HomeMy WebLinkAbout010825 Item 05.1 Original Town Green Pavilion PlansAPPROVED
RCE
SENIOR CIVIL ENGINEER
NO.
EXPIRES:
DATE APPD REVISION DESIGNED:
Plotted on:
PLANS PREPARED BY:
DRAWN:
CHECKED:
REVIEWED:
DATE:SCALE:
TOWN OF DANVILLE
DATE
TOWN GREEN IMPROVEMENTS
C I P N O . B -6 2 8
C01/05/2024
1/4" = 1'-0"
DTA
Dreiling Terrones Architecture Inc.
Architecture | Infrastructure | Environments
PAVILION FLOOR PLAN
A2.1
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
1/4" = 1'-0"1 Pavilion Floor Plan
6'-11"15'-5"15'-5"6'-11"
14'-6"8'-2"8'-2"
1 2 '-5 "
6 '-7 "
2 4 '-6 "
Dn.
Dn.
Pavillion
Storage
1 9 '-0 "
Concrete stairs
(2) treads 1'-6" ea.
(3) risers, max 7"
Line of Beam abv
Line of Beam abv
L
i
n
e
o
f
B
e
a
m
a
b
v
1 : 2 0
L i n e o f B e a m a b v
20.0 0°
3 '-9 "
3 '-8 "
5 '-0 "
Sloped walkway. refer to
landscape plan
Stucco-clad CMU column
4 '-0 "
R
=
5
1
'
-
5
"
CL CL
2 '-0 "
20.00°
2'-0"
3 '-8 "
2 '-3 "
1 '-6 "
R
=
3
2
'
-
8
"
Concrete finish, integral color
7'-0"
T r u e N
R
e
f
N
APPROVED
RCE
SENIOR CIVIL ENGINEER
NO.
EXPIRES:
DATE APPD REVISION DESIGNED:
Plotted on:
PLANS PREPARED BY:
DRAWN:
CHECKED:
REVIEWED:
DATE:SCALE:
TOWN OF DANVILLE
DATE
TOWN GREEN IMPROVEMENTS
C I P N O . B -6 2 8
C01/05/2024
DTA
Dreiling Terrones Architecture Inc.
Architecture | Infrastructure | Environments
PAVILION ROOF PLAN
A3.1
1/4" = 1'-0"
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
1/4" = 1'-0"1 Pavilion Roof Plan
6'-11"15'-5"15'-5"6'-11"
R i d g e
Metal roof cap, painted
5:12
4 :1 2
4:12 4:12
2 %
Standing seam metal roof, typ.
1 2 '-5 "
6 '-7 "
1 9 '-0 "
DS
DS
DS
DS
GSM gutter, painted typ.
Wood fascia, painted typ.
Roof cricket at 4:12 pitch
Line of beams below, typ.
APPROVED
RCE
SENIOR CIVIL ENGINEER
NO.
EXPIRES:
DATE APPD REVISION DESIGNED:
Plotted on:
PLANS PREPARED BY:
DRAWN:
CHECKED:
REVIEWED:
DATE:SCALE:
TOWN OF DANVILLE
DATE
TOWN GREEN IMPROVEMENTS
C I P N O . B -6 2 8
C01/05/2024
DTA
Dreiling Terrones Architecture Inc.
Architecture | Infrastructure | Environments
PAVILION EXTERIOR
ELEVATIONS
A4.1
1/4" = 1'-0"
1/4" = 1'-0"1 Exterior Elevation : Front
T.O Column
12'-0"
T.O Column
8'-6"
F.F
0'-0"
12
5
1 2 3 4 5
Downspout Chain anchored at
bottom in planting area, typ.
GSM Gutter, painted typ.
Wood rafters, stained typ.
Steel Beam painted, typ
Concrete stairs
Stucco-clad CMU column, typ.
T.O CMU Wall
20'-0"
Stone cap
CMU wall, split-face finish w/
integral color, typ.
1/4" = 1'-0"2 Exterior Elevation : Right
T.O Column
12'-0"
T.O Column
8'-6"
F.F
0'-0"
12
4
Downspout Chain anchored at
bottom in planting area, typ.
GSM Gutter, painted
ABC
Sloped walking path, refer to
Landscape plans
Standing seam metal roof
Metal sloped roof cap
Steel beam, painted typ.
Steel ridge beam, painted typ.
Stucco-clad CMU column, typ.
CMU wall, split-face finish w/
integral color, typ.
Stone cap
T.O CMU Wall
20'-0"
Roof cricket, ref A3.1 Roof Plan
APPROVED
RCE
SENIOR CIVIL ENGINEER
NO.
EXPIRES:
DATE APPD REVISION DESIGNED:
Plotted on:
PLANS PREPARED BY:
DRAWN:
CHECKED:
REVIEWED:
DATE:SCALE:
TOWN OF DANVILLE
DATE
TOWN GREEN IMPROVEMENTS
C I P N O . B -6 2 8
C01/05/2024
1/4" = 1'-0"
DTA
Dreiling Terrones Architecture Inc.
Architecture | Infrastructure | Environments
PAVILION EXTERIOR
ELEVATIONS
A4.2
1/4" = 1'-0"1 Exterior Elevation : Rear
T.O Column
12'-0"
T.O Column
8'-6"
F.F
0'-0"
12
5
Downspout Chain anchored at
bottom in planting area, typ.
GSM Gutter, painted, typ.
Aluminum clad wood doors, typ.
Standing seam metal roof, typ.
Metal sloped roof cap
12345
Steel beam painted, typ
Stucco-clad CMU collumn, typ.
CMU wall split-face finish, w/
integral color, typ.
T.O CMU Wall
20'-0"
1/4" = 1'-0"2 Exterior Elevation : Left
T.O Column
12'-0"
T.O Column
8'-6"
F.F
0'-0"
12
4
Downspout Chain anchored at
bottom in planting area, typ.
GSM Gutter, painted
Sloped walking path refer to
Landscape plans
Steel ridge beam, painted, typ.
Metal sloped roof cap
A B C
Standing seam metal roof
Steel beam, painted, typ.
Stucco-clad CMU column, typ.
T.O CMU Wall
20'-0"
Roof cricket, ref. A3.1 Roof Plan
CMU wall split-face finish, w/
integral color, typ.
APPROVED
RCE
SENIOR CIVIL ENGINEER
NO.
EXPIRES:
DATE APPD REVISION DESIGNED:
Plotted on:
PLANS PREPARED BY:
DRAWN:
CHECKED:
REVIEWED:
DATE:SCALE:
TOWN OF DANVILLE
DATE
TOWN GREEN IMPROVEMENTS
C I P N O . B -6 2 8
C01/05/2024
1/4" = 1'-0"
DTA
Dreiling Terrones Architecture Inc.
Architecture | Infrastructure | Environments
PAVILION FOUNDATION
PLAN
S2.1
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
1/4" = 1'-0"1 Pavilion Foundation Plan
Pavillion
Storage
Line of Beam abv
Line of Beam abv
20.0 0°
2 '-0 "
20.00°
2'-0"
5" Conc. slab w/ #4 bars @ 12" O.C ea.
way o/ vapor barrier (conforming to
ASTME A45 class C) o/ 6" crushed rock
Posts & Beams above, ref Roof Framing
Plan, typ.
Line of concrete footing below, typ.
T r u e N
R
e
f
N
APPROVED
RCE
SENIOR CIVIL ENGINEER
NO.
EXPIRES:
DATE APPD REVISION DESIGNED:
Plotted on:
PLANS PREPARED BY:
DRAWN:
CHECKED:
REVIEWED:
DATE:SCALE:
TOWN OF DANVILLE
DATE
TOWN GREEN IMPROVEMENTS
C I P N O . B -6 2 8
C01/05/2024
1/4" = 1'-0"
DTA
Dreiling Terrones Architecture Inc.
Architecture | Infrastructure | Environments
PAVILION ROOF FRAMING
PLAN
S2.2
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
1/4" = 1'-0"1 Pavilion Roof Framing Plan
H S S B e a m
HSS Beam
2 x 8 F a s c i a
Roof rafters @
24" o.c typ.
Ledger
HSS King Post
Roof rafters @
24" o.c typ.
HSS Beam
Ledger
Ledger Ledger
H S S R i d g e B e a m
HGR, typ.
2x8 Fascia 2 x 8 F a s c i a
H
S
S
B
e
a
m
2
x
8
F
a
s
c
i
a
2x8 Fascia
CMU wing walls below
HSS post, typ.
Skewed hangers for
rafters to fascia where
occurs
HSS King Post
CMU walls
through roof
T r u e N
R
e
f
N