HomeMy WebLinkAbout071624-06.7ADMINISTRATIVE STAFF REPORT 6*7 TO: Mayor and Town Council July 16, 2024 SUBJECT: Resolution No. 56-2024, awarding a professional services agreement and transferring funds from CIP No. C-593 Front Street Creek Bank Stabilization to CIP No. A-330 Town -wide Storm Drain System Management BACKGROUND In October 2022, the Town completed the first phase of the Storm Drainage Master Plan which included inspections and condition assessments for approximately 15% of the Town's stormwater network. This initial phase also identified six locations in need of repair. The 2024/25 Capital Improvement Program (CIP) includes a project to perform a second phase of the Storm Drainage Master Plan to inventory, inspect, and perform condition assessments of an additional 75% of the stormwater conveyance system (pipes and inlets) throughout the Town. The project also proposes to complete the design of the six locations in need of repair. DISCUSSION On May 31, 2024, Wood Rodgers of Oakland, CA submitted a proposal to complete the second phase of the Storm Drainage Master Plan. Wood Rodgers served as the consultant for the initial phase. The work is scheduled to begin in late summer 2024 and be completed in mid -2025. PUBLIC CONTACT Posting of the meeting agenda serves as notice to the general public. FISCAL IMPACT The amount for the design contract is $368,910. An additional 10% design contingency in the amount of $37,000 will be reserved for a total design budget of $405,910. A transfer from CIP C-593 Front Street Creek Bank Stabilization in the amount of $552,459 is needed to fully fund the project. A Notice of Completion for the Front Street Creek Bank Stabilization project was approved on February 20, 2024. RECOMMENDATION Adopt Resolution No. 56-2024, awarding a professional services agreement and transferring funds from CIP No. C-593 Front Street Creek Bank Stabilization to CIP No. A-330 Town -wide Storm Drain System Management. Prepared by: Steven Jones City Engineer Reviewed by: Diane J. Friedmann Development Services Director Attachments: A - Resolution No. 56-2024 B - CIP Page No. A-330 C - CIP Page No. C-593 Town -wide Storm Drainage 2 July 16, 2024 Master Plan - Phase 2 (CIP No. A-330) Docusign Envelope ID: 88FA45B5-03D5-47A1-8251-50029C7A2E3F RESOLUTION NO. 56-2024 AWARDING A PROFESSIONAL SERVICES AGREEMENT AND TRANSFERRING FUNDS FROM CIP NO. C-593 FRONT STREET CREEK BANK STABILIZATION TO CIP NO. A-330 TOWN -WIDE STORM DRAIN SYSTEM MANAGEMENT WHEREAS, the Town previously completed phase one of the Town -wide Storm Drainage Master Plan, which included inspections and condition assessments covering approximately fifteen percent of the Town's stormwater network; and WHEREAS, the Danville Town Council previously appropriated funding for the Town - wide Storm Drain System Management, CIP No. A-330, in the adopted 2024/25 Capital Improvement Program that includes completing the second phase of the Town -wide Storm Drainage Master Plan; and WHEREAS, the Town desires to hire Wood Rodgers of Oakland, CA to continue with the implementation of phase two of the Town -wide Storm Drainage Master Plan; now, therefore, be it RESOLVED, by the Danville Town Council, that funds in the amount of $552,459 be transferred from Front Street Creek Bank Stabilization (CIP C-593) to Town -wide Storm Drain System Management (CIP A-330) to fund the design phase of the project; and, be it further RESOLVED, by the Danville Town Council that the Town Manager be and hereby is authorized to execute on behalf of the Town, the Professional Services Agreement with Wood Rodgers of Oakland, CA with a not -to -exceed budget of $368,910, and that the Town Manager be authorized to establish and utilize a 10% design contingency in the amount of $37,000 for additional work that may be subsequently approved by contract amendment. ATTACHMENT A Docusign Envelope ID: 88FA45B5-03D5-47A1-8251-50029C7A2E3F APPROVED by the Danville Town Council at a regular meeting on July 16, 2024, by the following vote: AYES: NOES: ABSTAINED: ABSENT: MAYOR APPROVED AS TO FORM: ATTEST: DocuSigneed by: Ep-a• Gt(/0.5 40ADBF4BF CITY ATTORNEY CITY CLERK PAGE 2 OF RESOLUTION NO. 56-2024 TOWN -WIDE STORM DRAIN SYSTEM MANAGEMENT CIP No: A-330 STATUS: In Design GREEN PROJECT:Yes I PRIORITY: 1 Ongoing PROJECT MANAGER: 51 r A-330 r PROJECT DESCRIPTION AND LOCATION: r This project provides for ongoing capital replacement and maintenance of the Town -wide drainage system. Project includes drainage improvements and maintenance for areas identified in the Storm Drainage Master Plan. 4 PROJECT COST ESTIMATE Expenditure Category Prior Years Design/Plan Review $236,742 Construction $3,980,714 Inspection & Admin. $34,979 Transfer ($165,000) Total Cost Estimate: $4,087,435 Total Expenditure: $4,014,834 2023/24 Diablo Road Culvert Replacement (Complete) Vista Grande Drainage Improvements (Complete) Van Patten Drainage Improvements (Complete) East Linda Mesa Storm Drain Replacement (Complete) 2024/25 Perform second phase of the Storm Drainage Master Plan Future Projects: Begin design phase for projects identified in first phase of the Storm Drainage Master Plan Lomitas Drive Storm Drain Replacement Stetson Drive Drainage Improvements EI Rincon Rd Drainage Improvements Gil Blas Rd Drainage Improvements DESCRIPTION OF MODIFICATIONS: Updated description and added funding. ................................................................................. Funding Source(s) Prior Years 2024/25 PRINTED ON;. .... 5/23/2024.............. 2024/25 2025/26 2026/27 2027/28 2028/29 Total $250,000 $0 $0 $0 $0 $486,742 $0 $100,000 $100,000 $100,000 $100,000 $4,380,714 $0 $0 $0 $0 $0 $34,979 $0 $0 $0 $0 $0 ($165,000) $250,000 $100,000 $100,000 $100,000 $100,000 $4,737,435 Unexpended: $72,601 on 05-01-2024 .PROIEGT.APPROPRIAIIO.N. AND.FUNDIN.G.......................................................................................... Funding Source(s) Prior Years 2024/25 2025/26 2026/27 2027/28 2028/29 Total CIP Gen Purpose Rev $3,346,305 $245,000 $95,000 $95,000 $95,000 $95,000 $3,971,305 Cleanwater Program $658,000 $5,000 $5,000 $5,000 $5,000 $5,000 $683,000 Developer Contribution $83,130 $0 $0 $0 $0 $0 $83,130 Total Funding: $4,087,435 $250,000 $100,000 $100,000 $100,000 $100,000 $4,737,435 RATIONALE FOR PROPOSED PROJECT: EXPECTED IMPACT ON OPERATING BUDGET: Maintenance of the existing storm drain system is needed on an Additional worker hours required to maintain per year: 0 ongoing basis. Additional Town direct operating costs per year: $0 ATTACHMENT B FRONT STREET CREEK BANK STABILIZATION CIP No: C-593 I STATUS: In Construction I GREEN PROJECT:Yes I PRIORITY: 1/2 1 PROJECT MANAGER: 5J PROJECT DESCRIPTION AND LOCATION: Provide a feasibility study, design, and construction of a retaining wall on Front Street north of Diablo Road. Work includes retaining walls, curb, gutter, street work, and creek bank slope protection. Construction for the slope repair was completed in 2023. Ongoing monitoring as required for environmental permitting. DESCRIPTION OF MODIFICATIONS: Updated description. PROJECT COST ESTIMATE ......................................................................................................................................................................... PRINTED ON: 5/23/2024. Expenditure Category Prior Years 2024/25 2025/26 2026/27 2027/28 2028/29 Total Design/Plan Review $202,400 $0 $0 $0 $0 $0 $202,400 Construction $2,765,925 $0 $0 $0 $0 $0 $2,765,925 Total Cost Estimate: $2,968,325 $0 $0 $0 $0 $0 $2,968,325 Total Expenditure: $2,907,131 Unexpended: $61,194 on 5-01-2024 .PROIEGT.APPROPRIAIIO.N. AND.FUNDIN.G.......................................................................................... Funding Source(s) Prior Years 2024/25 2025/26 2026/27 2027/28 2028/29 Total CIP Gen Purpose Rev $2,968,325 $0 $0 $0 $0 $0 $2,968,325 Total Funding: $2,968,325 $0 $0 $0 $0 $0 $2,968,325 RATIONALE FOR PROPOSED PROJECT: Existing slope failure. EXPECTED IMPACT ON OPERATING BUDGET: Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0 ATTACHMENT C