Loading...
HomeMy WebLinkAbout041525-08.3Group photo featuring some of the women of Development Ser vices Celebra ting Inter na tional Women’s Day March 8, 2025 Development Services - Town Council Report The Development Services Department protects public health, safety and welfare; preserves Danville’s history and retains the community’s special character. Development Services consists of four primary divisions: Building, Planning, Engineering and Transportation. These divisions work together to support the Towns mission statement of delivering superior municipal services that make people’s lives better. The Building Division ensures construction plans comply with California Building Code Requirements and local codes related to land use, zoning, sanitation, water, sewer, fire resistance and electrical codes. The Planning Division ensures that Danville has adopted plans that guide its physical development (required by state law), new development is consistent with these adopted plans, new construction meets all ‘development standards’ (guided by these plans and code) and plans and standards are updated as necessary due to federal, state or local policy changes. The Engineering Division oversees the development of the Capital Improvement Program (CIP), a 5-year capital investment plan for design, construction and renovation of the infrastructure for the entire organization (roads, parks, buildings, etc.), prepares design plans, specifications and estimates for the bidding of all capital projects, oversees the construction of all capital projects, reviews all proposed land development projects in Danville and assists during construction of those developments. The Transportation Division oversees the operation of traffic signals, roadway signage and striping that directs the flow of traffic, traffic data collection and validation, transportation capital improvement program, traffic development reviews and traffic safety programs (Street Smarts, Neighborhood Traffic Management Program). Department Overview 01 Development Services - Town Council Report San Ramon Valley Boulevard Improvements Project: C-600 Paving is complete on San Ramon Valley Boulevard. CAT tracking and striping will begin by the end of April. This project includes paving on Front Street between Hartz Way and Rose Street. Storm Drainage Master Plan Project: A-330 Completed Phase II of inspections, inventory and survey of the town's 128 miles of storm drainage system to assess system condition and identify potential maintenance projects. Department Highlights 02Development Services - Town Council Report Downtown Catalyst Project: A-362 Nearing the end of construction phase at the Village Theatre and Art Gallery. Electrical work and installation of the string lighting has begun. Decorative Thermoplastic paving to follow depending on temperature/weather conditions. Diablo Road Trail Project: C-055 Removal and clearing of 18 trees and 12 tree stumps along Diablo Road in preparation for construction of Diablo Road Multi-Purpose Trail. Diablo Vista Playground Renovation Project: B-560 Contract has been signed and the playground equipment submittal review is complete. Construction will begin in May. Fiber Optic Cable Interconnect Project: C-620 Construction continues with Front Street installation. The project will be complete as of May. Department Highlights 03 Development Services - Town Council Report Traffic Signal Modernization: C-634 This project improves existing traffic signal infrastructure to intelligent transportation systems (ITS). ITS technology will provide real-time data and analytics for traffic signals along 48 intersections on roads of regional significance. This project is currently in the design phase. Sycamore Valley/Camino Tassajara Sound Wall Project: A-513 This Project consists of the repair of 12 segments of sound walls along Sycamore Valley Road Road and Camino Tassjara Road. Project will begin in May. Department Highlights Iron Horse Trail Crossing Improvements: C-305 New Rapid Rectangular Flashing Beacons along the Iron Horse Trail crossings at Linda Mesa, Love Lane, and Del Amigo and the intersections of Monte Sereno/Stone Valley Road and Love Lane and Railroad Avenue. Construction begins in August. 04Development Services - Town Council Report Magee Preserve (Davidon Homes) - Building permits have been issued for the final 14 of 69 homes. 600 Hartz Avenue (The Address Company) – Building inspectors are now performing final inspections on the individual condominium units. 375 West El Pintado (Diamond Construction) – The 50-unit senior housing project is currently in the framing phase of construction. 3020 Fostoria Way (The Pacific Company) - 43 affordable apartment permits are approved and ready for issuance. Fostoria Way (Trumark Homes) Master Plan approved for 124 Townhomes. 2026 Building Code Updates will be presented to Town Council in the fall. Building Division By the Numbers (Year-to-date 2024/25) Processed and reviewed 1862 building applications 76% of all building permit applications submitted online 1130 building plan reviews 99% of building plan reviews completed on time 98% of building plan reviews are conducted in-house Performed 6,908 building inspections The average number of building inspections per day is 37 The average number of inspection stops per day is 27 The Building Division Permit Center has served 2,266 walk-in customers The average number of walk-in customers per week is 56 600 Har tz Avenue 05 Development Services - Town Council Report Planning Division By the Numbers Year - to - Date (2024/25) 363 development plan reviews 277 entitled Housing Units 71 permitted Housing Units 60 completed Housing Units 37 completed Accessory Dwelling Units 24 sign reviews 11 Development Plans The Ivy (O&I Development) - This is an SB 330 development application for a 105-unit assisted living facility at 828 Diablo Road. The SB 330 application is currently under 30-day review. Danville Village (Blake|Griggs Property) - Preliminary application has been submitted for a 200-unit apartment development under SB 330. Elworthy East (Bates Stringer Martin Hills Ranch LLC.) - 20-unit single-family development on 100 acres. Draft EIR is currently being prepared. Misson Development - 18-unit single-family development off Sherburne Hills Road. Draft EIR is currently being prepared. 425 El Pintado (Diamond Construction) - This is an SB 330 development application for a 99-unit senior condominium project. This project is fully entitled. Submitted the Annual Progress Report to the California Department of Housing and Community Development in April. Submitted the General Plan Annual Progress Report to the Governor’s Office of Land Use and Climate Innovation (LCI) in April. Architectural Plans (FINAL) for Borel Property Multi-family Attached Residential Development 06Development Services - Town Council Report Storm Drainage Master Plan Phase II will be completed this month. Hill Meadow Storm Drain Pipe Repair - 371 linear feet of pipe needs replacement. The project is currently in the design phase. Completed the OpenGov CIP Budgeting Software integration. Next phase is the online budget book launch. Pack Trail/Park Haven Drive Landslide Repair - repair of 200 linear feet of trail loss. Currently in the design phase. San Ramon Valley Boulevard Project is nearing completion. Complete the Design for Arts District Maker Space. Complete the Design for Town Green and Arts District (Pavillion). Staff training for online public works inspections. Engineering Division By the Numbers Year-to-Date 2024/25 287 engineering plan reviews 373 encroachment permits issued 410 encroachment permit inspections 13 grading permits issues 85 grading inspections completed 214 model water efficiency landscape reviews (MWELO) 120 Clean Water construction site field inspections 07 Development Services - Town Council Report Pavement Management Program Projects - C-610G & 610H 106 streets will be resurfaced this year 15 total miles of resurfacing, concrete repair and new pedestrian ramps Pavement Condition Index of 79 08Development Services - Town Council Report Upcoming Projects Sycamore Valley Road Project is cur rently in 60% design phase 2025/26 pavement management project is cur rently in the design phase Streets Resurfaced in Fall of FY 2023/2024: C-610G Blue Rock Cour t Brookside Drive Brookside Drive Caboose Place Daylight Place Delta Place Delta Way El Por tal Road Entrada Mesa Lane Esther Lane Front Street Front Street Glen Meadow Cour t Gold Poppy Cour t Grassland Cour t Hardester Cour t Har tz Way Hill Meadow Drive Hill Meadow Place Hill Meadow Place Hill Meadow Place Houston Cour t Linda Mesa Avenue Mariposa Cour t Mariposa Cour t Mikado Place Olney Cour t Prospect Avenue Prospect Avenue Prospect Avenue Quinnterra Lane Quinnterra Lane Ranger Place Redbud Cour t Rock Ridge Cour t Sheri Cour t Sheri Lane Sheri Lane Sheri Lane St Teresa Cour t Stoddard Cour t Stoddard Place Stone Cour t Topeka Place Wabash Place Wabash Place Wild Flower Cour t Wiley Cour t William Cour t Zephyr Circle Zephyr Place Street Name Segment From To Hill Meadow Place El Capitan Drive Wabash Place Delta Way Brookside Drive Delta Way El Capitan Drive La Gonda Way Linda Mesa Avenue Linda Mesa Avenue Linda Mesa Avenue Diablo Road Hill Meadow Place Hill Meadow Place Hill Meadow Place Brookside Drive Hartz Avenue Camino Tassajara Hill Meadow Drive Rock Ridge Court Hill Meadow Drive Quinnterra Lane Montair Drive Estates Drive Sheri Lane Brookside Drive Brookside Drive Quinnterra Lane El Dorado Avenue Estates Drive Entrada Mesa Road Esther Lane Delta Way Hill Meadow Place Hill Meadow Place Sheri Lane Mariposa Cour t Town & Country Drive Remington Drive Brookside Drive Brookside Drive Stoddard Cour t Brookside Drive Brookside Drive Brookside Drive Brookside Drive Hill Meadow Place Brookside Drive Entrada Mesa Road El Capitan Drive Brookside Drive End Wabash Place Greenbrook Drive End End End Mustang Drive Danville Boulevard Quinnterra Lane Quinnterra Lane Diablo Road Hartz Way End End End End 350 feet East of Hartz Avenue Hill Meadow Place Rock Ridge Court Hill Meadow Place East end Prospect Avenue Railroad Avenue Sheri Lane End End End Railroad Avenue Estates Drive End of public street Prospect Avenue West end End End End End Town & Country Drive Remington Drive Gerald Drive End End End End End End End End End End End End 09 Development Services - Town Council Report Street Name Segment From To Streets to be Resurfaced in Spring of FY 2024/2025: C-610H Adobe Drive Almadine Way Alta Vista Court Alta Vista Way Bobbie Court Bobbie Drive Bobbie Drive Buckeye Lane Camino Ramon Place Charles Lane Chateau Court Claypool Cour t Cliffside Dr Cliffside Drive Discovery Cour t Glenhill Cour t Gwen Cour t Hope Lane Hope Lane Ilo Lane La Vista Way Montego Drive Montego Place Murcia Cour t Pinewood Cour t Rock Island Circle San Carlo Cour t San Paulo Cour t San Vicente Cour t St Ramon Cour t Trish Cour t Trish Drive Tunbridge Road Tunbridge Road Tunbridge Road Tur rini Circle Tur rini Cour t Tur rini Drive Tur rini Drive Tuscany Cour t Tuscany Way Tuscany Way Tuscany Way Victoria Place Waingar th Way Waingar th Way West El Pintado West El Pintado Whitside Cour t Willowmere Road Wood Ranch Drive Highbridge Lane (West) Tuscany Way Alta Vista Way Camino Tassajara Bobbie Drive Turrini Drive Highbridge Lane 70 feet South of Willowmere Road Camino Ramon Ilo Lane Tuscany Way Turnbridge Road 280 feet West of Montego Drive Montego Drive Waingar th Way Tunbridge Road Richard Lane 467 feet East of Green Valley Road Green Valley Road West El Pintado West End Ocho Rios Drive Montego Drive Alta Vista Way Ambience Way Southwest Corner Camino Ramon Place Camino Ramon Place Camino Ramon Place Camino Ramon End Alta Vista Way Old Creek Road Whiteside Cour t Glenhill Cour t Turrini Drive (South) Turrini Drive Bobbie Drive Turrini Circle (Nor th) Tuscany Way Alta Vista Way Wood Ranch Drive Cannes Cour t Old Blackhawk Road Hope Lane 467 feet East of Green Valley Road Ilo Lane 675 Feet Nor th of Diablo Road Tunbridge Road Diablo Road Tuscany Way End La Vista Way End 1400 feet Nor th of Tuscany Way End Diablo Road Tur rini Drive Nor th End End of Public Street End End End 1,162 feet West of Montego Drive 280 feet West of Montego Drive End End End End 467 feet East of Green Valley Road End East End 260 feet West of Montego Place End End End Nor thwest corner End End End End End Trish Cour t Sycamore Valley Road Glenhill Cour t End Tur rini Drive (Nor th) End Tur rini Circle (Nor th) El Cerro Boulevard End Cannes Cour t East end Wood Ranch Drive End 467 feet East of Green Valley Road Green Valley Road 675 feet Nor th of Diablo Road Diablo Road End End Camino Tassajara 10Development Services - Town Council Report Capital Improvement Project C-607 - Project includes raised crosswalks, signage, drainage improvements and pavement markings along the Iron Horse Trail crossings at Greenbrook, Paraiso and El Capitan Drive. Bicycle Advisory Commissioner Appointment to the Iron Horse Corridor Advisory Committee. Neighborhood Traffic Management Program - reviewed and closed 14 NTMP projects. Transportation staff is currently managing 5 open NTMP projects. Neighborhood Traffic Management Program is being updated. Additional Bicycle Infrastructure improvements included in the striping plan. for the San Ramon Valley Boulevard Project, including signage and a bike box to increase visibility of bicyclists merging towards Railroad Avenue. Fiber Optic Interconnect Project Phase Two is under design. Diablo Road Trail Project Construction begins late summer, including rough grading and installation of drainage structures on the upper trail areas away from the creek. AB 413 (daylighting law) recommendations for the downtown business district. Bicycle Wayfinding Request for Proposal will be published in July. Transportation Division 11 Development Services - Town Council Report