HomeMy WebLinkAbout031825-06.10ADMINISTRATIVE STAFF REPORT 6.10 TO: Mayor and Town Council March 18, 2025 SUBJECT: Resolution No. 21-2025, awarding a construction contract for the 2024/25 Pavement Rehabilitation Project, Contract No. C-610H BACKGROUND This project is part of the Pavement Management Program (CIP No. C-610H). The project will consist of the following work: resurfacing of aging and deteriorating pavement with an asphalt concrete overlay, dig-out repairs, concrete curb and sidewalk repairs, installing Americans with Disability Act (ADA) compliant sidewalk curb ramps, and traffic striping/marking replacement in various neighborhoods throughout the Town. To determine those streets that will receive pavement rehabilitation treatment, the Town, along with many other Bay Area cities, use the Metropolitan Transportation Commission’s (MTC) Pavement Management Program computer software. The software relies on a classification system known as Pavement Condition Index (PCI), which ranges from 100 to zero. New streets start at 100 and decrease as they age. The Town’s Pavement Management Program seeks to sustain an average overall PCI of 70 or better for Town streets using funding allocated annually. The current project will focus on overlaying street pavement in several neighborhoods that have PCI values predominantly below 50. A complete list of streets is shown in Attachment C. DISCUSSION Nine bids were received and opened on March 11, 2025. The lowest responsive bid was submitted by MCK Services, Inc. of Concord, California with a bid of $3,532,702.65. Bid results are summarized in Attachment D. The work is scheduled to begin in Summer 2025 and expected to be completed by the end of year. This project has been found to be Categorically Exempt from the California Environmental Quality Act (CEQA) according to Guidelines Section 15301 (Class 1). Award of Contract for 2024/25 2 March 18, 2025 Pavement Rehabilitation Project Contract No. C-610H PUBLIC CONTACT Posting of the meeting agenda serves as notice to the general public. A standard Town Capital Improvement sign will be placed at the various project sites. Adjacent property owners will be notified in advance of the construction schedule. FISCAL IMPACT The low bid amount of $3,532,702.65, plus a 15% contingency of $530,000, results in a total construction budget of $4,062,702.65. Sufficient funds have been appropriated in the Capital Improvement Program (Pavement Management Program) to cover these costs. RECOMMENDATION Adopt Resolution No. 21-2025, awarding a construction contract for the 2024/25 Pavement Rehabilitation Project, Contract No. C-610H. Prepared by: Steven Jones, P.E. City Engineer Reviewed by: Diane J. Friedmann Development Services Director Attachments: A – Resolution No. 21-2025 B – CIP Page C-610 C – Candidate Street List D – Bid Results Summary RESOLUTION NO. 21-2025 AWARDING A CONSTRUCTION CONTRACT FOR THE 2024/25 PAVEMENT REHABILITATION PROJECT, CONTRACT NO. C-610H WHEREAS, the Danville Town Council has appropriated funding in the Capital Improvement Program for the Pavement Management Program, CIP No. C-610 in the 2024/25 Capital Improvement Program; and WHEREAS, the plans and specifications for the subject project have been reviewed and approved by the City Engineer; and WHEREAS, this project is categorically exempt from the requirements of the California Environmental Quality Act, Section 15301, Class 1; and WHEREAS, the City Clerk of this Town did, in open session on the 11 th day of March, 2025, publicly open and read aloud the sealed bids received as required by law; and WHEREAS, the lowest responsive bidder is MCK Services, Inc. of Concord, California, and the City Engineer has recommended awarding a contract for the project to said contractor; now, therefore, be it RESOLVED, by the Danville Town Council, that the Town award the construction contract for the 2024/25 Pavement Rehabilitation Project, Contract No. C-610H to MCK Services, Inc. of Concord, California; and, be it further RESOLVED, by the Danville Town Council, that the Town Manager be and hereby is authorized to execute, on behalf of the Town, a written contract with MCK Services, Inc. for $3,532,702.65 and authorize use of a 15% construction contingency of $530,000 for a total construction budget of $4,062,702.65 for work in connection therewith, and the City Clerk is hereby directed to attest same and affix thereto the official seal of the Town; and, be it further RESOLVED, that the Town shall within five (5) days of the adoption of this resolution, transmit an Extract of Public Works contract award to the Department of Industrial Relations, Division of Apprenticeship Standards, P.O. Box 420603, San Francisco, CA 94142. (Note: Should a finding of any discrepancy regarding this ratio of apprentices to journeymen be made, the Town shall notify the Division of Apprenticeship Standards of such findings.) Docusign Envelope ID: A12B14B8-AEEB-400D-BA9A-64EE04479A49 PAGE 2 OF RESOLUTION NO. 21-2025 APPROVED by the Danville Town Council at a regular meeting on March 18, 2025, by the following vote: AYES: NOES: ABSTAINED: ABSENT: MAYOR APPROVED AS TO FORM: ATTEST: CITY ATTORNEY CITY CLERK Docusign Envelope ID: A12B14B8-AEEB-400D-BA9A-64EE04479A49 ATTACHMENT A CIP 109 • 2024–2025 Operating Budget & Capital Improvement Program ProjectsProjects PAVEMENT MANAGEMENT PROJECT DESCRIPTION AND LOCATION: DESCRIPTION OF MODIFICATIONS: Updated description and added funding for 2028/29. RATIONALE FOR PROPOSED PROJECT: Provide for maintaining the Town's PCI above 70.EXPECTED IMPACT ON OPERATING BUDGET:Additional worker hours required to maintain per year:0 Additional Town direct operating costs per year:$0 PROJECT COST ESTIMATE This project has been modified from the previous year. PROJECT APPROPRIATION AND FUNDING The pavement management program is an annual effort approved by the Town Council to maintain the Town's street system at a high level of service. A proactive approach to pavement maintenance prevents more costly pavement repairs in the future. The program consists of two approaches: a proactive approach that utilizes preventative maintenance methods such as Crack Seal, Slurry Seal and Rubberized Cape Seal; and rehabilitation which includes overlays and reconstruction that replace the pavement wearing surface. The planned level of expenditures is aimed at sustaining an overall pavement condition index (PCI) of 70 for Town streets. A CalRecycle grant ($200,000) was awarded as part of the Rubberized Pavement Grant Program that will be used for the 2021/22 Rubberized Cape Seal Project. 5/23/2024PRINTED ON: CIP No:C-610 STATUS:In Construction PRIORITY:1 PROJECT MANAGER:NNSGREEN PROJECT:No 2024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalExpenditure Category Design/Plan Review $0 $0 $0 $0$66,000 $66,000$0 Construction $3,000,000 $2,500,000 $2,350,000 $2,350,000$18,644,316 $31,844,316$3,000,000 Inspection & Admin.$0 $0 $0 $0$132,000 $132,000$0 $18,842,316 $3,000,000 $3,000,000 $2,500,000 $2,350,000 $2,350,000 $32,042,316Total Cost Estimate: $10,954,816Total Expenditure:Unexpended: $7,887,499 on 05-01-2024 2024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalFunding Source(s) CIP Gen Purpose Rev $7,408,915 $800,000 $200,000 $0 $0 $9,158,915$750,000 Gas Tax $4,220,000 $750,000 $750,000 $750,000 $750,000 $7,970,000$750,000 Grant $200,000 $0 $0 $0 $0 $200,000$0 Meas J Rtrn to Src $3,600,000 $550,000 $550,000 $550,000 $550,000 $6,350,000$550,000 Operating Reserve $100,000 $0 $0 $0 $0 $100,000$0 Solid Waste VIF $3,833,401 $900,000 $1,000,000 $1,050,000 $1,050,000 $8,783,401$950,000 Transfer to C-601 ($520,000)$0 $0 $0 $0 ($520,000)$0 $18,842,316 $3,000,000 $3,000,000 $2,500,000 $2,350,000 $2,350,000 $32,042,316Total Funding: www.danville.ca.govCIP177 ATTACHMENT B From To 1 ADOBE DR HIGHBRIDGE LN (WEST) END 2 ALMADINE WAY TUSCANY WAY LA VISTA WAY 3 ALTA VISTA CT ALTA VISTA WAY END 4 ALTA VISTA WAY CAMINO TASSAJARA 1400 FT N/O TUSCANY WAY 5 BOBBIE CT BOBBIE DR END 6 BOBBIE DR TURRINI DR DIABLO RD 7 BOBBIE DR HIGHBRIDGE LN TURRINI DR 8 BUCKEYE LN 70 FT S/O WILLOWMERE RD NORTH END 9 CAMINO RAMON PL CAMINO RAMON END OF PUBLIC STREET 10 CHARLES LN ILO LN END 11 CHATEAU CT TUSCANY WAY END 12 CLAYPOOL CT TUNBRIDGE RD END 13 CLIFFSIDE DR 280 FT W/O MONTEGO DR 1162 FT W/O MONTEGO DR 14 CLIFFSIDE DR MONTEGO DR 280 FT W/O MONTEGO DR 15 DISCOVERY CT WAINGARTH WAY END 16 GLENHILL CT TUNBRIDGE RD END 17 GWEN CT RICHARD LN END 18 HOPE LN 467 FT E/O GREEN VALLEY RD END 19 HOPE LN GREEN VALLEY RD 467 FT E/O GREEN VALLEY RD 20 ILO LN WEST EL PINTADO END 21 LA VISTA WAY WEST END EAST END 22 MONTEGO DR OCHO RIOS DR 260 FTW/O MONTEGO PL 23 MONTEGO PL MONTEGO DR END 24 MURCIA CT ALTA VISTA WAY END 25 PINEWOOD CT AMBIENCE WAY END 26 ROCK ISLAND CIR SOUTHWEST CORNER NORTHWEST CORNER 27 SAN CARLO CT CAMINO RAMON PL END 28 SAN PAULO CT CAMINO RAMON PL END 29 SAN VICENTE CT CAMINO RAMON PL END 30 ST RAMON CT CAMINO RAMON END 31 TRISH CT END END 32 TRISH DR ALTA VISTA WAY TRISH CT 33 TUNBRIDGE RD OLD CREEK RD SYCAMORE VALLEY RD 34 TUNBRIDGE RD WHITESIDE CT GLEN HILL CT 35 TUNBRIDGE RD GLENHILL CT END 36 TURRINI CIR TURRINI DR (SOUTH) TURRINI DR (NORTH) 37 TURRINI CT TURRINI DR END 38 TURRINI DR BOBBIE DR TURRINI CIR (NORTH) 39 TURRINI DR TURRINI CIR (NORTH) EL CERRO BLVD 40 TUSCANY CT TUSCANY WAY END 41 TUSCANY WAY ALTA VISTA WAY CANNES CT 42 TUSCANY WAY WOOD RANCH DR EAST END No. 2024/25 Pavement Rehabilitation Project Street List CIP No. C-610H Street Name Limit ATTACHMENT C From To No.Street Name Limit 43 TUSCANY WAY CANNES CT WOOD RANCH DR 44 VICTORIA PL OLD BLACKHAWK RD END 45 WAINGARTH WAY HOPE LN 467 FT E/O GREEN VALLEY RD 46 WAINGARTH WAY 467 FT E/O GREEN VALLEY RD GREEN VALLEY RD 47 WEST EL PINTADO ILO LN 675 FT N/O DIABLO RD 48 WEST EL PINTADO 675 FT N/O DIABLO RD DIABLO RD 49 WHITSIDE CT - WHITSIDE TUNBRIDGE RD END 50 WILLOWMERE RD DIABO RD END 51 WOOD RANCH DRR TUSCANY WAY CAMINO TASSAJARA From To Length (LF) Width (LF) Area (SF) Mon (EA) SD MH (EA) SS MH (EA) WV (EA)ATT C&G R&R (LF) WEST EL PINTADO ILO LN 675 FT N/O DIABLO RD 720 37 26640 374.6 1 1 5 3 1 40 CHARLES LN ILO LN END 392 25 9800 160.3 2 1 135 WEST EL PINTADO 675 FT N/O DIABLO RD DIABLO RD 675 37 24975 351.2 1 2 6 1 ILO LN - ILO WEST EL PINTADO END 1418 32 45376 660.6 1 1 4 7 427 BOBBIE CT BOBBIE DR END 490 27 13230 186.0 0 BOBBIE DR TURRINI DR DIABLO RD 832 37 30784 432.9 1 3 3 0 ADOBE DR HIGHBRIDGE LN (WEST) HIGHBRIDGE LN (EAST) 965 33 31845 447.8 5 2 4 5 0 TURRINI CIR TURRINI DR (SOUTH) TURRINI DR (NORTH) 1240 27 33480 493.3 1 4 0 85 ADOBE DR HIGHBRIDGE LN (EAST) END 710 29 22408 337.6 4 4 4 0 BOBBIE DR HIGHBRIDGE LN TURRINI DR 592 35 20720 291.4 1 2 3 0 TURRINI CT TURRINI DR END 386 30 11580 185.3 0 1 2 21 TURRINI DR BOBBIE DR TURRINI CIR (NORTH) 930 35 32550 457.7 2 2 0 95 TURRINI DR TURRINI CIR (NORTH) EL CERRO BLVD 705 33 23265 327.2 3 3 3 95 ST RAMON CT CAMINO RAMON END 474 29 13746 215.8 6 3 4 0 SAN VICENTE CT CAMINO RAMON PL END 198 33 7996 134.9 1 1 2 15 CAMINO RAMON PL CAMINO RAMON END OF PUBLIC STREET 1750 33 57750 834.6 5 7 8 SAN PAULO CT CAMINO RAMON PL END 237 33 9359 154.1 1 1 3 SAN CARLO CT CAMINO RAMON PL END 235 33 9293 153.2 1 1 1 ALTA VISTA WAY CAMINO TASSAJARA TUSCANY WAY 550 60 33000 464.1 3 1 1 1 TRISH CT END END 619 33 20427 309.8 3 1 2 4 ALTA VISTA WAY TUSCANY WAY 1400 FT N/O TUSCANY WAY 1400 37 51800 728.4 0 0 MURCIA CT ALTA VISTA WAY END 1275 37 48290 701.6 6 4 5 TUSCANY WAY ALTA VISTA WAY CANNES CT 1700 37 62900 884.5 10 1 6 15 CHATEAU CT TUSCANY WAY END 156 27 6170 109.3 1 1 2 TRISH DR ALTA VISTA WAY TRISH CT 490 33 16170 227.4 1 0 TUSCANY WAY WOOD RANCH DR EAST END 1344 37 49728 721.8 5 4 6 ALTA VISTA CT ALTA VISTA WAY END 184 27 6926 119.9 1 1 1 2 TUSCANY WAY CANNES CT WOOD RANCH DR 1075 37 39775 559.3 5 4 10 QUANTITY SUMMARY - TRAFFIC LEGEND, STRIPING, AND RAISED PAVEMENT MARKERS (Contractor to verify quantities in field) 2" HMA (Ton) Adjust Iron Covers to Final Grade (EA) AR E A ' A ' AR E A ' N ' AR E A ' X ' Area Street Name Limit Dimensions From To Length (LF) Width (LF) Area (SF) Mon (EA) SD MH (EA) SS MH (EA) WV (EA)ATT C&G R&R (LF) QUANTITY SUMMARY - TRAFFIC LEGEND, STRIPING, AND RAISED PAVEMENT MARKERS (Contractor to verify quantities in field) 2" HMA (Ton) Adjust Iron Covers to Final Grade (EA) Area Street Name Limit Dimensions PINEWOOD CT AMBIENCE WAY END 462 25 17146 263.6 2 1 4 VICTORIA PL OLD BLACKHAWK RD END 819 27 22113 333.5 2 2 5 WOOD RANCH DRR TUSCANY WAY CAMINO TASSAJARA 552 57 31464 442.5 2 3 ALMADINE WAY TUSCANY WAY LA VISTA WAY 376 27 10152 142.8 0 0 TUSCANY CT TUSCANY WAY END 283 27 7641 130.0 2 1 2 LA VISTA WAY WEST END EAST END 782 27 23072 347.0 4 3 5 TUNBRIDGE RD OLD CREEK RD SYCAMORE VALLEY RD 515 37 19055 268.0 1 4 TUNBRIDGE RD WHITESIDE CT GLEN HILL CT 850 33 28050 394.5 3 7 TUNBRIDGE RD GLENHILL CT END 1390 33 45870 667.5 5 13 GLENHILL CT TUNBRIDGE RD END 275 29 7975 134.6 1 2 WHITSIDE CT TUNBRIDGE RD END 219 29 8334 139.7 1 2 CLAYPOOL CT TUNBRIDGE RD END 466 29 13514 212.5 2 1 ROCK ISLAND CIR SOUTHWEST CORNER NORTHWEST CORNER 225 37 8325 117.1 2 3 ROCK ISLAND CIR NORTHWEST CORNER NORTH END 440 29 12760 179.4 2 3 ROCK ISLAND CIR SOUTH END SOUTHWEST CORNER 405 29 11745 165.2 2 3 CLIFFSIDE DR 280 FT W/O MONTEGO DR 1162 FT W/O MONTEGO DR 882 25 22050 310.1 1 3 2 CLIFFSIDE DR MONTEGO DR 280 FT W/O MONTEGO DR 280 25 7000 98.4 1 3 2 MONTEGO DR OCHO RIOS DR 260 FTW/O MONTEGO PL 820 34 27880 392.1 4 251 MONTEGO PL MONTEGO DR END 160 30 4800 67.5 GWEN CT RICHARD LN END 564 25 14100 220.8 2 1 2 6 107 BUCKEYE LN 70 FT S/O WILLOWMERE RD WILLOWMERE RD 339 18 6102 85.8 0 0 0 1 BUCKEYE LN WILLOWMERE RD NORTH END 168 21 3528 49.6 0 0 1 0 WILLOWMERE RD DIABO RD END 605 23 13915 195.7 0 1 0 0 WAINGARTH WAY HOPE LN 467 FT E/O GREEN VALLEY RD 385 33 12705 178.7 2 1 1 0 WAINGARTH WAY 467 FT E/O GREEN VALLEY RD GREEN VALLEY RD 467 33 15411 216.7 1 0 4 3 HOPE LN 467 FT E/O GREEN VALLEY RD END 182 33 6006 84.5 2 1 2 4 HOPE LN GREEN VALLEY RD 467 FT E/O GREEN VALLEY RD 415 33 13695 215.1 0 0 0 0 DISCOVERY CT WAINGARTH WAY END 198 33 6534 114.4 2 0 1 3 AR E A G QUANTITY SUMMARY - TRAFFIC LEGEND, STRIPING, AND RAISED PAVEMENT MARKERS A 75 1750 240 100 300 450 7 13 3 G 400 120 180 6 2 L 100 250 2 N 380 100 250 5 Q 500 30 1 X 1010 2330 960 570 26 26 9 TOTAL 75 1010 5460 240 100 1730 1480 33 53 14 (Contractor to verify quantities in field) SPEED LUMP STRIPING "STOP" Legend (EA) Detail 38B (LF)Area LL Stripe (LF) TYPE I & IV Arrows (EA) Detail 2 Stripe (LF) Detail 22 Stripe (LF) YCW 12" Line Stripe (LF) WCW 12" Line Stripe (LF) Detail 23 Stripe (LF) Page 1 of 1 Curb Ramp No. Location CR01 TURRINI DRIVE @ EL CENTRO BLVD CR02 TURRINI DRIVE @ EL CENTRO BLVD CR03 WHITSIDE COURT @ TURNBRIDGE ROAD CR04 WHITSIDE COURT @ TURNBRIDGE ROAD CR05 CLAYPOOL COURT @ TURNBRIDGE ROAD CR06 CLAYPOOL COURT @ TURNBRIDGE ROAD CR07 GLENHILL COURT @ TURNBRIDGE ROAD CR08 GLENHILL COURT @ TURNBRIDGE ROAD CR09 ROCK ISLAND CIRCLE @ GREENBROOK DRIVE CR10 ROCK ISLAND CIRCLE @ GREENBROOK DRIVE CR11 ROCK ISLAND CIRCLE @ GREENBROOK DRIVE CR12 ROCK ISLAND CIRCLE @ GREENBROOK DRIVE CR13 SAN CARLO COURT @ CAMINO RAMON PLACE CR14 SAN CARLO COURT @ CAMINO RAMON PLACE CR15 SAN PAULO COURT @ CAMINO RAMON PLACE CR16 SAN PAULO COURT @ CAMINO RAMON PLACE CR17 SAN VICENTE COURT @ CAMINO RAMON PLACE CR18 SAN VICENTE COURT @ CAMINO RAMON PLACE CR19 TRISH DRIVE @ TRISH COURT CR20 TRISH DRIVE @ TRISH COURT CR21 TRISH DRIVE @ ALTA VISTA WAY CR22 TRISH DRIVE @ ALTA VISTA WAY CR23 ALTA VISTA WAY @ TUSCANY WAY CR24 ALTA VISTA WAY @ TUSCANY WAY CR25 CHATEAU COURT @ TUSCANY WAY CR26 CHATEAU COURT @ TUSCANY WAY CR27 TUSCANY WAY ACROSS FROM ALMADINE WAY CR28 ALMADINE WAY @ TUSCANY WAY CR29 ALMADINE WAY @ LA VISTA WAY CR30 ALMADINE WAY @ LA VISTA WAY CR31 TUSCANY WAY @ WOOD RANCH DRIVE CR32 TUSCANY WAY @ WOOD RANCH DRIVE CR33 TUSCANY WAY @ WOOD RANCH DRIVE CR34 MURICA COURT @ ALTA VISTA WAY CR35 ALTA VISTA WAY ACROSS FROM MURCIA COURT CR36 ALTA VISTA COURT @ ALTA VISTA WAY CR37 ALTA VISTA COURT @ ALTA VISTA WAY CR38 TUSCANY COURT @ TUSCANY WAY CR39 TUSCANY COURT @ TUSCANY WAY CR40 PINEWOOD COURT @ AMBIENCE WAY CR41 VICTORIA PLACE @ OLD BLACKHAWK ROAD CR42 VICTORIA PLACE @ OLD BLACKHAWK ROAD CR43 WAINGARTH WAY @ HOPE LANE CR44 WAINGARTH WAY @ HOPE LANE CR45 DISCOVERY COURT @ WAINGARTH WAY CR46 DISCOVERY COURT @ WAINGARTH WAY QUANTITY SUMMARY PCC WORK AND ADA CASE C CURB RAMPS Page 1 of 1 PROJECT: 2024/25 Pavement Rehabilitation Program, Contract No. C-610H BID OPENING: March 11, 2025, at 2:00 p.m. PST Please direct all questions regarding this bid opening to: Nader Salama, P.E., (925) 314-3348, nsalama@danville.ca.gov Number of Addendums: One OFFICIAL BID RESULTS CONTRACTOR BID AMOUNT *MCK Services Inc.$3,532,702.65 McGuire and Hester $3,726,517.50 Radius Earthwork $3,797,440.56 Roadway Construction $3,888,888.00 Goodfellow Brothers $3,968,968.00 O’Grady Paving $4,170,329.50 Teichert Construction $4,209,610.60 DeSilva Gates Construction $4,211,211.00 Ghilotti Brothers $4,212,437.50 *Lowest Responsive Bid I, Marie Sunseri, City Clerk for the Town of Danville, do hereby affirm that the bids received were not opened prior to the time of the public bid opening. ATTACHMENT D