Loading...
HomeMy WebLinkAboutSummaryDRB20240516 4.1Design Review Board Meeting Summary May 16, 2024 - DRAFT 1. CALL TO ORDER The regular meeting of the Danville Design Review Board was called to order at 5:00 p.m., at the Town Offices, 500 La Gonda Way, Danville, CA Board Attendance: Mark Belotz Alt., Robert Combs, Lou Palandrani, Kevin Wong Absent: Afshan Hamid, Chris Trujillo Staff Attendance: Riley Anderson -Barrett 2. CHANGES TO THE ORDER OF THE AGENDA - None 3. FOR THE GOOD OF THE TOWN - None 4. ITEMS FOR CONSIDERATION/ACTION 4.1 Consider approval of the Meeting Summary from the Design Review Board regular meeting of February 15, 2024 Board Member Belotz made a motion to approve the meeting summary which was seconded by Chair Wong. Motion carried 4-0-0-2 5. DESIGN REVIEW ITEMS 5.1 Review and approve final building permit plans for previously approved Development Plan (DEV21-0003) allowing the redevelopment of the property located at 344 Diablo Road with a new 22,847 square foot self -storage building (Project Planner: Riley Anderson -Barrett). Riley Anderson -Barrett, Associate Planner, introduced the project and presented the staff report. Design Review Board Meeting Summary May 16, 2024 Page 2 Chris Koenig, Applicant, presented the project and answered questions from Design Review Board Members. Board Member Combs commented that the future signs should avoid being too conspicuous and shall require future approval from the DRB. Board Members asked questions about trees and any additional changes to the project. Decision: Board Member Combs made a motion to approve the project, which was seconded by Board Member Belotz. Motion carried 4-0-0-2 5.2 Review and approve Development Plan request DEV24-0007 to allow the construction of a patio cover for Pete's Brass Rail located at 201 Hartz Ave (Project Planner: Riley Anderson -Barrett). Riley Anderson -Barrett, Associate Planner, introduced the project and presented the staff report. Ron Abbes, Applicant, presented the project and answered questions from Design Review Board Members. Vice Chair Palandrani asked questions about the proposed dark brown paint color. Board Member Belotz and Combs discussed putting a cover on the structure during winter months and adding more permanent features to protect the structure. Board Members commented that the paint color should be lighter to match the building body or trim, the paint on the building is encouraged to be updated or repainted, and the paint colors should be revisited either through staff member coordination or with a site visit to review swatches. Decision: Vice Chair Palandrani made a motion to approve the project with the caveat that paint colors would be reviewed at a future date, which was seconded by Board Member Belotz. Motion carried 4-0-0-2 6. COMMUNICATIONS 6.1 Board Member and Staff Communication - None 7. ADJOURNMENT - Meeting Adjourned at 5:28 PM