TO: Bicycle Advisory Commission September 25, 2023
SUBJECT: Review Townwide Bicycle Master Plan
BACKGROUND
On July 6, 2021, the Town Council adopted the Town of Danville Bicycle Master Plan, CIP C-
609. The Bicycle Master Plan ("BMP") provides a roadmap for the prioritization and
construction of future bicycle improvements and sets policy on how to further encourage and
promote bicycling as a safe and viable form of transportation.
DISCUSSION
At the request of the Bicycle Advisory Commission, staff proceeded to conduct an analysis to
update the project prioritization process completed as part of the 2021 Danville Bicycle Master
Plan. For this process, the most -recent available collision data from April 2021 through June
2023 was used to complete an update of the Safety Analysis, which was subsequently combined
with the previous prioritization scoring rubric to update the prioritization ranking of projects
from the 2021 plan.
Summary of Findings
A summary of findings is as follows:
• A total of 28 bicycle -related collisions were reported during the study period from April
2021 to June 2023.
• Two (2) collisions resulting in severe injuries were reported at the intersections of
Sycamore Valley Rd and Park Hill Road and Danville Boulevard and Hartford Road.
• Seventeen (17) corridor recommendations received an updated prioritization score
(lower or higher) based on the updated safety score.
• Thirty-six (36) spot improvement recommendations received an updated prioritization
score (lower or higher) based on the updated safety score.
Additional details on the collision analysis and updated prioritization can be found in the
sections below.
BMP Update
Collision Analysis Findings
Staff completed an updated collision analysis to better -understand locations with high incidence
of bicycle collisions. Collision data from April 2021 through June 2023 was used to complete the
analysis. The updated collision analysis presented the following findings:
• There were 28 reported bicycle -related collisions during the study period from 2021-2023.
• Areas with commercial and mixed -use land use designations experienced higher rates of
collisions compared to other land use categories.
• Two (2) corridors experienced the highest number of collisions (see Table 1).
• Three (3) intersections emerged as key areas where multiple bicycle collisions occurred
(see Table 2).
• Two collisions resulting in severe injuries were reported at the intersections of Sycamore
Valley Rd and Park Hill Road and Danville Boulevard and Hartford Road.
Table 1: High Collision Incidence Corridors (2021-2023)
1 San Ramon Valley Blvd 6
2 Sycamore Valley Rd 5
Table 2: High Collision Incidence Intersections (2021-2023)
1 San Ramon Valley Blvd and Hartz Ave 2
1 Crow Canyon Rd and Center Court 2
1 Iron Horse Trail and Greenbrook Dr 2
As shown in Figure 1, more than 60% of all collisions resulted in an injury: 7% recorded as severe
injuries; 22 % as complaint of pain; and, 39 % other visible injuries. More than 60 % of all collisions
were recorded as broadside collisions (64%) (Figure 2). Notable causes for the collisions were
recorded as improper turning (22%), traffic signals or sign violations (21%), or auto R/W
violations (18 %) (see Figure 3). Finally, as noted in Figure 4, most collisions occurred on Fridays.
Figure 5 below shows the spatial distribution of bicycle -related collisions within Danville.
Clusters appear within the downtown areas, along San Ramon Valley Boulevard and at a
number of Iron Horse Trail intersections.
2
Figure 1. Highest Degree of Injury
Figure 2 Collision Type.
7%
22% 7%
Complaint of Pain 7%
32% Other Visible Injury 11%
Property Damage
Only 11%
Severe Injury
39%
Figure 3. Primary Collision Factor.
Figure 4. Day of the Week.
6
5
4
3
2
1
0
18%
7%
22%
4%
64%
Auto R/W Violation
Improper Turning
Other Hazardous Movement
Other Improper Driving
Other Than Driver
■ Traffic Signals and Signs
■ Unsafe Speed
■ Wrong Side of Road
■ Blank
aaJ aaJ eyaaA �yaaA iyaaA o�
i
3
Broadside
Head -On
Other
Rear -End
Sideswipe
Figure 5. Bicycle Collisions by Severity (Apr 21-Jun 2023)
ALAMO
H9 ntc
— VI.S r.3 Nlryl+
` I f
f I I
` F
[ r
� Lvs Ccr'r'vs MrdUlr Sch ov+
r'Errnlcnrar'y
r — —
Euryrnc o•IYdIC — r V"ra a,nndc
-N"te w Son Ramo,l L.edcy Efcmcmr?y
Hisrofic Site High Srl, vvl 7
a
I I
I Mowalr I
r
crrrn 1r.�lrryElrm�nr.�,.y
r
7 ,
4,.•: rr.,rr....,.
ti Elrrnrnrnry � ` I
I
f ■ sycamore I
I .. Oprrn SPo ca r
- — � � Jvl,n 8.zlrlVlrn .tiyram Mn
E+c+ncnia+y
Wngin.a.,+vc I Os.,gv �r/ �]+rCyaorc I
Wide rn ess I ''.fin Charles rte Wo per Elcm cn ra,y I
Mldr+lr Schnn+
Mddil c N,ch s
I _ P9rrldlvvl
! Va'+rry Fti rJ+cna!
i C:, cr nb,vvk
I Ffemonrary I n 1 r
ve ra
G ordcn D
WOW
E+rmrnr-y
I
SAN RAMAN L— _
— —
—LJ---IMILES
U 0 0.25 0.5
BICYCLE
COLLISIONS
DANVILLE BICYCLE
MASTER PLAN
(UPDATE 2023)
��� ><�rn s , ,r cum 'r: v,r• or nnn•:I, r,
Collisions by Severity (Apr 2021 - Jun 2023)
Minor Iniury/ ColTlplaint of Fain (1/)
w ProKjrnrly ❑awaye Only (5))
. Severe Inj ary (2)
11
Features
0 Post Office Iron Horse Trail
School Parks and Opcn Spacr:
aPark& Ride �— — — � lows Boundary
7'.?.S5.3)ary
Nr A.r
AElcr]1Cr] [a� y
Y
Crrrksrdc
E+crrPcnti�rY
Updated Prioritization Findings
Utilizing the project prioritization methodology developed as part of the 2021 Danville Bicycle
Master Plan and the results from the updated Safety Analysis, staff developed an updated list of
corridor and spot improvement projects. The methodology used for the project prioritization is
noted in Table 3 below. An updated prioritized list of projects can be found in Appendix 1.
NOTE: as part of the updated prioritization score, only the SAFETY criteria and points assigned
for each project were updated.
Table 3. Prioritization Methodology
• Projects that are within 250 ft of at least one bicycle -related fatality for 6.0
the last 2 years of data (Apr 21-jun23)
Safety
• Projects that are within 250 ft of at least one bicycle -related severe injury
collision for the last 2 years of data (Apr 21-jun23)
4.0
• Projects that are within 250 ft of at least one bicycle related collision
2.0
• Projects that connect people to Downtown
2.0
Connectivity to
• Projects that connect people to a school (i.e., elementary, middle, high
2.0
Destinations
school)
• Projects that provide direct connection to the Iron Horse Trail
2.0
• Projects that are comfortable for users of all ages and abilities (ex., Class I
3.0
Comfort (type of
or Class IIB)
facility)
• Other projects (ex., Class II, Class III or Class I1113)
1.0
• Recommended projects that received high support (50 or more likes for
3.0
corridor improvements; 30 or more likes for spot improvements)
Public Support
• Recommended projects that received medium support (27-49 likes for
2.0
corridors; 20-29 likes for spot improvements)
• Recommended projects that received low support (1-26 likes for corridor
1.0
improvements; 6-19 likes for spot improvements)
• Opportunity for quick implementation based on cost estimates.
Feasibility
1.0
• Opportunity for medium effort based on cost estimate
Table 4 provides a summary of corridors and spot improvements that received different
scores based on the updated safety criteria. Table 5 through Table 8 highlight the corridors
and spot improvements that received lower and higher prioritization scores based on the
safety rubric as part of the analysis.
5
Table 4. Corridors and spot improvements receiving different prioritization scores.
Corridors receiving HIGHER prioritization scores in 2023
Corridors receiving LOWER prioritization scores in 2023
Spot improvements receiving HIGHER prioritization scores in 2023
Spot improvements receiving LOWER prioritization scores in 2023
0
31
Table 5: Corridor improvements receiving HIGHER Prioritization Score in 2023 (by project number).
1
Camino Tassajara
Sycamore Valley Rd
Hansen Ln
Class IIB - Buffered Bicycle Lanes
2
13
4
15
2
Sycamore Valley Rd
San Ramon Valley Blvd
Camino Tassajara
Class IIB - Buffered Bicycle Lanes
2
13
4
15
6
Green Valley Trail
Highbridge Ln
Diablo Rd
Class I - Shared -Use Path
0
8
2
10
10
Greenbrook Dr
Camino Ramon
Sycamore Valley Dr
Class IIIB - Bicycle Boulevard (GB Sharrows)
2
13
4
15
19
McCauley Rd
Diablo Rd
Short Ridge Trail
Class IIIB - Bicycle Boulevard (GB Sharrows)
0
9
2
11
22
Prospect Ave
Railroad Ave
Sky Ter
Class III - Bicycle Route (Sharrows)
0
10
2
12
35
New Trail
Diablo Rd
Diablo Rd
Class I - Shared -Use Path
0
9
2
11
41
Danville Blvd
Del Amigo
El Portal
Class IIB - Buffered Bicycle Lanes
2
11
4
13
Table 6: Corridor improvements receiving LOWER prioritization score in 2023 (by project number).
3
San Ramon Valley Blvd
Podva Rd
Jewel Ter
Class IIB - Buffered Bicycle Lanes
6
15
2
11
4
Diablo Rd Trail
Fairway Drive
Mt Diablo Scenic Blvd
Class I - Shared -Use Path
2
10
0
8
5
San Ramon Valley Blvd
Hartz Way
Sycamore Valley Rd
Class IIB - Buffered Bicycle Lanes
2
13
1
12
7
Camino Ramon
Sycamore Valley Rd
Fostoria Way
Class IIIB - Bicycle Boulevard (GB Sharrows)
2
11
0
9
8
El Cerro Blvd
Danville Blvd
Diablo Road
Class IIB - Buffered Bicycle Lanes
4
15
0
11
9
Del Amigo Rd
IHT
Danville Blvd
Class IIIB - Bicycle Boulevard (GB Sharrows)
4
11
0
7
14
Ackerman Dr
El Cerro Blvd
End
Class IIIB - Bicycle Boulevard (GB Sharrows)
2
8
0
6
23
Highland Rd
Prospect Ave
Trailhead
Class III - Bicycle Route (Sharrows)
6
13
0
7
34
New Trail
Matadera Way
Dustin Ln
Class I - Shared -Use Path
2
11
0
9
7
Table 7. Spot improvements receiving HIGHER prioritization scores in 2023 (by project number).
20
Iron Horse Trail
West Prospect Ave
RRFB + High visibility crosswalk + Improve lighting
0
9.5
2
11.5
24
Sycamore Valley Road
San Ramon Valley Blvd
Bike box + Video detection device
0
8.5
2
10.5
35
Diablo Rd
Green Valley Rd
Bike box + Video detection device
0
8.5
2
10.5
43
Park & Ride
Bike Parking
0
1.0
0
2.0
44
Park & Ride
Iron Horse Trail Connections
0
1.0
0
2.0
Table 8. Spot improvement receiving LOWER prioritization scores in 2023 (by project number).
1
Camino Tassajara
2
Camino Tassajara
3
Camino Tassajara
4
Camino Tassajara
Sycamore Valley
5
Rd
6
Hartz Ave
7
Love Lane
8
Diablo Rd
11
Diablo Rd
13
Iron Horse Trail
16
Iron Horse Trail
17
Iron Horse Trail
18
Iron Horse Trail
19
Iron Horse Trail
Sycamore Valley
22
Rd
23
Blackhawk Rd
Crow Canyon Rd
Protected intersection
4
11.0
0
7.0
Old Blackhawk Rd
Bike box + Video detection device
2
7.0
0
5.0
Tassajara Ranch Rd
Bike box + Video detection device
2
7.5
0
5.5
Sycamore Valley Rd
Bicycle intersection crossings
2
7.5
0
5.5
IHT Crossing
Bridge overcrossing
2
12.0
0
10.0
Railroad Ave
Bike box + Video detection device
4
10.5
0
6.5
Railroad Ave
Bicycle intersection crossings
2
10.0
0
8.0
I-680
Overpass under lighting
4
10.0
2
8.0
Clydesdale Dr
Add lighting
4
7.0
0
3.0
El Capitan Dr
Raised crosswalk
2
8.5
0
6.5
Love Ln
RRFB + High visibility crosswalk + Improve lighting
4
13.5
0
9.5
Del Amigo Rd
RRFB + High visibility crosswalk + Improve lighting
4
12.0
0
8.0
Paraiso Dr
Raised crosswalk
2
10.5
0
8.5
Hartford Rd
RRFB + High Visibility Raised Crosswalk + Improve
Lighting
4
11.5
2
9.5
Camino Ramon/ IHT
Protected intersection
4
12.5
0
8.5
Mt Diablo Scenic Blvd
Bike box + Video detection device
4
8.5
0
2.5
E:3
Table 8 (continued)
26
Camino Ramon
28
Camino Tassajara
29
Camino Tassajara
32
Danville Blvd
34
Diablo Rd
37
Diablo Rd
38
Diablo Rd
39
Diablo Rd
41
Diablo Rd
42
Green Valley Rd
Sycamore Valley
45
Rd
Sycamore Valley
46
Rd
47
Diablo Road
48
Crow Canyon Rd
50
Railroad Ave
Greenbrook Dr
Crow Canyon Rd
Sycamore Valley Rd
El Cerro Blvd
El Cerro Blvd - Ackerman
Dr
Hartz Ave
Front St
West El Pintado
Matadera Way
Blemer Rd /Cameo Drive
I-680 On/Off Ramps
Bike box + Video detection device
Bike box + Video detection device
Bike box + Video detection device
Bike box + Video detection device
Bike box + Video detection device
Bike box + Video detection device
Bike box + Video detection device
Bike box + Video detection device
Bike box + Video detection device
Bike box + Video detection device
Bicycle intersection crossings
4 7.5
0
3.5
6 13.5
0
7.5
2 7.5
0
5.5
2 11.5
0
9.5
2 7.5
0
5.5
2 8.5
0
6.5
2 9.0
0
7.0
2 9.0
0
7.0
2 9.0
0
7.0
2 6.5
0
4.5
2 9.0
0
7.0
Camino Ramon
Bike box + Video detection device
4
11.5
0
7.5
Fairway Dr
PHB + High Visibility Crosswalk + Improve Lighting
4
11.0
0
7.0
Tassajara Ranch Dr
Bike box + Video detection device
6
7.5
0
1.5
Church St
Bike box + Video detection device
1
4.0
0
3.0
rj
Project Status Analysis
In addition to the project prioritization update analysis, staff prepared a summary of
the status of the subject projects (Attachment A) to identify current project phases and
funding status to better -assist the Commission with providing input on developing
project priorities and areas of focus going forward.
RECOMMENDATION
Review Townwide Bicycle Master Plan project prioritization update.
Prepared by:
Andrew Dillard
Transportation Manager
Attachment A - Bicycle Master Plan Project Prioritization Update with Status Summary
10
Corridor Improvements
Sycamore Valley Rd
Hansen Ln
Class II
Class 116
2
13
4
15
U,NS
San Ramon Valley Blvd
Camino Tassajara
Class II
Class 116
2
13
4
15
U,P
C-635
Camino Ramon
Sycamore Valley Dr
Class III
Class IIIB
2
12.5
4.0
14.5
PF, NS
C-621
Del Amigo
El Portal
Class II
Class 116
2
10.5
4.0
12.5
U,P
C-602
Hartz Way
Sycamore Valley Rd
Class II
Class 116
2
13
1
12
F,D
C-600
2024
Iron Horse Trail
Hartz Ave
None
Class III - Bicycle Route (w/ Sharrows)
2
12
2
12
PF, NS
C-621
Railroad Ave
Sky Ter
None
Class III - Bicycle Route (w/ Sharrows)
0
10
2
12
U,NS
C-621
Diablo Rd
Short Ridge Trail
None
Class IIIB
0
9
2
11
U,NS
C-621
Greenbrook HOW
Iron Horse Trail
Class I
Class I - Shared -Use Path
0
11
0
11
U,NS
Diablo Rd
Diablo Rd
None
Class I - Shared -Use Path
0
9
2
11
U,P
B-120
Podva Rd
Jewel Ter
Class II
Class 116
6
14.5
2.0
10.5
F,D
C-600
2024
Danville Blvd
Diablo Rd
Class 11
Class IIB
4
14.5
0.0
10.5
U,NS
Highbridge Ln
Diablo Rd
None
Class I - Shared -Use Path
0
8
2
10
U,P
B-120
Camino Ramon
Greenbrook Dr
Class III
Class IIIB
2
10
2
10
U,NS
C-621
Sycamore Valley Rd
Fostoria Way
Class III
Class IIIB
2
11
0
9
F,C
C-601
2023
Iron Horse Trail
Macomber Road
None
Class III - Bicycle Route (w/ Sharrows)
0
9
0
9
U,NS
C-621
Greenbrook Dr
Harlan Dr
Class I
Class I - Shared -Use Path
0
9
0
9
U,NS
Greenbrook Drive
Van Patten Dr
Class I
Class I - Shared -Use Path
0
9
0
9
U,NS
Matadera Way
Dustin Ln
None
Class I - Shared -Use Path
2
11
0
9
U,P
B-120
Fairway Dr
Mt Diablo Scenic Blvd/ Avenida
None
Class I - Shared -Use Path
2
10
0
8
F,D
C-055
2024
Linda Mesa Ave
Prospect Ave
None
Class III - Bicycle Route (w/ Sharrows)
0
8
0
8
PF,NS
C-621
Greenbrook Dr
St. Christopher Dr
None
Class III - Bicycle Route (w/ Sharrows)
0
8
0
8
F,D
C-305
2023
El Capitan Dr
Sycamore Valley Rd
None
Class I - Shared -Use Path
0
8
0
8
U,NS
Iron Horse Trail
Danville Blvd
None
Class IIIB
4
11
0
7
PF, NS
C-621
Sycamore Valley Park
SV Regional Open Space
Unpaved trail
Unpaved Trail
0
7
0
7
U,P
B-120
Prospect Ave
Trailhead
None
Class III - Bicycle Route (w/ Sharrows)
6
13
0
7
U,NS
El Capitan Dr
Greenbrook Dr
Class I
Class I - Shared -Use Path
0
7
0
7
U,NS
Greenbrook HOA
N/A
Class I
Class I - Shared -Use Path
0
7
0
7
U,NS
Diablo Rd
Blackhawk Rd
None
Class I - Shared -Use Path
0
7
0
7
F,D
C-055
2024
La Gonda Way
El Alamo
None
Class 11 - Bicycle Lanes
0
6
0
6
U,NS
El Alamo
El Cerro Blvd
None
Class III - Bicycle Route
0
6
0
6
U,NS
El Cerro Blvd
End
None
Class IIIB
2
8
0
6
U,NS
Laurelwood Dr
Camino Tassajara
None
Class III - Bicycle Route (w/ Sharrows)
2
8
0
6
PF,NS
C-621
Camino Tassajara
Shelterwood Ln
None
Class III - Bicycle Route
0
6
0
6
U,NS
El Capitan Dr
Greenbrook Dr
Class I
Class I - Shared -Use Path
0
6
0
6
U,NS
Diablo Rd (Alexan Riverwalk)
Freitas Trail
None
Class I - Shared -Use Path
0
6
0
6
U,NS
La Gonda Bridge
Danville Blvd
None
Class 11 - Bicycle Lanes
0
7
0
6
U,P
C-634
MVHS
Green Valley Rd
Class III
Class II - Bicycle Lanes
0
6
0
6
U,NS
Diablo Rd
New Trail
None
Class III - Bicycle Route (w/ Sharrows)
0
5.5
0.0
5.5
U,NS
SV Regional Open Space
N/A
Unpaved trail
Unpaved Trail
0
5
0
5
U,P
B-120
El Capitan Dr
Greenbrook Dr
None
Class III - Bicycle Route (w/ Sharrows)
0
5
0
5
F,D
C-305
2023
Short Ridge Trail
Old Blackhawk Rd
None
Class III - Bicycle Route (w/ Sharrows)
0
4
0
4
U,NS
Shelterwood Ln
Trail entrance
None
Class III - Bicycle Route (w/ Sharrows)
0
4
0
4
U,NS
Magee Preserve
SV Regional Open Space
Unpaved trail
Unpaved Trail
0
4
0
4
F,D
Dev.
2024
U
Unfunded
PF
Partially Funded
F
Fully Funded
NS
Not Started
P
Planning
D
Design
C
Construction
Spot Improvements
9 Iron Horse Trail
San Ramon Valley Blvd
Raised crosswalk
2
12
2
12
U,NS
U Unfunded
20 Iron Horse Trail
West Prospect Ave
RRFB + High visibility crosswalk + Improve lighting
0
9.5
2
11.5
U,NS
PF Partially Funded
10 San Ramon Valley
Railroad Ave
Bike box +Video detection device
2
11
2
11
F,D
C-600/C-634
2024
F Fully Funded
24 Sycamore Valley Road
San Ramon Valley Blvd
Bike box +Video detection device
0
8.5
2
10.5
F,D
C-600/C-634
2024
INS Not Started
35 Diablo Rd
Green Valley Rd
Bike box +Video detection device
0
8.5
2
10.5 COMPLETED
P Planning
5 Sycamore Valley Rd
Iron Horse Trail Crossing
Bridge overcrossing
2
12
0
10
U,P
D Design
15 Iron Horse Trail
Linda Mesa Ave
RRFB + High visibility crosswalk + Improve lighting
0
10
0
10
F,D
C-305
2024
C Construction
16 Iron Horse Trail
Love Ln
RRFB + High visibility crosswalk + Improve lighting
4
13.5
0
9.5
F,D
C-305
2024
19 Iron Horse Trail
Hartford Rd
RRFB + High Visibility Raised Crosswalk + Improve
4
11.5
2
9.5
U,P
C-305
32 Danville Blvd
El Cerro Blvd
Bike box +Video detection device
2
11.5
0
9.5
U/F*,P
14 Hartz Way
Hartz Ave
Bike box +Video detection device
2
9
2
9
PF/F*,D
C-634
2025
25 San Ramon Valley
Hartz Ave
Bike box + Video detection device
2
9
2
9
F*,D
C-600/C-634
2024
36 Front St
Hartz Way
Bike box +Video detection device
2
9
2
9
PF/F*,D*
C-634
2025
12 Iron Horse Trail
Greenbrook Dr
Raised crosswalk
2
8.5
2
8.5
F,P
C-607
2025
18 Iron Horse Trail
Paraiso Dr
Raised crosswalk
2
10.5
0
8.5
F,P
C-607
2025
22 Sycamore Valley Rd
Camino Ramon/ Iron Horse
Protected intersection
4
12.5
0
8.5
F,D
C-607
2025
33 Diablo Rd
Camino Tassajara
Bike box +Video detection device
0
8.5
0
8.5 COMPLETED
7 Love Lane
Railroad Ave
Bicycle intersection crossings
2
10
0
8
U,NS
8 Diablo Rd
1-680
Overpass under lighting
4
10
2
8
U,NS
17 Iron Horse Trail
Del Amigo Rd
RRFB + High visibility crosswalk + Improve lighting
4
12
0
8
F,C
C-305
2023
28 Camino Tassajara
Crow Canyon Rd
Bike box + Video detection device
6
13.5
0
7.5
F,D
C-634
2024
45 Sycamore Valley Rd
1-680 On/Off Ramps
Bicycle intersection crossings
2
9
0
7.5
U,NS
1 Camino Tassajara
Crow Canyon Rd
Protected intersection
4
11
0
7
U,NS
38 Diablo Rd
Front St
Bike box +Video detection device
2
9
0
7
PF/F*,D*
C-634
2025
39 Diablo Rd
West El Pintado
Bike box +Video detection device
2
9
0
7
PF/F*,P
C-634
40 El Cerro Blvd
La Gonda Way
Bike box + Video detection device
0
7
0
7
UF, INS
41 Diablo Rd
Matadera Way
Bike box +Video detection device
2
9
0
7
U,NS
44 Park & Ride
Iron Horse Trail
Iron Horse Trail Connection
0
8.0
0
7 COMPLETED
46 Sycamore Valley Rd
Camino Ramon
Bike box +Video detection device
4
11.5
0
7
F,D
C-634
2024
6 Hartz Ave
Railroad Ave
Bike box + Video detection device
4
10.5
0
6.5
PF,D
C-634
2025
13 Iron Horse Trail
El Capitan Dr
Raised crosswalk
2
8.5
0
6.5
F,P
C-607
2025
37 Diablo Rd
Hartz Ave
Bike box + Video detection device
2
8.5
0
6.5
F,D
A-364/C-634
2024
30 La Gonda Way
Bike Lanes
0
6.0
0
6
UF,P
C-638
TBD
3 Camino Tassajara
Tassajara Ranch Dr
Bike box + Video detection device
2
7.5
0
5.5
F,P/D
C-634
2024
4 Camino Tassajara
Sycamore Valley Rd
Bicycle intersection crossings
2
7.5
0
5.5
UF, INS
27 Greenbrook Dr
Sycamore Valley Rd
Bike box + Video detection device
0
5.5
0
5.5
F,D
C-634
2024
29 Camino Tassajara
Sycamore Valley Rd
Bike box + Video detection device
2
7.5
0
5.5
F,P/D
C-634
2025
31 Sycamore Valley Rd
Brookside Dr
Bike box +Video detection device
0
5.5
0
5.5
F,D
C-634
2024
34 Diablo Rd
El Cerro Blvd - Ackerman Dr
Bike box + Video detection device
2
7.5
0
5.5 COMPLETED
2 Camino Tassajara
Old Blackhawk Rd
Bike box +Video detection device
2
7.0
0
5
PF,D
C-634
2025
41 Old Orchard Dr
Freitas Trail
Bicycle intersection crossings
0
4.5
0
4.5
UF, INS
48 Crow Canyon Rd
Tassajara Ranch Dr
Bike box + Video detection device
6
7.5
0
4.5
PF,D
C-634
2025
21 Diablo Rd
New trail
PHB + High Visibility Crosswalk + Improve Lighting
0
4
0
4
F,D
C-055
2024
26 Camino Ramon
Greenbrook Dr
Bike box + Video detection device
4
7.5
0
3.5
F,C
C-601
2023
11 Diablo Rd
Clydesdale Dr
Add lighting
4
7.0
0
3
UF, INS
50 Railroad Ave
Church St
Bike box + Video detection device
1
4
0
3
PF,D
C-634
2025
23 Blackhawk Rd
Mt Diablo Scenic Blvd
Bike box +Video detection device
4
8.5
0
2.5
F,D
DEV/CCC
2024
42 Green Valley Rd
Blemer Rd / Cameo Drive
Bike box + Video detection device
2
6.5
0
2
UF, INS
43 Park & Ride Sycamore Valley Rd Bike Parking 0 1 0 2 PF,D C-598 TBD
47 Diablo Road Fairway Dr PHB + High Visibility Crosswalk + Improve Lighting 4 11 0 1.5 F,D C-055 2024