DESIGN REVIEW BOARD STAFF REPORT 5.1
TO: Design Review Board Members October 16, 2025
SUBJECT: Review and provide comments on the architecture, color and material
board, and landscape design for Major Subdivision request SD 9721 and
Development Plan request DEV25-0014 allowing the development of 47
townhomes with two attached accessory dwelling units on a 1.62-acre
property located at 200 Boone Court.
PROJECT DESCRIPTION
The project includes a Major Subdivision request (SD 9721) and a Development Plan
request (DEV25-0014). These requests would allow for the site to be subdivided to create
a 47 lot townhouse development. Two of the units would incorporate accessory dwelling
units resulting in a total 49 unit development. The Development Plan request includes
the proposed architectural elevations, materials, colors, and landscaping for the proposed
110,170 +/- square foot three-story development.
This development was submitted as a Preliminary Housing Development Plan
Application under SB 330 which was deemed complete on July 31, 2025. On September
4, 2025, the applicant submitted a Formal Development Plan application which was
deemed incomplete, requiring a resubmittal.
The application was submitted under the California State Density Bonus Law. While no
density units are proposed, several waivers to reduce development standards are
requested. These waivers include: a reduction of setbacks from 25 feet and 20 feet for the
front and side property lines, respectively, down to a minimum of 3.1 feet and 12.3 feet;
and a maximum height of 40 feet where an average height of 35 feet and a maximum of
37 feet are required.
The California State Density Bonus Law requires the project to include income-restricted
affordable units to receive the incentives and waivers. The project includes four below
market rate units which are comprised of two accessory dwelling units restricted to very
low-income levels, and two townhomes restricted to low-income levels.
This property was rezoned to the Town’s DBD13; Multifamily Residential-High Special
Land Use Designation and zoning district as part of the Town’s 2023-2031 Housing
Element process. This designation requires residential development at a density between
30-35 units per acre. The subject development is has a density of 30 units per acre.
200 Boone Ct – Development Plan 2 October 16, 2025
EVALUATION
Architecture
The proposed development has two complementary color schemes. Four
buildings would have light grey brick, light and dark grey stucco, dark grey board
and batten siding, dark brown garage doors, and a dark brown roofing. Two
buildings would have dark grey brick, off-white and dark grey stucco, dark grey
board and batten siding, dark grey garage doors, and a dark grey roofing.
Staff recommends the addition of awnings, ledges, or planters as well as rafter tails
or braces to the rear and sides of the buildings to break up the face of the wall and
provide for more complete architecture. Staff recommends the introduction of the
brick material shown on the front elevations to the rear and side elevations. Staff
also recommends modifying the vertical board and batten siding to have wider
delineations or be broken up by other materials as to not visually elongate the
building.
Landscape
All trees are a minimum of 24” box container sizes and the shrubs are 1-gallon and
5-gallons in size.
Trees and shrubs are proposed around the west and north property lines which
border neighboring residential developments.
Tree Removal
Nine Town-protected trees are proposed for removal, five of which are located off-
site requiring approval from the neighboring property. Five additional trees may
be requested for removal depending on the amount of root loss occurring during
excavation/grading.
200 Boone Ct – Development Plan 3 October 16, 2025
RECOMMENDATION
Review and provide comments on the architecture, color and material board, and
landscape design for Major Subdivision request SD 9721 and Development Plan request
DEV25-0014 allowing the development of 47 townhomes with two attached accessory
dwelling units located at 200 Boone Court.
Prepared by:
Riley Anderson-Barrett
Associate Planner
Attachments: A - Project Plans
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A-0.0.0COVER PAGE & SHEET INDEX
200 BOONE COURT
DANVILLE, CA
DEVELOPER:
THE ADDRESS COMPANY
3160 CROW CANYON RD, SUITE 270
SAN RAMON, CA 94583
(925) 272-4750
CONTACT: ERIC J CHEVALIER
ejchevalier@theaddress.company
ARCHITECT:
KTGY
1814 FRANKLIN STREET, SUITE 400
OAKLAND. CA 94612
(510) 463-2072
CONTACT: DAVID BURTON AIA
dburton@ktgy.com
CIVIL ENGINEER:
CARLSON, BARBEE & GIBSON
2633 CAMINO RAMON, SUITE 350
SAN RAMON, CA 94583
(925) 866-0322
CONTACT: JASON NERI, P.E.
jneri@cbandg.com
LANDSCAPE:
RIPLEY DESIGN
1615 BONANZA STREET, SUITE 314
WALNUT CREEK, CA 94596
(925) 938-7377
CONTACT: ANNIKA CARPENTER
acarpenter@ripleydesign.com
LEGAL:
HSW
3800 MT. DIABLO BLVD., 2nd FLOOR
LAFAYETTE, CA 94549
(925) 866-0322
CONTACT: BRYAN WENTER
bryan.wenter@hsw-legal.com
SHEET INDEX
ARCHITECTURE
A0.0.0 COVER SHEET & SHEET INDEX
A0.0.1 VICINITY MAP & SITE PHOTOGRAPHY
A1.0.0 ARCHITECTURAL SITE PLAN
A1.1.0 CODE ANALYSIS
A2.0.0 BUILDING ELEVATIONS - 7 PLEX
A2.0.1 BUILDING ELEVATIONS - 7 PLEX
A2.1.0 BUILDING ELEVATIONS - 8 PLEX-A
A2.1.1 BUILDING ELEVATIONS - 8 PLEX-A
A2.2.0 BUILDING ELEVATIONS - 8 PLEX-B
A2.2.1 BUILDING ELEVATIONS - 8 PLEX-B
A3.0.0 BUILDING PLANS - 7 PLEX
A3.0.1 BUILDING PLANS - 7 PLEX
A3.1.0 BUILDING PLANS - 8 PLEX-A
A3.1.1 BUILDING PLANS - 8 PLEX-A
A3.2.0 BUILDING PLANS - 8 PLEX-B
A3.2.1 BUILDING PLANS - 8 PLEX-B
A4.0.0 BUILDING SECTION
A4.0.1 BUILDING SECTION
A5.0.0 UNIT PLANS - PLAN 1-2
A5.1.0 UNIT PLANS - PLAN 3-5
A5.1.1 UNIT PLANS - PLAN 3-5
A5.2.0 UNIT PLANS - PLAN 4
A6.0.0 COLOR AND MATERIALS
A7.0.0 ARCHITECTURAL DETAILS
CIVIL
VMT VESTING TENTATIVE MAP FOR CONDOMINIUM
PURPOSES
C-1 PRELIMINARY SITE PLAN
C-2 EXISTING CONDITION PLAN
C-3 PRELIMINARY GRADING AND DRAINAGE PLAN
C-4 PRELIMINARY UTILITY PLAN
C-5 PRELIMINARY STORMWATER MANAGEMENT PLAN
LANDSCAPE
L1 PRELIMINARY SITE PLAN
L2 PRELIMINARY SITE SECTIONS
L3 PRELIMINARY DETAILS
L4 PRELIMINARY PLANTING PLAN
L5 TREE INVENTORY PLAN
L6 PRELIMINARY WATER USE PLAN
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A0.0.1VICINITY MAP AND SITE PHOTOGRAPHY
BOONE COURT
D
O
N
A
L
D
D
.
D
O
Y
L
E
H
I
G
H
W
A
Y
SYCAMORE VALLEY ROAD
NTS
S
A
N
R
A
M
O
N
V
A
L
L
E
Y
B
L
V
D
I
R
O
N
H
O
R
S
E
R
E
G
I
O
N
A
L
T
R
A
I
L
1. Boone Court
2. Boone Court
3. Danville Bowl
4. Parking Lot on Site
5. Boone Court
12
3
4
5
NTS
VICINITY MAP
B
O
O
N
E
C
T
HARTLEY DR ASHLE
Y
C
T
BLDG NO.18 PLEX A
B
L
D
G
N
O
.
2
8
P
L
E
X
A
B
L
D
G
N
O
.
3
7
P
L
E
X
B
L
D
G
N
O
.
4
8
P
L
E
X
B
BLDG
N
O
.
5
8 PLE
X
B
BLDG NO.68 PLEX ANo.888.456.5849 | ktgy.com200 BOONE COUR
T
S
B
3
3
0
P
R
E
L
I
M
I
N
A
R
Y
A
P
P
L
I
C
A
T
I
O
N
A
U
G
U
S
T
2
8
,
2
0
2
5
TOWN OF DANVILLE, C
A
.
No.888.456.5849 | ktgy.com200 BOONE COUR
T
S
B
3
3
0
P
R
E
L
I
M
I
N
A
R
Y
A
P
P
L
I
C
A
T
I
O
N
A
U
G
U
S
T
2
8
,
2
0
2
5
TOWN OF DANVILLE, C
A
.
S
I
T
E
P
L
A
N
&
P
R
O
J
E
C
T
D
A
T
A
A
1
.
0
.
0
0
2
0
4
0
1
0
S
c
a
l
e
:
1
"
=
2
0
'
-
0
"
B
E
L
O
W
M
A
R
K
E
T
R
A
T
E
U
N
I
T
S
+/
-
3
8
'
-
6
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
+/
-
3
8
'
-
6
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A2.0.0BUILDING ELEVATIONS
7 PLEX0 4 8 16 Scale: 1/8" = 1'-0"
FRONT ELEVATIONRIGHT ELEVATION
FRONT RIGHT PERSPECTIVE
1 23458 5 28 1 4 73
MATERIAL LEGEND
1. Stucco
2. Board and batten siding
3. Brick veneer
4. Vinyl window
5. Painted metal railing
6. Metal garage door
7. Entry door
8. Composition shingle roof
9. Light Fixtures
10. Unit Address
11. Heat pump unit screen
12. Painted wood brackets
13. High density foam trim
14. Fiber cement trim
15. Corbel
NTSKEY PLAN
9 101114141315
+/
-
3
8
'
-
6
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
+/
-
3
8
'
-
6
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A2.0.1BUILDING ELEVATIONS
7 PLEX0 4 8 16 Scale: 1/8" = 1'-0"
REAR ELEVATION
REAR LEFT PERSPECTIVE
LEFT ELEVATION
12 3458 2 8146
MATERIAL LEGEND
1. Stucco
2. Board and batten siding
3. Brick veneer
4. Vinyl window
5. Painted metal railing
6. Metal garage door
7. Entry door
8. Composition shingle roof
9. Light Fixtures
10. Unit Address
11. Heat pump unit screen
12. Painted wood brackets
13. High density foam trim
14. Fiber cement trim
15. Corbel
NTSKEY PLAN
14 9 1015
+/
-
3
8
'
-
6
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
+/
-
3
8
'
-
6
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A2.1.0BUILDING ELEVATIONS
8 PLEX - A0 4 8 16 Scale: 1/8" = 1'-0"
FRONT ELEVATIONRIGHT ELEVATION
FRONT RIGHT PERSPECTIVE
1 23458 5 28 1 4 7 3
MATERIAL LEGEND
1. Stucco
2. Board and batten siding
3. Brick veneer
4. Vinyl window
5. Painted metal railing
6. Metal garage door
7. Entry door
8. Composition shingle roof
9. Light Fixtures
10. Unit Address
11. Heat pump unit screen
12. Painted wood brackets
13. High density foam trim
14. Fiber cement trim
15. Corbel
NTSKEY PLAN
9 1014131115151411
+/
-
3
8
'
-
6
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
+/
-
3
8
'
-
6
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A2.1.1BUILDING ELEVATIONS
8 PLEX - A0 4 8 16 Scale: 1/8" = 1'-0"
REAR ELEVATIONLEFT ELEVATION
REAR LEFT PERSPECTIVE
12 3458 2 8146
MATERIAL LEGEND
1. Stucco
2. Board and batten siding
3. Brick veneer
4. Vinyl window
5. Painted metal railing
6. Metal garage door
7. Entry door
8. Composition shingle roof
9. Light Fixtures
10. Unit Address
11. Heat pump unit screen
12. Painted wood brackets
13. High density foam trim
14. Fiber cement trim
15. Corbel
NTSKEY PLAN
9 1011415
+/
-
4
0
'
-
0
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
+/
-
4
0
'
-
0
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A2.2.0BUILDING ELEVATIONS
8 PLEX - B0 4 8 16 Scale: 1/8" = 1'-0"
FRONT ELEVATIONRIGHT ELEVATION
FRONT RIGHT PERSPECTIVE
MATERIAL LEGEND
1. Stucco
2. Board and batten siding
3. Brick veneer
4. Vinyl window
5. Painted metal railing
6. Metal garage door
7. Entry door
8. Composition shingle roof
9. Light Fixtures
10. Unit Address
11. Heat pump unit screen
12. Painted wood brackets
13. High density foam trim
14. Fiber cement trim
15. Corbel
1245 78 5 28 1 4 7 3
NTSKEY PLAN
15 119101413910312
+/
-
4
0
'
-
0
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
+/
-
4
0
'
-
0
"
Level 2
Level 1
9'
-
3
/
4
"
va
r
i
e
s
9'
-
3
/
4
"
T.O.Plate
T.O.Roof
Level 3
+/
-
3
0
'
-
5
"
9'
-
3
/
4
"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A2.2.2BUILDING ELEVATIONS
8 PLEX - B0 4 8 16 Scale: 1/8" = 1'-0"
REAR ELEVATIONLEFT ELEVATION
REAR LEFT PERSPECTIVE
12 3458 5 2 81463
MATERIAL LEGEND
1. Stucco
2. Board and batten siding
3. Brick veneer
4. Vinyl window
5. Painted metal railing
6. Metal garage door
7. Entry door
8. Composition shingle roof
9. Light Fixtures
10. Unit Address
11. Heat pump unit screen
12. Painted wood brackets
13. High density foam trim
14. Fiber cement trim
15. Corbel
NTSKEY PLAN
9 101471114
119'-7 1/2"
46
'
-
3
"
48
'
-
3
"
117'-4"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A3.0.0BUILDING PLANS
7 PLEX0 4 8 16 Scale: 1/8" = 1'-0"
FIRST FLOOR
SECOND FLOOR
117'-4"
47
'
-
3
"
RIDGE
6:
1
2
4:12
4:12
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A3.0.1BUILDING PLANS
7 PLEX0 4 8 16 Scale: 1/8" = 1'-0"
THIRD FLOOR
ROOF PLAN
NOTE: Solar Panels are for illustrative purposes
only. Solar will be confirmed with solar consultant
during building submittal process. Location,
quantity, and orientation may change.
137'-1 1/2"
46
'
-
3
"
134'-10"
48
'
-
3
"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A3.1.0BUILDING PLANS
8 PLEX A0 4 8 16 Scale: 1/8" = 1'-0"
FIRST FLOOR
SECOND FLOOR
134'-10"
47
'
-
3
"
RIDGE
6:
1
2
4:12
4:12
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A3.1.1BUILDING PLANS
8 PLEX A0 4 8 16 Scale: 1/8" = 1'-0"
THIRD FLOOR
ROOF PLAN
NOTE: Solar Panels are for illustrative purposes
only. Solar will be confirmed with solar consultant
during building submittal process. Location,
quantity, and orientation may change.
133'-3 1/2"
52
'
-
4
1
/
2
"
131'-2"
54
'
-
4
1
/
2
"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A3.2.0BUILDING PLANS
8 PLEX B0 4 8 16 Scale: 1/8" = 1'-0"
FIRST FLOOR
SECOND FLOOR
131'-2"
54
'
-
4
1
/
2
"
6:
1
2
4:12
4:12
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
6:
1
2
RIDGE
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RI
D
G
E
RIDGE
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
VAL
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
VAL
L
E
Y
V
A
L
L
E
Y
V
A
L
L
E
Y
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A3.2.1BUILDING PLANS
8 PLEX B0 4 8 16 Scale: 1/8" = 1'-0"
THIRD FLOOR
ROOF PLAN
NOTE: Solar Panels are for illustrative purposes
only. Solar will be confirmed with solar consultant
during building submittal process. Location,
quantity, and orientation may change.
P5-PRIMARY BEDROOM P5-PRIMARY BATH P5-BEDROOM 2
P5-DECK P5-KITCHEN P5-GREAT ROOM
P5-GARAGEP5-BATH 3P5-BEDROOM 3
9'
-
0
3 4
31
'
-
9
"
LEVEL 1
LEVEL 2
LEVEL 3
T.O.PLATE
T.O.ROOF
±3
9
'
-
0
"
31
'
-
0
1 2 "
9'
-
0
3 4
11
'
-
0
3 4
va
r
i
e
s
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A4.0.0BUILDING SECTION
PLAN 50 2 4 8 Scale: 1/4" = 1'-0"
SECTION AA
Plan 5
AA
NTSKEY PLAN
P2-PRIMARY BATH P2-BEDROOM 2 P1-BEDROOM 2
P2-DECK P2-KITCHEN P1-GREAT ROOM
P2-PORCH P2-GARAGE P1-ENTRANCE
9'
-
0
3 4
9'
-
0
3 4
9'
-
0
3 4
29
'
-
9
"
va
r
i
e
s
LEVEL 1
LEVEL 2
LEVEL 3
T.O.PLATE
T.O.ROOF
±4
0
'
-
0
"
31
'
-
0
1 2 "
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A4.0.1BUILDING SECTION
PLAN 1-20 2 4 8 Scale: 1/4" = 1'-0"
SECTION BB
Plan 1-2
BB
NTSKEY PLAN
Bath 2
Primary
Bath
Laund.
Bedroom 2
11'-11" x 10'-1"
Primary
Bedroom
14'-1" x 10'-9"
Bath 2
Primary
Bath
Primary
Bedroom
13'-5" x 11'-4"
Bedroom 2
11'-2" x 10'-9"
30'-0"
28'-0"
23
'
-
1
1
"
20
'
-
1
1
"
1'
-
7
"
46
'
-
6
"
dn
dn
W.I.C.
11'-4" l.f.
W.I.C.
12'-0" l.f.
5'-11"18'-1"6'-0"
21
'
-
1
"
12
'
-
3
"
11
'
-
8
"
1'
-
6
"
46
'
-
6
"
30'-0"
Kitchen
Deck
12'-3" x 5'-5"
Great Room
18'-1" x 11'-8"
28'-0"
Deck
6'-0" x 7'-4"
Pdr
Laund.
Great Room
14'-6" x 13'-9"
Kitchen
24
'
-
5
"
20
'
-
1
1
"
1'
-
7
"
47
'
-
0
"
up
dn
up
dn
6'
-
0
"
3'
-
5
1 2 "
6'-212"5'-612"
3'-6"8'-2"
3'
-
5
1 2 "
6'
-
6
"
6'-0"18'-1"5'-11"
14'-10"13'-2"
7'
-
4
"
13
'
-
9
"
12
'
-
3
"
11
'
-
8
"
46
'
-
6
"
28'-0"
30'-0"
20
'
-
1
1
"
20
'
-
1
1
"
1'
-
7
"
3'
-
0
"
46
'
-
6
"
up
heat
pump
up
heat
pump
GARAGE
21'-8" x 16'-2"
REQ.19'-0" x 9'-0"
GARAGE
20'-0" x 20'-2"
REQ.18'-0" x 19'-0"
5'-11"
18'-1"6'-0"
1'
-
6
"
7'
-
4
"
13
'
-
9
"
12
'
-
3
"
11
'
-
8
"
46
'
-
6
"
19'-7"8'-6"
Entry
WH
WH
Entry
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A-5.0.0UNIT PLANS
PLAN 1-20 2 4 8 Scale: 1/4" = 1'-0"
FIRST FLOORSECOND FLOORTHIRD FLOOR
Plan 1
2 Bed / 2 Bath
1,255 Total n.s.f.
Plan 2
2 Bed / 2.5 Bath
1,251 Total n.s.f.
PL
A
N
1
PL
A
N
2
PL
A
N
1
PL
A
N
2
PL
A
N
1
PL
A
N
2
20'-4"
46
'
-
8
"
13'-2"
35'-912"
1'
-
7
"
19'-2"16'-6"
35'-10"
up
up
Bath
3
Bedroom 3/
opt. JADU
12'-11" x 12'-4"
W.H
W.H
heat
pump
heat
pump
GARAGE
12'-7" x 45'-1"
REQ. 9'-0" x 38'-0"
GARAGE
19'-7" x 19'-4"
REQ.18'-0" x 19'-0"
2'-112"
Entry
up
up
Bath
3
Bedroom 3
10'-9" x 10'-11"
W.H
W.H
GARAGE
12'-7" x 45'-1"
REQ. 9'-0" x 38'-0"
GARAGE
19'-7" x 19'-4"
REQ.18'-0" x 19'-0"
heat
pump
heat
pump
20'-2"
46
'
-
8
"
13'-2"
33'-6"
1'
-
7
"
16'-10"16'-6"
33'-6"
Entry
Bath
3
Bedroom 3
10'-9" x 10'-11"
GARAGE
19'-7" x 19'-4"
REQ.18'-0" x 19'-0"
Entry
W.H
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A-5.0.1UNIT PLANS
PLAN 3-50 2 4 8 Scale: 1/4" = 1'-0"
FIRST FLOOR
Plan 3
3 Bed / 3 Bath
1,275 Total n.s.f.
Plan 5 ALT
3 Bed / 3.5 Bath/JADU
1,954 Total n.s.f.
(Accessible option)Plan 5
3 Bed / 3.5 Bath
1,885 Total n.s.f.
End ConditionAccessible UnitAccessible Unit
End Condition
PLAN 5 ALT PLAN 3PLAN 5 PLAN 3PLAN 5 PLAN 5PLAN 5
14'-0"
48
'
-
3
"
13'-2"
33'-6"
16'-10"16'-6"
33'-6"
Great Room
12'-9" x 22'-6"
Kitchen
Pdr.
PantryDeck
11'-9" x 6'-0"
Bedroom 3
10'-3" x 10'-3"
Bath
3
Kitchen
Great Room
11'-11" x 12'-6"
up
dn
dn
up
Home
office Deck
10'-3" x 6'-0"
6'-2"
6'
-
0
"
7'
-
6
"
5'-612"3'-3"
6'
-
2
"
5'
-
0
"
2'-0"6'-0"
14'-0"
46
'
-
3
"
13'-2"
33'-6"
16'-10"11'-4"
33'-6"
Bath
2
Bedroom 2
13'-3" x 11'-2"
Primary
Bedroom
16'-3" x 14'-9"
Primary
Bath
Laund.
dn
dn
W.I.C.
16'-1" l.f.
Laund.
Primary Bedroom
12'-7" x 12'-6"
Primary
Bath
Bath
2
Bedroom 2
10'-7" x 9'-10"
5'-2"
6'-2"
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A-5.0.2UNIT PLANS
PLAN 3-50 2 4 8 Scale: 1/4" = 1'-0"
SECOND FLOORTHIRD FLOOR End ConditionEnd Condition
PLAN 5 PLAN 3PLAN 5 PLAN 5 PLAN 3PLAN 5
16'-0"
45
'
-
0
"
storage
Entry
upup
dn
Laund.
Primary
Bedroom
15'-5" x 12'-4"
Primary
Bath
W.I.C.
14'-6" l.f.
Bedroom 2
10'-2" x 11'-6"
Bath
2
Bedroom 3
10'-2" x 11'-6"
Bath
3
Great Room
11'-8" x 15'-5"
Kitchen
p
6'-0"3'-9"
Deck
10'-0" x 5'-8"
60 s.f.low linen
1'
-
0
"
47
'
-
6
"
47
'
-
6
"
5'
-
6
"
6'
-
7
"
GARAGE
9'-0" x 38'-0"
heat
pump
dn WH
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A-5.0.2UNIT PLANS
PLAN 40 2 4 8 Scale: 1/4" = 1'-0"
FIRST FLOORSECOND FLOORTHIRD FLOOR
Plan 4
3 Bed / 3 Bath
1,502 Total n.s.f.
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A6.0.0COLOR AND MATERIAL BOARD
SW 9550
MERCURIAL
SW 9575
METROPOLIS
ELDORADOSTONE
LOREIOBRICK-LILIA
SW 6207
RETREAT
STUCCO BODY 2 /
BOARD & BATTEN
SIDING
STUCCO BODY 1 /
TRIM 1
ENTRY DOOR 1
SW 6263
EXCLUSIVE PLUM
SW 9604
TEA LEAF
ENTRY DOOR 2
GARAGE DOOR
BRICK VENEER
SW 7004
SNOWBOUND
SW 6989
DOMINO
ELDORADOSTONE
LOREIOBRICK-HOLLIN
SW 2926
IRON GATE
STUCCO BODY 2
STUCCO BODY 1 /
TRIM 1/
BOARD & BATTEN
SIDING
ENTRY DOOR 1
SW 9179
ANCHORS AWEIGH
SW 2924
WOODSY BROWN
ENTRY DOOR 2
ENTRY DOOR 3
SW 7737
MEADOW TRAIL
RAILING/COLUMN
GARAGE DOOR
BRICK VENEER
ENTRY DOOR 4
SW 9645
BIG DIPPER
SW 7675
SEALSKIN
RAILING/COLUMN
SW 9575
METROPOLIS
CERTAINTEED
DRIFTWOOD
COMPOSITION
SHINGLE ROOF
CERTAINTEED
GEORGETOWN GRAY
COMPOSITION
SHINGLE ROOF
N/A
N/A
ENTRY DOOR 3
ENTRY DOOR 4
BOARD AND BATTEN
FIBER CEMENT VERTICAL SIDING
SAND FINISH STUCCO
(SEE COLOR SCHEMES FOR COLORS)
CERTAINTEED LANDMARK SHINGLES
(SEE COLOR SCHEMES FOR COLOR)
ELDORADO - LOREIO BRICK
(SEE COLOR SCHEMES FOR COLORS)
7 PLEX & 8 PLEX-A 8 PLEX-B
MANUFACTURER
1. PAINT - SHERWIN WILLIAMS OR EQUAL
2. ROOF - CERTAINTEED OR EQUAL
3. ENTRY DOOR - THERMA-TRU OR EQUAL
4. GARAGE DOOR - CLOPAY OR EQUAL
5. BRICK VENEER - ELDORADO STONE OR
EQUAL
No.
888.456.5849 | ktgy.com 200 BOONE COURT SB 330 PRELIMINARY APPLICATION
AUGUST 28, 2025TOWN OF DANVILLE, CA.
A7.0.0ARCHITECTURAL DETAILS
8 Plex B Front Right Perspective
8 Plex B Rear Right Perspective
7 Plex Front Right Perspective
7 Plex Rear Left Perspective
Fiber Cement Board and Batten
Siding (8" c/c)
Fiber Cement Board and Batten
Siding (16" c/c)
Composition Shingle Roof
Metal Railing
Heat Pump Screen
Light Fixture and Unit Address
Fiber Cement Board and Batten
Siding (16 c/c)
Brick Veneer
Stucco
Stucco
Fiber Cement Board and Batten
Siding (8" c/c)
Fiber Cement Board and Batten
Siding (16" c/c)
Composition Shingle Roof
Black Vinyl Window
Light Fixture and Unit Address
Black Vinyl Window
Entry Door
Wood Brackets
Metal Garage Door
Entry Door
ASHLEY CIRCLE
LOT 1
PARCEL A
HA
R
T
L
E
Y
D
R
I
V
E
BOONE COURT
LOT 2
LOT 3LOT 4LOT 5LOT 6
DR
I
V
E
"
A
"
DR
I
V
E
"
C
"
DRIVE "B"
H:\4121-000\ACAD\TM\C-1 VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES.DWG
LEGEND
EXISTING PROPOSED DESCRIPTION
VICINITY MAP
GENERAL NOTES
6040200 CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456
OF SHEETS
SHEET NO.VTM
6
SUBDIVISION 9721VESTING TENTATIVE MAP FORCONDOMINIUM PURPOSES
200 BOONE COURT
TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA
SCALE: 1"=20'DATE: AUGUST 2025
680
SHEET INDEX
SHEET NO.SHEET TITLE
CONTACTS
ABBREVIATIONS
OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW
ASHLEY CIRCLE
DR
I
V
E
"
A
"
DR
I
V
E
"
C
"
DRIVE "B"
LOT 1
BLDG 1
LOT 2
BLDG 2
LOT 3
BLDG 3
LOT 4
BLDG 4
LOT 5
BLDG 5
LOT 6
BLDG 6
PARCEL A
HA
R
T
L
E
Y
D
R
I
V
E
BOONE COURT
AU
AU
AU AU
AU
TYPICAL 26' ALLEY(DRIVES "A," "B," AND "C")
TYPICAL 20' ALLEY(ENDS OF DIVE "B")
BOONE COURT
H:\4121-000\ACAD\TM\C-2 PRELIMINARY SITE PLAN.DWG
6040200 CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456
OF SHEETS
SHEET NO.C-1
6
SUBDIVISION 9721PRELIMINARY SITE PLAN
200 BOONE COURT
TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA
SCALE: 1"=20'DATE: AUGUST 2025
ABBREVIATIONS
LEGEND
CONTACTS GENERAL NOTES
AU
OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW
1
2
2
22
3
3
3
3
11
4
5
55
6
6
7
68
77
A A A
9
B
B
C
C 1010
10
ASHLEY CIRCLE
HA
R
T
L
E
Y
D
R
I
V
E
BOONE COURT
E
F
F
G
17 18
1920211
2
3 4
22
5
23
6
24
7
8
9
10251112131426
15
16
27
27 27
27
27 27 27
275
TREE SUMMARY
TREE #SPECIES TRUNK
DIAMETER (IN)DISPOSITION
H:\4121-000\ACAD\TM\C-3 EXISTING CONDITIONS PLAN.DWG
6040200 CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456
OF SHEETS
SHEET NO.C-2
6
SUBDIVISION 9721EXISTING CONDITIONS PLAN
200 BOONE COURT
TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA
SCALE: 1"=20'DATE: AUGUST 2025
LEGEND
1
1
OHW
DEMOLITION NOTES
NOTE DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
PRESERVATION MEASURES
NOTE DESCRIPTION
A
B
C
D
E
F
G
SECTION A
SECTION B
SECTION C
SECTION D
SECTION E SECTION F
>
>
>
>
>
>
>
>HA
R
T
L
E
Y
D
R
I
V
E
BOONE COURT
DR
I
V
E
"
A
"
DR
I
V
E
"
C
"
DRIVE "B"
BLDG 6
FF 384.8 BLDG 5
FF 383.8
BLDG 4
FF 380.9
BLDG 3
FF 380.5
BLDG 1
FF 381.9
BLDG 2
FF 380.6
AU
AU
AU AU
AU
>
>
>
A B C
B
D
D
EE
F
F
ASHLEY CIRCLE
H:\4121-000\ACAD\TM\C-4 PRELIMINARY GRADING AND DRAINAGE PLAN.DWG
6040200 CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456
OF SHEETS
SHEET NO.C-3
6
SUBDIVISION 9721PRELIMINARY GRADING ANDDRAINAGE PLAN
200 BOONE COURT
TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA
SCALE: 1"=20'DATE: AUGUST 2025
ABBREVIATIONS
LEGEND
AU
OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW
ASHLEY CIRCLE
BOONE COURT
HA
R
T
L
E
Y
D
R
I
V
E
DR
I
V
E
"
A
"
DR
I
V
E
"
C
"
DRIVE "B"
BLDG 6 BLDG 5 BLDG 4 BLDG 3
BLDG 1 BLDG 2
H:\4121-000\ACAD\TM\C-5 PRELIMINARY UTILITY PLAN.DWG
6040200 CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456
OF SHEETS
SHEET NO.C-4
6
SUBDIVISION 9721PRELIMINARY UTILITY PLAN
200 BOONE COURT
TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA
SCALE: 1"=20'DATE: AUGUST 2025
PROPOSED DESCRIPTIONEXISTING
LEGEND
PRIVATE WATER SERVICETRENCH DETAIL
BOONE COURT
DMA 1
DMA 2HA
R
T
L
E
Y
D
R
I
V
E
DR
I
V
E
"
A
"
DR
I
V
E
"
C
"
DRIVE "B"
LOT 1
BLDG 1
LOT 2
BLDG 2
LOT 3
BLDG 3
LOT 4
BLDG 4
LOT 5
BLDG 5
LOT 6
BLDG 6
ASHLEY CIRCLE
TYPICAL SILVA CELL DETAIL
SECTION A-A
H:\4121-000\ACAD\TM\C-6 PRELIMINARY STORMWATER MANAGEMENT PLAN.DWG
6040200 CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456
OF SHEETS
SHEET NO.C-5
6
SUBDIVISION 9721PRELIMINARY STORMWATERMANAGEMENT PLAN
200 BOONE COURT
TOWN OF DANVILLE CONTRA COSTA COUNTY CALIFORNIA
SCALE: 1"=20'DATE: AUGUST 2025
STORMWATER MANAGEMENT SUMMARY
DRAINAGE
MANAGEMENT AREATOTAL AREA (SF)TOTAL IMPERVIOUS
AREA (SF)
TOTAL PERVIOUS
AREA (SF)
TREATMENT AREA
PER SILVA CELL (SF)
TOTAL NUMBER OF
SILVA CELLS
REQUIRED
TOTAL NUMBER OF
SILVA CELLS
PROVIDED
PROPOSED DESCRIPTIONEXISTING
LEGEND
1"=20'
ATP
L 1
PRELIMINARY
LANDSCAPE
SITE
PLAN
CLIENT:
THEADDRESSCOMPANY
3160 CROW CANYON
ROAD
SAN RAMON, CA 9458
RIPLEY DESIGN GROUP, INC.
Landscape Architecture
Land Planning
1615 Bonanza St., Suite 314
Walnut Creek
California 94596
Tel 925.938.7377
Fax 925.938.7436
PROJECT #:
DATE: AUG. 29, 2025
SCALE:
DRAWN BY:
CHECKED BY: AMC
SHEET
OF 1 SHEET
REVISIONS:
PROJECT:
200BOONECOURT
DANVILLE,
CALIFORNIASECTION B-
SEE SHEET L 2
S
E
C
T
I
O
N
A
-
S
E
E
S
H
E
E
T
L
2
AS SHOWN
ATP
L 2
PRELIMINARY
LANDSCAPE
SITE
SECTIONS
CLIENT:
THEADDRESSCOMPANY
3160 CROW CANYON
ROAD
SAN RAMON, CA 9458
RIPLEY DESIGN GROUP, INC.
Landscape Architecture
Land Planning
1615 Bonanza St., Suite 314
Walnut Creek
California 94596
Tel 925.938.7377
Fax 925.938.7436
PROJECT #:
DATE: AUG. 29, 2025
SCALE:
DRAWN BY:
CHECKED BY: AMC
SHEET
OF 1 SHEET
REVISIONS:
PROJECT:
200BOONECOURT
DANVILLE,
CALIFORNIA
A B
AS SHOWN
ATP
L 3
PRELIMINARY
LANDSCAPE
DETAILS
CLIENT:
THEADDRESSCOMPANY
3160 CROW CANYON
ROAD
SAN RAMON, CA 9458
RIPLEY DESIGN GROUP, INC.
Landscape Architecture
Land Planning
1615 Bonanza St., Suite 314
Walnut Creek
California 94596
Tel 925.938.7377
Fax 925.938.7436
PROJECT #:
DATE: AUG. 29, 2025
SCALE:
DRAWN BY:
CHECKED BY: AMC
SHEET
OF 1 SHEET
REVISIONS:
PROJECT:
200BOONECOURT
DANVILLE,
CALIFORNIA
FRONT ELEVATION SIDE ELEVATION
9
10
11
12
13
4
3
2
1
14
5
15
6
7
8
1P 2P
16
CA
ED F
G H
½
¼
B
I
1"=20'
ATP
L 4
PRELIMINARY
TREE
INVENTORY
PLAN
CLIENT:
THEADDRESSCOMPANY
3160 CROW CANYON
ROAD
SAN RAMON, CA 9458
RIPLEY DESIGN GROUP, INC.
Landscape Architecture
Land Planning
1615 Bonanza St., Suite 314
Walnut Creek
California 94596
Tel 925.938.7377
Fax 925.938.7436
PROJECT #:
DATE: AUG. 29, 2025
SCALE:
DRAWN BY:
CHECKED BY: AMC
SHEET
OF 1 SHEET
REVISIONS:
PROJECT:
200BOONECOURT
DANVILLE,
CALIFORNIA
TREE SUMMARY
TREE #SPECIES TRUNK
DIAMETER (IN)DISPOSITION
1"=20'
ATP
L 5
PRELIMINARY
LANDSCAPE
PLANTING
PLAN
CLIENT:
THEADDRESSCOMPANY
3160 CROW CANYON
ROAD
SAN RAMON, CA 9458
RIPLEY DESIGN GROUP, INC.
Landscape Architecture
Land Planning
1615 Bonanza St., Suite 314
Walnut Creek
California 94596
Tel 925.938.7377
Fax 925.938.7436
PROJECT #:
DATE: AUG. 29, 2025
SCALE:
DRAWN BY:
CHECKED BY: AMC
SHEET
OF 1 SHEET
REVISIONS:
PROJECT:
200BOONECOURT
DANVILLE,
CALIFORNIA