Loading...
HomeMy WebLinkAboutAdditional Pickleball at Osage Station ParkAdditional Pickleball at Osage Station Park Background What Brought Us Here Today Danville’s Parks, Recreation & Arts Strategic Plan Update 2017 Plan Recommendations Community Recommendations Background Needs Identified Pilot Programming to Introduce Pickleball Court Conversations January 13, 2021, PRAC Meeting February 10, 2021, PRAC Meeting Tennis Court Conversion to Pickleball Background Demand for Additional Courts June 2022 Council Approved CIP Project B637 Pickleball Courts Court Additions July 13, 2022 Possible Locations Discussed Preliminary Site Analysis Danville South Park Diablo Vista Park Osage Station Park Sycamore Valley Park Other Locations Discussion More Extensive Site Analysis of Preferred Site Osage Station Park Community Feedback Noticing of Meeting Environmental Review Support and Concerns Number of Courts Hours of Operation Noise Considerations Safety Concerns Traffic Conditions Community Feedback Support and Concerns Noticing of Meeting Environmental Review Discussion Number of Courts Up to 14 Pickleball Courts 4 Tennis Courts Hours of Operation Existing –When Park is Open Hours Can be Limited Limit with Programming Discussion Sound Considerations Pickleball’s Reputation for Noise Town’s Noise Ordinance Options to Assist in Sound Reduction Sound Reduction Measures Placement of Courts Sound Barrier on Fencing Equipment Discussion Safety Considerations Safety of the Park Safety of the Students Flood Zone Traffic Considerations ITE Land Use Code Land Use Vehicle Trip Generation Rate (per court) Peak Hour Avg. Daily 490 Tennis Courts 4.21 30.32 Table 1 –ITE Trip Generation Rate The Institute of Transportation Engineers’ (ITE) Trip Generation Manual Traffic Considerations The Institute of Transportation Engineers’ (ITE) Trip Generation Manual Table 2 –Trip Generation,Existing +Project Concept (18 courts -14 Pickleball &4 Tennis) Use Description Units (Courts) Vehicle Trip Generation Summary Peak Hour Total Daily Traffic VolumeInOutTotal Existing¹ 5 11 10 21 152 Proposed (net new)²13 28 27 55 394 Totals³18 39 37 76 546 ¹Three (3)Tennis/Two (2)Pickleball Courts ²One (1)Tennis/Twelve (12) Pickleball Courts ³ Four (4) Tennis Courts/Fourteen (14) Pickleball Courts Traffic Considerations The Institute of Transportation Engineers’ (ITE) Trip Generation Manual Table 3 –Trip Generation,Existing +Project Concept (11 courts -8 Pickleball &3 Tennis Use Description Units (Courts) Vehicle Trip Generation Summary Peak Hour Total Daily Traffic VolumeInOutTotal Existing¹ 5 11 10 21 152 Proposed (net new)²6 13 12 25 182 Totals³11 24 22 46 334 ¹Three (3)Tennis/Two (2)Pickleball Courts ²Six (6)Pickleball Courts ³Three (3)Tennis/Eight (8)Pickleball Courts Traffic Considerations Trip Generation Summary Road Classification Road Classification Volume Capacity (vehicles per day) Average Daily Traffic Volume (vehicles per day) El Capitan Drive Minor Collector 3,500 –10,000 3,021 Orange Blossom Way Local (Residential)<1,500 1,037 Road Existing Traffic Volume Existing + Project Daily Traffic Volume (50%-50% trip distribution)Road Classification Volume Capacity (vehicles per day)18 Courts 11 Courts New Trips (546)Total New Trips (334)Total El Capitan Drive 3,021 273 3,294 167 3,188 3,500 –10,000 Orange Blossom Way 1,037 273 1,310 167 1,204 <1,500 Table 4 –Roadway Classifications &Existing Traffic Volume Conditions Table 5 –Traffic Volume Summary,Existing +Project Concepts (18 &11-court concepts) Parking Demand ITE Land Use Code Land Use Parking Generation Peak Hour Rate 490 Tennis Courts 2.67 Use Description Units (Courts) Peak Hour Parking Demand Summary Peak Period Totals %-use of Osage South Parking Lot (64 spaces) Existing Use 5 14 22% Proposed (net new) 13 35 55% Totals 18 49 75% Table 6 –ITE Parking Generation Rate Table 7 –Parking Generation,Existing +Project Concept (18 courts -14 Pickleball &4 Tennis) Parking Demand Use Description Units (Courts) Parking Demand Summary Peak Period Totals %-use of Osage South Parking Lot (64 spaces) Existing Use 5 14 21% Proposed (net new) 6 16 25% Totals 11 30 47% Table 8 –Parking Generation,Existing +Project Concept (11 courts -8 Pickleball &3 Tennis) Discussion Additional Courts –No More than 8 Discussion Additional Courts –6 Courts Next Steps Consider Community and Commissioner Feedback Consider Approval of Additional Courts at Osage Station Park Move Forward to Design & Construction Additional Pickleball at Osage Station Park Commissioner Questions