Loading...
HomeMy WebLinkAbout012323 - 04.1 ATTACHMENT EATTACHMENT A TENTATIVE MAP NOTES: 1.OWNER: EAST BAY REGIONAL PARK DISTRICT 2950 PERALTA OAKS CT. OAKLAND, CA 94605 2.APPLICANT: TRUMARK HOMES 3001 BISHOP DRIVE, #100 SAN RAMON, CA 94583 CONTACT: GARRETT HINDS / HEIDE ANTONESCU (925) 999-3970 3.ENGINEER:MACKAY & SOMPS 5142 FRANKLIN DR, SUITE B PLEASANTON, CA 94588-3355 CONTACT: KIM REED / CHRIS GUENTHER (925) 225-0690 4.GEOTECHNICAL CONSULTANTS:ENGEO INCORPORATED 2010 CROW CANYON PLACE, SUITE 250 SAN RAMON 94583 CONTACT: TODD BRADFORD / MACY TONG (925) 868-9000 5.AREA SUBJECT TO INUNDATION:YES PER FIRM 06013C0461F DATED JUNE 16, 2009 6.SUBDIVIDED AREA:7.0 ± ACRES 7.ASSESSOR'S/TRACT PARCEL NUMBER: PORTION OF 218-090-034 8.FIRE PROTECTION:SAN RAMON VALLEY FIRE DEPARTMENT 9.SEWER SYSTEM: TO BE INSTALLED IN CONFORMANCE WITH CENTRAL CONTRA COSTA SANITARY DISTRICT STANDARDS. 10.WATER SYSTEM:TO BE INSTALLED IN CONFORMANCE WITH EAST BAY MUNICIPAL UTILITY DISTRICT STANDARDS. 11.DRAINAGE:TO BE INSTALLED IN CONFORMANCE WITH TOWN OF DANVILLE STANDARDS. 12.GAS & ELECTRICITY:TO BE INSTALLED IN CONFORMANCE WITH STANDARDS OF PACIFIC GAS AND ELECTRIC CO. 13.TELEPHONE:TO BE INSTALLED IN CONFORMANCE WITH STANDARDS OF AT&T. 14.CABLE:TO BE INSTALLED IN CONFORMANCE WITH STANDARDS OF COMCAST. 15.STREET IMPROVEMENTS:CURB, GUTTER, SS MAIN, W MAIN, AND SD MAIN IN CAMINO RAMON. 16.EXISTING/PROPOSED ZONING:A-2 / M-30 AND M-25 17.EXISTING LAND USE:NON-ACTIVE, NON-PRODUCING WALNUT ORCHARD 18.PROPOSED LAND USE:RESIDENTIAL 19.UNLESS OTHERWISE SPECIFICALLY STATED IN THE CONDITIONS OF APPROVAL, LOCAL AGENCY APPROVAL OF THIS MAP SHALL CONSTITUTE AN EXPRESS FINDING THAT THE PROPOSED DIVISION AND DEVELOPMENT OF THE SUBJECT PROPERTY WILL NOT UNREASONABLY INTERFERE WITH THE FEE AND COMPLETE EXERCISE OF RIGHTS DESCRIBED IN GOVERNMENT CODE SECTION 66436(a)(3)(A)(i). 20.UTILITY SIZES AND LOCATION, STREET GRADES AND LOT DIMENSIONS ARE PRELIMINARY AND SUBJECT TO FINAL ENGINEERING DESIGN AND BUILDING PLOTTING. 21.ALL SEWER AND POTABLE WATER MAINS ARE 8" UNLESS NOTED. ALL PUBLIC STORM DRAINS ARE 12" (MIN), OR AS NOTED. 22.APPLICANT RESERVES THE RIGHT TO FILE MULTIPLE / PHASED FINAL MAPS TO SUBDIVIDE THE PROPERTY, IN COMPLIANCE WITH THIS VESTING TENTATIVE MAP. 23.THE DEVELOPER INTENDS TO FILE AIRSPACE CONDOMINIUM PLANS FOR CONDOMINIUM UNITS AFTER THE FINAL MAP APPROVAL. UP TO 168 CONDOMINIUM UNITS MAY BE CREATED ON LOTS 1 THRU 17. 24.PUBLIC UTILITY AND ACCESS EASEMENTS WILL BE GRANTED OVER PRIVATE STREETS, AND COURTS TO ALLOW ACCESS TO THE PUBLIC AND INSTALLATION OF PUBLIC UTILITIES. ADDITIONAL EASEMENTS AND DEDICATIONS ARE SHOWN ON THE ATTACHED VESTING TENTATIVE MAP. 25.COVERAGE OF LAND BY BUILDINGS: 37.7% BOUNDARY LINE RIGHT OF WAY FUTURE LOT LINE SPLIT EASEMENT STORM DRAIN, MANHOLE AND CURB INLET AREA DRAIN CATCH BASIN / FIELD INLET WATER LINE AND VALVES SANITARY SEWER AND MANHOLE LOT LINE PAD GRADE FIRE HYDRANT BIO-RETENTION BASIN BIO-RETENTION BASIN RETAINING WALL SOUNDWALL VALLEY GUTTER FLOWLINE LOT NUMBER EX TREE TO BE REMOVED SIDEWALK 1 PROPOSEDEXISTING / BY OTHERS TOWN OF DANVILLE DESIGN GUIDELINES SP-105 -TYPICAL CONCRETE CURBS SP-107 -TYPICAL DRIVEWAY SP-114 -TRENCH BACKFILL SP-115 -SURVEY MONUMENT SP-117 - STOP SIGN LOCATION SP-120 -FIRE HYDRANT LOCATION SP-201 -STORM DRAIN TYPE "A" INLET SP-204 -STORM DRAIN PRECAST MANHOLE & TYPE "I" BASE SP-207 -MANHOLE FRAME AND COVER SOILS REPORT: PROVIDED BY: ENGEO INCORPORATED DATED: MAY 19, 2021, REVISED JUNE 2, 2021 ENTITLED: BOREL PROJECT - PRELIMINARY GEOTECHNICAL RECOMMENDATIONS PROJECT #: 012353.001.001 DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G VICINITY MAP PROJECT SITE ABBREVIATIONS AB - AGGREGATE BASE AC - ASPHALT CONCRETE BC - BACK OF CURB BCB - BACK OF CONCRETE BAND BFP - BACK FLOW PREVENTER BIO - BIORETENTION AREA BMR - BELOW MARKET RATE BNDY - BOUNDARY BO - BLOW OFF VALVE BOW - BACK OF WALK BW - BOTTOM OF WALL CCCFCD - CONTRA COSTA COUNTY FLOOD CONTROL DISTRICT CCCSD - CENTRAL CONTRA COSTA SANITARY DISTRICT C/L - CENTERLINE D/W - DRIVEWAY EBMUD - EAST BAY MUNICIPAL UTILITY DISTRICT EASEMENT EBRPD - EAST BAY REGIONAL PARK DISTRICT ESMT - EASEMENT EG - EXISTING GROUND EV - ELECTRIC VEHICLE EVAE - EMERGENCY VEHICLE ACCESS EASEMENT FC - FACE OF CURB FTC - TOP OF FACE OF VERTICAL CURB GB - GRADE BREAK HM - HYDROMODIFICATION HP - HIGH POINT LP - LOW POINT L/S - LANDSCAPE NAP - NOT A PART OF THIS SUBDIVISION P/L - PROPERTY LINE PRAE - PRIVATE ACCESS EASEMENT PUE - PUBLIC UTILITY EASEMENT PSE - PUBLIC SIDEWALK EASEMENT RET - RETAINING R/W - RIGHT OF WAY SD - STORM DRAIN SDE - STORM DRAIN EASEMENT SS - SANITARY SEWER SSE - SANITARY SEWER EASEMENT STFE - STORMWATER TREATMENT FACILITY EASEMENT SW - SIDEWALK SWQ - STORM WATER QUALITY TC - TOP OF CURB & GUTTER TCB - TOP OF CONCRETE BAND TWC - TOP OF WEDGE CURB TW - TOP OF WALL W - WATER LINE (DOMESTIC) WLE - WATER LINE EASEMENT WM - WATER METER BASIS OF BEARINGS: THE BEARING OF NORTH 26°07'33" WEST AS SHOWN BETWEEN FOUND MONUMENTS ON CAMINO RAMON (FORMERLY CROW CANYON PLACE), AS SHOWN ON SUBDIVISION 6806 FILED IN BOOK 319 OF MAPS AT PAGE 3, CONTRA COSTA COUNTY RECORDS. BASIS OF ELEVATIONS - BENCHMARK: CONTRA COSTA COUNTY BENCHMARK #1240 THE BENCHMARK IS A RAILROAD SPIKE IN AN OAK TREE, SET EAST OF THE CENTERLINE OF BOLLINGER CANYON ROAD, 215 FEET NORTH OF THE INTERSECTION OF BOLLINGER CANYON ROAD AND CROW CANYON ROAD. ELEVATION = 595.406 (NGVD29) OVERALL SITE PLAN SCALE: 1" =80'LEGEND INDEX OF TENTATIVE MAP SHEETS SHEET DESCRIPTION CIVIL PLANS C1 COVER SHEET AND NOTES C2 EXISTING CONDITIONS / DEMOLITION PLAN C3 VESTING TENTATIVE TRACT MAP C4 SITE DEVELOPMENT PLAN C5 DETAILS AND SECTIONS C6 PRELIMINARY GRADING PLAN C7 PRELIMINARY UTILITY PLAN C8 PRELIMINARY EROSION CONTROL PLAN & DETAILS C9 PRELIMINARY STORMWATER CONTROL PLAN C10 PRELIMINARY SIGNING AND STRIPING PLAN C11 OFFSITE IMPROVEMENT PLAN EXHIBIT LAND USE AND DENSITY EXHIBIT ARCHITECTURE PLANS (TOWNHOMES) A00 COVER SHEET A01 TITLE SHEET A02 SITE AERIAL & PHOTOS A03 ARCHITECTURAL SITE PLAN A04 BUILDING 8 MASSING VIEWS A05 UNIT 1 & 2 FLOOR PLANS A06 UNIT 3 & 4 FLOOR PLANS A07 UNIT 3 & 4 ALTERNATE & ADAPTABLE PLANS A08 BUILDING 6 FRONT ELEVATION A09 BUILDING 6 FLOOR & ROOF PLANS A10 BUILDING 6 EXTERIOR ELEVATION A11 BUILDING 8 FRONT ELEVATION A12 BUILDING 8 FIRST & SECOND FLOOR PLANS A13 BUILDING 8 THIRD FLOOR PLAN & ROOF PLAN A14 BUILDING 8 EXTERIOR ELEVATIONS A15 BUILDING 10 FRONT ELEVATION A16 BUILDING 10 FIRST & SECOND FLOOR PLANS A17 BUILDING 10 THIRD FLOOR PLAN & ROOF PLAN A18 BUILDING 10 FRONT & RIGHT ELEVATIONS A19 BUILDING 10 REAR & LEFT ELEVATIONS A20 ARCHITECTURAL EXTERIOR MATERIALS & DETAILS A21 ARCHITECTURAL EXTERIOR MATERIALS & DETAILS A22 ARCHITECTURAL EXTERIOR EAVE & RAKE DETAILS ARCHITECTURE PLANS (APARTMENTS) A23 APARTMENT BUILDING B MASSING VIEWS A24 UNIT 1 FLOOR PLAN A25 UNIT 2 FLOOR PLAN A26 NIT 3 FLOOR PLAN A27 COMMUNITY CENTER FLOOR PLAN A28 BUILDING A - FIRST FLOOR PLAN A29 BUILDING A - SECOND & THIRD FLOOR PLANS A30 BUILDING A - EXTERIOR ELEVATIONS A31 ROOF PLAN & SECTION A32 BUILDING B - TYPICAL FLOOR PLAN A33 BUILDING B - EXTERIOR ELEVATIONS A34 BUILDING B - ROOF PLAN & SECTION A35 ARCHITECTURAL EXTERIOR MATERIALS & DETAILS A36 COLOR SCHEME LANDSCAPE PLANS L-1 ILLUSTRATIVE SITE PLAN L-2 PEDESTRIAN CIRCULATION PLAN L-3 CHARACTER IMAGES L-4 PLANT PALETTE L-5 OVERALL TREE PLAN L-6 COMMUNITY SPACE L-7 DOG AREA L-8 NORTH BOUNDARY L-9 SCHEMATIC DETAILS FRONTAGE CURB & GUTTER TO BE REMOVED WITHIN PROJECT BOUNDARY LIMITS FENCE TO BE REMOVEDBEGIN FENCE REMOVAL END FENCE REMOVAL 10 ' 20 ' E X . E B M U D E A S E M E N T EX . R O W E A S E M E N T VA R I E S 69 68 67 71 51 65 R=930.09'Δ=7°57'49"L=129.27'BNDY S14°50'0 0 " E 3 3 5 . 5 9 ' B N D Y S22°47'49"E 304.32' BNDY S6 3 ° 5 2 ' 2 7 " W 4 7 5 . 9 9 ' B N D Y N26°07'33"W 172.90' BNDY R=40.00' Δ=75°31'21" L=52.72' BNDY N26°07'33"W 450.15' BNDY N8 7 ° 2 3 ' 0 8 " E 4 4 2 . 9 4 ' B N D Y PROTECTED TREES TO BE REMOVED WITHIN THE SITE TREE NUMBER TRUNK DIA (IN)SPECIES 51 12 COAST LIVE OAK 65 22,21,19 COAST LIVE OAK 67 13 COAST LIVE OAK 71 28 COAST LIVE OAK DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G LEGEND: CONTRA COSTA COUNTY FLOOD CONTROL DISTRICT EXISTING 10' ACCESS ROAD TO BE RELOCATED EXISTING PERVIOUS AREA = 309,010 SF EXISTING PAVEMENT TO BE REMOVED FOR SS, SD, AND W MAIN PIPE INSTALLATION EXISTING TREE TO BE REMOVED GENERAL NOTES: 1.AERIAL TOPOGRAPHY OBTAINED BY GEOMAPS ON OCTOBER 2020. 2.ALL EXISTING ONSITE UTILITIES, TREES, UNDERGROUND AND SURFACE IMPROVEMENTS TO BE REMOVED UNLESS OTHERWISE NOTED. TREE NOTES: A.THE SITE IS CURRENTLY USED AS AN ORCHARD. B.ONLY PROTECTED TREES ARE IDENTIFIED ABOVE. C.TREE SURVEY PERFORMED BY LIVE OAK ASSOCIATES DATED JANUARY 6, 2020. SUPPLEMENTAL SURVEY PERFORMED AUGUST 1, 2022. TREE REMOVAL CHART: TREE DRIP LINE (TYP) PROTECTED TREES TO BE PRESERVED WITHIN THE SITE TREE NUMBER TRUNK DIA (IN)SPECIES 68 36 COAST LIVE OAK 69 29 COAST LIVE OAK PARCEL TO BE DEDICATED IN FEE TO TOWN WITH FINAL MAP 16.3 7 ' 29 . 5 ' 22' PARCEL TO BE DEDICATED TO CCCFCD BY SEPARATE INSTRUMENT 10 ' EX . R O W DI S T A N C E V A R I E S 22 ' 25 ' 34'16' 21 ' 23 . 1 2 ' 31' 14.7 7 ' 9.29 ' 29 . 5 ' 21 ' 22' 22' 40.5' 34' 31' PARCEL E PARCEL M 15 17 PARCEL D 87 PARCEL A 910 3 1 2 16 13 PARCEL C 5 PARCEL K PARCEL F PARCEL I PARCEL J 11 12 PARCEL G PARCEL H 14 4 6 PARCEL B PARCEL L 20 ' EX . E B M U D E A S E M E N T 6004± SF15 16233± SF17 16757± SF PRAE, EBMUD, PUE, SSE, EVAE PARCEL D 9991± SF89991± SF7 95 3 9 ± S F PR A E , E B M U D , PU E , S S E , E V A E PA R C E L A 10530± SF910476± SF10 7904± SF PRAE, EBMUD, PUE, SSE, EVAE PARCEL E 8677± SF3 169'176' 57 ' 160' 160'160' 60 ' 157'157' 1 9 ' 18' 19' 18' 18 8 ' 168'162' 10 0 ' 345' 345' 314'19' 60 ' 19' 52 ' 39 ' 48 ' 82 ' 164'162' 349' 49 ' 36 ' 39 ' 48 ' 52 ' 19' 52 ' 134' 145' 79' 94' 3 2 ' 9' 36 ' 19' 3 6 ' 19' 28 ' 24 ' 55' 69' 124' 5' 7 2 ' 12 5 ' 64' 45 ' 12 5 ' 14 2 ' 22'61' 14 2 ' 61' 39'2 5 ' 18 1 ' 18 1 ' 61' 11 1 ' 11 1 ' 86 ' 64' 97 ' 61'22' 23 ' 12 2 ' 10 2 ' 43 4 ' 43 4 ' 61 ' 60 ' 52 ' 13 9 ' 39 ' 66 ' 19' 21 ' 22' 37 ' 51'3' 11 0 ' 55' 11 0 ' 60 ' 100' 132' 59 ' 21 ' 140' 41 ' 5' 32' 132' 50' 104' 21 ' 21 ' 40 ' 8' 21' 34' 4' S6 3 ° 5 2 ' 2 7 " W 4 7 5 . 9 9 ' B N D Y N26°07'33"W 172.90' BNDY N8 7 ° 2 3 ' 0 8 " E 4 4 2 . 9 4 ' B N D Y S22°47'49"E 304.32' BNDY R=930.09'Δ=7°57'49"L=129.27'BNDY S14°50'00 " E 3 3 5 . 5 9 ' B N D Y N26°07'33"W 450.15' BNDY R=40.00' Δ=75°31'21" L=52.72' BNDY 16'24' 17'19'69' 83' 189'156' 47 6 ' 304' 304' 129' 77' 42 2 ' 20 ' 16480± SF16 9063± SFPARCEL I 6247± SF14 8150± SF13 2777± SF PUE, PRAE, SSE PARCEL F 13867± SFPARCEL J 10537± SF11 9483± SF12 6600± SF66746± SF1 8659± SF511026± SF2 8864± SF4 16991± SF PRAE, EBMUD, PUE, SSE, EVAE PARCEL C 10758± SF PRAE, EBMUD, PUE, SSE, EVAE PARCEL G 19699± SF PRAE, EBMUD, PUE, SSE, EVAE PARCEL B 11834± SFPARCEL M 15422± SFPARCEL K 5491± SFPARCEL L 12221± SFPARCEL H 6' 1 6 ' 2 0 ' 4' 8' 1 9' 2 9 '19' 28' 1 9 '28' 2 9' 2 9 '28'19 ' 58 ' 29' 64' 22'50' 76' 36' 235' 42 ' 22' 56 ' 48 ' 10 0 ' 23 ' 18 ' 3' 15' 160' 6' 72' 53' DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G LEGEND EXISTING PROPERTY BOUNDARY EXISTING LOT LINE OR RIGHT-OF-WAY EXISTING EASEMENT PROPERTY LINE RIGHT-OF-WAY NOTES 1.PARCELS H-K TO HAVE PRAE & PUE 2.ALLEY PARCELS F TO HAVE PUE, PRAE & SSE N6 3 ° 5 2 ' 2 7 " E 4 7 5 . 9 9 ' B N D Y N22°47'49"W 304.32' BNDY N14°50'0 0 " W 3 3 5 . 5 9 ' B N D Y N8 7 ° 2 3 ' 0 8 " E 4 4 2 . 9 4 ' B N D Y N26°07'33"W 450.15' BNDY N26°07'33"W 172.90' BNDY BCB FC FC FC BC CCCFCD GRAVEL ACCESS ROAD C C C C C C CCCCCCCCC C C C C C C C CC C C VAN EV EV EV EV EV EV VAN C CCCC SEE SHEET C-11 FOR OFFSITE IMPROVEMENT PLAN FC FC FC CREEK STRUCTURE SETBACK LIMIT BC FC FC BCB BCB BC BC BC BCB BC FC FC FC FC FC FC FC FC FC 135.46' 10 4 . 8 3 ' BCB FC FC BLDG 1 BLDG 2 BLDG 3 BLDG 4 BLDG 5 BLDG 6 BLDG 7 BLDG 8 BLDG 10 BLDG 9 BLDG 11 BLDG 12 BLDG 13 BLDG 14 BLDG 15 BLDG 16BLDG 17 24 ' 19 ' 19 ' 26'19'19' 26'19' 21 ' 7' 7' 26'19' 20 ' 21 ' 26' 26' 21 ' 21'10.74'5' 21'11.74'5' 10.74'5' 6. 1 3 ' 8' 21 ' 6. 3 9 ' 8' 10 ' 24 ' 19 ' 19 ' 10 ' 20 ' 4' 6' 14 2 . 5 9 ' BCB 21' 26'6' 20' 20' 20' 20 . 8 3 ' 20 ' 23 . 2 1 ' 15.21' 25 . 2 1 ' 25 . 2 1 ' 20' 20' 20' 21 . 3 2 ' 20 ' 28 . 4 6 ' 28 . 7 9 ' 21.5 3 ' 22.8 3 ' 22.9 3 ' 5' 5' 10' 14.67' 8. 9 6 ' 7' 6. 2 5 ' 6. 3 3 ' 12.5' 12.5' 10.79' 9.67' 9.67' 9.67'9.67' 1 . 5 ' D E C K 1.5 ' DEC K 1.5 ' DEC K 1 . 5 ' D E C K 2.1 ' DEC K 2 . 1 3 ' D E C K 2 . 5 5 ' D E C K 2' DEC K 2 . 5 5 ' D E C K 3.9 4 ' DECK 4.5 7 ' 5 . 0 7 ' 5.6 8 ' 3 . 4 4 ' 1. 7 8 ' DE C K 3. 7 7 ' D E C K 5' 5' 21'13.2' R=40.00' Δ=75°31'21" L=52.72' BNDY R=930.09'Δ=7°57'49"L=129.27'BNDY 35 . 3 2 ' FENCE VG VG VGVG VG VG 1 5 ' DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G NOTES: 1.SEE SHEET C5 FOR SECTIONS. 2.THE 30' CREEK STRUCTURE SETBACK LIMIT LINE HAS BEEN DELINEATED PER THE SAN RAMON CREEK EXHIBIT THAT WAS COORDINATED WITH AND APPROVED BY CONTRA COSTA COUNTY FLOOD CONTROL DISTRICT ON AUGUST 26, 2021. 3.ALL UNITS IN BUILDINGS 16 AND 17 ARE BMR. LEGEND: BUILDING NUMBER ADA ADAPTABLE UNITS BMR UNITS (REFER TO ARCHITECTURAL PLANS) VALLEY GUTTER 1 30' CREEK STRUCTURE SETBACK LIMIT LINE (SEE NOTE 2 ABOVE) J J J J K K AA AA C C OO EE DD B B FF G G AA H H II DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G 6'±VARIES BIORETENTION BASIN W/UNDERGROUND STORMWATER CAPTURE MODULES (SWQ + HM) SECTION M NTS PROPOSED BLDG 3'3' 3:1 4' S/W 7' OR 9' LANDSCAPE 2% FC CAMINO RAMON 2% MIN 2:1 MAX 18" MAX 1' 3:1 SECTION A - PRIVATE ALLEYS NTS 3' VALLEY GUTTER NTS NOTE: SEE TOWN OF DANVILLE STANDARD PLAN 112 FOR ADDITIONAL DETAILS NOT SHOWN HERE 3' 1- 1 / 4 " 8" PCC 6" CLASS II AGG. BASE 2.0% 22'PROPOSED BLDG 2%-12% 11'± D/WPROPOSED BLDG 2%-12% AB AC WEDGE CURB SEE DETAIL THIS SHEET FLUSH CONCRETE BAND SEE DETAIL THIS SHEET 5' D/W BCB BC 21' DRIVE AISLE 1' SECTION B NTS 24' DRIVE AISLE VALLEY GUTTER (SEE DETAIL THIS SHEET) 4' S/W 2%1% AB CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") AC CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") FC CL VALLEY GUTTER 19' PARKING FC FLUSH CONCRETE BAND NTS AC PAVEMENT CLASS 2 AB R=0.5"SLOPE PER PLANS (T C B ) T O P O F C O N C . BA N D E L E V . 19' PARKING 4' S/W SECTION C NTS 8' PARALLEL PARKING 21' DRIVE AISLE FC VALLEY GUTTER (SEE DETAIL ON THIS SHEET) PROPOSED BLDG 2%-12% 5'± D/W 2%2% AB FLUSH CONCRETE BAND (TFC) SEE DETAIL THIS SHEET CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") AC CL VALLEY GUTTER BCB SECTION D NTS 19' PARKING 26' DRIVE AISLE FC VALLEY GUTTER (SEE DETAIL THIS SHEET) 4' SWLKPROPOSED BLDG 4' S/W 2%2% AB 8' CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") AC CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") FC CL VALLEY GUTTER 4' S/W 19' PARKING SECTION E NTS CITY STANDARD CURB & GUTTER (ST-105 "TYPE A") PROPOSED BLDG 5' FC FC AB 2% 3% CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") AC 26' DRIVE AISLE 4' S/W SECTION F NTS FC FC AB 2% 3% CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") AC 26' DRIVE AISLEPROPOSED BLDG 5.5' SECTION G NTS CITY STANDARD CURB & GUTTER (ST-105 "TYPE A") PROPOSED BLDG 6.25'FC FC AB 2% CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") AC 21' DRIVE AISLEPROPOSED BLDG 6.33' SECTION H NTS CITY STANDARD CURB & GUTTER (ST-105 "TYPE A") PROPOSED BLDG 6.5'FC FC AB 2% CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") AC 20' DRIVE AISLEPROPOSED BLDG 5' SECTION I NTS CITY STANDARD CURB & GUTTER (ST-105 "TYPE A") 26' DRIVE AISLE 2% AB AC FC 6.5' LANDSCAPE FC 2% CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") PROPOSED BLDG 4' S/W 7' PROPOSED BLDG 2%-12% 4.5' D/W 1' SECTION J - PRIVATE ALLEYS NTS 2.0% 22'PROPOSED BLDG 2%-12% 6' D/WPROPOSED BLDG 2%-12% AB AC WEDGE CURB SEE DETAIL THIS SHEET FLUSH CONCRETE BAND SEE DETAIL THIS SHEET 7' D/W BCB BC 21' DRIVE AISLE 1' SECTION K - PRIVATE ALLEYS NTS 2.0% 21'PROPOSED BLDG 2%-12% 6' D/WPROPOSED BLDG 2%-12% AB AC WEDGE CURB SEE DETAIL THIS SHEET FLUSH CONCRETE BAND SEE DETAIL THIS SHEET BCB BC 20' DRIVE AISLE 1' 4' D/W EDGE OF RIPARIAN EX GROUND ELEV 466.5 FENCE 3' 2'10' ACCESS ROAD 2' 3:1 2% ELEV 466.8 PROJ BNDY SECTION L NTS 10' SOUNDWALL SEE LS PLANS BNDY PROPOSED BLDG SECTION P NTS 12" MAX 20' 4' 10' SELF RETAININGEBRPD VARIES 4' 3" 1.0'1.5' SLOPE VARIES 1/ 2 " 2- 1 / 2 " DRIVEWAY APRON 2% MIN. FL 4" M I N . CL 2 A B (TWC) TOP OF WEDGE CURB WEDGE CURB AND GUTTER NTS 1/2"R 1/2"R (TYP.) 2% 2% 5' LANDSCAPE EG BNDY 10' SOUNDWALL SEE LS PLANS 12" MAX SECTION O NTS 24' DRIVE AISLE VALLEY GUTTER (SEE DETAIL THIS SHEET) 4' S/W 3%1% AB CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") AC CITY STANDARD 6" VERTICAL CURB (ST-105 "TYPE B") FC CL VALLEY GUTTER 19' PARKING FC19' PARKING 4' S/W BNDY EG VARIES LANDSCAPE 2% 12" MAX PROPOSED BLDG PROPOSED BLDG 4' S/W 4' S/W PROPOSED BLDG PROPOSED BLDG 2% MIN 4' VARIES (SEE PLAN) SECTION N NTS 2% MIN S/W BNDY EG 12" MAX SECTION Q NTS 2%2% 2% 2% 2% 2% 2% 2%2% PROPOSED BLDG 4' 6"2% 6' SECTION R NTS 10' SOUNDWALL SEE LS PLANS 2% 4'6' PROJ BNDY 20' SELF RETAINING 6" CAMINO RAMON FC 8' SOUNDWALL SEE LS PLANS EG 1- 1 / 4 " 6" 69 68 465 464463462461460 466 GRADING DAYLIGHT OCCURES AT PROJECT BOUNDARY UNLESS OTHERWISE NOTED GRADING DAYLIGHT EA R T H S W A L E SE E S E C T I O N M EARTH SWALE DRAINS TO SIDEWALK CROSS DRAIN 4' BL D G 1 BL D G 2 BL D G 3 BL D G 4 BL D G 5 BL D G 6 BLDG 7 BLDG 8 BLDG 10 BLDG 9 BLDG 11 BLDG 12 BLDG 13 BLDG 14 BL D G 1 5 BLDG 16BLDG 17 STORM CAPTURE STORAGE MODULES GRADING DAYLIGHT OCCURS AT BACK OF WALK ALONG CAMINO RAMON 4 6 7 467 46 8 4 6 9 469 468 468 468 46 7 46 8 465 463 464 46 6 4 6 6 466 46 7 467 46 8 46 9 4 6 9 468 P467.9 P467.1 P468.6 P468.7P469.0 P468.9 P467.6 P469.0 P469.4 P4 7 0 . 6 P4 7 0 . 8 P4 7 0 . 3 P4 7 0 . 1 P4 6 9 . 7 P4 6 9 . 5 P467.7 P4 6 7 . 5 TFC 470.86 TWC 470.54 TFC 469.46 TWC 469.14 TWC 469.56 TWC 469.87 TWC 470.11 TWC 470.21 TC 470.40TC 470.54 TC 469.93TC 470.07 TC 469.71 TC 469.56 TC 469.23 TC 469.09 TFC 469.01 TFC 468.51 TWC 468.90 TWC 468.40 TFC 467.50 TWC 467.39 TFC 467.69 TWC 467.58 TC 469.18 TC 468.65 TC 468.41 TC 467.88 TC 468.34 TC 467.81 TC 467.57 TC 467.04 BOW 467.90 BOW 467.20 TC 468.94 LP TC 468.37 LP TC 469.25 TC 468.68 TC 468.88 TC 469.19 TC 469.75 TC 470.05 GB TC 469.40 TC 470.01 TC 470.71 HP TC 471.29 HP TC 469.43 LP TFC 469.36 LP TC 469.00 TFC 469.3 6 H P TFC 469.43 TFC 468.9 8 TC 468.95 GB TC 468.45 GB TC 468.34TC 469.12 TC 468.94 TC 469.21 GB TC 468.93 GB TC 468.72 GB TC 468.08 GB TC 467.88 TC 467.56 GB TC 467.31 TC 468.15 TC 468.00 TC 466.55 TC 467.30 TC 467.95TC 468.79 TC 468.14 TC 468.72 TC 468.07 TC 469.56 TC 468.90 TFC 467.92 HP TWC 467.81 HP TFC 469.15 HP TWC 469.04 HP TFC 468.46 LP TWC 468.35 LP TFC 468.87 HP TWC 468.76 HP TFC 471.00 HP TWC 470.68 HP TFC 470.33 LP TFC 470.56 HP TWC 470.24 HP TC 469.36 HP TC 468.79 HP TFC 469.63 HP TC 469.58 TC 469.82 HP TFC 469.08 LP TC 469.27 LP TC 469.5 5 H P TC 469.16 TC 467.32 GB TC 466.80 GB 0.5% 0.5% 0.5% 0.5%0.5%0.5%0.5% 2.0% 0. 5 % 0. 5 % 0. 5 % 0. 5 % 0.5%0.5% BOW 463.60 FG 466.6 FG 465.8 3.0% 3.0% 3.0% 2.0% 2.0% 2. 0 % 2. 0 % 2. 0 % 2. 0 % 2. 0 % 2. 0 % 1. 0 % 1. 0 % 2. 0 % 2. 0 % 2. 0 % TC 465.69 GBTC 466.45 GB 0. 5 % 0. 5 % 1. 5 % 0.5% 0.5% 0.5% 0.5% 0. 8 % 0 . 5 % 0. 5 % 1. 0 % 0. 5 % 1. 5 % 10 ' S O U N D W A L L 10' SOUNDWALL 8' S O U N D W A L L 3.0%1.0% 2.0% 5. 3 % 4. 1 % 3. 5 % 3. 9 % 2.0% 0.5% 3.9 % 2.9 % 3.0% 3.0%2.0% BOW 463.40 8' S O U N D W A L L DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G GRADING NOTES: 1.THE PRELIMINARY GRADING PLAN ANTICIPATES A BALANCE BETWEEN CUT AND FILL. SEE EARTHWORK SUMMARY TABLE. 2.NO GRADING SHALL BE PERMITTED ON THIS SITE UNTIL A FINAL GRADING PLAN AND AN EROSION AND SEDIMENTATION CONTROL PLAN HAVE BEEN REVIEWED AND APPROVED BY THE TOWN OF DANVILLE AND A GRADING PERMIT IS ISSUED IN ACCORDANCE WITH THE TOWN OF DANVILLE GRADING ORDINANCE. 3.NO GRADING WORK WILL BE ALLOWED DURING THE RAINY SEASON, FROM OCTOBER 1 TO APRIL 30, EXCEPT UPON A CLEAR DEMONSTRATION, TO THE SATISFACTION OF THE DIRECTOR OF THE PUBLIC WORKS, THAT AT NO STAGE OF THE WORK WILL THERE BE ANY SUBSTANTIAL RISK OF INCREASED SEDIMENT DISCHARGE FROM THE SITE. 4.SEE SHEET C5 FOR SECTIONS. EARTHWORK SUMMARY: THE EARTHWORK SUMMARY IS PROVIDED AS A COURTESY AND CONVENIENCE TO THE CONTRACTOR. THE EXCESSES OR SHORTAGES SHOWN ARE APPROXIMATE CALCULATED QUANTITIES BASED ON THE DIFFERENCES BETWEEN EXISTING GROUND ELEVATIONS AND ROUGH GRADE ELEVATIONS. FOR THIS REASON AND BECAUSE OF VARIABLES SUCH AS COMPACTION, SHRINKAGE AND THE CONTRACTOR'S METHOD OF OPERATION, THE VOLUME OF DIRT MOVED IN THE FIELD WILL IN ALL LIKELIHOOD DEVIATE TO SOME EXTENT FROM THE CALCULATED VOLUME. THE EARTHWORK SUMMARY DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY REQUIRED TO DETERMINE FOR HIMSELF THE QUANTITY OF EARTHMOVING THAT WILL BE REQUIRED TO ROUGH GRADE THIS JOB. IT IS UNDERSTOOD THAT THE CONTRACTOR'S BID PRICE FOR ROUGH GRADING THIS JOB IS BASED ON THE CONTRACTOR'S OWN EARTHWORK ESTIMATE AND INCLUDES PROVISION FOR ANY GRADE ADJUSTMENTS REQUIRED TO BRING THE JOB TO THE ROUGH GRADE, AS DEFINED ON THE PLANS. IN THE EVENT THAT THE OVERALL SITE DOES NOT BALANCE AS INDICATED ABOVE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY MACKAY & SOMPS FOR ADDITIONAL DIRECTION ON HOW TO UTILIZE THE ADJUSTMENT AREAS AS INDICATED ON THIS PLAN. NOTES: 1.BASED ON CONVERSATIONS WITH THE PROJECT GEOTECHNICAL ENGINEER AND SIMILAR PROJECTS IN THE VICINITY OF THIS SITE, A SHRINKAGE OF 10% IS ANTICIPATED. 2.BASED ON CONVERSATIONS WITH THE PROJECT GEOTECHNICAL ENGINEER, A CONSOLIDATION BETWEEN 3"-4" DUE TO ORCHARD BACKFILL AND AN ADDITIONAL 1"-1.5" FOR CLAY IS RECOMMENDED. BASED ON THOSE RECOMMENDATIONS A 4.5" VALUE HAS BEEN CHOSEN TO CALCULATE CONSOLIDATION WITHIN THE PROJECT LIMITS. 3.TRENCH SPOILS ARE CALCULATED FOR GRAVITY PIPES ONLY AND ANTICIPATE A TRENCH SECTION OF THE PIPE DIAMETER PLUS 6" ON EITHER SIDE NON-NATIVE BACKFILL TO THE PIPE CROWN FOR SD. FOR W AND SS, AGGREGATE BACKFILL. 4.ASSUMES LOT SPOILS OF 125/CY PER BUILDING FOR BUILDINGS 1-15 AND 300 CY FOR BUILDINGS 16 & 17. 5.A VOLUME OF 3 CY PER TREE FOR 100 TREES FOR ROOT VOLUME REMOVAL & SHRINKAGE HAS BEEN ADDED AT THE REQUEST OF THE DEVELOPER. 6.VOLUME OF STORMWATER CAPTURE MODULES IS 16' X 8' X 8' AND THERE ARE 18 UNITS. 7.PAD GRADES AS SHOWN WERE CALCULATED ASSUMING A DIFFERNCE BETWEEN FINISH FLOOR AND PAD OF 12" TO ACCOUNT FOR THE FOUNDATION (INCLUSIVE OF CONCRETE, IMPERVIOUS BARRIER, SAND AND THE LIKE). ANY DIFFERENCE IN THIS SLAB THICKNESS MUST BE BROUGHT TO THE ATTENTION OF THE DEGIGN ENGINEER IMMEDIATELY. THIS PLAN SET AND THE PAD GRADES SHOWN MAY NEED TO BE REVISED IF THE FINAL SLAB THICKNESS DIFFERS FROM ABOVE, WHICH MAY IMPACT EARTHWORK CALCULATIONS. L L M M PP Q Q R R NN NN NN N N N N N N N N C C C C C C CCCCCCCCC C C C C C C C CC C C VAN EV EV EV EV EV EV VAN C CCCC REMOVE EX 8"SS STUB CONNECT TO EX STORM DRAIN SYSTEM AT SDMH RAISE SDMH RIM TO GRADE INV 460.40 CONNECT TO EX SEWER SYSTEM INV 456.58 11'7'8' 11'7'8' 11'5'5' 11 ' 5' 5' 11'5'10' SSMH INV 461.07 SSMH INV 462.56 SSMH INV 463.96 SSMH INV 461.69 SSMH INV 458.71 SSMH INV 460.12SSMH INV 461.44 SSMH INV 458.78 SSMH INV 459.84 SSMH INV 457.89 8" W 8" W 8"W 8" W 8" W 8" W S= 0 . 0 0 7 7 8" S S S= 0 . 0 0 7 7 8" S S S=0.0078 8"SS S= 0 . 0 0 7 7 8" S S S= 0 . 0 0 7 7 8" S S S= 0 . 0 0 7 7 8" S S S=0.0077 8"SS S=0.0077 8"SS S= 0 . 0 0 7 7 8" S S S=0.0077 8"SS S=0 . 0 0 7 7 8"S S S=0.0077 8"SS S=0.0077 8"SS S=0.0077 8"SS SSMH INV 460.38 SSMH INV 461.23 SSMH INV 462.21 SSMH INV 462.75 8" W 8"W CB INV -3.23 CB INV 464.08 CB INV 462.12 CB INV 462.50 CB INV 459.00 DI INV 461.79 CB INV 463.35 CB INV 461.47 CB INV 461.30 DI INV 462.88 CB INV 462.40 CB INV 460.72 DI INV 461.04 CB INV 458.03 CB INV 457.40 EX SDMH S= 0 . 0 0 5 0 15 " S D S= 0 . 0 0 5 0 15 " S D S=0.018 6 12"SD S= 0 . 0 1 5 4 12 " S D S= 0 . 0 0 5 0 15 " S D S= 0 . 0 0 5 0 12 " S D S = 0 . 0 0 5 0 1 2 " S D S= 0 . 0 0 5 0 15 " S D S=0.0362 12"SD 8"W 8" W BL D G 1 BL D G 2 BL D G 3 BL D G 4 BL D G 5 BL D G 6 BLDG 7 BLDG 8 BLDG 10 BLDG 9 BLDG 11 BLDG 12 BLDG 13 BLDG 14 BL D G 1 5 BLDG 16BLDG 17 S= 0 . 0 2 6 0 15 " S D CB INV 461.80 DI INV 463.30 DI INV 462.47 S=0.0050 12"SD S=0.0050 12"SD SWQ/HM BASINSWQ/HM BASIN STORMDRAIN OUTLET RISER FH FHSUMP PUMP SWQ/SELF RETAINING AREA FH FH FH SW Q / S E L F R E T A I N I N G A R E A SWQ/SELF RETAINING AREA CONNECT TO EX WATER SYSTEM SSMH INV 456.91 UNTREATED STORMWATER TO ENTER THE UNDERGROUND STORMCAPTURE MODULES CONNECT TO EX WATER SYSTEM STORMCAPTURE STORAGE MODULES UNTREATED STORMWATER TO ENTER THE UNDERGROUND STORMCAPTURE MODULES S=0.0050 12"SD DI INV 461.42 DI INV 460.70 S=0.0050 12"SD DI INV 461.02 S=0.0050 12"SD DI INV 461.83 S=0. 0 0 5 0 15"S D S= 0 . 0 0 5 0 15 " S D S=0.0050 12"SD CB INV 461.66CB INV 460.99 S=0.0050 12"SD CB INV 464.44 S= 0 . 0 0 5 0 12 " S D CB INV 464.54 BUBBLE UP BUBBLE UP S= 0 . 0 0 5 0 15 " S D S=0.0050 15"SD S= 0 . 0 0 5 0 15 " S D S=0.0050 12"SD S=0.0050 12"SD S= 0 . 0 0 5 0 12 " S D CB INV 463.01 CB INV 463.11 SDMH INV 461.91 72 ' PR A E , E B M U D , PU E , S S E , E V A E 74' PRAE,EBMUD, PUE,SSE,EVAE 31' PRAE,EBMUD, PUE,SSE,EVAE 21 ' PR A E , E B M U D , PU E , S S E , E V A E 29 ' PR A E , E B M U D , PU E , S S E , E V A E 22' PRAE,EBMUD, PUE,SSE,EVAE 22 ' PR A E , E B M U D , PU E , S S E , E V A E 24 ' PR A E , E B M U D , PU E , S S E , E V A E 34' PRAE,EBMUD, PUE,SSE,EVAE S= 0 . 0 0 5 0 15 " S D DI INV 462.42 S=0.0050 12"SD S= 0 . 0 0 7 7 8" S S 7. 2 ' 35 . 8 ' 19 ' 5' 11 ' 5' 8' 16'9.2' 0.8' 8. 8 ' 10 . 5 ' 0. 8 ' 5' STORM DRAIN OUTLET RISER 11 ' 10 ' DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G LEGEND: SELF-RETAINING AREA EXISTING PROPERTY BOUNDARY NOTES: 1.UTILITIES SHOWN IN THE PRELIMINARY UTILITY PLAN ARE SUBJECT TO FINAL ENGINEERING DESIGN AND TOWN OF DANVILLE, EBMUD, CCCSD, AND PG&E REVIEW AND APPROVAL. 2.WATER SYSTEM TO BE DESIGNED BY EBMUD. 3.LOCATE WATER METERS PER EBMUD STANDARDS. 4.LOCATE SS LATERAL STUBS PER CCCSD STANDARDS. STORMWATER QUALITY/ HYDROMODIFICATION BASIN 465 464463462461460 466 BL D G 1 BL D G 2 BL D G 3 BL D G 4 BL D G 5 BL D G 6 BLDG 7 BLDG 8 BLDG 10 BLDG 9 BLDG 11 BLDG 12 BLDG 13 BLDG 14 BL D G 1 5 BLDG 16BLDG 17 DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G LEGEND STRAW WATTLES HYDROSEED (APPROXIMATE LIMITS) GRAVEL CONSTRUCTION ENTRANCE CATCH BASIN SEDIMENT BARRIER PERIMETER SILT FENCE EROSION CONTROL NOTES: 24-HOUR CONTACT PERSON: TO BE DETERMINED ONCE A CONTRACTOR IS CHOSEN 1.THE FACILITIES SHOWN ON THIS PLAN ARE DESIGNED TO CONTROL SEDIMENT DURING THE RAINY SEASON, OCTOBER 1 TO APRIL 30, AFTER ROUGH GRADING HAS BEEN COMPLETED. MEASURES ARE TO BE OPERABLE PRIOR TO OCTOBER 1ST OF ANY YEAR THAT GRADING OPERATIONS HAVE LEFT AREAS UNPROTECTED FROM EROSION. INSTALL AND MAINTAIN ALL REQUIRED EROSION CONTROL MEASURES IN ACCORDANCE WITH ABAG STANDARDS. 2.MAINTENANCE IS TO BE PERFORMED AS FOLLOWS: A.REPAIR DAMAGE CAUSED BY SOIL EROSION OR CONSTRUCTION AT THE END OF EACH WORKING DAY. B.STRAW WATTLES, BERMS AND SWALES ARE TO BE INSPECTED AFTER EACH STORM AND REPAIRS MADE AS NEEDED. C.SEDIMENT SHALL BE REMOVED AND SEDIMENT TRAPS RESTORED TO ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO WITHIN ONE FOOT OF THE OUTLET ELEVATION. D.SEDIMENT REMOVED FROM TRAPS SHALL BE DEPOSITED IN SUITABLE AREAS AND IN SUCH A MANNER THAT IT WILL NOT ERODE. E.RILLS AND GULLIES MUST BE REPAIRED. 3.AFTER UTILITY TRENCHES ARE BACKFILLED AND COMPACTED, THE SURFACES OVER SUCH TRENCHES SHALL BE MOUNDED SLIGHTLY TO PREVENT CHANNELING OF WATER IN THE TRENCH AREA. CARE SHOULD BE EXERCISED TO PROVIDE FOR CROSS-FLOW AT FREQUENT INTERVALS WHERE TRENCHES ARE NOT ON THE CENTER LINE OF A CROWNED STREET. 4.HYDROSEED ALL DISTURBED AREAS. AFTER HYDROSEEDING HAS BEEN COMPLETED. SPRAY ALL AREAS WITH TACKIFER AND STRAW. REFER TO THIS SHEET FOR MIX. 5.DURING THE RAINY SEASON, ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAIN SYSTEM. 6.INLETS NOT USED IN CONJUNCTION WITH EROSION CONTROL SHALL BE BLOCKED UNLESS THE AREA DRAINED IS UNDISTURBED OR STABILIZED. 7.ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. CHANGES TO THIS EROSION CONTROL PLAN SHALL BE MADE ONLY WITH THE APPROVAL OF OR AT THE DIRECTION OF THE TOWN'S ENGINEERING DEPARTMENT. 8.SEDIMENT BASINS SHALL BE CLEANED OUT WHENEVER SEDIMENT REACHES THE SEDIMENT CLEANOUT LEVEL. 9.AS STORM DRAIN IMPROVEMENTS ARE CONSTRUCTED, ALL STRUCTURES AND INLET PIPES SHALL BE PROTECTED FROM INFLOW OF SILT BY USING EROSION CONTROL MEASURES. 10.CONTRACTOR SHALL HAVE TOOLS, EQUIPMENT, AND MATERIALS TO PROVIDE EROSION CONTROL MEASURES MADE NECESSARY BY A CONSTRUCTION OPERATION, ON THE JOB SITE BEFORE BEGINNING THAT OPERATION. 11.ADJACENT PROPERTIES SHALL BE PROTECTED FROM STORM WATERS. 12.A CONSTRUCTION ENTRANCE CONSISTING OF MIN. 8" THICK 2" - 3" COARSE DRAINROCK FOR A DISTANCE OF 50' IS TO BE PROVIDED AT EACH VEHICLE ACCESS POINT TO EXISTING PAVED STREETS, PER ABAG STANDARDS. 13.THIS PLAN MAY NOT COVER ALL OF THE SITUATIONS THAT ARISE DURING CONSTRUCTION DUE TO UNANTICIPATED FIELD CONDITIONS. VARIATIONS MAY BE MADE TO THE PLAN IN THE FIELD SUBJECT TO THE APPROVAL OF THE TOWN'S ENGINEERING DEPARTMENT. 14.INSTALL STRAW WATTLES PER DETAIL ON THIS SHEET. WATER FERTILIZER (20-20-10) R BINDER WOOD FIBER MULCH SEED MATERIAL TOTAL SEED VARIETY LBS. PER ACRE ROSE CLOVER 8 CAL POPPY 4 BLUE LUPINE 6 75 LBS/AC. (SLOPE MEASURE.) 2,000 LBS 75 LBS 60 LBS 400 LBS AS NEEDED FOR APPLICATION RECOMMENDED HYDROSEED MIX: REGREEN 36 ZORRO 6 BLANDO 15 THE EROSION CONTROL MATERIALS SHALL BE MIXED AND APPLIED IN APPROXIMATELY THE FOLLOWING PROPORTIONS: TYPICAL CONSTRUCTION STAKE SAW 2X4 (100X50mm) LUMBER 2'-3' (0.6-1m) ON DIAGONAL 3" - 4 " SP A C I N G 3' - 4 ' DE P T H 8"-1 0 " D I A . BIO - D E G R A D E F I B E R S ST U F F E D I N A P H O T O - DE G R A D A B L E O P E N N E T CA L I F O R N I A S T R A W W O R K S NOTES: SP A C I N G 3' - 4 ' 3" - 4 " DE P T H 1. REPAIR OR REPLACE SPLIT, TORN, UNRAVELING OR SLUMPING FIBER ROLLS. 2. INSPECT FIBER ROLLS WHEN RAIN IS FORECAST, FOLLOWING RAIN EVENTS AND AT LEAST DAILY DURING PROLONGED RAINFALL. PERFORM REQUIRED MAINTENANCE. 3. IN MOST CASES, FIBER ROLLS DO NOT REQUIRE REMOVAL AND CAN BE ABANDONED IN PLACE. IF NOT EXCESSIVELY SOILED. ROLLS MAY BE REPLACED AND REUSED. WATTLES ALONG C/G & SIDEWALK INSTALL CB SEDIMENT BARRIER AT NEXT CB ON CAMINO RAMON WALKWAY AREA RUNOFF WITHIN DMA 2 SHEET FLOWS TO THE SELF RETAINING AREAS (TYP) SELF TREATING AREA (DRAINS TO CREEK) BL D G 1 BL D G 2 BL D G 3 BL D G 4 BL D G 5 BL D G 6 BLDG 7 BLDG 8 BLDG 10 BLDG 9 BLDG 11 BLDG 12 BLDG 13 BLDG 14 BL D G 1 5 BLDG 16BLDG 17 ALLEY PAVEMENT WITHIN DMA 2 DRAINS TO THE SELF RETAINING AREA BY SD PIPE/BUBBLE UP SYSTEM. ALLEY PAVEMENT WITHIN DMA 2 DRAINS TO THE SELF RETAINING AREA BY SD PIPE/BUBBLE UP SYSTEM. DMA 2 DMA 1 DMA 2 STORMCAPTURE STORAGE MODULES (TYP) 15 UNITS TOTAL SWQ/SELF RETAINING AREA SW Q / S E L F R E T A I N I N G A R E A SWQ/SELF RETAINING AREA BIORETENTION BASINS TO TREAT DMA 1 (TREATMENT AND FLOW CONTROL) AA PARCEL K PARCEL I PARCEL J PARCEL L PARCEL H PARCEL H SELF RETAINING AREA (SWQ) 8,400 SF IMPERVIOUS WALKWAY AREA 19,930 SF (OF WHICH 1,780 SF DRAINS TO SELF-RETAINING AREA) IMPERVIOUS STREET AREA 82,621 SF (OF WHICH 5,000 SF DRAINS TO SELF-RETAINING AREA) IMPERVIOUS ROOF AREA 114,902 SF PERVIOUS LANDSCAPE AREA 68,737 SF (OF WHICH 1,680 SF DRAINS TO SELF-RETAINING AREA) LEGEND 18" SOIL MIX - 5 INCHES / HOUR INFILTRATION RATE 12" CLASS 2 PERMEABLE MATERIAL OR EQUAL SECTION A: BIO RETENTION BASIN / STORAGE MODULE DETAIL NTS 18 " 12 " BIO RETENTION LANDSCAPING PER LANDSCAPE PLANS3:1 3:1 6" 4" 2" 4" PERFORATED SUBDRAIN DRAINS TO EX SD SYSTEM 0. 6 ' SD OUTLET RISER STORMCAPTURE STORAGE MODULE (TYP) DEEPENED STORMCAPTURE STORAGE MODULE FOR SUMP PUMP 12 " SUMP PUMP STORMWATER PUMPED TO BIO RETENTION BASIN FOR TREATMENT 2" CLEAN CRUSHED ROCK PAD ELEVATION FINISHED GRADE ELEVATION BOTTOM OF ROCK LAYER DMA BOUNDARY BIORETENTION BASIN (SWQ/HM) 4,900 SF IMP SIZING CALCULATOR RESULTS DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G SELF TREATING AREA 5,491 SF 1' DRAINS INTO STORMCAPTURE MODULESDRAINS INTO STORMCAPTURE MODULES C C C C C C CCCCCCCCC C C C C C C C CC C C VAN EV EV EV EV EV EV VAN C CCCC 16 ' 19' TYP FH FH FH 9' TY P FH FH 9' TYP 19 ' TY P 10' 10 ' 22' TYP 8' TY P 19' TYP 9' TY P 9' TYP 19 ' TY P R1-1/R3-2/SNS 16 ' STOP SIGN AND STOP BAR TO BE PLACED PER TOWN OF DANVILLE STD 117 (TYP) 12" WHITE RELOCATE W3-1 ADD R28(S) RELOCATED R28(S) RELOCATED R28(S) 12" WHITE 50' DETAIL 23(TYP) R1-1/SNS RELOCATED R1-1 24" WHITE STOP SIGN AND STOP BAR TO BE PLACED PER TOWN OF DANVILLE STD 117 50' DETAIL 23 10' (TYP) ENTRANCE SIGN - FIRE LANE, SEE LEGEND ENTRANCE SIGN - FIRE LANE, SEE LEGEND 5' 8' TYP 8'5' 8' TY P 19' TYP 9' TY P 19' TYP 8' R1-1/SNS 10 ' FENCE R1-1/SNS SNS CAL TRANS CASE C RAMP BL D G 1 BL D G 2 BL D G 3 BL D G 4 BL D G 5 BL D G 6 BLDG 7 BLDG 8 BLDG 10 BLDG 9 BLDG 11 BLDG 12 BLDG 13 BLDG 14 BL D G 1 5 BLDG 16BLDG 17 R1-1/SNS R1-1/SNS R1-1/SNS R1-1/SNS 9' TYP 9' TY P LEGEND: PER CALTRANS A24D INSTALL NEW STRIPING PER NOTED DESIGNATIONS INSTALL NEW SIGN AND POST PER NOTED DESIGNATION SNS RED CURB (FIRE LANE NO PARKING) NOTES: 1.SIGNING, STRIPING AND PAVEMENT MARKERS SHALL CONFORM TO THE APPLICABLE DETAILS OF THE TOWN OF DANVILLE DESIGN GUIDELINES, THE LATEST CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD PLANS, STANDARD SPECIFICATIONS, AND THE APRIL 2017 CALIFORNIA MUTCD SIGN SPECIFICATION SHEETS. 2.ALL STRIPING SHALL BE THERMOPLASTIC UNLESS OTHERWISE NOTED. ALL TRAFFIC STRIPES AND PAVEMENT MARKINGS SHALL BE APPLIED AT A THICKNESS OF 0.15 INCH. 3.INSTALL BLUE PAVEMENT MARKERS AT EVERY FIRE HYDRANT PER DETAIL THIS SHEET. 4.ALL SIGNS SHALL HAVE 7 FOOT CLEARANCE FROM GROUND TO SIGN PANEL. 5.SIGNS SHALL BE LOCATED 2' FROM THE FACE OF CURB IF THERE IS NO ADJACENT S/W. 6.EV CHARGING SPACE LOCATIONS SHOWN ARE CONCEPTUAL. FINAL LOCATIONS AND NUMBER OF STALLS TO BE DETERMINED DURING FINAL DESIGN. BLUE REFLECTIVE MARKER AT FIRE HYDRANT STOP SIGNR1-1 NO STOPPING ANYTIMER28(S) STREET NAME SIGN PER TOWN OF DANVILLE STANDARD PLAN NO. 121 WITH UPPER AND LOWER CASE LETTERING. "PVT" LOGO TO BE ADDED TO LOWER RIGHTHAND CORNER OF SIGN IN PRIVATE ALLEYS. DECORATIVE PAVEMENT PER LANDSCAPE PLANS COMPACT PARKING SPACEC BLUE REFLECTOR AT FIRE HYDRANTS NTS 6" 15 ' M I N 15 ' M I N STOP AHEADW3-1 PARKING SUMMARY PARKING PROVIDED = 103 STALLS COMPACT PARKING = 31 STALLS STANDARD PARKING = 72 STALLS *PER THE TOWN OF DANVILLE MUNI CODE 32-45-30, COMPACT STALLS SHALL NOT EXCEED 30% OF THE REQUIRED PARKING LOT. NO LEFT TURNR3-2 DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G ELECTRIC VEHICLE CHARGING SPACEEV FUTURE FENCING TO BE DETERMINED BY OTHERS CURB AND GUTTER TO REMAIN CONFORM TO EXISTING SIDEWALK EX FH EX FH FH EX . R O W E A S E M E N T VA R I E S 40' DRIVEWAY INSTALL NEW CURB AND GUTTER WITH DRIVEWAY AND RAMPS 4' S \ W 20 ' E X . E B M U D E A S E M E N T BEGIN OFFSITE IMPROVEMENTS EXISTING CHAIN LINK FENCE TO BE RELOCATED TO ROW REPLACE 4' OF AC BEHIND NEW DRIVEWAY FUTURE FENCING TO BE DETERMINED BY OTHERS EX WM AND BFP TO BE RELOCATED BEHIND PROPOSED SW EX FH EX R O W E A S E M E N T VA R I E S 20 ' E X . E B M U D E A S E M E N T 4' S \ W END OFFSITE IMPROVEMENTS EX CURB AND GUTTER TO REMAIN EXISTING CHAIN LINK FENCE TO BE RELOCATED TO ROW DA T E RE V I S I O N NO . CH E C K E D B Y : DA T E : SC A L E : DR A W N B Y : DE S I G N E D B Y : SHT PROJECT NO. OF CA L I F O R N I A R E P R O D U C T I O N S O F T H I S D O C U M E N T T H A T A R E G E N E R A T E D B Y O T H E R S F R O M E L E C T R O N I C M E D I A . MA C K A Y & S O M P S I S N O T R E S P O N S I B L E F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F EN G I N E E R S PL A N N E R S 51 4 2 B F R A N K L I N D R , P L E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 2 2 5 - 0 6 9 0 SU R V E Y O R S 29036.TRU2 DE C E M B E R 2 0 2 3 11 DA N V I L L E AS S H O W N CF CF / K R CW G LEGEND: PROPOSED SIDEWALK PROPOSED FENCE PROPOSED PROPERTY LINE EXISTING PAE EASEMENT GENERAL NOTES: 1.EXISTING CURB AND GUTTER TO REMAIN EXCEPT AS NOTED. PROTECT IN PLACE. 2.PROPOSED SIDEWALK TO TRANSITION AND TIE INTO THE EXISTING SIDEWALK AT FOSTORIA WAY. MA T C H L I N E . S E E B E L O W MA T C H L I N E . S E E A B O V E A A SECTION A-A NTS 4' S/W 1' 2% FC CAMINO RAMON 2:1 MAX FENCE BY OTHERS 10'± ROW EXISTING CHAIN LINK FENCE TO BE RELOCATED TO ROW EXISTING CURB AND GUTTER TO REMAIN EXCEPT AS NOTED EBRPD VARIES EG C C C C C C CCCCCCCCC C C C C C C C CC C C VAN EV EV EV EV EV EV VAN C CCCC BOREL PROPERTY LAND USE AND DENSITY EXHIBIT MU 20-25: 1.93 ACRES 44 DU 22.8 DU/ACRE MU 25-30: 4.95 ACRES 124 DU 25.1 DU/ACRE CCCFCD SE R V I C E R O A D A R E A : 0.13 ACRE S CCCFCD SERVICE ROAD FENCE FOR CCCFCD SERVICE ROAD 37 3 . 0 2 0 Borel Danville, CA December 22, 2023 Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 PROJECT DATA TABLE ADDRESS: CAMINO RAMON RD. AT CAMINO RAMON PLACE DANVILLE, CA 94526 APN: 218-090-034 GENERAL PLAN:RESIDENTIAL HIGH/MEDIUM DENSITY 20-25 DU/AC (M25) - 1.93 AC RESIDENTIAL HIGH DENSITY 25-30 DU/AC (M30) - 4.95 AC ZONING: PLANNED UNIT DISTRICT (P-1) SITE AREA: AREA A: (M25): 1.93 ACRES (84,071 S.F.) AREA B: (M30): 4.95 ACRES (215,622 S.F.) 6.88 ACRES CCCFCD SERVICE ROAD .13 ACRES (5,663 S.F.) (NOT INCLUDED IN DENSITY CALCULATION) MINIMUM DENSITY:20 (AREA A): 20 DU/AC (1.93 AC) = 38.6 UNITS 25 (AREA B): 25 DU/AC (4.95 AC) = 123.75 UNITS 162.4 = 163 UNITS MINIMUM PROPOSED DENSITY: 44 UNITS (AREA A: 22.8 du / ac) + 124 UNITS (AREA B: 25.1 du / ac) = 168 UNITS PROPOSED BUILDING CODE: 2022 CALIFORNIA BUILDING CODE / DANVILLE MUNICIPAL CODE OCCUPANCY:R2 / S2 (TOWNHOMES); R2 / A-3 / B (APARTMENTS) CONSTRUCTION:TYPE V-B (NON-RATED) FIRE SPRINKLERS:INCLUDED PER C.B.C. 903.2 & 903.3 BUILDING AREA SUMMARY (TOWNHOMES) 6 UNIT BUILDING: (x 4 BUILDINGS) FIRST FLOOR:1,301 S.F. 5,204 S.F. SECOND FLOOR:4,288 S.F.17,152 S.F. THIRD FLOOR:4,172 S.F.16,688 S.F. TOTAL RESIDENTIAL: 9,761 S.F.39,044 SQ. FT. GARAGE:2,735 S.F.10,940 SQ. FT. 8 UNIT BUILDING:(x 5 BUILDINGS) FIRST FLOOR:1,656 S.F.8,280 S.F. SECOND FLOOR:5,734 S.F.28,670 S.F. THIRD FLOOR:5,520 S.F.27,600 S.F. TOTAL RESIDENTIAL: 12,910 S.F.64,550 SQ. FT. GARAGE:3,730 S.F.18,650 SQ. FT. 10 UNIT BUILDING:(x 6 BUILDINGS) FIRST FLOOR: 2,011 S.F.12,066 S.F. SECOND FLOOR: 7,180 S.F.43,080 S.F. THIRD FLOOR: 6,868 S.F.41,208 S.F. TOTAL RESIDENTIAL: 16,059 S.F. 96,356 S.F. GARAGE:4,725 S.F.28,350 SQ. FT. BUILDING AREA SUMMARY (APARTMENTS) 'BUILDING 'A' - 20 UNITS + COMMUNITY ROOM & LAUNDRY FIRST FLOOR: 9,194 S.F. SECOND FLOOR: 8,624 S.F. THIRD FLOOR: 8,412 S.F. TOTAL AREA = 26,230 S.F. x (1) BUILDING A = 26,230 SQ. FT. 'BUILDING 'B' - 24 UNITS FIRST FLOOR: 9,148 S.F. SECOND FLOOR: 8,624 S.F. THIRD FLOOR: 8,412 S.F. TOTAL AREA = 26,184 S.F. x (1) BUILDING B = 26,184 SQ. FT. THE FOLLOWING TABLE SUMMARIZES THE PROJECT: SETBACKS REQUIRED / ALLOWED PROPOSED FRONT 25' MIN.25' REAR 20' MIN.20' RIGHT SIDE 20' MIN.20' LEFT SIDE 20' MIN. 30' HEIGHT:35' (M-25); 39'-11" (APARTMENTS) 37' (M-30) 36'-11" (TOWNHOMES) FLOOR AREA RATIO (F.A.R.): MAXIMUM ALLOWABLE = 80% PARKING STANDARDS (PER DANVILLE MUNICIPAL CODE 32-24.9 ) REQUIRED SPACES 1.5 SPACES PER 1 BEDROOM DWELLING UNIT: 30 SPACES (APARTMENTS) 2 SPACES PER 2 OR MORE BEDROOM DWELLING UNIT:48 SPACES (APARTMENTS) 248 SPACES (TOWNHOMES) 1 GUEST SPACE PER 4 DWELLING UNITS: 43 SPACES TOTAL REQUIRED:369 SPACES (MIN. 1/2 REQUIRED SPACES SHALL BE COVERED = 185 SPACES) DENSITY BONUS PARKING STANDARDS PER GOV. CODE 65915 (p) (1) REQUIRED SPACES 1 SPACE PER UNIT 1 BEDROOM UNIT: 20 SPACES (APARTMENTS) 1.5 SPACES PER UNIT 2&3 BEDROOM UNIT: 36 SPACES (APARTMENTS) 186 SPACES (TOWNHOMES) GUEST AND ADA (INCLUDED): 0 SPACES TOTAL SPACES REQUIRED: 242 SPACES REQUIRED PARKING PROVIDED STANDARD SPACES: 103 SPACES (SURFACE PARKING SPACES) COVERED SPACES: 186 SPACES (PRIVATE GARAGE SPACES) TOTAL PROVIDED: 289 SPACES PROVIDED PROJECT DATA A01 UNIT MIX CHART - TOWNHOMES UNIT NAME DESCRIPTION GARAGE S.F.GARAGE TYPE QUANTITY %UNIT NET S.F. UNIT GROSS S.F. UNIT 1 3 BED + 3 BATH 546 2-CAR (1 STD. + 1 TANDEM)32 25.81 1533 2079 UNIT 2 3 BED + 3 BATH 449 2-CAR (2 STD.)32 25.81 1616 2065 UNIT 3 2 BED + 2 BATH + PWDR 445 2-CAR (1 STD. + 1 SUBCOMPACT TANDEM) 15 12.10 1504 1949 UNIT 3 ALT 2 BED + 2 BATH + PWDR 445 2-CAR (1 STD. + 1 SUBCOMPACT TANDEM) 15 12.10 1498 1943 UNIT 4 3 BED + 3 BATH + PWDR 425 2-CAR (2 STD.)17 13.71 1802 2227 UNIT 4 ADP 2 BED + 2 BATH + 2 PWDR 425 2-CAR (2 STD.)13 10.48 1802 2227 TOTAL:124 100.00 UNIT MIX CHART - APARTMENTS UNIT NAME DESCRIPTION QUANTITY %BMR QUANTITY BMR %UNIT NET S.F. UNIT GROSS S.F. UNIT 1 1 BED + 1 BATH 20 46.51 20 46.51 564 604 UNIT 2 2 BED + 1 BATH 12 27.91 12 27.91 815 860 UNIT 3 3 BED + 2 BATH 11 25.58 11 25.58 1113 1116 TOTAL:43 100.00 43 100.00 MANAGER'S UNIT: 3 BED + 1 BATH - NOT RENTABLE 1 2.33 0 0.00 1113 1116 PROJECT DESCRIPTION THE BOREL TOWNHOMES / APARTMENT PROJECT IS A MULTI-FAMILY RESIDENTIAL PROJECT LOCATED ON A 7 ACRE PARCEL AT CAMINO RAMON RD. & CAMINO RAMON PL. IN DANVILLE, CA. THE PROJECT IS COMPRISED OF TWO RESIDENTIAL PRODUCT TYPES: 1. TOWNHOMES: 124 UNITS OF MARKET RATE UNITS TOTALING 199,950 SQ. FT. OF ABOVE GRADE RESIDENTIAL LIVING SPACE WITHIN (3) SEPARATE 3-STORY BUILDING TYPES. EACH TOWNHOME UNIT ALSO CONTAINS A 2-CAR GARAGE WITH (1) LEVEL 2 EV CHARGING STATION. 2. APARTMENTS: 44 BELOW MARKET RATE (BMR) UNITS TOTALING 33,840 SQ. FT. OF ABOVE GRADE RESIDENTIAL LIVING SPACE IN (2) 3-STORY BUILDINGS, ONE OF WHICH CONTAINS 2,471 SQUARE FEET OF GROUND-FLOOR COMMUNITY ROOM, RECREATION, OFFICE, & PUBLIC RESTROOM SPACE, 375 SQ. FT. OF MAINTENANCE / UTILITY SPACE, AND A 232 SQ. FT. COMMON LAUNDRY ROOM. SEE PARKING ANALYSIS ABOVE FOR PARKING SPACES PROVIDED ONSITE. FAR CALCULATION ALLOWABLE SQ.FT. PROVIDED SQ. FT. SITE AREA = 7.01 ACRES 80% MAX. 82.6% 305,356 SQ. FT. 244,284 SQ. FT. 252,364 SQ. FT. TOTAL BUILDING AREA PROVIDED (EXCLUDES TOWNHOUSE GARAGES, PORCHES, & DECKS) TOWNHOUSE 6-UNIT BUILDINGS = 39,044 SQ. FT. TOWNHOUSE 8-UNIT BUILDINGS = 64,550 SQ. FT. TOWNHOUSE 10-UNIT BUILDINGS = 96,356 SQ. FT. APARTMENT BUILDING A = 26,230 SQ. FT. APARTMENT BUILDING B = 26,184 SQ. FT. TOTAL BUILDING AREA = 252,364 SQ. FT. AFFORDABLE HOUSING / DENSITY BONUS AFFORDABLE HOUSING AFFORDABLE UNITS:44 B.M.R. PROVIDED (APARTMENTS) WAIVERS STANDARD WAIVER 1. FLOOR AREA RATIO .8 (80%) .826 (82.6%) 2. BUILDING HEIGHT 35' (AREA A) 40' 37' (AREA B) 40' 3. BUILDING-TO-BUILDING DISTANCE 20' MIN. 15'-3" 4. BUILDING HEIGHT LIMIT 2 STORIES 3 STORIES AT AREA A (PER DANVILLE 2030 GENERAL PLAN, PG. 3-55) 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 SITE AERIAL & PHOTOS A02 BIRDS EYE VIEW OF SITE LOOKING SOUTH 1 2 3 5 4 1 2 3 4 5 PROJECT SITE 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 PARCEL E PARCEL P 15 17 PARCEL D PARCEL I PARCEL C PARCEL J 5 12 11 87 2 1 3 PARCEL G 4 6 PARCEL A PARCEL H 14 13 PARCEL K PARCEL F BLDG 16 ARCHITECTURAL SITE PLAN A03 0 6'12'18'30'60'24' NOTE: 1.Refer to Civil sheets for all property lines, easements, site dimensions, accessible unit locations, etc. 2.Refer to Landscape sheets for landscape design, dimensions and detailed information SITE PLAN LEGEND TOWNHOUSE UNIT 1 TOWNHOUSE UNIT 2 TOWNHOUSE UNIT 3 TOWNHOUSE UNIT 4 24-UNIT APARTMENT BUILDING 20-UNIT APARTMENT BUILDING WITH COMMUNITY CENTER PROPERTY LINE NOT TO SCALE VICINITY MAP NORTH PRIVATE STREET D PRIVATE STREET E PRIVATE STREET G PR I V A T E S T R E E T B PR I V A T E S T R E E T C PRIVATE STREET F C A M I N O R A M O N BLDG 1 BLDG 6 BLDG 2 BLDG 3 BLDG 4 BLDG 5 BLDG 7 BLDG 8 BLDG 9BLDG 10 BLDG 11 BLDG 12 BLDG 13 BLDG 14 BLDG 15 BLDG 17 BLDG 16 PR I V A T E S T R E E T A PROJECT SITEPROJECT SITE 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 Danville, CA December 22, 2023 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 BUILDING 8 MASSING VIEWS A04 FRONT VIEW REAR VIEW 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 32 GAL 64 GAL 32 GAL 32'-0" 44 ' - 0 " UNIT 2 2-CAR GARAGE 19'-10" x 20'-1" UNIT 1 TANDEM GARAGE 10'-11" x 43'-3" UNIT 2 ENTRY UP UP UNIT 1 ENTRY UNIT 2 PORCH UNIT 1 PORCH 2' - 0 " 3' - 0 " UNIT 2 DEN 6'-10" x 14'-2" 34 SQ. FT.58 SQ. FT. M.C. M.C. DN UP DN UP UNIT 1 BEDROOM 3 10'-11" x 10'-1" UNIT 1 BA 3 UNIT 1 KITCHEN UNIT 1 NOOK 7'-11" x 10'-9" UNIT 1 FAMILY 11'-11" x 13'-8" UNIT 2 FAMILY 12'-0" x 12'-8" UNIT 2 KITCHEN UNIT 2 DINING 7'-9" x 11'-11" UNIT 2 BA 3 UNIT 2 BEDROOM 3 10'-11" x 10'-1" UNIT 1 DECK UNIT 2 DECK 57 SQ. FT. 41 SQ. FT. M.C. M.C. M.C. M.C. UNIT 1 BEDROOM 2 10'-11" x 11'-1" UNIT 1 BA 2 WALK-IN CLOSET DN DN WALK-IN CLOSET PRIMARY BATH PRIMARY BEDROOM 12'-5" x 14'-9" UNIT 1 UNIT 1 LNDY UNIT 2 BEDROOM 2 10'-10" x 10'-1" UNIT 2 BA 2 PRIMARY BEDROOM 11'-6" x 13'-11" UNIT 1 PRIMARY BATH UNIT 2 UNIT 2 LNDY UNIT 2 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 FIRST FLOOR PLANSECOND FLOOR PLAN UNIT 1 SQUARE FOOTAGES UNIT 1 FIRST FLOOR UNIT 1 SECOND FLOOR UNIT 1 THIRD FLOOR UNIT 1 TOTAL LIVING UNIT 1 TANDEM GARAGE UNIT 1 DECK UNIT 1 PORCH 143 SQ. FT. 709 SQ. FT. 681 SQ. FT. 1533 SQ. FT. 546 SQ. FT. 57 SQ. FT. 34 SQ. FT. 0 1'2'3'4'8' TOWNHOUSE UNIT 1 & 2 FLOOR PLANS A05 THIRD FLOOR PLAN UNIT 2 SQUARE FOOTAGES UNIT 2 FIRST FLOOR UNIT 2 SECOND FLOOR UNIT 2 THIRD FLOOR UNIT 2 TOTAL LIVING UNIT 2 2-CAR GARAGE UNIT 2 DECK UNIT 2 PORCH 212 SQ. FT. 737 SQ. FT. 667 SQ. FT. 1616 SQ. FT. 449 SQ. FT. 41 SQ. FT. 58 SQ. FT. 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 32'-0" 40 ' - 8 1 / 2 " 32 GAL 64 GAL 32 GAL 64 GAL 32 GAL 32 GAL 3' - 0 " UNIT 4 ENTRY UNIT 4 BA 3 UP UP 3' - 3 1 / 2 " 1' - 6 " UNIT 3 TANDEM GARAGE 11'-0" x 38'-0" UNIT 4 2-CAR GARAGE 19'-9" x 19'-2" UNIT 4 BEDROOM 3 11'-1" x 10'-7" UNIT 3 PORCH 12 SQ. FT. UNIT 4 PORCH 70 SQ. FT. UNIT 3 ENTRY UNIT 3 PWDR UNIT 3 LIVING 11'-3" x 14'-10" UNIT 3 KITCHEN UNIT 3 DINING 11'-6" x 15'-6" PANTRY UNIT 3 DECK DN UP UNIT 4 DECK UNIT 4 DINING 9'-2" x 17'-0" UP DN UNIT 4 KITCHEN UNIT 4 PWDR 43 SQ. FT. 77 SQ. FT. UNIT 4 LIVING 13'-10" x 15'-8" W D W D PRIMARY BEDROOM 16'-3" x 12'-0" P. BATH WALK-IN CLOSET UNIT 3 BEDROOM 2 10'-2" x 10'-2" UNIT 3 BA 2 UNIT 4 LNDY UNIT 4 DN DN WALK-IN CLOSET PRIMARY BEDROOM 13'-6" x 13'-1" UNIT 3 UNIT 4 P. BATH UNIT 3 UNIT 4 BEDROOM 2 12'-6" x 11'-4" UNIT 4 BA 2 UNIT 3 LNDY 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 FIRST FLOOR PLANSECOND FLOOR PLAN UNIT 3 SQUARE FOOTAGES UNIT 3 FIRST FLOOR UNIT 3 SECOND FLOOR UNIT 3 THIRD FLOOR UNIT 3 TOTAL LIVING UNIT 3 2-CAR GARAGE UNIT 3 DECK 67 SQ. FT. 760 SQ. FT. 677 SQ. FT. 1504 SQ. FT. 445 SQ. FT. 77 SQ. FT. 0 1'2'3'4'8' TOWNHOUSE UNIT 3 & 4 FLOOR PLANS A06 THIRD FLOOR PLAN UNIT 4 SQUARE FOOTAGES UNIT 4 FIRST FLOOR UNIT 4 SECOND FLOOR UNIT 4 THIRD FLOOR UNIT 4 TOTAL LIVING UNIT 4 2-CAR GARAGE UNIT 4 DECK 406 SQ. FT. 661 SQ. FT. 735 SQ. FT. 1802 SQ. FT. 425 SQ. FT. 43 SQ. FT. 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 32 GAL 64 GAL 32 GAL 64 GAL 32 GAL 32 GAL UNIT 4 ENTRY UNIT 4 ADP PWDR UP UNIT 4 DEN 11'-2" x 12'-4" UNIT 4 PORCH 32 GAL 64 GAL 32 GAL 64 GAL 32 GAL 32 GAL UNIT 3 TANDEM GARAGE 11'-0" x 38'-0" UNIT 3 PORCH UNIT 3 ENTRY FIRE RISER CLOSET 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 UNIT 4 FIRST FLOOR ADAPTABLE PLAN 0 1'2'3'4'8' TOWNHOUSE UNIT 3 & 4 ALTERNATE & ADAPTABLE PLANS A07 UNIT 3 FIRST FLOOR ALTERNATE PLAN UNIT 3 SQUARE FOOTAGES UNIT 3 FIRST FLOOR ALT UNIT 3 SECOND FLOOR UNIT 3 THIRD FLOOR UNIT 3 ALT TOTAL LIVING UNIT 3 2-CAR GARAGE UNIT 3 DECK 61 SQ. FT. 760 SQ. FT. 677 SQ. FT. 1498 SQ. FT. 445 SQ. FT. 77 SQ. FT. 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 44 ' - 0 " 96'-2" M . C . M . C . 6 :126:12 RIDGE 6 :12 6 :12 RI D G E 6 :12 6 :12 RI D G E 6 :12 RI D G E 6 :126:12 RI D G E 6 :12 RI D G E 3 :1 2 3 :1 2 3 :1 2 6 :1 2 6 :1 2 VA L L E Y V A L L E Y V A L L E Y VA L L E Y VA L L E Y V A L L E Y V .V. V. V . RI D G E V A L L E Y VA L L E Y COMPOSITION SHINGLE ROOFINGSEE ELEVATIONS FOR MAXIMUM HEIGHT OF ROOF SEE ELEVATIONS FOR EAVE HEIGHT W D W D W D W D M . C . M . C . M . C . M . C . 6 :1 2 6 :12 R. FIRST FLOOR PLAN SECOND FLOOR PLAN 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 ROOF PLAN THIRD FLOOR PLAN UNIT 3 UNIT 4 UNIT 1R UNIT 2R UNIT 4R UNIT 3R UNIT 3 UNIT 4 UNIT 1R UNIT 2R UNIT 4R UNIT 3R UNIT 3 UNIT 4 UNIT 1R UNIT 2R UNIT 4R UNIT 3RUNIT 3 UNIT 4 UNIT 1R UNIT 2R UNIT 4R UNIT 3R TOWNHOUSE BUILDING 6 FLOOR & ROOF PLANS A09 0 2'4'6'8'16' 2ND FLR. @ BLDG. 1, 6, 15 PARTIAL 3RD FLR. @ BLDG. 1, 6, 15 PARTIAL ROOF PLAN @ BLDG. 1, 6, 15 PARTIAL 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 37 3 . 0 2 0 Borel Danville, CADanville, CA December 22, 2023 44 ' - 0 " 128'-3" M.C. M.C. M . C . M . C . FIRST FLOOR PLAN SECOND FLOOR PLAN 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 TOWNHOUSE BUILDING 8 FIRST & SECOND FLOOR PLANS A12 0 2'4'6'8'16' UNIT 4R UNIT 3RUNIT 2R UNIT 2 UNIT 1UNIT 1RUNIT 4UNIT 3 UNIT 4R UNIT 3RUNIT 2R UNIT 2 UNIT 1UNIT 1RUNIT 4UNIT 3 Danville, CA December 22, 2023 M.C. M.C. M.C. M.C. W D W D M . C . M . C . M . C . M . C . W D W D 6 :12 6 :12 RI D G E 6 :12 RI D G E 6 :1 2 6 :12 6 :12 RI D G E RI D G E 6 :12 6 :1 2 3 :1 2 RIDGE 3 :1 2 3 :1 2 RIDGE 3 :1 2 3 :1 2 RI D G E RI D G E RI D G E 6 :12 6 :12 6 :12 VA L L E Y VA L L E Y V A L L E Y V A L L E Y VA L L E Y V A L L E Y V. V A L L E Y VA L L E Y V . V. V . V A L L E Y V A L L E Y VA L L E Y VA L L E Y 6 :126:126:12 COMPOSITION SHINGLE ROOFING SEE ELEVATIONS FOR MAXIMUM HEIGHT OF ROOF SEE ELEVATIONS FOR EAVE HEIGHT THIRD FLOOR PLAN ROOF PLAN 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 TOWNHOUSE BUILDING 8 THIRD FLOOR PLAN & ROOF PLAN A13 0 2'4'6'8'16' UNIT 4R UNIT 3RUNIT 2R UNIT 2 UNIT 1UNIT 1RUNIT 4UNIT 3 UNIT 4R UNIT 3RUNIT 2R UNIT 2 UNIT 1UNIT 1RUNIT 4UNIT 3 Danville, CA December 22, 2023 Danville, CA December 22, 2023 Danville, CA December 22, 2023 44 ' - 0 " 160'-4" M.C. M.C. M.C. M.C. M . C . M . C . FIRST FLOOR PLAN SECOND FLOOR PLAN 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 TOWNHOUSE BUILDING 10 FIRST & SECOND FLOOR PLANS A16 0 2'4'6'8'16' UNIT 4R UNIT 3RUNIT 4UNIT 3 UNIT 2R UNIT 2 UNIT 1UNIT 1R UNIT 2 UNIT 1 UNIT 4R UNIT 3RUNIT 4UNIT 3 UNIT 2R UNIT 2 UNIT 1UNIT 1R UNIT 2 UNIT 1 Danville, CA December 22, 2023 M.C. M.C. M.C. M.C. M.C. M.C. M.C. M.C. M . C . M . C . M . C . M . C . W D W D W D W D 6 :12 6 :12 RI D G E 6 :12 RI D G E 6 :1 2 6 :12 6 :12 RI D G E RI D G E 6 :12 6 :1 2 VA L L E Y V A L L E Y V. V A L L E Y VA L L E Y V . RIDGE 3 :1 2 3 :1 2 RIDGE 3 :1 2 3 :1 2 V .V. 6 :126:12 3 :1 2 RI D G E V A L L E Y VA L L E Y RI D G E VA L L E Y V A L L E Y 6 :126:12 RI D G E VA L L E Y V A L L E Y 6 :126:12RI D G E 6 :126:12 V A L L E Y VA L L E Y 3 :1 2 RI D G E 6 :12 6 :12 V A L L E Y V A L L E Y VA L L E Y VA L L E Y COMPOSITION SHINGLE ROOFING SEE ELEVATIONS FOR MAXIMUM HEIGHT OF ROOF SEE ELEVATIONS FOR EAVE HEIGHT THIRD FLOOR PLAN ROOF PLAN 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 TOWNHOUSE BUILDING 10 THIRD FLOOR PLAN & ROOF PLAN A17 0 2'4'6'8'16' UNIT 4R UNIT 3RUNIT 4UNIT 3 UNIT 2R UNIT 2 UNIT 1UNIT 1R UNIT 2 UNIT 1 UNIT 4R UNIT 3RUNIT 4UNIT 3 UNIT 2R UNIT 2 UNIT 1UNIT 1R UNIT 2 UNIT 1 Danville, CA December 22, 2023 Danville, CA December 22, 2023 Danville, CA December 22, 2023 123123123 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 TYPICALTOWNHOUSE EXTERIOR MATERIALS & DETAILS A20 SMOOTH FIBER CEMENT PANEL COMPOSITION SHINGLE ROOFING VINYL WINDOWS BACKLIT ADDRESS EXTERIOR PLASTER FINISH HOLLOW METAL DOOR FRAME FIBERGLASS DOOR DOOR HEAD @ EXT. PLASTER EXTERIOR PLASTER FINISH METAL CANOPY VINYL WINDOW FRAME EXTERIOR PLASTER FINISH WINDOW FRAME SMOOTH FIBER CEMENT SIDING SMOOTH FIBER CEMENT SIDING WINDOW FRAME EXTERIOR PLASTER FINISH VINYL WINDOW FRAME COMPOSITION SHINGLE ROOFING EXTERIOR PLASTER FINISH 6" FIBER CEMENT SIDING SIDING TO PLASTER TRANSITION EXTERIOR PLASTER FINISH SMOOTH FIBER CEMENT SIDING DOOR HEAD @ SIDING WINDOW HEAD @ SIDING WINDOW SILL @ SIDING WINDOW HEAD w/o TRIM WINDOW SILL w/o TRIM VINYL WINDOWS HOLLOW METAL DOOR FRAME FIBERGLASS DOOR SMOOTH FIBER CEMENT SIDING SIDING TO PLASTER MATERIAL TRANSITION 6" FIBER CEMENT SIDING BACKLIT ADDRESS Danville, CA December 22, 2023 123 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 TYPICAL TOWNHOUSE EXTERIOR MATERIALS & DETAILS A21 6" FIBER CEMENT SIDING STEEL & WOOD RAILING COMPOSITION SHINGLE ROOFING EXTERIOR PLASTER FINISH VINYL WINDOWS SECTIONAL FLUSH PANEL ROLL-UP GARAGE DOORS SLIDING DOOR HEAD SLIDING DOOR JAMB EXTERIOR PLASTER FINISH EXTERIOR PLASTER FINISH RAIL CONNECTION FRONT SECTION 3' - 6 " 1 1 / 2 T Y P . 1 1/2" 1-1/2" METAL TUBING VERTICALS, TYP. 2x6 FIBER CEMENT SLATS, TYP. DECK RAIL VINYL SASH SLIDING DOOR VINYL SASH SLIDING DOOR STUCCO CANTILEVER FLOOR FRAMING S.S.D. EXTERIOR PLASTER FINISH BACKLIT ADDRESS WALL PACK EXTERIOR LIGHT FIXTURE 2x4 BLOCKING @ ATTACHMENT T.O. DECK DECK BEAM PER STRUCT. 1-1/2" METAL TUBING VERTICALS, TYP. PLI-DEK FINISH SYSTEM Danville, CA December 22, 2023 123 123 37 3 . 0 2 0 Borel Danville, CA Trumark Homes 3001 Bishop Drive, Suite 100 San Ramon, CA 925.648.8300 TYPICAL TOWNHOUSE EAVE & RAKE DETAILS A22 TYPICAL EAVE TYPICAL RAKE PAINTED GSM FLASHING 12" TYP. EXTERIOR FINISH 2x8 RAKE BOARD ROOF TRUSS COMPOSITION SHINGLE ROOFING 2x4 FLAT FRAMING @ 24" O.C. - PAINT TO MATCH EXTERIOR FINISH COLOR COMPOSITION SHINGLE ROOFING 2x CONT. BLOCKING VARIES 12"-18" ROOF TRUSS 2x8 RAKE BOARD BEYOND EXTERIOR FINISH 7" FULL PROFILE GUTTER NOTES: - PAINT STEEL HARDWARE TO MATCH CANOPY EXTERIOR FINISH ESCUTCHEON PLATE, EYE BOLT & TENSION ROD BY CANOPY MFR. 8" STANDARD FASCIA w/ 1-INCH SQUARE TUBE AT TOP & BOTTOM ALUMINUM CANOPY 2x BLOCKING Danville, CA December 22, 2023 Danville, CA December 22, 2023 30 ' - 7 " 24'-10" 17'-10" 3' - 3 " 8' - 0 " 10'-0" 27 ' - 4 " BEDROOM 10'-1" x 10'-2" BATH W/D KITCHEN LIVING PATIO / DECK WH D/W DINING APARTMENT UNIT 1 FLOOR PLAN A24 0 1'2'3'4'8'UNIT 1 SQUARE FOOTAGE NET LIVING GROSS LIVING 564 SQ. FT. 604 SQ. FT. FLOOR PLAN - UNIT 1 Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CADanville, CA December 22, 2023 36'-6" 31 ' - 1 1 " 16'-11" 20 ' - 2 1 / 2 " 6' - 5 " 3' - 5 " BEDROOM 2 10'-3" x 12'-2" BATH W/D DINING LIVING PATIO / DECK WH D/W BEDROOM 1 11'-9" x 13'-9" WALK-IN CLOSET KITCHEN APARTMENT UNIT 2 FLOOR PLAN A25 0 1'2'3'4'8'UNIT 2 SQUARE FOOTAGE NET LIVING GROSS LIVING PATIO / DECK 815 SQ. FT. 860 SQ. FT. 107 SQ. FT. FLOOR PLAN - UNIT 2 Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CADanville, CA December 22, 2023 BATH 1 W/D DINING LIVING PATIO / DECK WH D/W BEDROOM 1 11'-6" x 13'-0" WALK-IN CLOSET 41'-11" 33 ' - 3 1 / 2 " 29 ' - 3 1 / 2 " 16'-9" 6' - 0 " BEDROOM 2 11'-6" x 10'-4" BEDROOM 3 11'-6" x 10'-4" BATH 2 KITCHEN APARTMENT UNIT 3 FLOOR PLAN A26 0 1'2'3'4'8' Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CA UNIT 3 SQUARE FOOTAGE NET LIVING GROSS LIVING PATIO / DECK 1113 SQ. FT. 1166 SQ. FT. 96 SQ. FT. FLOOR PLAN - UNIT 3 Danville, CA December 22, 2023 67 ' - 2 " 49'-9" TRASH KITCHEN COMMUNITY ROOM MANAGER OFFICE MAINTENANCE ROOM LAUNDRY MEN WOMEN ENTRY TECH ROOM STORAGE STORAGE STORAGE FAU FIRE RISER MAIL BOXES EXERCISE ROOM COMMUNITY CENTER FLOOR PLAN A27 0 1'2'3'4'8' Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CA COMMUNITY CENTER COMMUNITY CENTER SQUARE FOOTAGE UTILITY LAUNDRY MAINTENANCE COMMUNITY ROOM 73 SQ. FT. 232 SQ. FT. 302 SQ. FT. 2471 SQ. FT. Danville, CA December 22, 2023 147'-8" 67 ' - 2 " UNIT 2RUNIT 3 UNIT 2UNIT 3R COMMUNITY CENTER APARTMENT BUILDING A - 20 UNIT BUILDING A28 0 2'4'6'8'16' BUILDING A (20 UNIT BLDG) - FIRST FLOOR PLAN Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CADanville, CA December 22, 2023 APARTMENT BUILDING A - 20 UNIT BUILDING A29 0 2'4'6'8'16' BUILDING A (20 UNIT BLDG) - SECOND & THIRD FLOOR PLANS Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CA UNIT 3R UNIT 1 UNIT 1R UNIT 3 UNIT 1UNIT 1R UNIT 2 UNIT 2R Danville, CA December 22, 2023 Danville, CA December 22, 2023 6:12 ROOF PITCH, TYP. COMPOSITION ROOFING 7' - 9 " DECK PATIO DECK KITCHEN LIVING DECK PATIO DECK ENTRY KITCHEN LIVING ENTRY KITCHEN LIVING ENTRY KITCHEN KITCHEN KITCHEN LIVING ENTRY LIVING ENTRY LIVING ENTRY APARTMENT BUILDING A - ROOF PLAN & SECTION A31 0 2'4'6'8'16' BUILDING A (22 UNIT BLDG) - FIRST FLOOR PLAN Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CA TYPICAL SECTION Danville, CA December 22, 2023 147'-8" 67 ' - 2 " UNIT 2 UNIT 1UNIT 1R UNIT 3R UNIT 2R UNIT 1 UNIT 1R UNIT 3 APARTMENT BUILDING B - 24 UNIT BUILDING A32 0 2'4'6'8'16' BUILDING B (24 UNIT BLDG) - TYPICAL FLOOR PLAN Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CADanville, CA December 22, 2023 Danville, CA December 22, 2023 6:12 ROOF PITCH, TYP. COMPOSITION ROOFING 7' - 9 " DECK PATIO DECK KITCHEN LIVING DECK PATIO DECK ENTRY KITCHEN LIVING ENTRY KITCHEN LIVING ENTRY KITCHEN KITCHEN KITCHEN LIVING ENTRY LIVING ENTRY LIVING ENTRY APARTMENT BUILDING B - ROOF PLAN & SECTION A34 0 2'4'6'8'16' BUILDING B (22 UNIT BLDG) - FIRST FLOOR PLAN Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CA TYPICAL SECTION Danville, CA December 22, 2023 Trumark Homes 3001 Bishop Drive, Suite 100, San Ramon, CA 94583 925.648.8300 34 6 . 0 3 1 Borel Danville, CA TYPICAL APARTMENT BUILDING EXTERIOR MATERIALS & DETAILS A35 COMPOSITION SHINGLE ROOFING SAND COLORED VINYL WINDOWS BOARD & BATT SIDING SIDING TO SIDING MATERIAL TRANSITION 8" FIBER CEMENT SIDING WINDOW SILL w/ TRIM WINDOW HEAD w/ TRIM SMOOTH FIBER CEMENT SIDING SMOOTH FIBER CEMENT HORZ. TRIM SMOOTH FIBER CEMENT HORZ. TRIM SMOOTH FIBER CEMENT SIDING VINYL WINDOW FRAME VINYL WINDOW FRAME HOLLOW METAL DOOR FRAME SMOOTH FIBER CEMENT TRIM VINYL WINDOW FRAME DOOR JAMB/SIDELITE JAMB DOOR HEAD w/ TRIM SMOOTH FIBER CEMENT HORZ. TRIM SMOOTH FIBER CEMENT SIDING HOLLOW METAL DOOR FRAME SIDING TO PLASTER TRANSITION SMOOTH FIBER CEMENT HORZ. TRIM SMOOTH FIBER CEMENT BOARD & BATT SIDING SMOOTH FIBER LAP SIDING w/ 8" REVEAL EXTERIOR FINISH - SEE PLAN 2x BLOCKING, S.S.D. METAL VERTICAL RAILS METAL TOP & BOTTOM RAILS RAIL CONNECTION ATTACHMENT TO WALL 1 1/2" SQ. METAL TUBING TOP & BOTTOM RAILS T.O. PORCH / DECK 1" SQ. METAL PICKETS @ MAX. 4 1/2" O.C. 2' - 9 " 3" METAL RAIL PAINTED GSM FLASHING 12" TYP. EXTERIOR FINISH 2x8 RAKE BOARD ROOF TRUSS COMPOSITION SHINGLE ROOFING 2x4 FLAT FRAMING @ 24" O.C. - PAINT TO MATCH EXTERIOR FINISH COLOR COMPOSITION SHINGLE ROOFING 2x CONT. BLOCKING 12" TYP. ROOF TRUSS 2x8 RAKE BOARD BEYOND EXTERIOR FINISH METAL RAIL TYPICAL EAVE TYPICAL RAKE 5" OGEE GUTTER Danville, CA December 22, 2023 December 22, 2023 BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-10 1 5 ’ 3 0 ’ 6 0 ’ ILLUSTRATIVE SITE PLAN 1 11 12 17 17 14 2 16 13 10 3 4 1 112 126 163137 174148515910Main Entry w/ Enhanced Paving Secondary Entry Existing Gravel Service Road To Remain 10’ Soundwall Dry Creek Arroyo BBQ Area Play Area Seating Node Community Gathering Stormwater Treatment BasinARB REVISIONS:Block wall added to northern project boundary Added bike parking, see L-2 Proposed 4’ City Sidewalk Enhanced Crosswalk Existing Trees To Remain typ. Lawn with Split Rail Fence Dog Area View Fence Slump Block Wall 14 7 6 9 5 12 158 10 CA M I N O R A M O N Fe n c i n g b y O t h e r s 8’6’ BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-20 1 5 ’ 3 0 ’ 6 0 ’ PEDESTRIAN CIRCULATION PLANARB REVISIONS:Added bike parking Primary Loop Path Secondary Walks Enhanced Crossings Bike Parking (24 Bikes Total) CA M I N O R A M O N BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-3 CHARACTER IMAGES BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-4 PLANT PALETTE SH R U B S TR E E S Po d o c a r p u s m a c r o p h y l l u s ‘M a k i ’ Qu e r c u s l o b a t a Q u e r c u s a g r i f o l i a Ul m u s p a r v i f o l i a ` D r a k e ` T i b o u c h i n a u r v i l l e a n a L a g e r s t r o e m i a i n d i c a ‘ N a t c h e z ’ Pl a t a n u s A c e r i f o l i a ‘C o l u m b i a ’ Sh r u b b y Y e w P i n e Va l l e y O a k C o a s t L i v e O a k Dr a k e E l m P r i n c e s s F l o w e r C r a p e M y r t l e Co l u m b i a P l a n e T r e e Ar b u t u s x ‘ M a r i n a ’ Ce r c i s o c c i d e n t a l i s St r a w b e r r y T r e e We s t e r n R e d b u d Ga u r a l i n d h e i m e r i Ga u r a Dymondia margaretae Silver Carpet My o p o r u m p a r v i f o l i u m ‘ P i n k ’ Tr a i l i n g M y o p o r u m Lavandula angustifolia ‘Hidcote Blue’Hidcote Blue Lavender Mi m u l u s ‘ J e l l y B e a n O r a n g e ’ Or a n g e M o n k e y f l o w e r Te u c r i u m f r u t i c a n s ‘ A z u r e u m ’ S a l v i a m i c r o p h y l l a ‘ H o t L i p s ’ L o m a n d r a l o n g i f o l i a ‘ B r e e z e ’ Bu s h G e r m a n d e r B a b y S a g e B r e e z e M a t R u s h Di e t e s g r a n d i f l o r a Fo r t n i g h t L i l y Bu l b i n e f r u t e s c e n s ‘ T i n y T a n g e r i n e ’ St a l k e d B u b l i n e Rh a p h i o l e p i s i n d i c a ‘ B a l l e r i n a ’ Ba l l e r i n a I n d i a n H a w t h o r n Mu h l e n b e r g i a d u b i a Pi n e M u h l y Ep i l o b i u m c a n u m Hu m m i n g b i r d T r u m p e t An i g o z a n t h o s Ka n g a r o o P a w BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-50 1 5 ’ 3 0 ’ 6 0 ’ OVERALL TREE PLAN AR B R E V I S I O N S : Up d g r a d e d 3 6 ” b o x t r e e s a l o n g Ca m i n o R a m o n BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-6 COMMUNITY SPACE 1 2 63 74 8 95 Pl a y A r e a La w n Dr y C r e e k A r r o y o BB Q A r e a Sp l i t R a i l F e n c e Bi k e P a r k i n g Oa k T r e e s Ac c e n t T r e e s Sh a d e T r e e s 1 2 3 5 4 6 3 8 9 7 KEY MAPSCALE: 3/32” =1’ BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-7 DOG AREA12637485Street Tree Parking Mailboxes Fenced Dog Area Soundwall Enhanced Paving Bench Entry Sign 4 6 5 1 2 8 7 3 CA M I N O R A M O N KEY MAP SC A L E : 1 / 8 ” = 1 ’ BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-8 NORTH BOUNDARYKEY MAP SC A L E : 1 ” = 2 0 ’ SCALE: 1/4” =1’ SE C T I O N A - A 5’ 4 ’ 6’ Min.8’VARIES 8’ - 35’ A A BO R E L DA N V I L L E , C A L I F O R N I A DECEMBER 2023L-9 SCHEMATIC DETAILS SO U N D W A L L A T B I O S W A L E SO U N D W A L L E L E V A T I O N 1/ 2 ” = 1 ’ SP L I T R A I L F E N C E EN T R Y S I G N 1/ 2 ” = 1 ’ VIEW FENCE 1/2” = 1’ AC U T I L I T Y S C R E E N SLUMP BLOCK WALL & PILASTER 3/4” = 1’