Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
120925-03.2
AB1572 Non-Functional Turf 1 AB1572 Non-Functional Turf Phase 3 Phase 2 Phase 1 2 Phase 1 – Alta Vista to Wood Ranch 3 Phase 2 – Tassajara Lane to Sherburne Hills (before) 4 Phase 2 – Tassajara Lane to Sherburne Hills (in progress) 5 Phase 3 – Hill Meadow to Tassajara Lane (before) 6 Phase 3 – Hill Meadow to Tassajara Lane (in progress) 7 Design Consistency Construction Drawings & Bid Specifications Design Components: Entry Statement Highlights Lower Level Plants Upper Level Trees Next Steps: Design Contract Conceptual Designs AB1572 Non-Functional Turf Landscape Master Plan 8