HomeMy WebLinkAbout091625-05.09 ADMINISTRATIVE STAFF REPORT 5.9 TO: Mayor and Town Council September 16, 2025 SUBJECT: Resolution No. 70-2025, authorizing a Professional Services Agreement with ENGEO Incorporated for environmental consulting services during construction of the Diablo Road Pedestrian Trail, CIP No. C-055 BACKGROUND The Diablo Road Pedestrian Trail Project, CIP No. C-055, involves the construction of a pedestrian/bicycle trail along Diablo Road, including removal of trees, minor regrading, installation of hot mix asphalt, drainage improvements such as concrete v-ditches, drainage pipes, inlets, bioretention areas, traffic control, tree replacement planting, wildlife exclusion and cattle fencing, a drinking fountain, signs, and other related work. The design and permitting assistance for the project was performed by ENGEO Incorporated. ENGEO’s original scope-of-work was limited to design and environmental permitting for the project. The scope-of-work for ENGEO’s services during and after construction was deferred until the project advanced to the construction phase. DISCUSSION Now that construction is underway and work anticipated to begin in October 2025, a contract for environmental consulting services is necessary to provide environmental oversight including, testing, inspection, biological monitoring, and post-construction mitigation monitoring as required by the resource agency permits, including the Lake and Streambed Alteration Agreement (LSAA) with the California Department of Fish and Wildlife (CDFW) and the agreement with the Regional Water Quality Control Board (RWQCB). The proposed contract also accounts for ongoing consultation, responses to requests for information, and other minor changes that may occur during construction. The cost of these services amounts to $623,930. PUBLIC CONTACT Posting of the meeting agenda serves as notice to the general public. ENGEO Professional Services Amendment 2 September 16, 2025 FISCAL IMPACT The cost of environmental consulting services to be conducted by ENGEO during construction of the Diablo Road Trail Project, CIP C-055 is $623,930. Sufficient funding has been appropriated within CIP C-055 for this contract. RECOMMENDATION Adopt Resolution No. 70-2025, authorizing a Professional Services Agreement with ENGEO Incorporated for environmental consulting services during construction of the Diablo Road Pedestrian Trail, CIP No. C-055. Prepared by: Allan Shields Transportation Manager Reviewed by: Diane J. Friedmann Development Services Director Attachments: A – Resolution No. 70-2025 B – CIP Page No. C-055 RESOLUTION NO. 70-2025 AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT WITH ENGEO INCORPORATED FOR ENVIRONMENTAL CONSULTING SERVICES DURING CONSTRUCTION OF THE DIABLO ROAD PEDESTRIAN TRAIL, CIP NO. C-055 WHEREAS, the Town entered into a Professional Services Agreement with ENGEO Incorporated on March 8, 2024, for engineering services associated with design and permitting for the Diablo Road Pedestrian Trail, CIP C-055; and WHEREAS, the adopted 2025/26 Capital Improvement Program allocates sufficient funding for CIP C-055 to account for the additional compensation limit; and WHEREAS, the total compensation limit for the Diablo Road Pedestrian Trail, CIP C-055, must be increased in order for ENGEO Incorporated to continue providing uninterrupted service to the Town for construction engineering, specialized inspections, and environmental monitoring and reporting to maintain compliance with environmental permits; now, therefore, be it RESOLVED, by the Danville Town Council, that the Town Manager be authorized to execute an amendment to the Professional Services Agreement with ENGEO Incorporated for the Diablo Road Pedestrian Trail, CIP C-055, which accounts for ongoing consultation, responses to requests for information, and other minor changes that may occur during construction. The cost of these services amounts to $623,930. APPROVED by the Danville Town Council at a regular meeting on September 16, 2025, by the following vote: AYES: NOES: ABSTAINED: ABSENT: ______________________________ MAYOR APPROVED AS TO FORM: ATTEST: _______________________________ ______________________________ CITY ATTORNEY CITY CLERK Docusign Envelope ID: F1340FC9-142F-4653-9679-D7525ACF598E ATTACHMENT A CIP 89 • 2025–2026 Operating Budget & Capital Improvement Program Projects Diablo Road Trail from Alameda Diablo to Tank Access Road CIP Project: C-055 Department/Division:Transportation Type: New (or Modified New) Project Status: Completed Phases: 20222/23 ◦Environmental MND/IS approved 2023/24 ◦Redesign of Trail Segments due to 2022/23 winter storms, regulatory approval Future Phases: 2025/26 ◦Construction to begin Description: The Diablo Road Trail from Alameda Diablo to Tank Access Road Project is part of the North East Roadway Improvement Assessment District (NERIAD) and consists of construction of a paved 0.9-mile Class I pedestrian/ bicycle path located adjacent to the south side of Diablo Road from Fairway Drive to the west to the tank access road (1,200 feet west of Mt. Diablo Scenic/Blackhawk intersection) to the east. Path will connect to existing 0.5- mile Diablo Road Trail (aka Barbara Hale) to the west and a new 0.7-mile Class I path to the east, constructed as part of the Magee Preserve Development. Project Cost Estimate: Prior Years 2025/26 2026/27 2027/28 2028/29 2029/30 Design/Plan Review $910,459 $0 $0 $0 $0 $0 Construction $4,731,568 $1,700,000 $0 $0 $0 $0 Inspection & Admin. $57,200 $0 $0 $0 $0 $0 Total Cost Estimate: $5,699,227 $1,700,000 $0 $0 $0 $0 Total Expenditure: ($894,375) Unexpended as of 4/8/25: $4,804,852 Project Appropriation and Funding: Prior Years 2025/26 2026/27 2027/28 2028/29 2029/30 CIP Gen Purpose Rev $0 $1,700,000 $0 $0 $0 $0 Meas J Major St 24c $3,059,536 $0 $0 $0 $0 $0 Meas J-CC-TLC (2012) $75,000 $0 $0 $0 $0 $0 Meas J-CC-TLC (2017) $1,500,000 $0 $0 $0 $0 $0 NERIAD $914,691 $0 $0 $0 $0 $0 TDA Grant $150,000 $0 $0 $0 $0 $0 Total Funding: $5,699,227 $1,700,000 $0 $0 $0 $0 ATTACHMENT B