HomeMy WebLinkAbout011023-06.3 ADMINISTRATIVE STAFF REPORT 6.3 TO: Mayor and Town Council January 10, 2023 SUBJECT: Resolution No. 1-2023, authorizing the submittal of a request to the Metropolitan Transportation Commission for the Allocation of Fiscal Year 2023/24 Transportation Development Act Article 3 Pedestrian/Bicycle Project Funds BACKGROUND The Metropolitan Transportation Commission (“MTC”) is soliciting applications for Fiscal Year 2023/24 Transportation Development Act (“TDA”) Article 3 funds for pedestrian and bicycle projects. TDA is a state grant program administered by MTC that provides annual funding for pedestrian and bicycle facility improvements. Contra Costa County Public Works Department acts on MTC’s behalf to review and prioritize applications so that one consolidated county-wide application for local agency funding can be submitted for MTC’s consideration. Last year, for the 2022/23 cycle, approximately $1,400,000 was available for Contra Costa County jurisdictions. In previous years, the Town has received grant awards for projects including the Diablo Road Bicycle Improvements (2020/21 cycle) and the Diablo Road Trail Crossing Improvements (2021/22 cycle). Final applications must be submitted to the County no later than January 26, 2023. Only one project per jurisdiction will be considered. The County’s TDA Subcommittee will then prioritize the projects, obtain Mayors’ Conference and Board of Supervisors’ approval of the prioritized list, and then submit the approved project list to MTC in June 2023. DISCUSSION The proposed Camino Tassajara/Sycamore Valley Road Corridor Bicycle Safety Project (“project”) consists of the installation of Bicycle Detection Traffic Signal Indicator Systems at 20 signalized intersections along Camino Tassajara, Sycamore Valley Road, and Crow Canyon Road between the intersections of Camino Tassajara/Lawrence Road (east project limits) and Sycamore Valley Road/Brookside Drive (west project limits), as shown in Attachment B. Bicycle Detection Signal Indicator Systems (Attachment C) have been identified in the Townwide Bicycle Master Plan as a necessary and effective safety Authorizing submittal of request to 2 January 10, 2023 MTC for TDA Article 3 funds for CIP C-634 enhancement for bicyclists that provides real-time messaging to cyclists that they have been detected by detection systems at traffic signals. To date, there are seven (7) intersection locations where the indicators have been installed. The Bicycle Detection Signal Indicator Systems will operate as a complimentary component to new traffic video detection systems that will be installed along the subject roadway corridors as part of CIP C-634, Townwide Traffic Signal Modernization Project (Attachment D) that is scheduled to begin the design phase in January 2023 and complete construction in 2023/24. As additional supporting components to this TDA grant application and the CIP C-634 project, in 2022 the Town submitted a Highway Safety Improvement Program, Cycle 11 grant application that would provide complimentary bicycle safety enhancements along the corridor through installation of striping enhancements consisting of advanced stop limit lines and bicycle boxes. The amount of the TDA grant request is $80,000 with a total project cost of $95,000. PUBLIC CONTACT Posting of the meeting agenda serves as notice to the general public. As required by the grant program’s submission requirements, the preliminary TDA application was reviewed by the Town of Danville’s Bicycle Advisory Commission at its special meeting of November 28, 2022. FISCAL IMPACT None. Authorizing submittal of request to 3 January 10, 2023 MTC for TDA Article 3 funds for CIP C-634 RECOMMENDATION Adopt Resolution No. 1-2023, authorizing the submittal of a request to the Metropolitan Transportation Commission for the Allocation of Fiscal Year 2023/24 Transportation Development Act Article 3 Pedestrian/Bicycle Project Funds. Prepared by: Andrew Dillard Transportation Manager Reviewed by: Tai J. Williams Assistant Town Manager Attachments: A - Resolution No. 1-2023 Exhibit 1 – 2023/24 TDA Article 3 Project Application B - Project Location Map C - Bicycle Detection Indicator Systems D - CIP Page C-634 RESOLUTION NO. 1-2023 AUTHORIZING THE SUBMITTAL OF A REQUEST TO THE METROPOLITAN TRANSPORTATION COMMISSION FOR THE ALLOCATION OF FISCAL YEAR 2023/24 TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 PEDESTRIAN/BICYCLE PROJECT FUNDS WHEREAS, Article 3 of the Transportation Development Act (TDA), Public Utilities Code (PUC) Section 99200 et seq., authorizes the submission of claims to a regional transportation planning agency for the funding of projects exclusively for the benefit and/or use of pedestrians and bicyclists; and WHEREAS, the Metropolitan Transportation Commission (MTC), as the regional transportation planning agency for the San Francisco Bay region, has adopted MTC Resolution No. 4108, entitled “Transportation Development Act, Article 3, Pedestrian and Bicycle Projects,” which delineates procedures and criteria for submission of requests for the allocation of “TDA Article 3” funding; and WHEREAS, MTC Resolution No. 4108 requires that requests for the allocation of TDA Article 3 funding be submitted as part of a single, countywide coordinated claim from each county in the San Francisco Bay region; and WHEREAS, the Town of Danville desires to submit a request to MTC for the allocation of TDA Article 3 funds to support the project described in Exhibit 1 to this resolution, which is for the exclusive benefit and/or use of pedestrians and/or bicyclists; now, therefore, be it RESOLVED, that the Town of Danville declares it is eligible to request an allocation of TDA Article 3 funds pursuant to Section 99234 of the Public Utilities Code; and, be it further RESOLVED, that the project has been reviewed by the Town of Danville’s Bicycle Advisory Commission; and, be it further RESOLVED, that the Town of Danville attests to the accuracy of and approves the statements in Exhibit 1 to this resolution; and, be it further RESOLVED, that a certified copy of this resolution and its attachments, and any accompanying supporting materials shall be forwarded to the congestion management agency, county-wide transportation planning agency, or county association of governments, as the case may be, of Contra Costa County for submission to MTC as part of the county-wide coordinated TDA Article 3 claim. DocuSign Envelope ID: 67FEFE11-0706-442C-A501-E2EA0BE4615E ATTACHMENT A PAGE 2 OF RESOLUTION NO. 1-2023 APPROVED by the Danville Town Council at a regular meeting on January 10, 2023, by the following vote: AYES: NOES: ABSTAINED: ABSENT: ______________________________ MAYOR APPROVED AS TO FORM: ATTEST: _______________________________ ______________________________ CITY ATTORNEY CITY CLERK DocuSign Envelope ID: 67FEFE11-0706-442C-A501-E2EA0BE4615E MTC Programming and Allocations Section April 2021 TDA Article 3 Model Resolution Page 1 Metropolitan Transportation Commission Transportation Development Act Article 3 Funds Bicycle and Pedestrian Projects Instructions for the Use of the Model Governing Body Resolution by Claimants (A model resolution follows these instructions) The model resolution contains four parts: 1. Abstract of the purpose of the resolution (optional) 2. Body of the Resolution 3. Attachment A to the Resolution – Required Findings 4. Attachment B to the Resolution – MTC Claim Form(s) All TDA Article 3 claimants should use this model resolution since it includes proper wording for findings to be made by the claimant. One resolution may be used for requesting allocations for multiple projects. A claimant may reformat the resolution for administrative purposes, but any wording changes should be approved by MTC in advance. Attachment A, the “Findings,” must be included as part of the resolution. If you have questions about revising any of the text in the resolution or in Attachment A, or altering any of the findings, please contact MTC for prior approval. For attachment B – local Congestion Management agency or county-approved forms may be used in lieu of MTC’s standard format if basic identifying information about the project and the project sponsor is included. A separate “Project Application” form must be used for each project. If the claim covers multiple projects, the multiple claim forms still constitute only one Attachment B. In other words, Attachment B can be one to “n” number of claim forms, and the total number of pages of Attachment B is the total number of pages of all of the claim forms (including any accompanying pages). Where you see RESOLUTION, insert – in black type – the number you assign to the resolution. Where you see INSERT NAME OF CITY, insert – in upper and lower case black type – the official name of the city or county (e.g., “the City of Oakland,” “the County of Solano”). Where you see INSERT NAME OF COUNTY, insert – in upper and lower case black type – the name of the county from which the claim is being submitted (e.g., “Napa County”). EXHIBIT 1 April 2021 TDA Article 3 Model Resolution Page 3 Resolution No. 1-2023 Re: Request to the Metropolitan Transportation Commission for the allocation of fiscal year 2023-2024 Transportation Development Act Article 3 Pedestrian/Bicycle project funding WHEREAS, Article 3 of the Transportation Development Act (TDA), Public Utilities Code (PUC) Section 99200 et seq., authorizes the submission of claims to a regional transportation planning agency for the funding of projects exclusively for the benefit and/or use of pedestrians and bicyclists; and WHEREAS, the Metropolitan Transportation Commission (MTC), as the regional transportation planning agency for the San Francisco Bay region, has adopted MTC Resolution No. 4108, Revised, entitled “Transportation Development Act, Article 3, Pedestrian/Bicycle Projects,” which delineates procedures and criteria for submission of requests for the allocation of “TDA Article 3” funding; and WHEREAS, MTC Resolution No. 4108, Revised requires that requests for the allocation of TDA Article 3 funding be submitted as part of a single, countywide coordinated claim from each county in the San Francisco Bay region; and WHEREAS, the Town of Danville desires to submit a request to MTC for the allocation of TDA Article 3 funds to support the projects described in Attachment B to this resolution, which are for the exclusive benefit and/or use of pedestrians and/or bicyclists; now, therefore, be it RESOLVED, that the Town of Danville declares it is eligible to request an allocation of TDA Article 3 funds pursuant to Section 99234 of the Public Utilities Code, and furthermore, be it RESOLVED, that there is no pending or threatened litigation that might adversely affect the project or projects described in Attachment B to this resolution, or that might impair the ability of the Town of Danville to carry out the project; and furthermore, be it RESOLVED, that the Town of Danville attests to the accuracy of and approves the statements in Attachment A to this resolution; and furthermore, be it RESOLVED, that a certified copy of this resolution and its attachments, and any accompanying supporting materials shall be forwarded to the congestion management agency, countywide transportation planning agency, or county association of governments, as the case may be, of Contra Costa County for submission to MTC as part of the countywide coordinated TDA Article 3 claim. The Town of Danville adopted this resolution on January 10, 2023. AYES: NAYS: Certified to by (signature): Robert Storer, Mayor April 2021 TDA Article 3 Model Resolution Page 4 Resolution No. 1-2023 Attachment A Re: Request to the Metropolitan Transportation Commission for the Allocation of Fiscal Year 2023-2024 Transportation Development Act Article 3 Pedestrian/Bicycle Project Funding Findings Page 1 of 1 1. That the Town of Danville is not legally impeded from submitting a request to the Metropolitan Transportation Commission for the allocation of Transportation Development Act (TDA) Article 3 funds, nor is the Town of Danville legally impeded from undertaking the project(s) described in “Attachment B” of this resolution. 2. That the Town of Danville has committed adequate staffing resources to complete the project(s) described in Attachment B. 3. A review of the project(s) described in Attachment B has resulted in the consideration of all pertinent matters, including those related to environmental and right-of-way permits and clearances, attendant to the successful completion of the project(s). 4. Issues attendant to securing environmental and right-of-way permits and clearances for the projects described in Attachment B have been reviewed and will be concluded in a manner and on a schedule that will not jeopardize the deadline for the use of the TDA funds being requested. 5. That the project(s) described in Attachment B comply with the requirements of the California Environmental Quality Act (CEQA, Public Resources Code Sections 21000 et seq.). 6. That as portrayed in the budgetary description(s) of the project(s) in Attachment B, the sources of funding other than TDA are assured and adequate for completion of the project(s). 7. That the project(s) described in Attachment B are for capital construction and/or final design and engineering or quick build project; and/or for the maintenance of a Class I bikeway which is closed to motorized traffic and/or Class IV separated bikeway; and/or for the purposes of restriping Class II bicycle lanes; and/or for the development or support of a bicycle safety education program; and/or for the development of a comprehensive bicycle and/or pedestrian facilities plan, and an allocation of TDA Article 3 funding for such a plan has not been received by the Town of Danville within the prior five fiscal years. 8. That the project(s) described in Attachment B which are bicycle projects have been included in a detailed bicycle circulation element included in an adopted general plan,or included in an adopted comprehensive bikeway plan (such as outlined in Section 2377 of the California Bikeways Act, Streets and Highways Code section 2370 et seq.) or responds to an immediate community need, such as a quick-build project. 9. That any project described in Attachment B bicycle project meets the mandatory minimum safety design criteria published in the California Highway Design Manual or is in a National Association of City and Transportation Officials (NACTO) guidance or similar best practices document. 10. That the project(s) described in Attachment B will be completed in the allocated time (fiscal year of allocation plus two additional fiscal years). 11. That the Town of Danville agrees to maintain, or provide for the maintenance of, the project(s) and facilities described in Attachment B, for the benefit of and use by the public. April 2021 TDA Article 3 Model Resolution Page 5 Resolution No. 1-2023 Attachment B page 1 of 2 TDA Article 3 Project Application Form Fiscal Year of this Claim: 2023-2024 Applicant: Town of Danville Contact person: Andrew Dillard, Transportation Manager Mailing Address: 500 La Gonda Way, Danville, CA 94526 E-Mail Address: adillard@danville.ca.gov Telephone: (925) 314-3384 Secondary Contact (in event primary not available); Edwin Martinez, Traffic Engineering Associate E-Mail Address: emartinez@danville.ca.gov Telephone: (925) 314-3375 Project Title (Short Description): Camino Tassajara/Sycamore Valley Road Corridor Bicycle Safety Improvements Amount of claim: $95,000 Description of Overall Project: Project Scope Proposed for Funding: (Project level environmental, preliminary planning, and ROW are ineligible uses of TDA funds.) The Town of Danville Camino Tassajara/Sycamore Valley Road Corridor Bicycle Safety Project consists of the installation of Bicycle Detection Traffic Signal Indicator Systems at 20 Intersections. Bicycle Detection Signal Indicator Systems has been identified in the Town of Danville Bicycle Master Plan as a necessary safety enhancement for bicyclists. The project will provide bicyclists with safe and accessible messaging that they have been positively detected by traffic signal detector systems while waiting in the queue to cross signalized intersections. The Bicycle Detection Signal Indicator Systems will work in conjunction with vehicular/bicycle video detection systems that will be installed along the corridor as part of the Town of Danville’s fully-funded C-634 Townwide Traffic Signal Modernization Project that is scheduled to begin Design phase in January 2023 and complete Construction in 2023-24. To date, the Town of Danville has installed Bicycle Detection Signal Indicator Systems at 7 (seven) intersection locations and has been proven to be an effective device to improve and enhance bicycle safety and signalized intersection messaging. The project consists of PS&E and Construction (procurement and installation) phases to implement bicycle detection signal indicator systems on all roadway approaches to 20 signalized intersections along the Sycamore Valley Road- Camino Tassajara Corridor. The project intersection locations consist of the following: 1.Camino Tassajara – Lawrence Road 2.Camino Tassajra – Jasmine Way 3.Camino Tassajara – Rassani Drive 4.Camino Tassajara – Tassajara Ranch Drive 5.Camino Tassajara – Crow Canyon Road 6.Crow Canyon Road – Center Way 7.Crow Canyon Road – Tassajara Ranch Drive 8.Camino Tassajara – Liverpool Street 9.Camino Tassajara – Wood Ranch Road 10.Camino Tassajara – Alta Vista 11.Camino Tassajara – Holbrook Drive 12.Camino Tassajara – Sherburne Hills Road 13.Camino Tassajara – Tassajara Lane 14.Camino Tassajara – Hill Meadow Drive/Shady Creek Drive 15.Camino Tassajara – Glasgow Drive/Messian Place 16.Camino Tassajara – Sycamore Valley Road 17.Sycamore Valley Road – Tunbridge Road 18.Sycamore Valley Road – Old Orchard Drive/Greenbrook Drive 19.Sycamore Valley Road – Morninghome Road 20.Sycamore Valley Road – Brookside Drive April 2021 TDA Article 3 Model Resolution Page 6 Project Budget and Schedule Project Eligibility: YES/NO A. Has the project been approved by the claimant's governing body? (If "NO," provide the approximate date approval is anticipated). Yes 1/10/23 B. Has this project previously received TDA Article 3 funding? If "YES," provide an explanation on a separate page. No C. For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California Highway Design Manual? (Available on the internet via: http://www.dot.ca.gov). Yes D. Has the project been reviewed by the Bicycle and Pedestrian Advisory Committee? (If "NO," provide an explanation). Yes 11/28/22 E. Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that include construction). N/A F. Will the project be completed before the allocation expires? Enter the anticipated completion date of project (month and year) July 2024 Yes G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name: ) Yes Project Phase TDA 3 Other Funds Total Cost Estimated Completion (month/year) Bike/Ped Plan - - - ENV - - PA&ED - - PS&E - $5,000 $5,000 January 2024 ROW - - CON 80,000 $10,000 $90,000 Total Cost $95,000 July 2024 Di a b l o R d Ir o n H o r s e R e g i o n a l T r l Bollin g e r C y n Blackha w k D r Blackha w k R d L a w r e n c e R d C a m i n o R a m o n P l G r e e n b r o o k D r McC a u l e y R d el Cerro Blvd Sycamore Valley Rd W Kuss R d Har t z A v e Laurel Dr e l P i n t a d o R d del A m i g o R d Massara S t Ramona RdLove L n M o n t e r o s s o S t Fostoria W a y C h a r b r a y S t Mera n o S t Alta Vista Way el R i o R d A c k e r m a n D r Ha r l a n D r Gil Blas Rd Woo d r a n c h R d el Pi n t o R d O l d O r c h a r d D r Hi l l R d Gla s g o w C i r She r b u r n e H i l l s R d Bla c k h a w k C l u b D r e l A l a m o S u n h a v e n R d Stirling Dr R a s s a n i D r Win d o v e r D r Sh a d e w e l l D r Magee Ranch R d Jasm i n e W a y Tas s a j a r a R a n c h D r Nat h a n P l el Cajon Dr C r e s t r i d g e D r el Por t a l Culet Ranch Rd Rima C t San t i a g o D r A l l e g h e n y D r Co t t o n w o o d D r Center C t Dunhill Dr Meadow Lake Dr Hig h b r i d g e L n Che s h i r e C i r Gerber a S t Hill M e a d o w P l Hol b r o o k D r Dia b l o C r e e k P l Linda M e s a A v e Summerfiel d S t B r i a r P l B r o o k s i d e D r M o r n i n g h o m e R d Gre e n b r o o k D r Tunbridg e R d Cami n o T a s s a j a r a Tas s a j a r a L n Old B l a c k h a w k R d Crow C a n y o n Pros p e c t A v e Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI,Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Communit Town Intersection Town of Danville # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ATTACHMENT B SmartCycle® Bike Indicator Providing positive feedback to cyclists that they have been detected Copyright © 2017 Iteris, Inc. All rights reserved. NOTICE: Iteris, Inc. reserves the right to change product specifications without notice. Information furnished is for informational purposes only. This information may not be complete or the latest revision. For the most up-to- date information, please contact Iteris, Inc. Oc t o b e r 2 0 1 7 R e v 2 Bike detection confirmation SmartCycle Bike Indicator* is a perfect companion to Iteris’ SmartCycle video detection system that provides confirmation of successful bicycle detection. By providing confirmation of detection, bicyclists are assured that they will get the appropriate green light timing to safely traverse the intersection. It also eliminates the need for a bicyclist to dismount their ride to push the pedestrian walk button when they are unsure that they were detected, thus avoiding a hazardous safety condition. Each low-power indicator assembly requires only two wires to operate with the provided illumination control module. There is also an ambient light sensor to control the brightness of the indicator to dim the light at night and maximize the brightness during the day. The illumination control module seamlessly interfaces with Iteris video detection processors that employ the SmartCycle algorithm. The highly accurate algorithm differentiates bicycles from motor vehicles to provide detection confirmation of bicyclists. Features •Low power 12 VDC operation •1.2 Watts per indicator •DIN rail mounted illumination control module Benefits •Added safety for bicycle riders •Indicator assembly can be mounted anywhere convenient for the bicycle rider’s view •Easy system installation •No maintenance required *Patent pending ATTACHMENT C ATTACHMENT D