HomeMy WebLinkAbout122022-08.1 Diablo Road Trail (122022)DIABLO ROAD
TRAIL PROJEC
Danville Town Council Meeting
December 20, 2022
Danville
Townwide
Trail Plan
PROJECT HISTORY
A 3 -decade long vision to close a trail gap
LEGEND
0 O 0 0 ETISTING TRAILS
• PROPOSED TRAILS
«tea PROPOSED ON -STREET
CONNECTING ROUTES
=r3 EXISTING OPEN SPACE
TRAILS
PROPOSTREAILSD OPEN
SPACE
PROPOSED STAGING
AREAS
PROPOSED
�® CROSSWALKS
• m o • IRON HORSE TRAIL
MAJOR CREEKS
GREEN VALLEY CREEK
MAP 2 0
Danville
Townwide Trail
Plan, adopted
1989
2
PUBLIC EASEMENT
Secured public trail easement as part of the Magee Preserve housing approval, which dedicated
381 acres (93%) of the 410 -acre ranch for public open space and trail development
Green all y-
Igbmentary
School
3
TWO-PART CONSTRUCTION
Easterly section underway by the developer, as part of the Magee Preserve subdivision improvements
Westerly section will be constructed by the Town in 2023, connecting to Barbara Haile Trail (existing)
Fairway
Drive
Diablo
Existing Diablo Road Trail
(0.5 miles)
New Town -constructed
trail segment (0.9 miles)
New Developer -constructed
trail segment (0.7 miles)
4
58
DIABLO ROAD TRAILALIGNMENT- EXISTING CONDITIONS
TOWN OF DANVILLE
1- ASPHALT TRAIL WIDTH =-
2-
2- TRAIL SECTION ADJACENT TO CREEK LENGTH = 900'
3- CULVERT CROSSING LENGTH = 35.0'
4- 1$4' OF MECHANICAL STABILIZED EARTH WALLS OF 4.0' MAK. HEIGNT
5- 156' OF 4.0' MAX. HEIGHT OF WOOD WALL
259' CALTRANS RAILS
7- 800' CREEK SIDE RAILS
B- REMOVAL OF 7 TREES (TWO OAK TREES)
5
DIABLO ROAD TRAILALIGNMENT
LOCATION MAP
Developer -constructed trail
segment,Jn-progress.
(0.7 miles)
EAST Segment
(following EVA)
(0.9 MILES)
ITO
WEST Segment
(following along creek
Existing Diablo Road _ M1
(aka "Barbara Haile") •4
Trail
Trail Crossing -
"HAWK" Signal
sua
StTimothy's t
• 4 Episcopal Church
LEGEND:
TOWNS OF DANVILLE
DIABLO ROAD TRAIL PROJECT
Fairway Drive to Alameda Diablo (West Segment)
14010
SAn N.I •
-410
FR018CT VJCINITY MAP
• ._-.!=AMS MtnO
+ARO 400[01404,
ulykk 4140141.
• CONLVIVI
04000404
4004 111111
,14.1 401
niEr wan., come.
004, ,410.300 01.4
1.4094 46,P
a ,iK
030
40. Pla01v 0.0• 44040004.4- nunr,C SWIM. 001.1
aum 4,1
Yon 14.0
031.10 041.
44,10,14 1,4 40.011
NEM
RETAINING WALL DETAIL
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
GUARD RAIL
AS NEEDED
FENCE AS NEEDED
2.0SHOULDER
2" HMA
8" AGGREGATE BASE
CLASS 11
TRAIL TYPICAL '•LCLDN
10 20 W0
SCALE- II • Id
PRELIMINARY PLANS - NOT FOR CONSTRUCTION
TOWN OF DANVILLE
DIABLO ROAD TRAIL PROJECT
TITLE SHEET
C•ACC,
ITT
•
EDGE OF
PAVEMENT
DIRT
,- EDGE OF PAVEMENT
—
DOUBLE LANE LINE
MELLOW POTS
'r03E OF PAVE9112..-.,...R,,w«—.e,o
D/
LO ROAD
IVRE FEN.
2.55' CONCRETE
— TOP OF SLOPE
TOP OF ELOPE Wif7,'.,.
/
,901
%rte/// l!
FOP OF ;LOPE
2
—TOP OF SLOPE
70P 05 SLOPE ="T`T-------/
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
'OF C'F .Lisp
TOE 1
IF LO�E ice`!_
TOF OF SLOPE J `�
— RETAINfNG WALL ._
uh
OF SCOP
i1
/( 12" CONCREPE WALL
47L 95') TOP OF WALL
1 CONCRETE WALL
(469 33') 16p for WALL
L12. CONCRETE WALL
(470.00'1 (05 OF WALL
E2' LINC;Pt It WALL
(469.65") TOP OF WALL
12' CONCRETE WALL
(409.82'1 AT GROUND
L
),l� \�I`,ZOpr
0
8
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
14
f
•
i0F ,FC
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
00,0
44.5
.05
10+50.00
RCTAINJNG WALL
DIETING CULVERT
8+00.00
GUARD RAIL 5+50-0
RETA1NING WALL
495.
11+00.00
GUARD RAIL 8+50.001
GUARD RAIL
.500
0505
11+33.06
GUARD RAIL 9+00,00 FENCE
FENCE
RETAINING WAIL +eaw RETAINING WALL
6+00.00
3+00.00 3+50.00
REfA1NING WALL
tei
40.
0+50.00 1+00.00
465 00
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
.05.00
1.00
.000
4.5500
FENCE
▪ RETAINING WALL
00.00
FENCE
▪ RETAINING WALL
.500
as.w
.00.00
170 05
GUARD RAJL 6+50.00_
FENCE
RETAINING WALL
4+00.00
.000
47000
MOO
4.0000
475.00
9+50 00
7+00.00
�RETAINfNG WALL
4+50.00
40.
470
1.5.100
10+00.00
7+50.00
001+ 85 WALL
5+00,00
1+50.00 2+00, 00 2+50, 00
175.
JOB. 1.711.05
000 moo 10.00
Le
NNVflff.
11
/,
oRosEa TRAIL
10 DIRT
590 0011
580.0Ca- �
570e-
560 Olt
550.0gr „
540 011W- >
s oag- J-11
•
520.00
510.00 000.00 -
49900
L.1
0 UJ
0,00.00
1,00.00
CP
41
00— —
PLAN
ADE BREAK STA = 5•08
----- --- -
3,00 00 4+00 00 500.00
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
PROFILE
GRADE BREAK
6,00.00
LO
GRADE BREAK STA = 7+12 26
ELEV 537.305
GRADE BREAK
7*00.80
0,0'0 00
12
GRADE BREAK
,1.10 005
GRADE BREAK
+00,00
GRADE BREAK
GRADE BREAK
PLAN
N
GRADE BREAK STA
GRADE BREAK STA - 13+2674
0
N
h
a 2 1
M W
S I1
¢ 6
W N W >
4 W
O 1u aU W
RADE BREAK STA
10+0000 11+0000 10+00.00 13+00.00
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
PROFILE
14+00.00 15+00.00 16700.00 17+0
,CNV II j
• . , r'
13
s
PLAN
00 (.1:
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
MOO
PROFILE
2,2-00.0(1
_,END
-P-EOPO
GRADE BRE
562,874
GRADE BREAK STA = 25+60.91
PLAN
BEAK STA = 26+61.84
u
EXI' TINlC$ DIRT
ADE BREAK STA = 27+91,73
TRADE BREAK: STA
24+00.00 25+00A0 26+0000 27+00.04 29+00 AO 29*00.00 30+00.00
PRELIMINARY PLANS - ALIGNGMENT AND ELEVATION
NOT FOR CONSTRUCTION
PROFILE
15
DIABLO ROAD TRAIL ALIGNMENT
MAGEE PRESERVE SEGMENTS UNDER CONSTRUCTION
Diablo Trail — Magee Preserve, east section
@Blackhawk Road)
Diablo Trail — Magee Preserve, west section (@tank access road)
DIABLO ROAD TRAIL CROSSING - "HAWK" SIGNAL
TDA GRANT EXHIBIT (2021)
GROSSIVG LOC41 %1:
FAIRWAY DRIVE (GEJll3WL VIGNTTI1
T
Diablo Road Trail Pedestrian and
Bicycle Crossing Improvements
To Mt. Diablo
State Park
GREEN
_ VALLEY our%
ELEMENT
44.
144.7., aii 0 IA 6110 ROAD
ti
Diablo Road Trail Crossing
("Project")
LEGEND
Diablo Road Trail Crossing ("Project")
Planned Diablo Road Trail
(Construction in 2422)
Existing Diablo RoadTrail
(exist ngo.y•rnile multiuse paved path)
Magee PreserveMiablo Rd Trail Extension
(Construction in 2421)
East Bay Regional Parks District Trails
(future public rnulti•use trai11 dirttgravel)
Black hawk Road Path
(existing multiuse paved path)
TO SHORTRIDGE/SVCALMORE
DIABLO ROAD - TRAIL CROSSING
"HAWK" SIGNAL
Pedestrians
Drivers
Haw does a
HAWK Signal
Work?
Will see this...
Will do this...
ILJ
Push the
button to
activate the
WALK signal
Will see this...
Will do thiy...
Proceed
What is a
HAWK Signal?
Wait
;19.. h,Ruk[s up 'Ea
rim r.
Iu, ib.
nig.]
j
Flashing
Proceed with
Caution
.0)
1pel.o-ir, 341,ai
he. lrr, aw.:.
Slow down
and
prepare
to STOP
A HAWK IlHigh-Intensity Activated
crassWi IK� signai is a signal-b&a OOr
designed to help pedesfriars and
bicyclists safely cross the street_
While different in appearance for
motorists, for the pedestrian: this signal
..narks like other push-button activated
traffic signals by stopping tragic with a
+ed signal, allowing pedestrians to
cross with a WALK signal.
-\>
I7Startcrossing 3
after you see
the WALK
signal
IE4 va. r,KLl�a. .i�.n.: �• .
Continue
Crossing
t I.ining l.n a�gkJ
Push the
button
to cross
STOP!
Then proceed
with caution
if clear
Proceed
if crosswalk
is clear
PROJECT STATUS
&NEXTSTEPS
• Summer 2020: In-house preliminary
design; grant submittals
• Fall 2020: Project area specific
topographic survey (validate preliminary
design)
• 2021-22: Environmental assessment and
regulatory permitting process
• Spring 2022: Diablo Road/ Fairway Drive
crossing treatment design began
• Oct/Nov 2022: Mitigated Negative
Declaration ("MND") of Environmental
Impacts (45 -day comment period)
• December 20, 2022: Town Council
adoption of MND and approval of
alignment
• Winter 2023: Final Design
• Summer/Fall 2023: Bid process and
Construction begins
19