HomeMy WebLinkAbout051525-05.1
DESIGN REVIEW BOARD STAFF REPORT 5.1
TO: Design Review Board Members May 15, 2025
SUBJECT: Review and approve Development Plan request DEV25-0007 to allow a
change in exterior paint colors and awnings for the building located at 495
Hartz Ave.
PROJECT DESCRIPTION
The proposal includes a Development Plan request for modified exterior paint colors and
awnings for the building located at 495 Hartz Ave. The proposal was discussed at the
April 24, 2025, Design Review Board meeting where Board Members advised the
applicant to adhere to the current color palette.
EVALUATION
The applicant is proposing to change the section of the building located at the corner from
the existing red to a tan color to match the rest of the building’s existing body color. The
windows, doors, and awnings would be black. A new horizontal wood trim beam would
be added between the stone and stucco.
RECOMMENDATION
Review and approve Development Plan request DEV25-0007 to allow a change in exterior
paint colors and awnings for the building located at 495 Hartz Ave.
Prepared by:
Riley Anderson-Barrett
Associate Planner
Attachment: A - Proposed Colors Rendering
New Building Owner: Darren Jewelers
495 A Hartz Ave, Danville, CA
Existing Elevation
Minor Exterior Color Change:
Windows Doors - Black Color
Awings - Black Fabric
Wood Trim - at Stone/Plaster Edge (close raw joint
ATTACHMENT A