HomeMy WebLinkAbout091625-05.08 ADMINISTRATIVE STAFF REPORT 5.8 TO: Mayor and Town Council September 16, 2025 SUBJECT: Resolution No. 69-2025, approving a Notice of Completion and construction contract amendment for the Fiber Optic Cable Interconnect Improvements Project, CIP No. A-620 BACKGROUND The Town’s Capital Improvement Program includes Fiber Optic Cable Interconnect Improvements, CIP No. A-620. This project involves the installation of a fiber optic communication network to enhance traffic signal coordination and connectivity along key corridors in the Town of Danville. Phase 1 of the project includes the construction of underground fiber optic cabling, conduit systems, and associated infrastructure to support advanced traffic management systems, and improved operational efficiency for traffic signals and other municipal systems along the San Ramon Valley Boulevard and Hartz Avenue Corridor. Additionally, the project scope increased to incorporate a portion of Phase 2 fiber optic connectivity upgrades to Town buildings including compatibility with modern communication technologies - Town Offices, Town Meeting Hall, Danville Community Center, Library, Village Theatre, and future Town Studio Arts District Maker Space. DISCUSSION Phase 1 of the project is now complete and ready for acceptance by the Town. All work was performed in accordance with the approved plans and specifications. The original contract for the Town-wide fiber project, A-620, was set at $1,194,700. Nine change orders increased the contract by $346,627.77, resulting in a final contract amount of $1,541,327.77. These change orders included adjustments to bid items, emergency conduit repairs, rerouting of existing conduit, and an expanded scope to connect five downtown buildings and the Town Offices. The final amount exceeds the original contract and its $180,000 contingency fund by $166,627.77, necessitating an amendment to the original contract. PUBLIC CONTACT Posting of the meeting agenda serves as notice to the general public. Notice of Completion 2 September 16, 2025 Townwide Fiber Optic Project, CIP No. A-620 FISCAL IMPACT The proposed amendment increases St. Francis’s contract for the Fiber Optic Cable Interconnect Improvements (CIP No. A-620) by $166,627.77, bringing the total budget for Phase 1 to a maximum of $1,541,327.77. Funding for this amendment is fully covered by the allocated budget in the 2025/26 Capital Improvement Program for CIP A-620. RECOMMENDATION Adopt Resolution No. 69-2025, approving a Notice of Completion and amendment to the construction contract for the first phase of the Fiber Optic Cable Interconnect Improvements Project, CIP No. A-620. Prepared by: Allan Shields Transportation Manager Reviewed by: Diane J. Friedmann Development Services Director Attachments: A - Resolution No. 69-2025 B - Notice of Completion C - Resolution No. 78-2024 RESOLUTION NO. 69-2025 APPROVING A NOTICE OF COMPLETION AND CONSTRUCTION CONTRACT AMENDMENT FOR THE FIBER OPTIC CABLE INTERCONNECT IMPROVEMENTS PROJECT, CIP NO. A-620 WHEREAS, on December 17, 2024, the Town of Danville awarded a construction contract to St. Francis for the Fiber Optic Cable Interconnect Improvements Project, CIP No. A- 620; and WHEREAS, the project involved the installation of a fiber optic communication network to enhance traffic signal coordination and connectivity along the San Ramon Valley Boulevard and Hartz Avenue Corridor, including underground fiber optic cabling, conduit systems, and additional Phase 2 connectivity upgrades to Town buildings (Town Offices, Town Meeting Hall, Danville Community Center, Library, Village Theatre, and future Town Studio Arts District Maker Space); and WHEREAS, the City Engineer has determined that the work under Phase 1 of this project has been completed as of August 15, 2025 in accordance with the approved plans and specifications; and WHEREAS, the original contract amount of $1,194,700 was increased by $346,627.77 through nine change orders, resulting in a final contract amount of $1,541,327.77, which exceeds the original contract and its $180,000 contingency fund by $166,627.77, necessitating a contract amendment; and WHEREAS, the proposed amendment increases St. Francis’s contract by $166,627.77, bringing the total budget for Phase 1 to a maximum of $1,541,327.77, with funding fully covered by the allocated budget in the 2025/26 Capital Improvement Program for CIP No. A-620; and WHEREAS, California Civil Code section 9204 specifies the requirements for recordation of a Notice of Completion; and WHEREAS, not less than thirty (30) days nor more than forty-five (45) days after a Notice of Completion is recorded, the Town must release all undisputed retention payments to the contractor; now, therefore, be it RESOLVED, by the Danville Town Council that said work by and with St. Francis is hereby accepted as complete; and, be it further RESOLVED, that the contract amendment increasing the contract amount by $166,627.77, for a total not to exceed $1,541,327.77, is hereby approved; and, be it further Docusign Envelope ID: DBD34A8A-F32D-4CA6-AF5B-9761A440F15C ATTACHMENT A PAGE 2 OF RESOLUTION NO. 69-2025 RESOLVED, that the City Clerk is hereby authorized and directed to file with the County Recorder of the County of Contra Costa, a Notice of Completion for said project within fifteen (15) days from the date hereof; and, be it further RESOLVED, that undisputed retention payments be released in accordance with Sections 8812 and 9356 of the California Civil Code. APPROVED by the Danville Town Council at a regular meeting on September 16, 2025, by the following vote: AYES: NOES: ABSTAINED: ABSENT: ______________________________ MAYOR APPROVED AS TO FORM: ATTEST: _______________________________ ______________________________ CITY ATTORNEY CITY CLERK Docusign Envelope ID: DBD34A8A-F32D-4CA6-AF5B-9761A440F15C RECORDING REQUESTED BY: Town of Danville 500 La Gonda Way Danville, CA 94526 WHEN RECORDED MAIL TO: Town of Danville City Clerk’s Office 500 La Gonda Way Danville, CA 94526 NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN PURSUANT TO SECTION 9204 OF THE CALIFORNIA CIVIL CODE: That on the 17th day of December, 2024, the Town of Danville (“Owner”), a public entity in the State of California, did award a construction contract to “Contractor”: Owner: Town of Danville 500 La Gonda Way Danville, CA 94526 Contractor: St. Francis Electric LLC 975 Carden Street San Leandro, CA 94577 for certain public improvement work: to wit, Fiber Optic Cable Interconnect Improvements, CIP No. A-620 Located at: San Ramon Valley Boulevard and Hartz Avenue from the southern Town limits to El Cerro and Danville Blvd and the following Town owned sites: Town Offices, Town Meeting Hall, Danville Community Center, Library, Village Theater, and future Arts District Makers Space. All work as described in the above named Contract between the above named Contractor and the Town of Danville has been completed on August 15, 2025, in accordance with plans and specifications. I verify, under penalty of perjury, that the foregoing is true and correct. Signed Steven D. Jones, City Engineer Date RCE #69367 Town of Danville ATTACHMENT B ATTACHMENT C