HomeMy WebLinkAbout6.1 - PresentationDIABLO ROAD TRAIL PROJECT Danville Bicycle Advisory Commission Updated November 28, 2022 Summary & Status TWO-PART CONSTRUCTION Easterly section underway by the developer, as part of the Magee Preserve subdivision improvements Westerly section will be constructed by the Town in 2023, connecting to Barbara Haile Trail (existing) 2 Athenian SchoolGreen Valley Elementary School Diablo Road Developer constructed trail segment (0.7 miles) Town constructed trail segment (0.9 miles) Existing Diablo Road Trail (0.5 miles) EASTERN SEGMENT Developer constructed trail segment WESTERN SEGMENT (PART 1) Town constructed trail to follow existing EVA alignment Trail Crossing - “HAWK” Signal DIABLO ROAD TRAIL ALIGNMENT & CROSSING LOCATION MAP Avenida Nueva 4 PROJECT STATUS & NEXT STEPS •Summer 2020: In-house preliminary design; grant submittals •Fall 2020: Project area specific topographic survey (validate preliminary design) •2021:(12-18 months): Environmental assessment and regulatory permitting process •Spring 2022: Diablo Road/ Fairway Drive crossing treatment design began •Oct/Nov 2022: Mitigated Negative Declaration of Environmental Impacts (45-day comment period) •Winter 2023:Final Design •Summer 2023:Bid process and construction