Loading...
HomeMy WebLinkAbout031825-06.8 ADMINISTRATIVE STAFF REPORT 6.8 TO: Mayor and Town Council March 18, 2025 SUBJECT: Resolution No. 19-2025, awarding a construction contract; and appropriating and transferring funds for the Diablo Vista Park Playground Renovation, CIP B-560 BACKGROUND The Capital Improvement Program (CIP) includes CIP Project B-560 which would replace and upgrade the existing children’s play area at Diablo Vista Park. Originally scheduled to be replaced during the 2022/23 fiscal year, the project was deferred pending a determination of the overall project scope. The age and condition of the existing play area are such that this feature warrants prompt attention. The project improvements feature an updated play area with a variety of play features for both older and younger children as well as those with limited mobility. The park’s iconic elements such as the ‘snake’ feature and existing hill allowing a southern view are preserved. CIP Project B-616, which would construct a multi-sport skate park, is a separate project which would be located adjacent to the play area. In 2021, CIP projects B-560 and B-616 were combined to proceed with design and construction. This combined project approach was pursued because the children’s play area and skate park sites are located adjacent to one another, and it presented an opportunity to achieve economies of scale and more favorable construction bids. Construction bids were solicited in Spring 2024. Only two bids were received. After considering all the information presented, the Town Council rejected both bids at their July 2, 2024, meeting. The Town Council subsequently opted to proceed with re-bidding and constructing the two projects separately. On January 16, 2025, the Town issued a call for bids for CIP B- 560 – Diablo Vista Park Playground Renovation. DISCUSSION Thirteen bids were received and opened on February 18, 2025. The lowest bid was submitted by Suarez and Munoz Construction Inc., of Hayward, California, with a base bid of $1,583,292. Three alternate bid items were also included as a part of the bid package. The bid alternate items included: Award of Construction Contract 2 March 18, 2025 Diablo Vista Park Playground Renovation  Alternate 1 – Play Area Shade Structure  Alternate 2 – Fitness Equipment for Adults and Seniors  Alternate 3 – Boulders Bid results are summarized in Attachment B. The following table summarizes the engineer’s estimate, bid plus contingency costs for the base bid and the three bid alternates: Engineer’s Low 10% Estimate Bid Contingency Total CIP B-560 - Play Area $1,941,258 $1,583,292 $158,329 $1,741,621 Alt. 1-Shade Structure $165,000 $155,000 $15,500 $170,500 Alt. 2-Fitness Equipment $82,874 $86,112 $8,611 $94,723 Alt. 3-Boulders $20,520 $26,500 $2,650 $29,150 Total $2,209,652 $1,850,904 $185,090 $2,035,994 At a special meeting held on March 5, 2025, the Senior Advisory Commission recommended the inclusion of bid alternates 1 and 2 which would provide a shade structure and fitness equipment for active adults and seniors. The commission further recommended allocating previously reserved Senior Services Funds to cover the additional cost plus contingency amounts for both bid alternates. This report recommends awarding the construction contract to Suarez and Munoz Construction Inc., of Hayward, California. The cost for the base project plus bid alternate 1 and bid alternate 2 totals $1,824,404, plus a 10% contingency amount of $182,440 yields a total construction budget of $2,006,844. PUBLIC CONTACT Posting of the meeting agenda serves as notice to the general public. Before construction begins, residents within proximity to the project will be notified by the contractor in writing. In addition, project identification signs will be posted together with changeable message boards. FISCAL IMPACT The low bid amount of $1,583,292 plus bid alternate 1 and bid alternate 2 which includes a shade structure and fitness equipment for adults and seniors in the amount of $241,112, totals $1,824,404, plus a 10% contingency amount of $182,440 yields a total construction budget of $2,006,844. Award of Construction Contract 3 March 18, 2025 Diablo Vista Park Playground Renovation CIP B-560 currently has $1,047,282 available for construction, including $1,000,000 in Local Fiscal Recovery Funds from the American Rescue Plan Act. An additional $959,562 is required to award this contract. The following appropriations and transfers are recommended to fully fund the project and award a contract to Suarez and Munoz Construction Inc. Parkland In Lieu Fees $363,987 Transfer from CIP B-616 $330,352 Senior Services Funds $265,223 $959,562 RECOMMENDATION Adopt Resolution No. 19-2025, awarding a construction contract; and appropriating and transferring funds for the Diablo Vista Park Playground Renovation, CIP B-560. Prepared by: Bob Russell, PLA Landscape Architect Reviewed by: Diane J. Friedmann Development Services Director Attachments: A - Resolution No. 19-2025 B – Bid Results - Diablo Vista Park Playground Renovation C – CIP Page No. B-560 D – CIP Page No. B-616 RESOLUTION NO. 19-2025 AWARDING A CONSTRUCTION CONTRACT; AND APPROPRIATING AND TRANSFERRING FUNDS FOR THE DIABLO VISTA PARK PLAYGROUND RENOVATION, CIP B-560 WHEREAS, the Danville Town Council has previously included Project B-560 - Diablo Vista Park Capital Maintenance, including the Diablo Vista Park Play Area Renovation in the Capital Improvement Program; and WHEREAS, the Town has determined that the project is Categorically Exempt from requirements of the California Environmental Quality Act (CEQA); and WHEREAS, bids were solicited from contractors for the project; and WHEREAS, the City Clerk of this Town did, in open session on the 18th day of February, 2025, publicly open and read aloud the sealed bids received as required by law; and WHEREAS, the low responsive bid was submitted by Suarez and Munoz Construction Inc., of Hayward, California and the City Engineer recommends awarding a construction contract to said contractor, based upon the base bid, bid alternate 1 and bid alternate 2; and WHEREAS, CIP B-560 currently has $1,047,282 available for construction, including $1,000,000 in Local Fiscal Recovery Funds from the American Rescue Plan Act; leaving an additional $959,562 required to award this contract based upon the base bid, bid alternate 1 and bid alternate 2; now, therefore, be it RESOLVED, by the Danville Town Council, that the Town award a construction contract for Diablo Vista Park Play Area Renovation B-560, to Suarez and Munoz Construction Inc., of Hayward, California; and, be it further RESOLVED, by the Danville Town Council, that the Town Manager be and hereby is authorized to execute, on behalf of the Town, a written contract with Suarez and Munoz Construction Inc., of Hayward, California for $1,824,404, and authorize the use of a 10% contingency not to-exceed $182,440 for a total construction budget of $2,006,844 for work in connection therewith, and the City Clerk is hereby directed to attest same and affix thereto the official seal of the Town; and, be it further RESOLVED, that the Danville Town Council hereby appropriates and transfers $959,562 to construct this project, including appropriating $363,987 in Parkland In Lieu Fees, transferring $330,352 from CIP Project B-616 Multi-Sport Skate Park, and transferring $265,223 from Senior Services funds; and be it further Docusign Envelope ID: 68AC43C7-2606-47C5-84A1-A90E9C92ED12 ATTACHMENT A PAGE 2 OF RESOLUTION NO. 19-2025 RESOLVED, that staff shall within five (5) days of the adoption of this resolution, transmit an Extract of Public Works contract award to the Department of Industrial Relations, Division of Apprenticeship Standards, P.O. Box 420603, San Francisco, CA 94142. (Note: Should a finding of any discrepancy regarding this ratio of apprentices to journeymen be made, the Town shall notify the Division of Apprenticeship Standards of such findings.) APPROVED by the Danville Town Council at a regular meeting on March 18, 2025, by the following vote: AYES: NOES: ABSTAINED: ABSENT: ________________________ MAYOR: APPROVED AS TO FORM: ATTEST: _________________________ ________________________ CITY ATTORNEY CITY CLERK Docusign Envelope ID: 68AC43C7-2606-47C5-84A1-A90E9C92ED12 PROJECT: Diablo Vista Park Playground Renovation, Contract No. B-560 BID OPENING: February 18, 2025 at 2:00 p.m. PST Please direct all questions regarding this bid opening to: Bob Russell, PLA, (925) 314-3315, brussell@danville.ca.gov Number of Addendums: 2 OFFICIAL BID RESULTS CONTRACTOR BASE BID ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 *Suarez & Munoz Construction Inc. $1,583,292 $155,000 $86,112 $26,500 Guerra Construction $1,605,660.09 $159,360 $73,928.50 $49,292 GradeTech $1,705,257.87 $154,896.50 $67,579.72 $56,997.80 FrontLine Construction $1,728,661.55 $146,435.35 $146,671.78 $36,963.34 Ella $1,756,816.22 $162,000 $117,769 $23,800 McGuire & Hester $1,855,494 $161,600 $84,068 $25,040 Carone and Company $1,888,881.65 $166,740 $110,743 $102,894 Build Corp. $2,057,000 $142,857 $110,186 $6,100 Calico California $2,211,247.76 $140,000 $86,144 $53,770 Kerex Engineering $2,359,824.50 $220,000 $186,595 $53,000 MVP Construction $2,366,161 $170,535 $94,759 $52,040 S&H Construction $2,398,600 $240,600 $213,140 $60,500 Saboo Inc. $2,545,240 $340,000 $266,030 $131,000 *Lowest Responsive Bid I, Marie Sunseri, City Clerk for the Town of Danville, do hereby affirm that the bids received were not opened prior to the time of the public bid opening. ATTACHMENT B Town of Danville www.danville.ca.gov • CIP 72 Projects DIABLO VISTA PARK CAPITAL MAINTENANCE PROJECT DESCRIPTION AND LOCATION: DESCRIPTION OF MODIFICATIONS: Updated description and added funding for 2028/29. RATIONALE FOR PROPOSED PROJECT: Provide for ongoing repair and replacement.EXPECTED IMPACT ON OPERATING BUDGET:Additional worker hours required to maintain per year:0 Additional Town direct operating costs per year:$0 PROJECT COST ESTIMATE This project has been modified from the previous year. PROJECT APPROPRIATION AND FUNDING This project provides ongoing maintenance of Diablo Vista Park facilities including: Ongoing: Major tree pruning Sports field and pathway lighting repairs Restroom maintenance - painting and repairs Cyclone fence and backstop repairs Fence painting and repairs Safety surface repairs Tennis/basketball court repairs Windscreen repairs/replacement 2023/24 Playground equipment replacement design 2024/25 Playground equipment replacement, project planned in conjunction with Skate Park (B-616) for a combined construction budget of $3.35M Future Projects: Replace field and court lighting with LED ($700,000) Parking lot repairs and resurfacing 5/23/2024PRINTED ON: CIP No:B-560 STATUS:In Design PRIORITY:2/3 PROJECT MANAGER:DC GREEN PROJECT:Yes 2024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalExpenditure Category Capital Maintenance $20,000 $20,000 $20,000 $20,000$1,437,283 $1,537,283$20,000 Construction $0 $0 $0 $0$25,000 $25,000$0 $1,462,283 $20,000 $20,000 $20,000 $20,000 $20,000 $1,562,283Total Cost Estimate: $351,986Total Expenditure:Unexpended: $1,110,296 on 05-01-2024 2024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalFunding Source(s) CIP Gen Purpose Rev $500,000 $0 $0 $0 $0 $500,000$0 LLAD Zone D $26,907 $0 $0 $0 $0 $26,907$0 Park Dedication Impact $0 $20,000 $20,000 $20,000 $20,000 $100,000$20,000 Park Facilities $935,376 $0 $0 $0 $0 $935,376$0 $1,462,283 $20,000 $20,000 $20,000 $20,000 $20,000 $1,562,283Total Funding: www.danville.ca.govCIP109 ATTACHMENT C Town of Danville www.danville.ca.gov • CIP 74 Projects MULTI-SPORT SKATE PARK PROJECT DESCRIPTION AND LOCATION: DESCRIPTION OF MODIFICATIONS: Updated description. RATIONALE FOR PROPOSED PROJECT: Provide recreation facilities for residents.EXPECTED IMPACT ON OPERATING BUDGET:Additional worker hours required to maintain per year:50 Additional Town direct operating costs per year:$5,000 PROJECT COST ESTIMATE This project has been modified from the previous year. PROJECT APPROPRIATION AND FUNDING The Parks, Recreation and Arts Commission recommends this as a high priority parks project. The project is identified in the Parks, Recreation, and Arts Strategic Plan as an important enhancement to the Parks, Recreation, and Arts system. 2018/19: Study for potential locations will include search for a location and a conceptual design. (COMPLETE) 2024/25: Multi-sport skate park construction, planned in conjunction with Diablo Vista Park playground equipment replacement (B- 560) with a combined construction budget of $3.35M 5/23/2024PRINTED ON: CIP No:B-616 STATUS:In Design PRIORITY:1/2 PROJECT MANAGER:HRPGREEN PROJECT:No 2024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalExpenditure Category Study $0 $0 $0 $0$20,000 $20,000$0 Design $0 $0 $0 $0$330,000 $330,000$0 Construction $0 $0 $0 $0$2,170,000 $2,170,000$0 $2,520,000 $0 $0 $0 $0 $0 $2,520,000Total Cost Estimate: $178,020Total Expenditure:Unexpended: $2,341,981 on 05-01-2024 2024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalFunding Source(s) ARPA $2,500,000 $0 $0 $0 $0 $2,500,000$0 CIP Gen Purpose Rev $0 $0 $0 $0 $0 $0$0 Park Facilities $20,000 $0 $0 $0 $0 $20,000$0 $2,520,000 $0 $0 $0 $0 $0 $2,520,000Total Funding: www.danville.ca.govCIP113 ATTACHMENT D