR END
35 GREEN VALLEY RD STONE VALLEY RD DONNA LN
36 GREEN VALLEY RD DONNA LN DIABLO RD
37 MAIDEN LN CAMEO DR END
38 MONTANA DR CAMEO DR END
39 NUEVO RD PLAZA CIR END
40 PLAZA CIR SOUTH END NORTH END
41 PLAZA CT PLAZA CIR END
42 PULIDO CT PULIDO DR END
2025/26 Slurry Seal Project C-610J
Street List
Attachment C
Page 1 of 4
ATTACHMENT C
No. Road Name Beging Location End Location
2025/26 Slurry Seal Project C-610J
Street List
43 PULIDO RD CAMEO DR END
44 ROAN DR BELGIAN DR CLYDESDALE DR
45 SCOTTS MILL CT SCOTTS MILL RD END
46 SORREL CT BELGIAN DR END
47 SURREY CT CLYDESDALE DR END
48 VALLE VERDE CT GREEN VALLEY RD END
49 VALLE VISTA CAMEO DR END
50 VERDE MESA DR GREEN VALLEY RD END
51 VIA CIMA CT PULIDO RD END
52 VISTA DEL DIABLO CAMEO DR END
53 AMBLESIDE CT INDIAN HOME RD END
54 AMESBURY CT OLD ORCHARD DR END
55 BRIDGEWATER CIR OLD CREEK RD (WEST)OLD CREEK RD (EAST)
56 BRIDGEWATER RD OLD CREEK RD (EAST)CASTLEFORD CIR
57 BURLEIGH PL CASTLEFORD CIR END
58 CASTLEFORD CIR PARK HILL RD (WEST)PARK HILL RD (EAST)
59 CASTLEFORD PL PARK HILL RD END
60 DERBYSHIRE PL PARK HILL RD END
61 DUNSMOOR CT OLD ORCHARD DR END
62 FARNHAM PL PARK HILL RD END
63 FOXHALL CT OLD ORCHARD DR END
64 GRAHAM CT OLD ORCHARD DR END
65 INDIAN HOME RD GREENBROOK DR TURNBRIDGE RD
66 JENSEN CT GRAHAM CT END
67 LEEDS CT EAST TURNBRIDGE RD END
68 LEEDS CT WEST TURNBRIDGE RD END
69 LODGEHILL CT INDIAN HOME RD END
70 NEW BOSTON CT TURNBRIDGE RD END
71 OLD CREEK RD OLD ORCHARD DR BRIDGEWATER RD
72 OLD ORCHARD DR OLD ORCHARD CT CAMINO TASSAJARA
73 OLD ORCHARD DR SYCAMORE VALLEY RD OLD ORCHARD CT
74 OLDHAM CT GRAHAM CT END
75 PARK HILL RD SYCAMORE VALLEY RD OLD ORCHARD DR
76 PENNINGTON PL PARK HILL RD END
77 PORTLAND CT GREENBROOK DR END
78 SALEM TOWN CT GREENBROOK DR END
79 TUNBRIDGE RD SYCAMORE VALLEY RD WHITSIDE CT
80 TYBURN PL PARK HILL RD END
81 ALCAZAR CT EL CAPITAN DR END
82 ALICANTE CT ALICANTE DR END
83 ALICANTE DR EL CAPITAN DR ST CHRISTOPHER DR
84 ALICANTE PL ALICANTE DR END
85 ALVISO CT ALVISO WAY END
86 ALVISO WAY END END
87 APTOS PL ALICANTE DR APTOS PL (JUNCTION)
Page 2 of 4
No. Road Name Beging Location End Location
2025/26 Slurry Seal Project C-610J
Street List
88 APTOS PL EAST END WEST END
89 BALCETA CT EL CAPITAN DR END
90 BORICA DR EL CAPITAN DR END
91 BORICA PL BORICA DR END
92 CAMARITAS CT CAMARITAS WAY END
93 CAMARITAS WAY EL CAPITAN DR END
94 CASTENADA CT BORICA PL END
95 CENTURY CIR CENTURY WAY (WEST)CENTURY WAY (EAST)
96 CENTURY WAY GREENBROOK DR EL CAPITAN DR
97 COMO WAY EL CAPITAN DR END
98 CORTE DORADO BORICA DR END
99 LOWELL CT BORICA DR END
100 LOWELL DR BORICA DR END
101 MCCLOUD PL EL CAPITAN DR END
102 MILWAUKEE PL EL CAPITAN DR END
103 ROYAL PALM PL CENTURY WAY END
104 ST ANN CT ST DAVID DR END
105 ST BEATRICE CT ST DAVID DR END
106 ST CHRISTOPHER DR GREENBROOK DR EL CAPITAN DR
107 ST DAVID DR ST CHRISTOPHER DR HARLAN DR
108 ST EDWARD CT GREENBROOK DR END
109 ST JOAN CT ST CHRISTOPHER DR END
110 ST LUKE CT ST DAVID DR END
111 ST MARK CT ST DAVID DR END
112 ST TIMOTHY CT ST DAVID DR END
113 STARLIGHT PL EL CAPITAN DR END
114 WESTERN STAR PL GREENBROOK DR END
115 ZAMORA PL EL CAPITAN DR END
116 ZITA CT EL CAPITAN DR END
117 ANTELOPE RIDGE SQUIRREL RIDGE WAY JASMINE WAY
118 ANTHURIUM CT CASABLANCA ST END
119 BENJAMIN LN CULET RANCH RD END
120 BOTTLE BRUSH CT SQUIRREL RIDGE WAY END
121 CAFÉ CT PROVENCE RD END
122 CASABLANCA CT FREESIA CT END
123 CASABLANCA ST (EAST) LAWRENCE RD EAST END
124 CASABLANCA ST (WEST) FREESIA CT LAWRENCE RD
125 CASOLYN RANCH CT CULET RANCH RD END
126 CULET DR CULET RANCH RD BENJAMIN LN
127 CULET RANCH RD LAWRENCE RD END
128 DAISY CT JASMINE WAY END
129 FREESIA CT LILY CT END
130 GERBERA CT PLUMERIA CT END
131 GREEN GABLES CT CULET RANCH RD END
132 HACKLER CT CULET RANCH RD END
Page 3 of 4
No. Road Name Beging Location End Location
2025/26 Slurry Seal Project C-610J
Street List
133 JASMINE CT JASMINE WAY END
134 JASMINE WAY CAMINO TASSAJARA LAWRENCE RD
135 LAWRENCE RD CAMINO TASSAJARA SOUTH END
136 LILY CT WEST END EAST END
137 LOYAL DRAGON PL CULET RANCH RD END
138 LYON CT PROVENCE RD END
139 MARIGOLD CT MARIGOLD ST END
140 MARIGOLD ST LAWRENCE RD MARIGOLD CT
141 MEADOW BLOSSOM CT SQUIRREL RIDGE WAY END
142 MELSENNA CT CULET RANCH RD END
143 NARCISSUS CT CASABLANCA ST END
144 NERINE CT CASABLANCA CT END
145 OGAWA CT SHELTERWOOD LN END
146 PLUMERIA CT LAWRENCE RD END
147 PROVENCE RD LAWRENCE RD SHELTERWOOD DR
148 SHELTERWOOD CT PROVENCE RD END
149 SHELTERWOOD DR PROVENCE RD END
150 SHELTERWOOD LN LAWRENCE RD SHELTERWOOD DR
151 SHELTERWOOD PL SHELTERWOOD LN END
152 SQUIRREL RIDGE WAY JASMINE WAY (NORTH) JASMINE WAY (SOUTH)
153 SWEET PEA CT ANTELOPE RIDGE END
Page 4 of 4
PROJECT: 2025/26 Pavement Slurry Seal Project,
Contract No. C-610J
BID OPENING: February 12, 2026, at 2:00 p.m. PST
Please direct all questions regarding this bid opening to:
Nader Salama, P.E., (925) 314-3348
nsalama@danville.ca.gov
Engineer’s Estimate: $2,578,998.00
Number of Addendums: 1
OFFICIAL BID RESULTS
CONTRACTOR BID AMOUNT
American Pavement Systems* $1,766,273.46
VSS International $1,806,325.00
Sierra Nevada Construction $2,024,007.00
Pavement Coatings $2,053,198.14
Dryco Construction $2,094,494.00
Graham Contractors $2,286,559.00
American Asphalt $2,555,411.12
*Lowest Responsive Bid
I, Marie Sunseri, City Clerk for the Town of Danville, do hereby affirm that the bids
received were not opened prior to the time of the public bid opening.
ATTACHMENT D