Development Services - Town Council Report
The Development Services Department protects public health, safety and welfare;
preserves Danville’s history and retains the community’s special character.
Development Services consists of four primary divisions: Building, Planning,
Engineering and Transportation. These divisions work together to support the Towns
mission statement of delivering superior municipal services that make people’s lives
better.
The Building Division ensures construction plans comply with California Building Code
Requirements and local codes related to land use, zoning, sanitation, water, sewer,
fire resistance and electrical codes.
The Planning Division ensures that Danville has adopted plans that guide its physical
development (required by state law), new development is consistent with these
adopted plans, new construction meets all ‘development standards’ (guided by these
plans and code) and plans and standards are updated as necessary due to federal,
state or local policy changes.
The Engineering Division oversees the development of the Capital Improvement
Program (CIP), a 5-year capital investment plan for design, construction and
renovation of the infrastructure for the entire organization (roads, parks, buildings,
etc.), prepares design plans, specifications and estimates for the bidding of all capital
projects, oversees the construction of all capital projects, reviews all proposed land
development projects in Danville and assists during construction of those
developments.
The Transportation Division oversees the operation of traffic signals, roadway signage
and striping that directs the flow of traffic, traffic data collection and validation,
transportation capital improvement program, traffic development reviews and traffic
safety programs (Street Smarts, Neighborhood Traffic Management Program).
Department Overview
01 Development Services - Town Council Report
San Ramon Valley
Boulevard Improvements
Project: C-600
Paving is complete on San Ramon Valley
Boulevard. CAT tracking and striping will
begin by the end of April. This project
includes paving on Front Street between
Hartz Way and Rose Street.
Storm Drainage Master
Plan Project: A-330
Completed Phase II of inspections,
inventory and survey of the town's 128
miles of storm drainage system to assess
system condition and identify potential
maintenance projects.
Department Highlights
02Development Services - Town Council Report
Downtown Catalyst
Project: A-362
Nearing the end of construction phase at
the Village Theatre and Art Gallery.
Electrical work and installation of the string
lighting has begun. Decorative
Thermoplastic paving to follow depending
on temperature/weather conditions.
Diablo Road Trail
Project: C-055
Removal and clearing of 18 trees and
12 tree stumps along Diablo Road in
preparation for construction of Diablo
Road Multi-Purpose Trail.
Diablo Vista Playground
Renovation Project: B-560
Contract has been signed and the
playground equipment submittal review is
complete. Construction will begin in May.
Fiber Optic Cable
Interconnect Project:
C-620
Construction continues with Front Street
installation. The project will be complete
as of May.
Department Highlights
03 Development Services - Town Council Report
Traffic Signal
Modernization: C-634
This project improves existing traffic signal
infrastructure to intelligent transportation
systems (ITS). ITS technology will provide
real-time data and analytics for traffic
signals along 48 intersections on roads of
regional significance. This project is
currently in the design phase.
Sycamore Valley/Camino
Tassajara Sound Wall
Project: A-513
This Project consists of the repair of 12
segments of sound walls along Sycamore
Valley Road Road and Camino Tassjara
Road. Project will begin in May.
Department Highlights
Iron Horse Trail Crossing
Improvements: C-305
New Rapid Rectangular Flashing Beacons
along the Iron Horse Trail crossings at
Linda Mesa, Love Lane, and Del Amigo
and the intersections of Monte
Sereno/Stone Valley Road and Love Lane
and Railroad Avenue. Construction
begins in August.
04Development Services - Town Council Report
Magee Preserve (Davidon Homes) - Building permits have been issued for
the final 14 of 69 homes.
600 Hartz Avenue (The Address Company) – Building inspectors are now
performing final inspections on the individual condominium units.
375 West El Pintado (Diamond Construction) – The 50-unit senior housing
project is currently in the framing phase of construction.
3020 Fostoria Way (The Pacific Company) - 43 affordable apartment
permits are approved and ready for issuance.
Fostoria Way (Trumark Homes) Master Plan approved for 124
Townhomes.
2026 Building Code Updates will be presented to Town Council in the fall.
Building Division
By the Numbers (Year-to-date 2024/25)
Processed and reviewed 1862 building applications
76% of all building permit applications submitted online
1130 building plan reviews
99% of building plan reviews completed on time
98% of building plan reviews are conducted in-house
Performed 6,908 building inspections
The average number of building inspections per day is 37
The average number of inspection stops per day is 27
The Building Division Permit Center has served 2,266 walk-in customers
The average number of walk-in customers per week is 56
600 Har tz Avenue
05 Development Services - Town Council Report
Planning Division
By the Numbers Year - to - Date (2024/25)
363 development plan reviews
277 entitled Housing Units
71 permitted Housing Units
60 completed Housing Units
37 completed Accessory Dwelling Units
24 sign reviews
11 Development Plans
The Ivy (O&I Development) - This is an SB 330 development application for a
105-unit assisted living facility at 828 Diablo Road. The SB 330 application is
currently under 30-day review.
Danville Village (Blake|Griggs Property) - Preliminary application has been
submitted for a 200-unit apartment development under SB 330.
Elworthy East (Bates Stringer Martin Hills Ranch LLC.) - 20-unit single-family
development on 100 acres. Draft EIR is currently being prepared.
Misson Development - 18-unit single-family development off Sherburne Hills
Road. Draft EIR is currently being prepared.
425 El Pintado (Diamond Construction) - This is an SB 330 development
application for a 99-unit senior condominium project. This project is fully
entitled.
Submitted the Annual Progress Report to the California Department of
Housing and Community Development in April.
Submitted the General Plan Annual Progress Report to the Governor’s Office
of Land Use and Climate Innovation (LCI) in April.
Architectural Plans (FINAL) for Borel Property Multi-family Attached Residential Development
06Development Services - Town Council Report
Storm Drainage Master Plan Phase II will be completed this month.
Hill Meadow Storm Drain Pipe Repair - 371 linear feet of pipe needs
replacement. The project is currently in the design phase.
Completed the OpenGov CIP Budgeting Software integration. Next phase
is the online budget book launch.
Pack Trail/Park Haven Drive Landslide Repair - repair of 200 linear feet of
trail loss. Currently in the design phase.
San Ramon Valley Boulevard Project is nearing completion.
Complete the Design for Arts District Maker Space.
Complete the Design for Town Green and Arts District (Pavillion).
Staff training for online public works inspections.
Engineering Division
By the Numbers Year-to-Date 2024/25
287 engineering plan reviews
373 encroachment permits issued
410 encroachment permit inspections
13 grading permits issues
85 grading inspections completed
214 model water efficiency landscape reviews (MWELO)
120 Clean Water construction site field inspections
07 Development Services - Town Council Report
Pavement Management Program
Projects - C-610G & 610H
106 streets will be resurfaced this year
15 total miles of resurfacing, concrete repair and new pedestrian ramps
Pavement Condition Index of 79
08Development Services - Town Council Report
Upcoming Projects
Sycamore Valley Road Project is cur rently in 60% design phase
2025/26 pavement management project is cur rently in the design phase
Streets Resurfaced in Fall of FY 2023/2024: C-610G
Blue Rock Cour t
Brookside Drive
Brookside Drive
Caboose Place
Daylight Place
Delta Place
Delta Way
El Por tal Road
Entrada Mesa Lane
Esther Lane
Front Street
Front Street
Glen Meadow Cour t
Gold Poppy Cour t
Grassland Cour t
Hardester Cour t
Har tz Way
Hill Meadow Drive
Hill Meadow Place
Hill Meadow Place
Hill Meadow Place
Houston Cour t
Linda Mesa Avenue
Mariposa Cour t
Mariposa Cour t
Mikado Place
Olney Cour t
Prospect Avenue
Prospect Avenue
Prospect Avenue
Quinnterra Lane
Quinnterra Lane
Ranger Place
Redbud Cour t
Rock Ridge Cour t
Sheri Cour t
Sheri Lane
Sheri Lane
Sheri Lane
St Teresa Cour t
Stoddard Cour t
Stoddard Place
Stone Cour t
Topeka Place
Wabash Place
Wabash Place
Wild Flower Cour t
Wiley Cour t
William Cour t
Zephyr Circle
Zephyr Place
Street Name
Segment
From To
Hill Meadow Place
El Capitan Drive
Wabash Place
Delta Way
Brookside Drive
Delta Way
El Capitan Drive
La Gonda Way
Linda Mesa Avenue
Linda Mesa Avenue
Linda Mesa Avenue
Diablo Road
Hill Meadow Place
Hill Meadow Place
Hill Meadow Place
Brookside Drive
Hartz Avenue
Camino Tassajara
Hill Meadow Drive
Rock Ridge Court
Hill Meadow Drive
Quinnterra Lane
Montair Drive
Estates Drive
Sheri Lane
Brookside Drive
Brookside Drive
Quinnterra Lane
El Dorado Avenue
Estates Drive
Entrada Mesa Road
Esther Lane
Delta Way
Hill Meadow Place
Hill Meadow Place
Sheri Lane
Mariposa Cour t
Town & Country Drive
Remington Drive
Brookside Drive
Brookside Drive
Stoddard Cour t
Brookside Drive
Brookside Drive
Brookside Drive
Brookside Drive
Hill Meadow Place
Brookside Drive
Entrada Mesa Road
El Capitan Drive
Brookside Drive
End
Wabash Place
Greenbrook Drive
End
End
End
Mustang Drive
Danville Boulevard
Quinnterra Lane
Quinnterra Lane
Diablo Road
Hartz Way
End
End
End
End
350 feet East of Hartz Avenue
Hill Meadow Place
Rock Ridge Court
Hill Meadow Place
East end
Prospect Avenue
Railroad Avenue
Sheri Lane
End
End
End
Railroad Avenue
Estates Drive
End of public street
Prospect Avenue
West end
End
End
End
End
Town & Country Drive
Remington Drive
Gerald Drive
End
End
End
End
End
End
End
End
End
End
End
End
09 Development Services - Town Council Report
Street Name Segment
From To
Streets to be Resurfaced in Spring of FY 2024/2025: C-610H
Adobe Drive
Almadine Way
Alta Vista Court
Alta Vista Way
Bobbie Court
Bobbie Drive
Bobbie Drive
Buckeye Lane
Camino Ramon Place
Charles Lane
Chateau Court
Claypool Cour t
Cliffside Dr
Cliffside Drive
Discovery Cour t
Glenhill Cour t
Gwen Cour t
Hope Lane
Hope Lane
Ilo Lane
La Vista Way
Montego Drive
Montego Place
Murcia Cour t
Pinewood Cour t
Rock Island Circle
San Carlo Cour t
San Paulo Cour t
San Vicente Cour t
St Ramon Cour t
Trish Cour t
Trish Drive
Tunbridge Road
Tunbridge Road
Tunbridge Road
Tur rini Circle
Tur rini Cour t
Tur rini Drive
Tur rini Drive
Tuscany Cour t
Tuscany Way
Tuscany Way
Tuscany Way
Victoria Place
Waingar th Way
Waingar th Way
West El Pintado
West El Pintado
Whitside Cour t
Willowmere Road
Wood Ranch Drive
Highbridge Lane (West)
Tuscany Way
Alta Vista Way
Camino Tassajara
Bobbie Drive
Turrini Drive
Highbridge Lane
70 feet South of Willowmere Road
Camino Ramon
Ilo Lane
Tuscany Way
Turnbridge Road
280 feet West of Montego Drive
Montego Drive
Waingar th Way
Tunbridge Road
Richard Lane
467 feet East of Green Valley Road
Green Valley Road
West El Pintado
West End
Ocho Rios Drive
Montego Drive
Alta Vista Way
Ambience Way
Southwest Corner
Camino Ramon Place
Camino Ramon Place
Camino Ramon Place
Camino Ramon
End
Alta Vista Way
Old Creek Road
Whiteside Cour t
Glenhill Cour t
Turrini Drive (South)
Turrini Drive
Bobbie Drive
Turrini Circle (Nor th)
Tuscany Way
Alta Vista Way
Wood Ranch Drive
Cannes Cour t
Old Blackhawk Road
Hope Lane
467 feet East of Green Valley Road
Ilo Lane
675 Feet Nor th of Diablo Road
Tunbridge Road
Diablo Road
Tuscany Way
End
La Vista Way
End
1400 feet Nor th of Tuscany Way
End
Diablo Road
Tur rini Drive
Nor th End
End of Public Street
End
End
End
1,162 feet West of Montego Drive
280 feet West of Montego Drive
End
End
End
End
467 feet East of Green Valley Road
End
East End
260 feet West of Montego Place
End
End
End
Nor thwest corner
End
End
End
End
End
Trish Cour t
Sycamore Valley Road
Glenhill Cour t
End
Tur rini Drive (Nor th)
End
Tur rini Circle (Nor th)
El Cerro Boulevard
End
Cannes Cour t
East end
Wood Ranch Drive
End
467 feet East of Green Valley Road
Green Valley Road
675 feet Nor th of Diablo Road
Diablo Road
End
End
Camino Tassajara
10Development Services - Town Council Report
Capital Improvement Project C-607 - Project includes raised crosswalks,
signage, drainage improvements and pavement markings along the Iron
Horse Trail crossings at Greenbrook, Paraiso and El Capitan Drive.
Bicycle Advisory Commissioner Appointment to the Iron Horse Corridor
Advisory Committee.
Neighborhood Traffic Management Program - reviewed and closed 14
NTMP projects. Transportation staff is currently managing 5 open NTMP
projects.
Neighborhood Traffic Management Program is being updated.
Additional Bicycle Infrastructure improvements included in the striping
plan. for the San Ramon Valley Boulevard Project, including signage and
a bike box to increase visibility of bicyclists merging towards Railroad
Avenue.
Fiber Optic Interconnect Project Phase Two is under design.
Diablo Road Trail Project Construction begins late summer, including
rough grading and installation of drainage structures on the upper trail
areas away from the creek.
AB 413 (daylighting law) recommendations for the downtown business
district.
Bicycle Wayfinding Request for Proposal will be published in July.