HomeMy WebLinkAbout090324-05.5 STUDY ADMINISTRATIVE STAFF REPORT 5.5 TO: Mayor and Town Council September 3, 2024 SUBJECT: Resolution No. 64-2024, re-allocating Coronavirus Local Fiscal Recovery Funds awarded to the Town of Danville under the American Rescue Plan Act of 2021 for specified Capital Improvement Projects BACKGROUND On March 11, 2021, the President signed the American Rescue Plan Act of 2021 (ARPA). The ARPA provides $1.9 trillion in relief funding intended to speed up the United States' recovery from the economic and health effects of the Coronavirus pandemic. Under the ARPA, Danville received a total of $10,647,738 in Coronavirus Local Fiscal Recovery Funds. Use of these funds is guided by Section 603(c)(1) (a) – (d) of the ARPA. The ARPA includes specific timing and financial reporting requirements. All Coronavirus Local Fiscal Recovery Funds must be obligated by December 31, 2024, and expended by December 31, 2026. At its October 5, 2021, public meeting, the Town Council adopted Resolution No. 64-2021, reserving and appropriating Coronavirus Local Fiscal Recovery Funds received under the American Rescue Plan Act of 2021 (“ARPA funds”) to a broad spectrum of programs, partnerships, and capital projects with the intent of speeding up Danville’s recovery from the effects of the Coronavirus pandemic. Distributing ARPA funds to service programs and community partners within the federal framework requires limited staff administration. However, the need to obligate and expend ARPA funds for selected capital projects within the strict federal timeline requires careful planning and timely delivery, given the Town’s limited project management resources and project complexities. Attachment B illustrates the Town’s current allocation of Coronavirus Local Fiscal Recovery Funds. This includes four Capital Improvement Projects: CIP A-362, Downtown Improvement Project, CIP B-616, Multi-Sport Skate Park, CIP B-626, Town Office Relocation and CIP B-629, Front Street Arts District Maker Space. Projects B-626 and B-629 have been completed. Re-allocating ARPA Funds 2 September 3, 2024 DISCUSSION Most current project timelines have raised concerns regarding the Town’s ability to complete CIP Project B-616, Multi-Sport Skate Park within the strict federal timeline prescribed by the ARPA. Therefore, it is appropriate to re-allocate the ARPA funds previously appropriated for CIP Project B-616 to other qualified projects which will be completed prior to December 31, 2026. This can be accomplished by amending funding appropriations for four capital projects as described below. These changes will amend the funding sources for each of the four projects. The total funding appropriated for each of the projects remains unchanged. •Project A-362 - Downtown Improvement Project – Reduce CIP General Purpose funding by $1,000,000; increase ARPA funding by $1,000,000. Total ARPA funding appropriated for this project is increased from $3,750,000 to $4,750,000. •Project A-620 - Fiber Optic Cable Interconnect - Reduce CIP General Purpose funding by $500,000; increase ARPA funding by $500,000. Total ARPA funding appropriated for this project is increased from $0 to $500,000. •Project B-560 - Diablo Vista Park Capital Maintenance (replace Children’s Play Area) - Reduce CIP General Purpose funding by $500,000; reduce Park Facilities funding by $500,000; increase ARPA funding by $1,000,000. Total ARPA funding appropriated for this project is increased from $0 to $1,000,000. •Project B-616 - Multi-Sport Skate Park - Reduce ARPA funding by $2,500,000; increase CIP General Purpose Funding by $2,500,000. Total ARPA funding appropriated for this project is reduced from $2,500,000 to $0. PUBLIC CONTACT Posting of the meeting agenda serves as notice to the general public. FISCAL IMPACT None. The total funding appropriated for CIP Projects A-362, A-620, B-560 and B-616 is unchanged as a result of the recommended re-allocation of ARPA funds. Re-allocating ARPA Funds 3 September 3, 2024 RECOMMENDATION Adopt Resolution No. 64-2024, re-allocating Coronavirus Local Fiscal Recovery Funds awarded to the Town of Danville under the American Rescue Plan Act of 2021 for specified Capital Improvement Projects. Prepared by: Joseph A. Calabrigo Town Manager Lani Ha Finance Director/Treasurer Attachments: A – Resolution No. 64-2024 B – Amended Allocation of Coronavirus Local Fiscal Recovery Funds C - Revised Funding Appropriations for CIP Projects A-362, A-620, B-560 and B-616 D – Revised CIP pages for CIP Projects A-362, A-620, B-560 and B-616 RESOLUTION NO. 64-2024 RE-ALLOCATING CORONAVIRUS LOCAL FISCAL RECOVERY FUNDS AWARDED TO THE TOWN OF DANVILLE UNDER THE AMERICAN RESCUE PLAN ACT OF 2021 FOR SPECIFIED CAPITAL IMPROVEMENT PROJECTS WHEREAS, on March 11, 2021, the President of the United States signed the American Rescue Plan Act of 2021 (ARPA); and WHEREAS, the ARPA provides $1.9 trillion in relief funding intended to speed up the United States' recovery from the economic and health effects of the Coronavirus pandemic; and WHEREAS, Section 9901 of the ARPA amended Title VI of the Social Security Act to add Section 603, which establishes the Coronavirus Local Fiscal Recovery (Recovery) Fund; and WHEREAS, Recovery Funds are intended to provide support to state local and tribal governments in responding to the impact of COVID-19 and in their efforts to contain COVID-19 on their communities, residents and businesses; and WHEREAS, under the ARPA, Danville was awarded $10,647,738 in Recovery Funds; and WHEREAS, Section 603(c)(1) of the ARPA provides that Recovery Funds may be used: a)To respond to the public health emergency or its negative economic impacts, including assistance to households, small businesses, and nonprofits, or aid to impacted industries such as tourism, travel, and hospitality. b)To respond to workers performing essential work during the COVID-19 public health emergency by providing premium pay to eligible workers. c)For the provision of government services to the extent of the reduction in revenue due to the COVID–19 public health emergency relative to revenues collected in the most recent full fiscal year prior to the emergency. d)To make necessary investments in water, sewer, or broadband infrastructure; and WHEREAS, pursuant to Section 603(c)(1) c), recipients may use funds for the direct provision of government services to citizens, to the extent of reduction in revenue; including, but not limited to, maintenance of infrastructure or pay-go spending for building new infrastructure, including roads; modernization of cybersecurity, including hardware, software, and protection of critical infrastructure; health services; environmental remediation; school or educational services; and the provision of police, fire, and other public safety services; and WHEREAS, the Danville Town Council has determined that Recovery Funds awarded to Danville should be expended to support programs, partnerships and projects that will speed up the Town’s recovery from the economic and health effects of the Coronavirus Docusign Envelope ID: 2B53CB20-B7C4-4BC1-9DA1-07FA7B198C22 ATTACHMENT A PAGE 2 OF RESOLUTION NO. 64-2024 pandemic while providing the broadest possible community benefit, including $9,707,738 for infrastructure improvements that support economic recovery and revitalization, and benefit the broader community; and WHEREAS, all Recovery Funds must be obligated by December 31, 2024, and expended by December 31, 2026; and WHEREAS, most current project timelines have called into question the Town’s ability to complete CIP Project B-616, Multi-Sport Skate Park within the completion timeline prescribed by the ARPA; now, therefore be it RESOLVED, that the Danville Town Council hereby amends the funding appropriations for the following four capital projects, in order to obligate and expend all Recovery Funds in accordance with timelines specified under the American Rescue Plan Act of 2021: •Project A-362 - Downtown Improvement Project – Reduce CIP General Purpose funding by $1,000,000; increase ARPA funding by $1,000,000. •Project A-620 - Fiber Optic Cable Interconnect - Reduce CIP General Purpose funding by $500,000; increase ARPA funding by $500,000. •Project B-560 - Diablo Vista Park Capital Maintenance (replace Children’s Play Area) - Reduce CIP General Purpose funding by $500,000; reduce Park Facilities funding by $500,000; increase ARPA funding by $1,000,000. •Project B-616 - Multi-Sport Skate Park - Reduce ARPA funding by $2,500,000; increase CIP General Purpose Funding by $2,500,000; and, be it further RESOLVED, that the Danville Town Council finds that such use of Coronavirus Local Fiscal Recovery Funds is consistent with and meets all requirements described in section 603(c)(1) of the American Rescue Plan Act of 2021. APPROVED by the Danville Town Council at a regular meeting held on September 3, 2024, by the following vote: AYES: NOES: ABSTAINED: ABSENT: MAYOR APPROVED AS TO FORM: ATTEST: CITY ATTORNEY CITY CLERK Docusign Envelope ID: 2B53CB20-B7C4-4BC1-9DA1-07FA7B198C22 ATTACHMENT B AMERICAN RESCUE PLAN ACT OF 2021 (ARPA) AMENDED Allocation of Coronavirus Local Fiscal Recovery Funds (CLFRF) Total CLFRF Received - $10,647,738 Current CLFRF REVISED CLFRFAllocationAllocation CAPITAL IMPROVEMENT PROGRAM A-362 Downtown Improvement Project $3,750,000 $4,750,000 A-620 Fiberoptic Cable Interconnect $0 $500,000 B-560 Diablo Vista Park Capital Maintenance (children's play area)$0 $1,000,000 B-616 Multi-Sport Skate Park $2,500,000 $0 B-626 Town Office Relocation $2,857,738 $2,857,738 B-629 Front St. Arts District Maker Space $600,000 $600,000 Sub-Total CIP $9,707,738 $9,707,738 PARTNERSHIPS Danville Area Chamber of Commerce $150,000 $150,000 Discovery Counseling Center $100,000 $100,000 Meals on Wheels - Diablo Region $100,000 $100,000 Danville Library Foundation $100,000 $100,000 Friends of the Danville Library $100,000 $100,000 Museum of the San Ramon Valley $100,000 $100,000 San Ramon Valley Education Foundation $100,000 $100,000 Down Syndrome Connection $100,000 $100,000 Eugene O'Neill Foundation $50,000 $50,000 $900,000 $900,000 ADMINISTRATION $40,000 $40,000 TOTAL $10,647,738 $10,647,738 ATTACHMENT B REVISED FUNDING APPROPRIATIONS - ARPA/General Fund/Miscellaneous Funds ATTACHMENT C CIP PROJECTS A-362, A-620, B-560 & B-616 CURRENT APPROPRIATIONS A-362 A-620 B-560 B-616 Downtown Fiber Optic Diablo Vista Improvement Cable Park Capital Multi-Sport Funding Source Project Interconnect Maintenance Skate Park Total CIP General Purpose 1,981,420$ 1,000,000$ 500,000$ 3,481,420$ Emergency Reserve Fund (GP)963,621$ 963,621$ HSIP Grant 107,910$ 107,910$ LLAD Zone C 150,000$ 150,000$ LLAD Zone D 26,907$ 26,907$ Park Dedication Impact 20,000$ 20,000$ Park Facilities 935,376$ 20,000$ 955,376$ ARPA 3,750,000$ 2,500,000$ 6,250,000$ P.E.G.280,000$ 280,000$ State Community Grant 500,000$ 500,000$ TOTAL APPROPRIATION 6,952,951$ 1,780,000$ 1,482,283$ 2,520,000$ 12,735,234$ REVISED APPROPRIATIONS A-362 A-620 B-560 B-616 Downtown Fiber Optic Diablo Vista Improvement Cable Park Capital Multi-Sport Funding Source Project Interconnect Maintenance Skate Park Total CIP General Purpose 981,420$ 500,000$ $0 2,000,000$ 3,481,420$ Emergency Reserve Fund (GP)963,621$ 963,621$ HSIP Grant 107,910$ 107,910$ LLAD Zone C 150,000$ 150,000$ LLAD Zone D 26,907$ 26,907$ Park Dedication Impact 20,000$ 20,000$ Park Facilities 435,376$ 520,000$ 955,376$ ARPA 4,750,000$ 500,000$ 1,000,000$ $0 6,250,000$ P.E.G.280,000$ 280,000$ State Community Grant 500,000$ 500,000$ TOTAL APPROPRIATION 6,952,951$ 1,780,000$ 1,482,283$ 2,520,000$ 12,735,234$ ATTACHMENT C ProjectsDOWNTOWN IMPROVEMENT PROJECT PROJECT DESCRIPTION AND LOCATION: DESCRIPTION OF MODIFICATIONS:Updated project funding and description.RATIONALE FOR PROPOSED PROJECT:Enhance the Downtown experience.EXPECTED IMPACT ON OPERATING BUDGET:Additional worker hours required to maintain per year:0Additional Town direct operating costs per year:$0 PROJECT COST ESTIMATEThis project has been modified from the previous year.PROJECT APPROPRIATION AND FUNDINGThe intent of the Danville Downtown Master Plan Update is to carry the vision of the original Downtown Master Plan (adopted in 1986) forward while adapting to community needs including a desire for more gathering spaces, stronger connections to and through the downtown, enhanced pedestrian safety and opportunities to play, recreate, celebrate and appreciate art and culture. The Downtown Master Plan was adopted by Town Council on September 6,2022.Project 1 - DMP Catalyst Project Design Concept Phase (COMPLETE)Project 2 - DMP Catalyst Project Construction Design (COMPLETE)Project 3 - Construction Phase (Ongoing)HSIP grant has been secured to partially fund the project.2023: ARPA funds transferred from B-626: $500k 2024: ARPA funds transferred from B-616: $1.0M CIP General Purpose Rev funds transferred to B-616: $1.0M8/19/2024PRINTED ON: CIP No:A-362STATUS:In ConstructionPRIORITY:1PROJECT MANAGER:DC GREEN PROJECT:Yes2024/25Prior Years2025/262026/272027/282028/29TotalExpenditure CategoryDesign/Plan Review$0$0$0$0$896,000$896,000$0Construction$0$0$0$0$5,949,601$5,949,601$0Inspection & Admin.$0$0$0$0$107,350$107,350$0$6,952,951$0$0$0$0$0$6,952,951Total Cost Estimate:$6,906,038Total Expenditure: Unexpended: $46,914 on 05-01-20242024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalFunding Source(s)ARPA$4,750,000$0$0$0$0$4,750,000$0CIP Gen Purpose Rev$981,420$0$0$0$0$981,420$0Emergency Resrv Fund$963,621$0$0$0$0$963,621$0HSIP Grant$107,910$0$0$0$0$107,910$0LLAD Zone C$150,000$0$0$0$0$150,000$0$6,952,951$0 $0 $0 $0 $0 $6,952,951Total Funding:www.danville.ca.govCIP34ATTACHMENT D ProjectsFIBER OPTIC CABLE INTERCONNECT PROJECT DESCRIPTION AND LOCATION: DESCRIPTION OF MODIFICATIONS:Updated funding and description.RATIONALE FOR PROPOSED PROJECT:Provide PEG services at Town facilities.EXPECTED IMPACT ON OPERATING BUDGET:Additional worker hours required to maintain per year:0Additional Town direct operating costs per year:$0 PROJECT COST ESTIMATEThis project has been modified from the previous year.PROJECT APPROPRIATION AND FUNDINGThis project will provide a fiber optic interconnect network for the various Town facilities. It will facilitate the transfer of data, video, audio, and internet connectivity to give the town facilities the capability to provide Public - Educational - Governmental (PEG) services to the community at large. The use of existing traffic signal conduit as well as the construction of new conduit is included in the project.2021/22: Fiber Optic Master Plan (Complete)2022/23: Funding Plan (Complete)2024/25: Begin Design Phase2024: ARPA funds transferred from B-616: $500K CIP General Purpose Rev funds transferred to B-616: $500K8/19/2024PRINTED ON: CIP No:A-620STATUS:In DesignPRIORITY:2PROJECT MANAGER:AD GREEN PROJECT:No2024/25Prior Years2025/262026/272027/282028/29TotalExpenditure CategoryDesign/Plan Review$0$0$0$0$50,000$50,000$0Construction$0$0$0$0$1,700,000$1,700,000$0Inspection & Admin.$0$0$0$0$30,000$30,000$0$1,780,000$0$0$0$0$0$1,780,000Total Cost Estimate:$144,381Total Expenditure: Unexpended: $1,635,619 on 05-01-20242024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalFunding Source(s)ARPA$500,000$0$0$0$0$500,000$0CIP Gen Purpose Rev$500,000$0$0$0$0$500,000$0P.E.G.$280,000$0$0$0$0$280,000$0State Community Grant$500,000$0$0$0$0$500,000$0$1,780,000$0 $0 $0 $0 $0 $1,780,000Total Funding:www.danville.ca.govCIP49 ProjectsDIABLO VISTA PARK CAPITAL MAINTENANCE PROJECT DESCRIPTION AND LOCATION: DESCRIPTION OF MODIFICATIONS:Updated description and added funding for 2028/29.RATIONALE FOR PROPOSED PROJECT:Provide for ongoing repair and replacement.EXPECTED IMPACT ON OPERATING BUDGET:Additional worker hours required to maintain per year:0Additional Town direct operating costs per year:$0 PROJECT COST ESTIMATEThis project has been modified from the previous year.PROJECT APPROPRIATION AND FUNDINGThis project provides ongoing maintenance of Diablo Vista Park facilities including: Ongoing: Major tree pruning Sports field and pathway lighting repairs Restroom maintenance - painting and repairs Cyclone fence and backstop repairs Fence painting and repairs Safety surface repairs Tennis/basketball court repairs Windscreen repairs/replacement2023/24 Playground equipment replacement design2024/25 Playground equipment replacement construction2024: ARPA funds transferred from B-616: $1.0M CIP General Purpose Rev funds transferred to B-616: $500K Park Facilities funds transferred to B-616: $500K8/19/2024PRINTED ON: CIP No:B-560STATUS:In DesignPRIORITY:2/3PROJECT MANAGER:DC GREEN PROJECT:Yes2024/25Prior Years2025/262026/272027/282028/29TotalExpenditure CategoryCapital Maintenance$20,000$20,000$20,000$20,000$1,437,283$1,537,283$20,000Construction$0$0$0$0$25,000$25,000$0$1,462,283$20,000$20,000$20,000$20,000$20,000$1,562,283Total Cost Estimate:$351,986Total Expenditure: Unexpended: $1,110,296 on 05-01-20242024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalFunding Source(s)ARPA$1,000,000$0$0$0$0$1,000,000$0CIP Gen Purpose Rev$0$0$0$0$0$0$0LLAD Zone D$26,907$0$0$0$0$26,907$0Park Dedication Impact$0$20,000$20,000$20,000$20,000$100,000$20,000Park Facilities$435,376$0$0$0$0$435,376$0$1,462,283 $20,000 $20,000 $20,000 $20,000 $20,000 $1,562,283Total Funding:www.danville.ca.govCIP72 ProjectsMULTI-SPORT SKATE PARK PROJECT DESCRIPTION AND LOCATION: DESCRIPTION OF MODIFICATIONS:Updated description.RATIONALE FOR PROPOSED PROJECT:Provide recreation facilities for residents.EXPECTED IMPACT ON OPERATING BUDGET:Additional worker hours required to maintain per year:50Additional Town direct operating costs per year:$5,000 PROJECT COST ESTIMATEThis project has been modified from the previous year.PROJECT APPROPRIATION AND FUNDINGThe Parks, Recreation and Arts Commission recommends this as a high priority parks project. The project is identified in the Parks, Recreation, and Arts Strategic Plan as an important enhancement to the Parks, Recreation, and Arts system.2018/19: Study for potential locations will include search for a location and a conceptual design. (COMPLETE)2024/25: Multi-sport skate park construction2024: ARPA funds transferred to A-362: $1.0M ARPA funds transferred to A-620: $500K ARPA funds transferred to B-560: $1.0M CIP General Purpose Rev funds transferred from A-362: $1.0M CIP General Purpose Rev funds transferred from A-620: $500K CIP General Purpose Rev funds transferred from B-560: $500K Park Facilities funds transferred from B-560: $500K8/19/2024PRINTED ON: CIP No:B-616STATUS:In DesignPRIORITY:1PROJECT MANAGER:HRPGREEN PROJECT:No2024/25Prior Years2025/262026/272027/282028/29TotalExpenditure CategoryStudy$0$0$0$0$20,000$20,000$0Design$0$0$0$0$330,000$330,000$0Construction$0$0$0$0$2,170,000$2,170,000$0$2,520,000$0$0$0$0$0$2,520,000Total Cost Estimate:$178,020Total Expenditure: Unexpended: $2,341,981 on 05-01-20242024/25Prior Years 2025/26 2026/27 2027/28 2028/29 TotalFunding Source(s)ARPA$0$0$0$0$0$0$0CIP Gen Purpose Rev$2,000,000$0$0$0$0$2,000,000$0Park Facilities$520,000$0$0$0$0$520,000$0$2,520,000$0 $0 $0 $0 $0 $2,520,000Total Funding:www.danville.ca.govCIP74