Loading...
HomeMy WebLinkAbout081325-05.3 PARKS, RECREATION AND ARTS COMMISSION STAFF REPORT 5.3 TO: Parks, Recreation and Arts Commission August 13, 2025 SUBJECT: Discuss the Danville South Park Playground Replacement Project and Provide Staff with Feedback and Direction BACKGROUND The Town owns and maintains six playgrounds in its parks. As these playgrounds age, the equipment requires replacement approximately every 15 to 20 years, essentially establishing a rotational replacement program. The playground at Danville South Park was last renovated in 2001; while repairs over the years have extended the life of the playground, it is now appropriate to consider its replacement. DISCUSSION The playground at Danville South Park is relatively small in size at approximately 3,400 square feet and currently includes slides, overhead rings, swings and spring toys. The surface currently consists primarily of engineered wood fiber (EWF), along with areas of poured in place (PIP) and sand. To help initiate the process of identifying replacement playground equipment, sample layouts are attached to give the Commission an idea of what types of features could fit within the space. Some options include traditional and accessible swings, as well as climbing, spinning, sliding and sensory features that appeal to a variety of ages and abilities. The colors shown in the sample layouts are also for visual purposes; feedback from the Commission on color preferences can be incorporated into draft designs. As shown in the sample layouts, based on the smaller playground footprint the most likely options include utilizing a larger primary play structure along with a secondary feature like swings, or a smaller primary structure along with several secondary features. Based on feedback from the Commission on primary structure size, secondary feature options, colors/themes and any other aspects of the playground, draft designs can be created for more detailed review. FISCAL IMPACT Project cost will be determined upon completion of a final design. Preliminary estimates for the playground equipment replacement are in the range of $250,000. Sufficient funds have been appropriated in the Capital Improvement Program for the cost of the playground equipment. Other potential improvements, such as surface replacement or shade structures, would require an additional funding appropriation. RECOMMENDATION Discuss the Danville South Park Playground Replacement Project and Provide Staff with Feedback and Direction. Prepared by: Dave Casteel Maintenance Services Director Attachment: Sample Playground Layouts