HomeMy WebLinkAbout052725 - Traffic Presentation828 Diablo Road
Traffic
Trip Generation
Trip generation is calculated based on survey data collected from other
similar developments and ITE trip generation rates for assisted living facilities.
ITE Results
Existing Nursery Use: 290 Daily Trips
ITE Rates: 284 Daily Trips
-4
Survey Results
Existing Nursery Use: 290 Daily Trips
Survey Results: 365 Daily Trips
+75
Study Intersections - LOS
Findings
All intersections except the following would operate at a satisfactory LOS:
1.Project driveway/Diablo Road LOS E in A.M. Peak
2.El Ceroo/West El Pintado/I-680 southbound ramp LOS F MD Peak and LOS PM Peak
*These two intersections existing operations are at these levels and the project will add less than an
additional 5-second delay, no mitigation required.
Traffic: Parking
The project is providing 60 parking spaces which exceeds the Town’s requirement
of 37 spaces and the ITE requirement of 44 spaces.