HomeMy WebLinkAbout101625-05.1 DESIGN REVIEW BOARD STAFF REPORT 5.1 TO: Design Review Board Members October 16, 2025 SUBJECT: Review and provide comments on the architecture, color and material board, and landscape design for Major Subdivision request SD 9721 and Development Plan request DEV25-0014 allowing the development of 47 townhomes with two attached accessory dwelling units on a 1.62-acre property located at 200 Boone Court. PROJECT DESCRIPTION The project includes a Major Subdivision request (SD 9721) and a Development Plan request (DEV25-0014). These requests would allow for the site to be subdivided to create a 47 lot townhouse development. Two of the units would incorporate accessory dwelling units resulting in a total 49 unit development. The Development Plan request includes the proposed architectural elevations, materials, colors, and landscaping for the proposed 110,170 +/- square foot three-story development. This development was submitted as a Preliminary Housing Development Plan Application under SB 330 which was deemed complete on July 31, 2025. On September 4, 2025, the applicant submitted a Formal Development Plan application which was deemed incomplete, requiring a resubmittal. The application was submitted under the California State Density Bonus Law. While no density units are proposed, several waivers to reduce development standards are requested. These waivers include: a reduction of setbacks from 25 feet and 20 feet for the front and side property lines, respectively, down to a minimum of 3.1 feet and 12.3 feet; and a maximum height of 40 feet where an average height of 35 feet and a maximum of 37 feet are required. The California State Density Bonus Law requires the project to include income-restricted affordable units to receive the incentives and waivers. The project includes four below market rate units which are comprised of two accessory dwelling units restricted to very low-income levels, and two townhomes restricted to low-income levels. This property was rezoned to the Town’s DBD13; Multifamily Residential-High Special Land Use Designation and zoning district as part of the Town’s 2023-2031 Housing Element process. This designation requires residential development at a density between 30-35 units per acre. The subject development is has a density of 30 units per acre. 200 Boone Ct – Development Plan 2 October 16, 2025 EVALUATION Architecture  The proposed development has two complementary color schemes. Four buildings would have light grey brick, light and dark grey stucco, dark grey board and batten siding, dark brown garage doors, and a dark brown roofing. Two buildings would have dark grey brick, off-white and dark grey stucco, dark grey board and batten siding, dark grey garage doors, and a dark grey roofing.  Staff recommends the addition of awnings, ledges, or planters as well as rafter tails or braces to the rear and sides of the buildings to break up the face of the wall and provide for more complete architecture. Staff recommends the introduction of the brick material shown on the front elevations to the rear and side elevations. Staff also recommends modifying the vertical board and batten siding to have wider delineations or be broken up by other materials as to not visually elongate the building. Landscape  All trees are a minimum of 24” box container sizes and the shrubs are 1-gallon and 5-gallons in size.  Trees and shrubs are proposed around the west and north property lines which border neighboring residential developments. Tree Removal  Nine Town-protected trees are proposed for removal, five of which are located off- site requiring approval from the neighboring property. Five additional trees may be requested for removal depending on the amount of root loss occurring during excavation/grading. 200 Boone Ct – Development Plan 3 October 16, 2025 RECOMMENDATION Review and provide comments on the architecture, color and material board, and landscape design for Major Subdivision request SD 9721 and Development Plan request DEV25-0014 allowing the development of 47 townhomes with two attached accessory dwelling units located at 200 Boone Court. Prepared by: Riley Anderson-Barrett Associate Planner Attachments: A - Project Plans No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A-0.0.0COVER PAGE & SHEET INDEX 200 BOONE COURT DANVILLE, CA DEVELOPER: THE ADDRESS COMPANY 3160 CROW CANYON RD, SUITE 270 SAN RAMON, CA 94583 (925) 272-4750 CONTACT: ERIC J CHEVALIER ejchevalier@theaddress.company ARCHITECT: KTGY 1814 FRANKLIN STREET, SUITE 400 OAKLAND. CA 94612 (510) 463-2072 CONTACT: DAVID BURTON AIA dburton@ktgy.com CIVIL ENGINEER: CARLSON, BARBEE & GIBSON 2633 CAMINO RAMON, SUITE 350 SAN RAMON, CA 94583 (925) 866-0322 CONTACT: JASON NERI, P.E. jneri@cbandg.com LANDSCAPE: RIPLEY DESIGN 1615 BONANZA STREET, SUITE 314 WALNUT CREEK, CA 94596 (925) 938-7377 CONTACT: ANNIKA CARPENTER acarpenter@ripleydesign.com LEGAL: HSW 3800 MT. DIABLO BLVD., 2nd FLOOR LAFAYETTE, CA 94549 (925) 866-0322 CONTACT: BRYAN WENTER bryan.wenter@hsw-legal.com SHEET INDEX ARCHITECTURE A0.0.0 COVER SHEET & SHEET INDEX A0.0.1 VICINITY MAP & SITE PHOTOGRAPHY A1.0.0 ARCHITECTURAL SITE PLAN A1.1.0 CODE ANALYSIS A2.0.0 BUILDING ELEVATIONS - 7 PLEX A2.0.1 BUILDING ELEVATIONS - 7 PLEX A2.1.0 BUILDING ELEVATIONS - 8 PLEX-A A2.1.1 BUILDING ELEVATIONS - 8 PLEX-A A2.2.0 BUILDING ELEVATIONS - 8 PLEX-B A2.2.1 BUILDING ELEVATIONS - 8 PLEX-B A3.0.0 BUILDING PLANS - 7 PLEX A3.0.1 BUILDING PLANS - 7 PLEX A3.1.0 BUILDING PLANS - 8 PLEX-A A3.1.1 BUILDING PLANS - 8 PLEX-A A3.2.0 BUILDING PLANS - 8 PLEX-B A3.2.1 BUILDING PLANS - 8 PLEX-B A4.0.0 BUILDING SECTION A4.0.1 BUILDING SECTION A5.0.0 UNIT PLANS - PLAN 1-2 A5.1.0 UNIT PLANS - PLAN 3-5 A5.1.1 UNIT PLANS - PLAN 3-5 A5.2.0 UNIT PLANS - PLAN 4 A6.0.0 COLOR AND MATERIALS A7.0.0 ARCHITECTURAL DETAILS CIVIL VMT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES C-1 PRELIMINARY SITE PLAN C-2 EXISTING CONDITION PLAN C-3 PRELIMINARY GRADING AND DRAINAGE PLAN C-4 PRELIMINARY UTILITY PLAN C-5 PRELIMINARY STORMWATER MANAGEMENT PLAN LANDSCAPE L1 PRELIMINARY SITE PLAN L2 PRELIMINARY SITE SECTIONS L3 PRELIMINARY DETAILS L4 PRELIMINARY PLANTING PLAN L5 TREE INVENTORY PLAN L6 PRELIMINARY WATER USE PLAN No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A0.0.1VICINITY MAP AND SITE PHOTOGRAPHY BOONE COURT D O N A L D D . D O Y L E H I G H W A Y SYCAMORE VALLEY ROAD NTS S A N R A M O N V A L L E Y B L V D I R O N H O R S E R E G I O N A L T R A I L 1. Boone Court 2. Boone Court 3. Danville Bowl 4. Parking Lot on Site 5. Boone Court 12 3 4 5 NTS VICINITY MAP B O O N E C T HARTLEY DR ASHLE Y C T BLDG NO.18 PLEX A B L D G N O . 2 8 P L E X A B L D G N O . 3 7 P L E X B L D G N O . 4 8 P L E X B BLDG N O . 5 8 PLE X B BLDG NO.68 PLEX ANo.888.456.5849 | ktgy.com200 BOONE COUR T S B 3 3 0 P R E L I M I N A R Y A P P L I C A T I O N A U G U S T 2 8 , 2 0 2 5 TOWN OF DANVILLE, C A . No.888.456.5849 | ktgy.com200 BOONE COUR T S B 3 3 0 P R E L I M I N A R Y A P P L I C A T I O N A U G U S T 2 8 , 2 0 2 5 TOWN OF DANVILLE, C A . S I T E P L A N & P R O J E C T D A T A A 1 . 0 . 0 0 2 0 4 0 1 0 S c a l e : 1 " = 2 0 ' - 0 " B E L O W M A R K E T R A T E U N I T S +/ - 3 8 ' - 6 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " +/ - 3 8 ' - 6 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A2.0.0BUILDING ELEVATIONS 7 PLEX0 4 8 16 Scale: 1/8" = 1'-0" FRONT ELEVATIONRIGHT ELEVATION FRONT RIGHT PERSPECTIVE 1 23458 5 28 1 4 73 MATERIAL LEGEND 1. Stucco 2. Board and batten siding 3. Brick veneer 4. Vinyl window 5. Painted metal railing 6. Metal garage door 7. Entry door 8. Composition shingle roof 9. Light Fixtures 10. Unit Address 11. Heat pump unit screen 12. Painted wood brackets 13. High density foam trim 14. Fiber cement trim 15. Corbel NTSKEY PLAN 9 101114141315 +/ - 3 8 ' - 6 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " +/ - 3 8 ' - 6 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A2.0.1BUILDING ELEVATIONS 7 PLEX0 4 8 16 Scale: 1/8" = 1'-0" REAR ELEVATION REAR LEFT PERSPECTIVE LEFT ELEVATION 12 3458 2 8146 MATERIAL LEGEND 1. Stucco 2. Board and batten siding 3. Brick veneer 4. Vinyl window 5. Painted metal railing 6. Metal garage door 7. Entry door 8. Composition shingle roof 9. Light Fixtures 10. Unit Address 11. Heat pump unit screen 12. Painted wood brackets 13. High density foam trim 14. Fiber cement trim 15. Corbel NTSKEY PLAN 14 9 1015 +/ - 3 8 ' - 6 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " +/ - 3 8 ' - 6 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A2.1.0BUILDING ELEVATIONS 8 PLEX - A0 4 8 16 Scale: 1/8" = 1'-0" FRONT ELEVATIONRIGHT ELEVATION FRONT RIGHT PERSPECTIVE 1 23458 5 28 1 4 7 3 MATERIAL LEGEND 1. Stucco 2. Board and batten siding 3. Brick veneer 4. Vinyl window 5. Painted metal railing 6. Metal garage door 7. Entry door 8. Composition shingle roof 9. Light Fixtures 10. Unit Address 11. Heat pump unit screen 12. Painted wood brackets 13. High density foam trim 14. Fiber cement trim 15. Corbel NTSKEY PLAN 9 1014131115151411 +/ - 3 8 ' - 6 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " +/ - 3 8 ' - 6 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A2.1.1BUILDING ELEVATIONS 8 PLEX - A0 4 8 16 Scale: 1/8" = 1'-0" REAR ELEVATIONLEFT ELEVATION REAR LEFT PERSPECTIVE 12 3458 2 8146 MATERIAL LEGEND 1. Stucco 2. Board and batten siding 3. Brick veneer 4. Vinyl window 5. Painted metal railing 6. Metal garage door 7. Entry door 8. Composition shingle roof 9. Light Fixtures 10. Unit Address 11. Heat pump unit screen 12. Painted wood brackets 13. High density foam trim 14. Fiber cement trim 15. Corbel NTSKEY PLAN 9 1011415 +/ - 4 0 ' - 0 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " +/ - 4 0 ' - 0 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A2.2.0BUILDING ELEVATIONS 8 PLEX - B0 4 8 16 Scale: 1/8" = 1'-0" FRONT ELEVATIONRIGHT ELEVATION FRONT RIGHT PERSPECTIVE MATERIAL LEGEND 1. Stucco 2. Board and batten siding 3. Brick veneer 4. Vinyl window 5. Painted metal railing 6. Metal garage door 7. Entry door 8. Composition shingle roof 9. Light Fixtures 10. Unit Address 11. Heat pump unit screen 12. Painted wood brackets 13. High density foam trim 14. Fiber cement trim 15. Corbel 1245 78 5 28 1 4 7 3 NTSKEY PLAN 15 119101413910312 +/ - 4 0 ' - 0 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " +/ - 4 0 ' - 0 " Level 2 Level 1 9' - 3 / 4 " va r i e s 9' - 3 / 4 " T.O.Plate T.O.Roof Level 3 +/ - 3 0 ' - 5 " 9' - 3 / 4 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A2.2.2BUILDING ELEVATIONS 8 PLEX - B0 4 8 16 Scale: 1/8" = 1'-0" REAR ELEVATIONLEFT ELEVATION REAR LEFT PERSPECTIVE 12 3458 5 2 81463 MATERIAL LEGEND 1. Stucco 2. Board and batten siding 3. Brick veneer 4. Vinyl window 5. Painted metal railing 6. Metal garage door 7. Entry door 8. Composition shingle roof 9. Light Fixtures 10. Unit Address 11. Heat pump unit screen 12. Painted wood brackets 13. High density foam trim 14. Fiber cement trim 15. Corbel NTSKEY PLAN 9 101471114 119'-7 1/2" 46 ' - 3 " 48 ' - 3 " 117'-4" No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A3.0.0BUILDING PLANS 7 PLEX0 4 8 16 Scale: 1/8" = 1'-0" FIRST FLOOR SECOND FLOOR 117'-4" 47 ' - 3 " RIDGE 6: 1 2 4:12 4:12 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 RI D G E RI D G E RI D G E RI D G E RI D G E RI D G E RI D G E V A L L E Y V A L L E Y V A L L E Y V A L L E Y V A L L E Y V A L L E Y V A L L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A3.0.1BUILDING PLANS 7 PLEX0 4 8 16 Scale: 1/8" = 1'-0" THIRD FLOOR ROOF PLAN NOTE: Solar Panels are for illustrative purposes only. Solar will be confirmed with solar consultant during building submittal process. Location, quantity, and orientation may change. 137'-1 1/2" 46 ' - 3 " 134'-10" 48 ' - 3 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A3.1.0BUILDING PLANS 8 PLEX A0 4 8 16 Scale: 1/8" = 1'-0" FIRST FLOOR SECOND FLOOR 134'-10" 47 ' - 3 " RIDGE 6: 1 2 4:12 4:12 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 RI D G E RI D G E RI D G E RI D G E RI D G E RI D G E RI D G E V A L L E Y V A L L E Y V A L L E Y V A L L E Y V A L L E Y V A L L E Y V A L L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A3.1.1BUILDING PLANS 8 PLEX A0 4 8 16 Scale: 1/8" = 1'-0" THIRD FLOOR ROOF PLAN NOTE: Solar Panels are for illustrative purposes only. Solar will be confirmed with solar consultant during building submittal process. Location, quantity, and orientation may change. 133'-3 1/2" 52 ' - 4 1 / 2 " 131'-2" 54 ' - 4 1 / 2 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A3.2.0BUILDING PLANS 8 PLEX B0 4 8 16 Scale: 1/8" = 1'-0" FIRST FLOOR SECOND FLOOR 131'-2" 54 ' - 4 1 / 2 " 6: 1 2 4:12 4:12 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 6: 1 2 RIDGE RI D G E RI D G E RI D G E RI D G E RI D G E RI D G E RIDGE VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y V A L L E Y V A L L E Y V A L L E Y V A L L E Y V A L L E Y VAL L E Y V A L L E Y V A L L E Y No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A3.2.1BUILDING PLANS 8 PLEX B0 4 8 16 Scale: 1/8" = 1'-0" THIRD FLOOR ROOF PLAN NOTE: Solar Panels are for illustrative purposes only. Solar will be confirmed with solar consultant during building submittal process. Location, quantity, and orientation may change. P5-PRIMARY BEDROOM P5-PRIMARY BATH P5-BEDROOM 2 P5-DECK P5-KITCHEN P5-GREAT ROOM P5-GARAGEP5-BATH 3P5-BEDROOM 3 9' - 0 3 4 31 ' - 9 " LEVEL 1 LEVEL 2 LEVEL 3 T.O.PLATE T.O.ROOF ±3 9 ' - 0 " 31 ' - 0 1 2 " 9' - 0 3 4 11 ' - 0 3 4 va r i e s No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A4.0.0BUILDING SECTION PLAN 50 2 4 8 Scale: 1/4" = 1'-0" SECTION AA Plan 5 AA NTSKEY PLAN P2-PRIMARY BATH P2-BEDROOM 2 P1-BEDROOM 2 P2-DECK P2-KITCHEN P1-GREAT ROOM P2-PORCH P2-GARAGE P1-ENTRANCE 9' - 0 3 4 9' - 0 3 4 9' - 0 3 4 29 ' - 9 " va r i e s LEVEL 1 LEVEL 2 LEVEL 3 T.O.PLATE T.O.ROOF ±4 0 ' - 0 " 31 ' - 0 1 2 " No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A4.0.1BUILDING SECTION PLAN 1-20 2 4 8 Scale: 1/4" = 1'-0" SECTION BB Plan 1-2 BB NTSKEY PLAN Bath 2 Primary Bath Laund. Bedroom 2 11'-11" x 10'-1" Primary Bedroom 14'-1" x 10'-9" Bath 2 Primary Bath Primary Bedroom 13'-5" x 11'-4" Bedroom 2 11'-2" x 10'-9" 30'-0" 28'-0" 23 ' - 1 1 " 20 ' - 1 1 " 1' - 7 " 46 ' - 6 " dn dn W.I.C. 11'-4" l.f. W.I.C. 12'-0" l.f. 5'-11"18'-1"6'-0" 21 ' - 1 " 12 ' - 3 " 11 ' - 8 " 1' - 6 " 46 ' - 6 " 30'-0" Kitchen Deck 12'-3" x 5'-5" Great Room 18'-1" x 11'-8" 28'-0" Deck 6'-0" x 7'-4" Pdr Laund. Great Room 14'-6" x 13'-9" Kitchen 24 ' - 5 " 20 ' - 1 1 " 1' - 7 " 47 ' - 0 " up dn up dn 6' - 0 " 3' - 5 1 2 " 6'-212"5'-612" 3'-6"8'-2" 3' - 5 1 2 " 6' - 6 " 6'-0"18'-1"5'-11" 14'-10"13'-2" 7' - 4 " 13 ' - 9 " 12 ' - 3 " 11 ' - 8 " 46 ' - 6 " 28'-0" 30'-0" 20 ' - 1 1 " 20 ' - 1 1 " 1' - 7 " 3' - 0 " 46 ' - 6 " up heat pump up heat pump GARAGE 21'-8" x 16'-2" REQ.19'-0" x 9'-0" GARAGE 20'-0" x 20'-2" REQ.18'-0" x 19'-0" 5'-11" 18'-1"6'-0" 1' - 6 " 7' - 4 " 13 ' - 9 " 12 ' - 3 " 11 ' - 8 " 46 ' - 6 " 19'-7"8'-6" Entry WH WH Entry No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A-5.0.0UNIT PLANS PLAN 1-20 2 4 8 Scale: 1/4" = 1'-0" FIRST FLOORSECOND FLOORTHIRD FLOOR Plan 1 2 Bed / 2 Bath 1,255 Total n.s.f. Plan 2 2 Bed / 2.5 Bath 1,251 Total n.s.f. PL A N 1 PL A N 2 PL A N 1 PL A N 2 PL A N 1 PL A N 2 20'-4" 46 ' - 8 " 13'-2" 35'-912" 1' - 7 " 19'-2"16'-6" 35'-10" up up Bath 3 Bedroom 3/ opt. JADU 12'-11" x 12'-4" W.H W.H heat pump heat pump GARAGE 12'-7" x 45'-1" REQ. 9'-0" x 38'-0" GARAGE 19'-7" x 19'-4" REQ.18'-0" x 19'-0" 2'-112" Entry up up Bath 3 Bedroom 3 10'-9" x 10'-11" W.H W.H GARAGE 12'-7" x 45'-1" REQ. 9'-0" x 38'-0" GARAGE 19'-7" x 19'-4" REQ.18'-0" x 19'-0" heat pump heat pump 20'-2" 46 ' - 8 " 13'-2" 33'-6" 1' - 7 " 16'-10"16'-6" 33'-6" Entry Bath 3 Bedroom 3 10'-9" x 10'-11" GARAGE 19'-7" x 19'-4" REQ.18'-0" x 19'-0" Entry W.H No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A-5.0.1UNIT PLANS PLAN 3-50 2 4 8 Scale: 1/4" = 1'-0" FIRST FLOOR Plan 3 3 Bed / 3 Bath 1,275 Total n.s.f. Plan 5 ALT 3 Bed / 3.5 Bath/JADU 1,954 Total n.s.f. (Accessible option)Plan 5 3 Bed / 3.5 Bath 1,885 Total n.s.f. End ConditionAccessible UnitAccessible Unit End Condition PLAN 5 ALT PLAN 3PLAN 5 PLAN 3PLAN 5 PLAN 5PLAN 5 14'-0" 48 ' - 3 " 13'-2" 33'-6" 16'-10"16'-6" 33'-6" Great Room 12'-9" x 22'-6" Kitchen Pdr. PantryDeck 11'-9" x 6'-0" Bedroom 3 10'-3" x 10'-3" Bath 3 Kitchen Great Room 11'-11" x 12'-6" up dn dn up Home office Deck 10'-3" x 6'-0" 6'-2" 6' - 0 " 7' - 6 " 5'-612"3'-3" 6' - 2 " 5' - 0 " 2'-0"6'-0" 14'-0" 46 ' - 3 " 13'-2" 33'-6" 16'-10"11'-4" 33'-6" Bath 2 Bedroom 2 13'-3" x 11'-2" Primary Bedroom 16'-3" x 14'-9" Primary Bath Laund. dn dn W.I.C. 16'-1" l.f. Laund. Primary Bedroom 12'-7" x 12'-6" Primary Bath Bath 2 Bedroom 2 10'-7" x 9'-10" 5'-2" 6'-2" No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A-5.0.2UNIT PLANS PLAN 3-50 2 4 8 Scale: 1/4" = 1'-0" SECOND FLOORTHIRD FLOOR End ConditionEnd Condition PLAN 5 PLAN 3PLAN 5 PLAN 5 PLAN 3PLAN 5 16'-0" 45 ' - 0 " storage Entry upup dn Laund. Primary Bedroom 15'-5" x 12'-4" Primary Bath W.I.C. 14'-6" l.f. Bedroom 2 10'-2" x 11'-6" Bath 2 Bedroom 3 10'-2" x 11'-6" Bath 3 Great Room 11'-8" x 15'-5" Kitchen p 6'-0"3'-9" Deck 10'-0" x 5'-8" 60 s.f.low linen 1' - 0 " 47 ' - 6 " 47 ' - 6 " 5' - 6 " 6' - 7 " GARAGE 9'-0" x 38'-0" heat pump dn WH No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A-5.0.2UNIT PLANS PLAN 40 2 4 8 Scale: 1/4" = 1'-0" FIRST FLOORSECOND FLOORTHIRD FLOOR Plan 4 3 Bed / 3 Bath 1,502 Total n.s.f. No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A6.0.0COLOR AND MATERIAL BOARD SW 9550 MERCURIAL SW 9575 METROPOLIS ELDORADOSTONE LOREIOBRICK-LILIA SW 6207 RETREAT STUCCO BODY 2 / BOARD & BATTEN SIDING STUCCO BODY 1 / TRIM 1 ENTRY DOOR 1 SW 6263 EXCLUSIVE PLUM SW 9604 TEA LEAF ENTRY DOOR 2 GARAGE DOOR BRICK VENEER SW 7004 SNOWBOUND SW 6989 DOMINO ELDORADOSTONE LOREIOBRICK-HOLLIN SW 2926 IRON GATE STUCCO BODY 2 STUCCO BODY 1 / TRIM 1/ BOARD & BATTEN SIDING ENTRY DOOR 1 SW 9179 ANCHORS AWEIGH SW 2924 WOODSY BROWN ENTRY DOOR 2 ENTRY DOOR 3 SW 7737 MEADOW TRAIL RAILING/COLUMN GARAGE DOOR BRICK VENEER ENTRY DOOR 4 SW 9645 BIG DIPPER SW 7675 SEALSKIN RAILING/COLUMN SW 9575 METROPOLIS CERTAINTEED DRIFTWOOD COMPOSITION SHINGLE ROOF CERTAINTEED GEORGETOWN GRAY COMPOSITION SHINGLE ROOF N/A N/A ENTRY DOOR 3 ENTRY DOOR 4 BOARD AND BATTEN FIBER CEMENT VERTICAL SIDING SAND FINISH STUCCO (SEE COLOR SCHEMES FOR COLORS) CERTAINTEED LANDMARK SHINGLES (SEE COLOR SCHEMES FOR COLOR) ELDORADO - LOREIO BRICK (SEE COLOR SCHEMES FOR COLORS) 7 PLEX & 8 PLEX-A 8 PLEX-B MANUFACTURER 1. PAINT - SHERWIN WILLIAMS OR EQUAL 2. ROOF - CERTAINTEED OR EQUAL 3. ENTRY DOOR - THERMA-TRU OR EQUAL 4. GARAGE DOOR - CLOPAY OR EQUAL 5. BRICK VENEER - ELDORADO STONE OR EQUAL No. 888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION AUGUST 28, 2025TOWN OF DANVILLE, CA. A7.0.0ARCHITECTURAL DETAILS 8 Plex B Front Right Perspective 8 Plex B Rear Right Perspective 7 Plex Front Right Perspective 7 Plex Rear Left Perspective Fiber Cement Board and Batten Siding (8" c/c) Fiber Cement Board and Batten Siding (16" c/c) Composition Shingle Roof Metal Railing Heat Pump Screen Light Fixture and Unit Address Fiber Cement Board and Batten Siding (16 c/c) Brick Veneer Stucco Stucco Fiber Cement Board and Batten Siding (8" c/c) Fiber Cement Board and Batten Siding (16" c/c) Composition Shingle Roof Black Vinyl Window Light Fixture and Unit Address Black Vinyl Window Entry Door Wood Brackets Metal Garage Door Entry Door ASHLEY CIRCLE LOT 1 PARCEL A HA R T L E Y D R I V E BOONE COURT LOT 2 LOT 3LOT 4LOT 5LOT 6 DR I V E " A " DR I V E " C " DRIVE "B" H:\4121-000\ACAD\TM\C-1 VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES.DWG LEGEND EXISTING PROPOSED DESCRIPTION VICINITY MAP GENERAL NOTES 6040200 CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OF SHEETS SHEET NO.VTM 6 SUBDIVISION 9721VESTING TENTATIVE MAP FORCONDOMINIUM PURPOSES 200 BOONE COURT TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA SCALE: 1"=20'DATE: AUGUST 2025 680 SHEET INDEX SHEET NO.SHEET TITLE CONTACTS ABBREVIATIONS OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW ASHLEY CIRCLE DR I V E " A " DR I V E " C " DRIVE "B" LOT 1 BLDG 1 LOT 2 BLDG 2 LOT 3 BLDG 3 LOT 4 BLDG 4 LOT 5 BLDG 5 LOT 6 BLDG 6 PARCEL A HA R T L E Y D R I V E BOONE COURT AU AU AU AU AU TYPICAL 26' ALLEY(DRIVES "A," "B," AND "C") TYPICAL 20' ALLEY(ENDS OF DIVE "B") BOONE COURT H:\4121-000\ACAD\TM\C-2 PRELIMINARY SITE PLAN.DWG 6040200 CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OF SHEETS SHEET NO.C-1 6 SUBDIVISION 9721PRELIMINARY SITE PLAN 200 BOONE COURT TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA SCALE: 1"=20'DATE: AUGUST 2025 ABBREVIATIONS LEGEND CONTACTS GENERAL NOTES AU OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW 1 2 2 22 3 3 3 3 11 4 5 55 6 6 7 68 77 A A A 9 B B C C 1010 10 ASHLEY CIRCLE HA R T L E Y D R I V E BOONE COURT E F F G 17 18 1920211 2 3 4 22 5 23 6 24 7 8 9 10251112131426 15 16 27 27 27 27 27 27 27 275 TREE SUMMARY TREE #SPECIES TRUNK DIAMETER (IN)DISPOSITION H:\4121-000\ACAD\TM\C-3 EXISTING CONDITIONS PLAN.DWG 6040200 CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OF SHEETS SHEET NO.C-2 6 SUBDIVISION 9721EXISTING CONDITIONS PLAN 200 BOONE COURT TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA SCALE: 1"=20'DATE: AUGUST 2025 LEGEND 1 1 OHW DEMOLITION NOTES NOTE DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 PRESERVATION MEASURES NOTE DESCRIPTION A B C D E F G SECTION A SECTION B SECTION C SECTION D SECTION E SECTION F > > > > > > > >HA R T L E Y D R I V E BOONE COURT DR I V E " A " DR I V E " C " DRIVE "B" BLDG 6 FF 384.8 BLDG 5 FF 383.8 BLDG 4 FF 380.9 BLDG 3 FF 380.5 BLDG 1 FF 381.9 BLDG 2 FF 380.6 AU AU AU AU AU > > > A B C B D D EE F F ASHLEY CIRCLE H:\4121-000\ACAD\TM\C-4 PRELIMINARY GRADING AND DRAINAGE PLAN.DWG 6040200 CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OF SHEETS SHEET NO.C-3 6 SUBDIVISION 9721PRELIMINARY GRADING ANDDRAINAGE PLAN 200 BOONE COURT TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA SCALE: 1"=20'DATE: AUGUST 2025 ABBREVIATIONS LEGEND AU OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW ASHLEY CIRCLE BOONE COURT HA R T L E Y D R I V E DR I V E " A " DR I V E " C " DRIVE "B" BLDG 6 BLDG 5 BLDG 4 BLDG 3 BLDG 1 BLDG 2 H:\4121-000\ACAD\TM\C-5 PRELIMINARY UTILITY PLAN.DWG 6040200 CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OF SHEETS SHEET NO.C-4 6 SUBDIVISION 9721PRELIMINARY UTILITY PLAN 200 BOONE COURT TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA SCALE: 1"=20'DATE: AUGUST 2025 PROPOSED DESCRIPTIONEXISTING LEGEND PRIVATE WATER SERVICETRENCH DETAIL BOONE COURT DMA 1 DMA 2HA R T L E Y D R I V E DR I V E " A " DR I V E " C " DRIVE "B" LOT 1 BLDG 1 LOT 2 BLDG 2 LOT 3 BLDG 3 LOT 4 BLDG 4 LOT 5 BLDG 5 LOT 6 BLDG 6 ASHLEY CIRCLE TYPICAL SILVA CELL DETAIL SECTION A-A H:\4121-000\ACAD\TM\C-6 PRELIMINARY STORMWATER MANAGEMENT PLAN.DWG 6040200 CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OF SHEETS SHEET NO.C-5 6 SUBDIVISION 9721PRELIMINARY STORMWATERMANAGEMENT PLAN 200 BOONE COURT TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA SCALE: 1"=20'DATE: AUGUST 2025 STORMWATER MANAGEMENT SUMMARY DRAINAGE MANAGEMENT AREATOTAL AREA (SF)TOTAL IMPERVIOUS AREA (SF) TOTAL PERVIOUS AREA (SF) TREATMENT AREA PER SILVA CELL (SF) TOTAL NUMBER OF SILVA CELLS REQUIRED TOTAL NUMBER OF SILVA CELLS PROVIDED PROPOSED DESCRIPTIONEXISTING LEGEND 1"=20' ATP L 1 PRELIMINARY LANDSCAPE SITE PLAN CLIENT: THEADDRESSCOMPANY 3160 CROW CANYON ROAD SAN RAMON, CA 9458 RIPLEY DESIGN GROUP, INC. Landscape Architecture Land Planning 1615 Bonanza St., Suite 314 Walnut Creek California 94596 Tel 925.938.7377 Fax 925.938.7436 PROJECT #: DATE: AUG. 29, 2025 SCALE: DRAWN BY: CHECKED BY: AMC SHEET OF 1 SHEET REVISIONS: PROJECT: 200BOONECOURT DANVILLE, CALIFORNIASECTION B- SEE SHEET L 2 S E C T I O N A - S E E S H E E T L 2 AS SHOWN ATP L 2 PRELIMINARY LANDSCAPE SITE SECTIONS CLIENT: THEADDRESSCOMPANY 3160 CROW CANYON ROAD SAN RAMON, CA 9458 RIPLEY DESIGN GROUP, INC. Landscape Architecture Land Planning 1615 Bonanza St., Suite 314 Walnut Creek California 94596 Tel 925.938.7377 Fax 925.938.7436 PROJECT #: DATE: AUG. 29, 2025 SCALE: DRAWN BY: CHECKED BY: AMC SHEET OF 1 SHEET REVISIONS: PROJECT: 200BOONECOURT DANVILLE, CALIFORNIA A B AS SHOWN ATP L 3 PRELIMINARY LANDSCAPE DETAILS CLIENT: THEADDRESSCOMPANY 3160 CROW CANYON ROAD SAN RAMON, CA 9458 RIPLEY DESIGN GROUP, INC. Landscape Architecture Land Planning 1615 Bonanza St., Suite 314 Walnut Creek California 94596 Tel 925.938.7377 Fax 925.938.7436 PROJECT #: DATE: AUG. 29, 2025 SCALE: DRAWN BY: CHECKED BY: AMC SHEET OF 1 SHEET REVISIONS: PROJECT: 200BOONECOURT DANVILLE, CALIFORNIA FRONT ELEVATION SIDE ELEVATION 9 10 11 12 13 4 3 2 1 14 5 15 6 7 8 1P 2P 16 CA ED F G H ½ ¼ B I 1"=20' ATP L 4 PRELIMINARY TREE INVENTORY PLAN CLIENT: THEADDRESSCOMPANY 3160 CROW CANYON ROAD SAN RAMON, CA 9458 RIPLEY DESIGN GROUP, INC. Landscape Architecture Land Planning 1615 Bonanza St., Suite 314 Walnut Creek California 94596 Tel 925.938.7377 Fax 925.938.7436 PROJECT #: DATE: AUG. 29, 2025 SCALE: DRAWN BY: CHECKED BY: AMC SHEET OF 1 SHEET REVISIONS: PROJECT: 200BOONECOURT DANVILLE, CALIFORNIA TREE SUMMARY TREE #SPECIES TRUNK DIAMETER (IN)DISPOSITION 1"=20' ATP L 5 PRELIMINARY LANDSCAPE PLANTING PLAN CLIENT: THEADDRESSCOMPANY 3160 CROW CANYON ROAD SAN RAMON, CA 9458 RIPLEY DESIGN GROUP, INC. Landscape Architecture Land Planning 1615 Bonanza St., Suite 314 Walnut Creek California 94596 Tel 925.938.7377 Fax 925.938.7436 PROJECT #: DATE: AUG. 29, 2025 SCALE: DRAWN BY: CHECKED BY: AMC SHEET OF 1 SHEET REVISIONS: PROJECT: 200BOONECOURT DANVILLE, CALIFORNIA