Loading...
HomeMy WebLinkAbout100923 - 06.1HERITAGE RESOURCE COMMISSION STAFF REPORT 6.1 TO: Heritage Resource Commissioners October 9, 2023 SUBJECT: Resolution 2023-02, approving Development Plan request DEV23-0012 allowing a second story addition, the infill of an existing porch, and other minor modifications to the Podva Farm House, a Designated Danville Heritage Resource located at 809 Podva Road (APN 208-462-013). PROJECT DESCRIPTION The project includes a Development Plan request (DEV23-0012) to review architectural elevations for the proposed 485 square foot addition to the second story, the infill of an existing 102 square foot ground floor porch, and other minor alterations to the Podva Farmhouse located at 809 Podva Road. The project was reviewed by the Historic Design Review Board at a special meeting on September 20, 2023, where it was recommended for approval with the caveat that the proposed addition of stained glass to the attic vent and skylights on the historic portion of the structure’s roof not be allowed. EVALUATION Conformance with General Plan and Zoning District The site is located within the O-1 Limited Office District. The proposed development is located within the existing building’s footprint and meets all applicable development standards, including height and setbacks to property lines. Issues to Discuss The applicant is proposing an addition to the second story, the infill of an existing ground floor porch, and other minor alterations. The following are requirements of the Town’s Design guidelines for a Heritage Resource, and a description of how the proposed development complies with the guidelines: •5.1 Preserve an older addition that has achieved historic significance in its own right. o The original Podva Farm House was a two-story house which was relocated to the current location at 809 Podva Road. A non-historic addition was 809 Podva Road – Development Plan 2 October 9, 2023 previously added to the rear of the main structure in 1995. The proposed development would not demolish or renovate the original historic home. • 5.2 A more recent addition that is not historically significant may be removed. o There is no proposed removal of any portion of the structure. • 5.3 Place an addition at the rear of a building or set it back from the front to minimize the visual impacts. o The proposed second-story addition is located to the rear of the original home above a previous non-historic addition. The enclosure of the entry niche would also take place on the previous non-historic addition. The development would not take away from the character of the home and would not be blatantly visible from the street. • 5.4 Do not obscure, damage, destroy or remove original architectural details and materials of the primary structure. o Construction of the proposed addition would not obscure, damage, destroy or remove original architectural details of the primary structure. The addition would be located above an existing non-historic addition. The development proposes to replace the existing weathered wooden slats located on the attic vent with stained glass panels to match the glass panels on the entry way door. Historic pictures indicate the wooden slats element is part of the historic architecture, and should be preserved or replaced in-kind. The Historic Design Review Board recommends retaining the wooden slats element and not allowing the addition of stained glass to the attic vent. • 5.5 An addition should be compatible in scale and character with the primary structure. o The proposed addition is subordinate to the main historical farm house as it is located to the rear of the primary structure and not blatantly visible from the street. • 5.6 Use building materials that are compatible with those of the primary structure. o Horizontal lap siding would be applied to match the previous addition and primary structure. Trim would match the existing home. Roof materials will be consistent with that of the primary structure and previous addition. • 5.7 Use windows that are similar in character to those of the main structure. 809 Podva Road – Development Plan 3 October 9, 2023 o Windows would be of similar character, proportion, and location to that of the main structure. • 5.8 The roof form of a new addition should be in character with that of the primary building. o The addition would have a roof form which is consistent with the existing roof structure. The historic portion of the building has a dutch gable roof with double cross gables. The non-historic addition has a dutch gable roof which is proposed to be replaced with a gable roof with the addition of the second story. Roof materials for the addition would be composition shingle to match the main residence. The development proposes the addition of skylights to the attic roof which is located on the historic portion of the structure. The Historic Design Review Board recommends not allowing the addition of skylights. • 5.9 When constructing a rooftop addition, keep the mass and scale subordinate to the primary building. o The second story addition is smaller in scale and mass than the historic primary structure placed in front of the addition. • 5.10 Set a rooftop addition back from the front of the building. o The rooftop addition will be set back from the front of the building as it is located behind the existing second story. • 5.11 When adding a dormer, it should be in character with the primary structure’s design. o The dormers in the proposed addition are in scale with the structure, are below the ridge line of the primary structure, and would not overwhelm the scale of the primary structure. 809 Podva Road – Development Plan 4 October 9, 2023 RECOMMENDATION Approve Development Plan request DEV23-0012 allowing a second story addition, the infill of an existing porch, and other minor modifications to the Podva Farm House, a Designated Danville Heritage Resource located at 809 Podva Road. Prepared by: Riley Anderson-Barrett Associate Planner Attachments: A - Resolution 2023-02 B - Public Notice C - Architectural Plans RESOLUTION NO. 2023-02 APPROVING DEVELOPMENT PLAN REQUEST DEV23-0012 ALLOWING A SECOND STORY ADDITION, THE INFILL OF AN EXISTING PORCH, AND OTHER MINOR MODIFICATIONS TO THE PODVA FARM HOUSE, A DESIGNATED DANVILLE HERITAGE RESOURCE LOCATED AT 809 PODVA ROAD (APN 208-462-013). WHEREAS, JOEL MALAKOFF (Owner/Applicant) has requested approval of Development Plan application DEV23-0012 to allow for a second story addition, the infill of an existing porch, and other minor modifications to a Designated Danville Heritage Resource; and WHEREAS, the subject site is located at 809 Podva Road, also known as the Podva Farm House, and is further identified as Assessor’s Parcel Number 208-462-013; and WHEREAS, the Town’s Historic Preservation Ordinance requires approval of a Development Plan application prior to the construction of any alteration to a structure that contains historical significance; and WHEREAS, the project has been found to be Categorically Exempt from the Requirements of the California Environmental Quality Act (CEQA), Section 15301, Class 1; Existing Facilities; and WHEREAS, the Heritage Resource Commission did review the project at a noticed public hearing on October 9, 2023; and WHEREAS, the public notice of this action was given in all respects as required by law; and WHEREAS, the Heritage Resource Commission did hear and consider all reports, recommendations, and testimony submitted in writing and presented at the hearing; now, therefore, be it RESOLVED, that the Danville Heritage Resource Commission approves Development Plan application DEV23-0012 and makes the following findings in support of this action: Development Plan: 1.The applicant intends to obtain permits for construction within 18 months from the effective date of plan approval. ATTACHMENT A PAGE 2 OF RESOLUTION NO. 2023-02 2.The development will be an attractive and efficient development, which will fit harmoniously into and will have no adverse effects upon the adjacent or surrounding development, in that, the applicant worked with a professional design team, a historic architect, and the Town’s reviewing bodies to determine the most appropriate and reasonable approach to the addition and modifications of the historic building. 3.The proposed development is consistent with the Danville 2030 General Plan and the O-1; Limited Office District Ordinance, in that the Development Plan approval will ensure the retention of a historic resource, and recognizes such resource as an essential part of the Town’s heritage. The addition will fit seamlessly into the fabric of the downtown and surrounding neighborhoods’ character. 4.The proposal will not be detrimental to the health, safety, and general welfare of the Town, in that the development will meet all health and safety codes and is subject to compliance with all applicable building codes and requirements. 5.The proposal is in consistent with The Town’s Historic Preservation Ordinance 32- 72 and the Town’s Design Guidelines for Heritage Resources, in that the Development Plan observes the recommended approaches for the alteration of a historic structure. Certificate of Approval: 1.The proposed alteration will not adversely affect the historically significant exterior architectural features of the Heritage Resource or the special character, interest or value of its neighboring improvements and surroundings, including facade, setback, roof shapes, scale, height and relationship of material, color and texture. Specifically, the applicant worked with a professional design team, a historic architect, and the Town’s reviewing bodies to determine the most appropriate and reasonable approach to the alteration of the historic building. In addition, the project is consistent with the requirements of the Town’s Historic Preservation Ordinance and Design Guidelines for Heritage Resources. 2.The reviewing body relied upon the most current version of the Secretary of the Interior's "Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings," the State Historic Building Code and the Town of Danville’s Design Guidelines for Heritage Resources. CONDITIONS OF APPROVAL Conditions of approval with an asterisk ("*") in the left-hand column are standard project conditions of approval. Unless otherwise specified, the following conditions shall be complied with prior to the issuance of a building permit for the project. The Planning Division shall review and approve each item unless otherwise specified. PAGE 3 OF RESOLUTION NO. 2023-02 A. GENERAL 1.This approval is for Development Plan request DEV23-0012 allowing a second story addition, the infill of an existing porch, and other minor modifications to the Designated Danville Heritage Resource at 809 Podva Road (the Podva Farm House). Except as may be modified by these conditions of approval, development shall be substantially as shown on the project drawings as follows: a.Floor plans and elevations, labeled “Building Remodel 809 Podva Road,” as prepared by Ruffin Architecture, consisting of 36 sheets, dated received by the Planning Division on August 30, 2023. 2.The applicant shall pay any and all Town and other related fees that the property may be subject to. These fees shall be based on the current fee schedule in effect at the time the relevant permits are secured, and shall be paid prior to issuance of said permit. Waiver of fees may be considered as part of the recommended historic preservation incentives for the property, which requires separate approval by the Town Council. 3.Prior to the issuance of a building permit, the applicant shall reimburse the Town for notifying surrounding neighboring residents of the public hearing. The fee shall be $198.89 ($130.00 + 83 notices X $0.83 per notice). * 4. Prior to the issuance of building permits, the applicant shall submit written documentation that all requirements of the San Ramon Valley Fire Protection District have been, or will be, met to the satisfaction of the District. * 5. In the event that subsurface archeological remains are discovered during any construction or pre-construction activities on the site, all land alteration work within 100 feet of the find shall be halted, the Town Planning Division notified, and a professional archeologist, certified by the Society of California Archeology and/or the Society of Professional Archeology, shall be notified. Site work in this area shall not occur until the archeologist has had an opportunity to evaluate the significance of the find and to outline appropriate mitigation measures, if they are deemed necessary. If prehistoric archaeological deposits are discovered during development of the site, local Native American organizations shall be consulted and involved in making resource management decisions. * 6. Construction activity shall be restricted to the period between the weekday hours of 7:30 a.m. to 5:30 p.m. (Mondays through Fridays), unless otherwise PAGE 4 OF RESOLUTION NO. 2023-02 approved in writing by the City Engineer for general construction activity and the Chief Building Official for building construction activity. Prior to any construction work on the site, including grading, the applicant shall install a minimum 3’ x 3’ sign at the project entry which specifies the allowable construction work days and hours, and lists the name and contact person for the overall project manager and all contractors and sub- contractors working on the job. * 7. The applicant shall provide security fencing, to the satisfaction of the City Engineer and/or the Chief Building Official, around the site during construction of the project. * 8. A watering program which incorporates the use of a dust suppressant, and which complies with Regulation 2 of the Bay Area Air Quality Management District shall be established and implemented for all on and off-site construction activities. Equipment and human resources for watering all exposed or disturbed soil surfaces shall be supplied on weekends and holidays as well as workdays. Dust-producing activities shall be discontinued during high wind periods. * 9. As part of the initial submittal for the building permit review process, the applicant shall submit a written Compliance Report. This report shall list each condition of approval followed by a description of what the applicant has provided as evidence of compliance with that condition. The applicant must sign the report. The report is subject to review and approval by the City Engineer and/or Chief of Planning and/or Chief Building Official, and may be rejected by the Town if it is not comprehensive with respect to the applicable conditions of approval. * 10. Planning Division sign-off is required prior to the completion of a Final Building Inspection. B. SITE PLANNING * 1. All lighting shall be installed in such a manner that lighting is generally down directed and glare is directed away from surrounding properties and rights-of-way. * 2. The location of any pad mounted electrical transformers shall be subject to review and approval by the Planning Division prior to the issuance of a building permit. To the extent feasible, such transformers shall not be located between any street and the front of a building. PAGE 5 OF RESOLUTION NO. 2023-02 C. ARCHITECTURE * 1. All ducts, meters, air conditioning and/or any other mechanical equipment whether on the structure or on the ground shall be effectively screened from view with landscaping or materials architecturally compatible with the main structures. * 2. The street number for the buildings shall be posted so as to be easily seen from the street at all times, day and night by emergency service personnel. 3.Project signage is not approved as part of this application. Design of tenant signage, including any proposed lighting, shall be submitted for review and approval by the Design Review Board and the Historic Design Review Committee under a separate Sign Permit application. 4.The proposed modifications to the attic roof located on the historic portion of the structure comprised of the addition of skylights and the addition of stained glass where wooden slats exist are not approved as part of this Development Plan. D. HISTORIC PRESERVATION 1.Prior to issuance of a building permit for the project, Town staff, the project Historic Architect, the Town Building Inspector for the project, and the building contractor for the project shall participate in a pre-construction meeting. The meeting shall focus on and highlight the historic preservation related details and requirements associated with the building permit. During the meeting, the Town and the contractor shall also review all historic preservation related conditions of approval related to the project. 2.At least one week prior to the removal of any exterior building materials or architectural elements that are required to be preserved and re-used as part of the project, the applicant shall be required to notify in writing the Planning Division of the date and time of the initiation of the work. The project’s Historic Architect shall be required to be on site as necessary to inspect the proper handling of the condition of the exterior building materials and elements to be re-used. If any of the exterior building materials or elements previously believed suitable for re-use is found to be in a substantially deteriorated condition, their replacement shall be subject to approval by the Planning Division in consultation with the project’s Historic Architect. 3.During the review of the building permit plans for the project and during PAGE 6 OF RESOLUTION NO. 2023-02 project construction, the Town and the building contractor shall utilize the Town Historic Preservation Checklist form to assure that all of the preservation requirements outlined by these conditions of approval and shown on the structural report/building preservation plans are fully complied with. E. GRADING * 1. Any grading on adjacent properties will require prior written approval of those property owners affected. * 2. Stockpiles of debris, soil, sand or other materials that can be blown by the wind shall be covered. * 3. If toxic or contaminated soil is encountered during construction, all construction activity in that area shall cease until the appropriate action is determined and implemented. The concentrations, extent of the contamination and mitigation shall be determined by the Contra Costa County Health Department. Suitable disposal and/or treatment of any contaminated soil shall meet all federal state and local regulations. If deemed appropriate by the Health Department, the applicant shall make provisions for immediate containment of the materials. Runoff from any contaminated soil shall not be allowed to enter any drainage facility, inlet or creek. F. STREETS * 1. The applicant shall obtain an encroachment permit from the Engineering Division prior to commencing any construction activities within any public right-of-way or easement. * 2. All mud or dirt carried off the construction site onto adjacent streets shall be swept each day. Water flushing of site debris or sediment or concrete washing is expressly prohibited. * 3. Any damage to street improvements now existing or done during construction on or adjacent to the subject property shall be repaired to the satisfaction of the City Engineer, at full expense to the applicant. This shall include slurry seal, overlay or street reconstruction if deemed warranted by the City Engineer. PAGE 7 OF RESOLUTION NO. 2023-02 * 4. All improvements within the public right-of-way, including curb, gutter, sidewalks, driveways, paving and utilities, shall be constructed in accordance with approved standards and/or plans and shall comply with the standard plans and specifications of the Development Services Department and Chapters XII and XXXI of the Town Code. At the time project improvement plans are submitted, the applicant shall supply to the City Engineer an up-to-date title report for the subject property. G. INFRASTRUCTURE * 1. Domestic water supply shall be from an existing public water system. Water supply service shall be from the East Bay Municipal Utility District water system in accordance with the requirements of the District. * 2. All wastewater shall be disposed into an existing sewer system. Sewer disposal service shall be from the Central Contra Costa Sanitary District sewer system in accordance with the requirements of the District. Any work conducted on the street for sewer connection shall be coordinated with the Town’s Development Services Department to avoid or minimize any public impact. * 3. Drainage facilities and easements shall be provided to the satisfaction of the City Engineer. * 4. All runoff from impervious surfaces shall be intercepted at the project boundary and shall be collected and conducted via an approved drainage method through the project to an approved storm drainage facility, as determined acceptable by the City Engineer. * 5. Roof drainage from structures shall be collected via a closed pipe and conveyed to an approved storm drainage facility in the street curb. No concentrated drainage shall be permitted to surface flow across sidewalks. * 6. The applicant shall furnish proof to the City Engineer of the acquisition of all necessary rights of entry, permits and/or easements for the construction of off-site temporary or permanent road and drainage improvements. * 7. All new utilities required to serve the development shall be installed underground in accordance with the Town policies and existing ordinances. All utilities shall be located and provided within public utility easements, sited to meet utility company standards or in public streets. PAGE 8 OF RESOLUTION NO. 2023-02 * 8. All street, drainage or grading improvement plans shall be prepared by a licensed civil engineer. H. MISCELLANEOUS 1.The project shall be constructed as approved. Minor modifications in the design, but not the use, may be approved by staff. Any other change will require Planning Commission and/or Heritage Resource Commission approval through a revised Development Plan review process. * 2. As a part of the issuance of a demolition permit and/or building permit for the project, the developer shall submit a recycling plan for building and construction materials and the disposal of green waste generated from land clearing on the site. Prior to obtaining framing inspection approval for the project, the applicant/owner shall provide the Planning Division with written documentation (e.g., receipts or records) indicating that waste materials created from the demolition of existing buildings and the construction of new buildings were/are being recycled according to their recycling plan, or in an equivalent manner. * 3. The proposed project shall conform to the Town’s Stormwater Management and Discharge Control Ordinance (Ord. No. 94-19) and all applicable construction and post-construction Best Management Practices (BMPs) for the site. For example, construction BMPs may include, but are not limited to: the storage and handling of construction materials, street cleaning, proper disposal of wastes and debris, painting, concrete operations, dewatering operations, pavement operations, vehicle/equipment cleaning, maintenance and fueling and stabilization of construction entrances. Training of contractors on BMPs for construction activities is a requirement of this permit. PAGE 9 OF RESOLUTION NO. 2023-02 APPROVED by the Heritage Resource Commission at a regular meeting on October 9, 2023 by the following vote: AYES: NOES: ABSTAINED: ABSENT: _____________________________ CHAIR APPROVED AS TO FORM: _______________________________ ______________________________ CITY ATTORNEY CHIEF OF PLANNING NOTICE OF A PUBLIC HEARING Danville Heritage Resource Commission Meeting Monday, October 9, 2023, at 5:00 p.m. | Town Meeting Hall, 201 Front Street Project Name: DEV23-0012 – 809 Podva Road Case File Nos.: DEV23-0012 Location: 809 Podva Road | APN: 208-462-013 Description: Development Plan request DEV23-0012 allowing a second story addition, the infill of an existing porch, and other minor modifications to the Designated Danville Heritage Resource at 809 Podva Road (the Podva Farm House). Environmental Review This project has been found to be Categorically Exempt from the requirements of the California Environmental Quality Act (CEQA), Section 15301, Class 1, Existing Facilities. Property Owner and Applicant: Joel Malakoff 809 Podva Road, Danville, CA 94526 Staff Contact: Riley Anderson-Barrett, Associate Planner (925) 314-3314 Randersonbarrett@danville.ca.gov All interested persons are encouraged to attend and be heard at the scheduled public hearing at 5:00 p.m. on Monday, October 9, 2023, at the Town Meeting Hall at 201 Front Street, Danville, CA. NOTE: If you challenge the Town’s decision on this matter in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the Town at, or prior, to the public hearing. In compliance with the Americans with Disabilities Act, the Town of Danville will provide special assistance for disabled citizens.  If you need special assistance to participate in this meeting, please contact the City Clerk (925) 314-3388.  Notification 48 hours prior to the meeting will enable the Town to make reasonable arrangements to ensure accessibility to this meeting. [28CFR 35.102-35.104 ADA Title II] ATTACHMENT B Vicinity Map and Hearing Notice Boundary 809 Podva Road To view the plans for the proposed project, please visit our Development Activity Map, which is available on our website or by scanning the QR code above. PROJECT SITE 1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556575859606162636465666768 A B C D E APN NAME ADDRESS CITY STATE ZIP 208381009 DREVNO MARK E & CAROL B TRE PO BOX 1164 LAFAYETTE CA 94549 208381001 BOURQUIN JEAN M TRE 10 ADAIR CT DANVILLE CA 94526 208381010 SHEFFIELD KRISTIN KAY 11 ADAIR CT DANVILLE CA 94526 208540003 LIN STEPHEN 112 GERALD DR DANVILLE CA 94526 208540004 AUS GEOFFREY & COLEEN TRE 118 GERALD DR DANVILLE CA 94526 207012008 BUTE DEVELOPMENT LLC 118 TRACY CT ALAMO CA 94507 208540002 NOLAN STEPHEN CRAIG & LISA 119 GERALD DR DANVILLE CA 94526 208540005 SCHUBB JONATHAN & BRECK TRE 124 GERALD DR DANVILLE CA 94526 208540001 COLEMAN JAMES D TRE 125 GERALD DR DANVILLE CA 94526 207011004 INTREPID PARTNERS LLC 12885 ALCOSTA BLVD #A SAN RAMON CA 94583 208462011 MULLIKIN PATRICK & GAIL TRE 131 GERALD DR DANVILLE CA 94526 208381018 CUELLAR JOHN S & MARIJO TRE 1333 FOUNTAIN ST ALAMEDA CA 94501 208461001 WHITESIDE DEAN E & WENLI 137 GERALD DR DANVILLE CA 94526 208461002 WASHALASKI JOHN R & GERALDINE 139 GERALD DR DANVILLE CA 94526 208381002 SCHMID DANIEL & CYNTHIA TRE 14 ADAIR CT DANVILLE CA 94526 207012006 SAN RAMON VALLEY FIRE PRO DIST 1500 BOLLINGER CANYON RD SAN RAMON CA 94583 207490005 LIU MARINA TRE 152 SAINT FRANCIS BLVD DALY CITY CA 94015 208462013 SWIGGETT GARY D TRE 156 LEONA CT ALAMO CA 94507 208381008 HEADSTROM DENISE DAWN TRE 17 ADAIR CT DANVILLE CA 94526 208381003 NIELSEN STANLEY & ELEANOR TRE 18 ADAIR CT DANVILLE CA 94526 208381011 DAY NORMAN S & SANDRA L TRE 200 MORRIS RANCH RD DANVILLE CA 94526 208382005 HERMAN KRISTEN & MATTHEW 201 MORRIS RANCH RD DANVILLE CA 94526 208381012 HAGEWIESCHE DANIEL P TRE 204 MORRIS RANCH RD DANVILLE CA 94526 208382004 MIRZAI NASSER & AFSOON 205 MORRIS RANCH RD DANVILLE CA 94526 208382003 BILL SEAN P & JENNIFER R 209 MORRIS RANCH RD DANVILLE CA 94526 208381007 HORUK RICHARD TRE 21 ADAIR CT DANVILLE CA 94526 208184009 GUASTAVINO GREGORY & ANNA 210 MONTEGO DR DANVILLE CA 94526 208381014 THOMAS REJI C & CHAITALI TRE 212 MORRIS RANCH RD DANVILLE CA 94526 208382002 MCHARGUE WILLIAM D TRE 213 MORRIS RANCH RD DANVILLE CA 94526 208382001 MARIOTTI RYAN & COLLEEN TRE 217 MORRIS RANCH RD DANVILLE CA 94526 208381004 CHACE THOMAS & PATRICIA TRE 22 ADAIR CT DANVILLE CA 94526 208390017 CHANCE ROBERT S & ANNA M TRE 221 MORRIS RANCH RD DANVILLE CA 94526 208381016 DAUGHTERS JAMES & MARILYN TRE 224 MORRIS RANCH RD DANVILLE CA 94526 208190025 BUCKLEY STACY E TRE 22550 SW HIGHLAND DR APT 230 SHERWOOD OR 97140 208184003 SIMPSON KRISTINE M TRE 226 MONTEGO DR DANVILLE CA 94526 208390010 GROSS GLENN J 227 MORRIS RANCH RD DANVILLE CA 94526 208381017 SMITH L STEPHEN TRE 228 MORRIS RANCH RD DANVILLE CA 94526 208390009 PSOMAS STEPHEN M & AMY C TRE 231 MORRIS RANCH RD DANVILLE CA 94526 208184002 PARKER JEAN 234 MONTEGO DR DANVILLE CA 94526 208462001 KLINS MARK A & KATHRYN L TRE 239 MORRIS RANCH CT DANVILLE CA 94526 208462010 HOLZ TIMOTHY J & MARILEE TRE 240 MORRIS RANCH CT DANVILLE CA 94526 208462002 VELTHOEN BRENT & JULIANNA TRE 243 MORRIS RANCH CT DANVILLE CA 94526 208462009 COLLINS ROBERT & JUDYANN TRE 244 MORRIS RANCH CT DANVILLE CA 94526 208462003 KLOPP MARK V & MEGAN M TRE 247 MORRIS RANCH CT DANVILLE CA 94526 208462008 FRANCO ERNEST A & CAROL J 248 MORRIS RANCH CT DANVILLE CA 94526 208381006 BALDYGA JOHN J TRE 25 ADAIR CT DANVILLE CA 94526 208462007 RUST WILLIAM C JR & LEE J 252 MORRIS RANCH CT DANVILLE CA 94526 208381005 GONSALVES DANIEL JR TRE 26 ADAIR CT DANVILLE CA 94526 208184004 SARGENT MARIA T TRE 2904 QUAIL ST DAVIS CA 95616 207011009 801 SAN RAMON LLC 3049 STONEGATE DR ALAMO CA 94507 208170001 HALL DAYLE S & NICOLE L TRE 324 CLIFFSIDE DR DANVILLE CA 94526 208184010 ABADIR JEFFREY & CYNTHIA ANN 33 PODVA PL DANVILLE CA 94526 208184011 HACKETT ZAIDA P TRE 35 PODVA PL DANVILLE CA 94526 208390016 REGELMANN ADAM 37 BOWER PL DANVILLE CA 94526 208184012 BIBEAU CAMILLE 37 PODVA PL DANVILLE CA 94526 208184013 HARRISON CLIVE A & JANET E TRE 39 PODVA PL DANVILLE CA 94526 208390011 MCENTUSH DAVID L & CYNTHIA L 40 BOWER PL DANVILLE CA 94526 207012010 790 SRVB LLC 4125 BLACKHAWK PLAZA CIR #105 DANVILLE CA 94506 208381015 CUNNINGHAM PAMELA R TRE 496 SAINT FRANCIS DR DANVILLE CA 94526 208390001 MERVINE C RICHARD & CLAIRE TRE 52 ALEXANDER LN DANVILLE CA 94526 208390008 MAZZONE CHRISTOPHER J TRE 55 ALEXANDER LN DANVILLE CA 94526 207011002 HIDALGO KATHLEEN TRE 550 GRIMSBY LN DANVILLE CA 94506 208390002 ELLIS JAMES B & BARBARA C TRE 56 ALEXANDER LN DANVILLE CA 94526 207012001 SARTIP NASSER 744 SAN RAMON VALLEY BLVD DANVILLE CA 94526 207012007 BAROUMAND HOMAYOUN 760 SAN RAMON VALLEY BLVD DANVILLE CA 94526 207012009 R & P VENTURES LLC 780 SAN RAMON VALLEY BLVD DANVILLE CA 94526 208540010 DANVILLE LIVERY OFFICES LLC 7855 IVANHOE AVE STE 333 LA JOLLA CA 92037 69707172737475767778798081828384 A B C D E 207490001 ZARDOSHTI FARZAD DEHNAVIZADEH 822 PODVA RD A DANVILLE CA 94526 207490002 KO SAN KO 822 PODVA RD B DANVILLE CA 94526 207490003 CHANDLER JAMES 824 PODVA RD A DANVILLE CA 94526 207490004 LIEDSTRAND CHARLES W 824 PODVA RD B DANVILLE CA 94526 208381013 RATHBUN TIMOTHY & CANDACE TRE 827 CAMINO AMIGO DANVILLE CA 94526 207490007 TIERNAN MEGHAN 828 PODVA RD A DANVILLE CA 94526 207490008 REED TERYL JUSTIN 828 PODVA RD B DANVILLE CA 94526 207490009 KITAJIMA MELISSA A 830 PODVA RD A DANVILLE CA 94526 207490010 CHRISTOV CHAVDAR & EMILY 830 PODVA RD B DANVILLE CA 94526 207490011 VERHOEK CHRISTINA 832 PODVA RD A DANVILLE CA 94526 207490012 ROSS LUCAS 832 PODVA RD B DANVILLE CA 94526 207011005 FERREIRA ROBERT A TRE 852 PODVA RD A DANVILLE CA 94526 216070004 E & G LLC 9 GARDINER CT ORINDA CA 94563 207490006 FISHER GARRICK WOODS 90 WOODRANCH CIR DANVILLE CA 94506 208184007 BLACKBURN JAMES & LESLIE TRE 901 OCHO RIOS DR DANVILLE CA 94526 207011006 866 PODVA ROAD LLC 923 NATOMA CT WALNUT CREEK CA 94596 GSPublisherVersion 2502.0.7.100 AU G S U B M I T T A L . p l n r e v : 8 / 1 9 / 2 3 p r i n t : 8 / 1 9 / 2 3 5 : 1 7 P M D RUFFIN AS NOTED A 0.1 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: 7-21-23 B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a COVER SHEET 23 6 3 B o u l e v a r d C i r c l e , S t e . 2 Wa l n u t C r e e k C A 9 4 5 9 5 da v e @ r u f f i n a r c h t i e c t u r e . c o m 92 5 - 3 4 8 - 2 6 0 6 RU F F I N A R C H I T E C T U R E + AR C H I T E C T U R E + I N T E R I O R S PLAN CHECK Owners: Joel Malakoff Address: 809 Podva Road Danville, CA 94556 APN: 208-462-013-3 Zoning: Lot Size: 19,602 square feet Built: Front Building 1887, rear Addition 1995 Front Set Back: 20’-0” Side Setbacks: Min 10’-0”, 20’-0” aggregate Rear Setback: 15’-0’ Height Limit: new work does not exceed existing height Construction: Three story Type V-A Wood Frame, with Sprinklers Occupancy: Offices B-2 Historic Home: 1,947 square feet circa 1887 (E) Addition: 1,607 square feet circa 1995 Proposed: 1.Add 485 square feet to enlarge Addition second floor 2. Remodel 3rd floor attic with stair and insulation to add 263 square feet of conditioned space. 3. Fill in entry porch for waiting area, add 102 square feet Proposed total: 4,404.00 square feet Description: 1.Accessiblity: a.Update Accessible parking per code: $2,500. b.Add new Accessible ramp to main entry: $37,000. c.Add new entry stair, landing and access doors: $44,500. d.Provide new accessible toilet room on second floor: $60,000. Total Accessible Upgrades: $144,000.00 2.In the Existing Buildings: a.Remove existing addition’s first floor offices and rebuild similar with new layout. b.Update interior framing in 1887 Attic and add new interior staircase to Attic. Finish room as office with north facing skylights, invisible from the parking lot. c.On the Addition’s second floor, remove and rebuild the roof to increase usable floor area over existing framing. This will add 485 square feet. d.Create new kitchens on first and second floors. e.Remodel existing private bathroom to add shower. f.Add doors to existing second floor offices. g.Update Mechanical systems to new layouts on each floor. Reuse (E) heat-pump for new 3rd floor space. A 0.1 A 0.2 A 0.4 A 0.3 A 1.1 A 2.0 A 2.1 A 2.2 A 2.3 A 2.4 A 2.5 A 2.6 A 2.7 A 2.8 A 3.1 A 3.2 A 4.1 A 4.2 A 4.3 A 4.4 A 4.5 A 4.6 A 5.1 A 5.2 G-1 G-2 T-24-1 T-24-2 T-24-3 T-24-4 T-24-5 T-24-6 T-24-7 S-1 S-2 S-3 COVER SHEET PHOTOS NOTES AND WINDOWS RENDERINGS SITE PLAN EXISTING FIRST FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR ATTIC NEW ROOF PLAN FIRST FLOOR LIGHTING 2ND FLOOR LIGHTING ATTIC LIGHTING ELECTRICAL PLANS SECTIONS SECTIONS SOUTH ELEVATION NORTH ELEVATION EAST ELEVATION & SEC… WEST ELEVATION & SE… FIRST FLR INTERIORS 2ND FLOOR INTERIORS DETAILS DETAILS CAL GREEN CAL GREEN TITLE 24 TITLE 24 TITLE24 TITLE 24 TITLE 24 TITLE 24 TITLE 24 STRUCTURAL STRUCTURAL STRUCTURAL NOTES Building Remodel 809 Podva Road Danville, CA VICINITY MAP PROJECT NOTES SHEET INDEX ADD NEW ACCESSIBLE RAMP, STAIRS AND LANDING TO MAIN ENTRY AT SIDE FILL IN EXISTING PORCH TO CREATE NEW INTERIOR WAITING AREA REBUILD ROOF AND WALLS ON EXISTING TJ FLOOR TO INCREASE SECOND FLOOR OFFICE AND ADD 2 NEW GABLES OVER ENTRY REMODEL ATTIC OF EXISTING 1997 ADDITION TO INCREASE OFFICE AREA BY 485 SQUARE FEET REMOVE WOODEN SLATS AND REFRAME WITH WINDOW AND STAINED GLASS PANEL TO MATCH FRONT DOOR ATTACHMENT C GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 0.2 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 0.2 7-21-23 PHOTOS 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a6FRONT OF 1887 BUIL DING 15 EXISTING 1995 ADDITION 5 EXISTING RAILING 1 EXISTING W AL KWA Y13WEST FACE 9 WI NDOW SILL FILL IN ENTRY NICHE AND ADD NEW CCNCETE LANDING, STAIR AND ACCESSIBLE RAMP REPLACE WOODEN VENT SLATS WITH NEW DOUBLE PANE WINDOW WITH STAINED GLASS PANEL NO OTHER CHANGES TO FACE OF HISTORIC BUILDING AT NEW LANDING ON SOUTH SIDE ENTRY, DUPLICATE EXISTING RAILING WITH REDWOOD BACK PRIME AND PAINT TO MATCH NEW SIDEWALK, RAMP AND SOUTHERN ENTRY PORCH TO DUPLICATE EXISTING BRICK PLATE PAVERS ALL NEW WINDOW TRIM TO MATCH EXISTING REDWOOD BACK PRIMED AND PAINTED TO MATCH GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 0.3 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 0.3 7-21-23 RENDERINGS 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a 5 EXISTING BUIL DINGFROM SOUTHEAST 7 PROPOSED CHANGES TO SOUTH SIDE15PROPOSED NORTH AND WEST WALLS 1 3 EXISTING BACK OF BUILDING FROM NOR THWE ST GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 1.1 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 1.1 7-21-23 SITE PLAN 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a 2 4 1 2 3 4 5 SCALE: 1:3.56ACCESSIBLE LOGO 7 5 '-0 " 5 '-0 " 4 0 '-0 " 1 0 '-0 " 17'-1/2"28'-0" 4 '-0 " 5 '-0 " 1887 HISTORIC OFFICE BUILDING EXTERIOR UNCHANGED (E) STEP NEW ACCESS RAMP NEW CONCRETE PORCH TO MAIN ENTRY W/RAMP, STAIRS & RAILINGS T0 MATCH (E) NO PARKING EXISTING PAVEDPARKING LOT REPAINT STRIPING & LOGO TO MATCH DETAILS 3 & 7 THIS PAGE SIDEWALK IS LEVEL TO PARKING LOT PAVING ADD UPDATED SIGN BELOW EXISTING DETAIL 11 THIS PAGE ADD ARROWED SIGN SHOWING ADA ACCESS AT SOUTH ENTRY PER DETAILS 15 THIS PAGE ADD PRIVATE PARKING SIGN AND TOWING PER DETAIL 11 UP 1/12 REMOVE AND REPLACE SIDEWALK TO (E) WESTERN ENTRY ADDING CONCRETE STEPS CL ADD NEW WINDOWS TO NORTH AND WEST WALLS OF ADDITION EXISTING SIDEWALK NEW APPROACH TO RAMP N 21'-0" 5 '-0 " 160'-1/2" PROPERTY LINE N 78º 21' 39" E 260.40 P R O P E R T Y L I N E S 1 1 X 0 4 2 ' E 7 5 '-0 0 " P R O P E R T Y L I N E S 1 1 º 4 2 ' 1 7 " E 7 5 '-0 " PROPERTY LINE S 78º 21' 39" W 260.40 1995 OFFICE ADDITION FILL IN 1ST FLOOR PORCH AND REFRAME 2ND FLOOR OFFICES FILL IN EXISTING PORCH SAVE PLANTINGS BETWEEN BUILDING AND RAMP SCAL E: 1/4" = 1'-0"15 UPDATED PARKING SIGN SCAL E: 1/4" = 1'-0"11 ACCESSIBLE SIGNAGE SCAL E: 1/4" = 1'-0"3 ACCESSIBLE PAR KING SCAL E: 1/4" = 1'-0"7 ACCESSIBLE L OGO SCAL E: 1" = 10'13 SITE PL AN & ACCESSIBLE PARKING GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A-1.2 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A-1.2 7-21-23 NEW RAMP & ENTRY 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a S11S12 A UP 1 0 '-0 " 17'-0" 6 '-1 1 1 /2 " 4 '-0 " 5 '-0 " 29'-0" VIF 5 '-4 1 /2 " 8'-0" 4'-6"4'-6" 12" 2 '-2 " 13A 4.4 13A 4.31A 4.1 NEW MAIN ENTRY ELEVATION +30" NEW +/- 29" HIGH ACCESSIBLE RAMP UP RAMP 1/12 SLOPE ALIGN PROTECT AND SAVE (E) PLANTING STRIP AT WINDOWS ALIGN BROOM SWEPT CONC PLATFORM +29-3/4" SLOPING ¼" TO SOUTH, WRAP STD SITE BRICK PLATE AROUND OUTSIDE 1 2 3 4 5 NEW CONCRETE ACCESSIBLE RAMP, DIVIDE INTO 6 EQUAL SECTIONS WITH SCORED JOINT. WRAP PERIMETER IN BRICK PLATE TO MATCH EXISTING SIDEWALKS AND AT THIRDS ON RAMPNEW CONCRETE STAIR WITH 6" RISERS AND 14" TREADS WITH ABBRASIVE STRIPS AT THE TOE REMOVE (E) SIDEWALK. ALIGN NEW SIDEWALK TO CENTER ON NEW ENTRY DOOR 1-½" Ø PAINTED STEEL HANDRAIL, EXTEND ONE TREAD PLUS 12" AT BOTTOM EXISTING SIDEWALK WITH BRICK PLATE EDGE REMOVE (E) CONCRETE PATIO AND WOOD STAIR NEW ENTRY 36" HIGH, 1-½" Ø PAINTED STEEL HANDRAIL, BOTH SIDES; EXTEND 12" AT TOP AND BOTTOM OF RAMP WRAP PLATFORM WITH PRIMED AND PAINTED REDWD BOLLARDS TO MATCH (E) CL 1'-0" MIN 3 '-0 "1 0 " 3 '-0 " 29'-0" EQUAL EQUAL EQUAL EQUAL 1'-0" 4 " NEW ACCESSIBLE RAMP, SLOPE EXACTLY 1" IN 12" WITH HANDRAILS AT 36" AND BOTTOM GUARD RAIL AT 4" ABV RAMP LIGHTLY SANDBLAST, PRIME AND PAINT BUILDING ACCENT BLUE WITH AUTOMOTIVE ACRYLIC ENAMEL, LOW SHEEN CAST CONCRETE WITH 2"Ø BY 9" RECESSES FOR RAILING POSTS SET IN DRYSET MORTAR OUTSIDE EDGE BORDER WITH SITE STANDARD BRICK PLATE TO MATCH SIDEWALK. MITER TO RAMP SURFADE BRICK PLATE SCALE: 3/8" = 1'-0"13 NEW ENTRY THRESHOLD SCALE: 1/4" = 1'-0"14 RAMP AND STAIR ISO SCALE: 1/4" = 1'-0"15 RAMP AND STAIR HAND RAILS SCALE: 1/4" = 1'-0"9 NEW ENTRY PLATORM SCAL E: 1/4" = 1'-0"7 R AMP ELEVATION GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 2.1 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 2.1 7-21-23 FIRST FLOOR 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a 1 2 3 4 5 6 7 8 9 10 11 12 13 1 4 1 5 1 6 1 7 N12N11 N13 5 ' b y 6 ' 0 1 3 ' b y 8 ' 01 3'-6" by 6'-8" 2'-6" by 6' 5 ' b y 6 ' 5 ' b y 6 ' 5 ' b y 6 ' W11 5' by 6'5' by 6' S11S12 A 2'-6" by 6'2'-6" by 6'2'-6" by 6' 2'-6" by 6' 02 3' by 6'-8" 0 2 3 ' b y 6 '-8 " 01 3' by 6'-8" 2'-6" by 6'2'-6" by 6'2'-6" by 6' G C F E D 23 2'-8" by 6'-8" B 1 2 3 4 5 N FRIG 40'-3"40'-6" 8'-2"5'-1/2"8'-2" 4 '-9 "5 '-1 1 /2 " 3'-1 1/2" 8 '-6 " 8 '-6 " 3 0 '-4 -½" 5'-7 1/2" 10'-8"3 1/2"3'-9"3 1/2"9'-2 1/2"3 1/2"15'-6" 6'-6" 1 2 '-1 " 1 1 '-2 1 /2 " 3 1 /2 " 9 '-2 1 /2 " 3 1 /2 " 9 '-2 1 /2 " 9'-2 1/2"3-½"9'-1 1/2"3 1/2"6'-1" 6'-1"6'-2"6'-1 1/2" 16'-4 1/2" 29'-7" 10'-8"3 1/2"10'-8" 1 0 '-0 " 17'-0" 6 '-1 1 1 /2 " 4 '-0 " 5 '-0 " 29'-7" 5 '-4 1 /2 " 5'-4"6'-3"5'-5" 6 '-7 1 /2 " 5 1 /2 " 6 '-0 " 5 '-0 " 5A 4.3 5A 4.5 7 A 4.5 6 A 4.5 9A 4.5 E-42 PORCH OFFICE EXISTING ACCESSIBLE TOILET EXISTING TOILET NEW MAIN ENTRY KITCHEN NEW SHOWER 100 101 102 103 104 105 106 107 108 109 110 114 113112 111 115 OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE WAITING 1995 ADDITION 1887 BUILDING CONFERENCE NEW +/- 29" HIGH ACCESSIBLE RAMP UP RAMP 1/12 SLOPE RECEPTION OFFICE ALIGN NORTH WINDOWS ON BOTH FLOORS CL ALIGN A L I G N PROTECT AND SAVE (E) PLANTING STRIP AT WINDOWSALIGN EXISTING STAIR TO SECOND FLOOR NEW SHOWER WITH 32" CLR. WASHING AREA AND SEMI-FRAMELESS 7'-0" ENCLOSURE 13A 4.4 13A 4.4 14A 3.1 14A 3.1 13A 4.3 13A 4.3 14 A 3.2 14 A 3.2 1A 4.1 #A 4.2 14A 4.2 SCAL E: 1/4" = 1'-0"13 PROPOSED FIRST FLOOR GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 2.2 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 2.2 7-21-23 SECOND FLOOR 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a 1 2 3 4 5 6 7 8 9 10 11 12 13 1 4 1 5 1 6 1 7 394.62 sq ft 9 '-7 1 /2 " 8'-10"8'-8 1/2"3 1/2"8'-3 1/2"3 1/2" 9'-8" 1 3 '-0 " 28'-11 1/2" 10'-0" OFFICE OFFICE OFFICE OFFICE OFFICE KITCHEN COPIES TOILET CONFERENCEROOM COMPUTERS REMOVE (E) WALLS AND CUT BACK ROOF SPRINKLER LINES TO ENLARGE SPACE REMOVE (E) WALLS AND REFRAME FOR NEW LAYOUT AND ACCESSIBLE TOILET ROOM 1 2 3 4 5 6 7 8 9 10 11 12 13 1 4 1 5 1 6 1 7 6 8 2 '-6 " b y 6 ' 6 8 2 '-6 " b y 6 ' 68 2'-6" by 6' 68 2'-6" by 6' 68 2'-6" by 6' 68 2'-6" by 6' 71 2'-6" by 6' 72 2'-6" by 6' N24 R M ON S22 W-22 W21 N23 S21 N21 N22 Q P I H K J L N FRIG 5A 4.3 9 '-7 1 /2 " 36'-1/2" 3 '-1 0 " 7'-3 1/2" 12'-2 1/2"5 1/2"11'-2-½"5 1/2"11'-2-½" 6'-0"6'-0" 3 '-8 1 /2 " 1 6 '-1 1 1 /2 " 1 2 '-7 1 /2 " 5 1 /2 " 6'-6 1/2" 3'-11"36'-1/2"33'-0" 3 '-1 0 " 2 3 '-6 1 /2 " 2 '-2 " 10'-8"2'-8 1/2"10'-9" 3 0 '-4 1 /2 " 4 '-2 1 /2 " 6 '-1 1 " 4'-1" 5 1 /2 " 1 1 '-2 1 /2 " 5 1 /2 " 3'-1-½" 16'-4 1/2" 29'-7" 7 '-6 " 4 '-3 1 /2 " 4 '-3 " 8 '-1 1 /2 " 4 '-0 " 13A 4.4 14A 4.6 10A 4.6 6A 4.6 5 A 4.6 12A 4.6 E-41 OFFICE OFFICE OFFICE OFFICE OFFICE STORAGE CLOSET OFFICE CONFERENCE OFFICE STORAGE S U P P L I E S COMPUTER CENTER ACCESSIBLE TOILET 200 202 201 207 203204205206 208 209 210 211212 214215216 213 CL REMOVE DOOR AND RETRIM OPENING CONFIRM THAT (E) DOORWAY IS 2'-10" CLEAR (E) (E) EXISTING STAIR NEW STAIRWAY TO ATTIC: UP 9'-4" (VIF) IN 16 7" RISERS WITH 11" TREADS AND DRESSED IN OAK TO MATCH (E) STAIR WITH HANDRAILS ON BOTH SIDES 14A 3.1 14A 3.1 13A 4.3 14 A 3.2 14 A 3.2 #A 4.2 14A 4.2 SCALE: 1/4" = 1'-0"13 EXISTING SE COND FL OOR SCAL E: 1/4" = 1'-0"15 PROPOSED SECOND FLOOR GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 2.3 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 2.3 7-21-23 THIRD FLOOR ATTIC 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 N 300 5A 4.3 13A 4.4 14A 3.1 13A 4.3 14 A 3.2 14 A 3.2 14A 4.2 CROW'S NEST SAVE EXISTING FLOOR JOISTS AND INSTALL NEW 1-¼" T&G PLYWOOD WALL TO WALL SCREWED AND GLUED 1 5 '-3 " 19'-2" 1 5 '-8 1 /2 " 8 '-5 " 31'-7" 3 0 '-4 -½" 13'-3 1/2"4'-7 1/2"3'-4 1/2" 6 '-4 " 1 8 '-3 " 5 '-9 1 /2 " 3 '-8 " 8 '-9 1 /2 " 4 '-8 " 26'-11" 2'-9 1/2"5'-5"9'-7"4'-9 1/2"4'-1" (E) TRIPLE 2 X 6 HIP RIDGE (E) 4 X 8 STRUCTURAL COLAR (E) 2 X 6 RAFTERS 16" O.C. (E) 6 X 3 ATTIC VENTS, EACH SIDE 263.34 sq ft N GFI GROUND FAULT DUPLEX WALL OUTLET SPACED PER CODE EXISTING WALL MOUNT WHITE DUPLEX ELECTRICAL OUTLET EXISTING ELECTRICAL FOURPLEX WALL OUTLET ELECTRICAL SCHEDULE NUMBER INDICATES HEIGHT OF CENTER OF INSTALLED J-BOX EXISTING RECESSED WALL MOUNT ELECTRICAL SUBPANEL GFI +44" WALL MOUNTED ELECTRIC HEAT PUMP HEAT PUMP (E) PNL WALL MOUNT WHITE DUPLEX ELECTRICAL OUTLET ELECTRICAL FOURPLEX WALL OUTLET (E) (E) NEW RECESSED ELECTRICAL SUBPANEL TELEPHONE HARD LINE OR INTERNET WALL JACK PNL 300 CROW'S NEST SCALE: 1/4" = 1'-0"15 NE W R OOF AND ATTIC IMPROVEMENTS SCAL E: 1/4" = 1'-0"5 ATTIC RCP FRAMING SCALE: 1/4" = 1'-0"1 3 CROW'S NEST ELECTRICAL GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 2.4 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 2.4 7-21-23 NEW ROOF PLAN 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a N 300 5A 4.3 13A 4.4 14A 3.1 14A 3.1 13A 4.3 14 A 3.2 14 A 3.2 #A 4.2 14A 4.2 ATTIC CROW'S NEST 3 0 '-4 -½" SKYLIGHTS SKY 1 & SKY 2 N SCALE: 1/4" = 1'-0"13 EXISTING R OOF PLAN SCAL E: 1/4" = 1'-0"1 5 PROPOSED ROOF PL AN GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 3.1 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 3.1 7-21-23 SECTIONS 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a4'-6" 9 '-7 " 1 '-6 " 8 '-8 " N T S 1 '-1 1 /2 " 9 '-1 /2 " 2 8 '-4 1 /2 " 3 '-6 " 9 '-7 " 1 '-6 " 4'-2 1/2" 41'-9"40'-6" 1 3 '-0 " EXISTING ADDITION HISTORIC BUILDING SCALE: 1/4" = 1'-0"14 WEST EAST SECTION GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 7 P M A 3.2 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 3.2 7-21-23 SECTIONS 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a 5 '-0 " 3 '-6 " 1 1 '-1 " 8 '-8 " N T S 1 0 '-1 1 " SCALE: 1/4" = 1'-0"14 EAST WE ST SECTION GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 8 P M D RUFFIN AS NOTED A 4.1 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: 7-21-23 B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a SOUTH ELEVATION 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S PLAN CHECK 3 '-6 " 1 4 '-6 " 1 2 '-7 1 /2 " 4'-3 1/2"5'-11"10'-9" 2'-8 1/2" 10'-9"5'-11" 3 0 '-7 1 /2 " 6 '-4 " 12 9 12 9 12 9 12 9 12 9 (E)(E)(E)(E)(E)(E) (E)(E)(E)(E) 1995 ADDITION 1887 BUILDING S21 S22 A S11 S12 REMOVE EXISTING ROOF AND BUILD LARGER ADDTION OVER EXISTING TRUSS JOIST FLOOR NEW ROOFING TO MATCH (E) WITH CLASS 'A' FLAME SPREAD RATING FILL IN EXISTING PORCH AND ADD NEW WALL TO CREATE EXTRA SPACE IN OFFICE NEW CONCRETE LANDING, STAIR AND ACCESSIBLE RAMP SCALE: 1/4" = 1'-0"1 SOUTH ELEVATION GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 8 P M A 4.2 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 4.2 7-21-23 NORTH ELEVATION 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a 3 7 '-8 " 3 0 '-7 1 /2 " 3'-1-½" 16'-4-½" 29'-7" 12 9 12 9 12 9 PROPOSED SKYLIGHTS N24 1995 ADDITION1887 BUILDING REMOVE EXISTING ROOF AND BUILD LARGER ADDTION OVER EXISTING TRUSS JOIST FLOOR NEW ROOFING TO MATCH (E) WITH CLASS 'A' FLAME SPREAD RATING ADD THREE NEW WINDOWS INTO EXISTING WALL. ALIGN TO WINDOWS ON SECOND FLOOR N23 N22 N21 N13 N12 N11 (E)(E) (E)(E)(E) CONTINUOUS RIDGE VENT OVER NEW ROOF SCALE: 1/4" = 1'-0"14 NORTH ELEVATION GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 8 P M A 4.3 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 4.3 7-21-23 EAST ELEVATION & SECTION 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a (E)(E) (E) (E) (E) 6 '-8 " 6 '-3 1 /2 " 3 '-6 " 1 1 '-1 " 8 '-8 " N T S 8 " 9 '-7 " NEW STAIRWAY TO ATTIC: UP 9'-4" (VIF) IN 16 7" RISERS WITH 11" TREADS AND DRESSED IN OAK TO MATCH (E) STAIR WITH HANDRAILS ON BOTH SIDES. FRAME WITH 4 2 X 12 STRINGERS EQUALLY SPACED CROWS NEST REMOVE AGED WOOD SLATS AND REPLACE WITH CUSTOM TRIANGULAR WDW WITH STAINED GLASS INSERT TO MATCH FIRST FLOOR STAINED GLASS SCAL E: 1/4" = 1'-0"13 NORTH SOUTH SECTION A SCAL E: 1/4" = 1'-0"5 EXISTING EAST ELEVATION GSPublisherVersion 2502.0.7.100 A U G S U B M I T T A L .p l n r e v : 8 /1 9 /2 3 p r i n t : 8 /1 9 /2 3 5 :1 8 P M A 4.4 ISSUE DATE: SCALE: DRAWN BY: SHEET NO: D RUFFIN AS NOTED A 4.4 7-21-23 WEST ELEVATION & SECTION 2 3 6 3 B o u l e v a r d C i r c l e , S t e . 2 W a l n u t C r e e k C A 9 4 5 9 5 d a v e @ r u f f i n a r c h t i e c t u r e .c o m 9 2 5 -3 4 8 -2 6 0 6 R U F F I N A R C H I T E C T U R E + A R C H I T E C T U R E + I N T E R I O R S B u i l d i n g R e m o d e l 8 0 9 P o d v a R o a d D a n v i l l e , C a l i f o r n i a 12 9 12 9 12 9 12 9 12 9 12 9 (E)(E) W11 W21 W22 W31 REMOVE EXISTING ROOF AND WALLS TO BUILD A LARGER OFFICE SPACE OVER EXISTING TRUSS JOIST FLOOR WITH BEAMS AND COLUNMNS TO ADDRESS NEW LOADS NEW ROOFING TO MATCH (E) WITH CLASS 'A' FLAME SPREAD RATING FILL IN EXISTING PORCH AND ADD NEW WALL TO CREATE EXTRA SPACE IN OFFICE NEW CONCRETE LANDING, STAIR AND ACCESSIBLE RAMP REMOVE WEATHERED WOOD ATTIC VENT AND REPLACE WITH CUSTOM TRIANGULAR WINDOW AND STAINED GLASS PANEL TO MATCH (E) ENTRY STAINED GLASS, PHOTO THIS PAGE 2'-6" 25'-3" 12 9 12 9 12 9 12 9 MATCH EXISTING CONSTRUCTION AND FINISH COLORS. 42" HIGH PT POSTS WITH 1 X 8 REDWOOD WRAP SCAL E: 1/4" = 1'-0"9 WEST ELEVATION SCALE: 1/4" = 1'-0"13 ADDITION ATTIC SECTION SCALE: 1:2.3111PODVA STAINED GLASS PATTERN SCALE: 1/4" = 1'-0"7 ORIGINAL POST DESIGN