Loading...
HomeMy WebLinkAbout021122-07.1 DATE: February 11, 2022 TO: Town Council & Commissions FROM: Lianna Adauto, Economic Development Specialist SUBJECT: Danville Business Activity Update Below is a snapshot of business activity in Danville from November 2021 to the present. The following designations have been established to indicate the type of activity for retail, restaurant and select service businesses: (CS) coming soon; (NB) new business; (R) relocated; (RME) remodeled/expanded; (T) temporary and (C) closed. Historic Downtown Status Business Name Business Type Address NB Autumn and Oak Salon Hair Salon 551 Hartz Ave. Ste. A NB Cantinho Do Brazil Restaurant 370 Hartz Ave. C Jolie Salon and Spa Hair Salon 551 Hartz Ave., Suite A C Koala Tea Restaurant 251 Hartz Ave. CS Lilikoi Boba Restaurant 251 Hartz Ave. CS Love You More Retail 175 E. Prospect Ave. #100 CS TLB Interiors Interior Design 125 Railroad Ave. Ste. F R The Flower Theory Flower Shop 155 Railroad Ave. NB The Flower Theory P.S. Flower Shop 100 Hartz Ave. C The Rouge Cosmetics Personal Services 145 E. Prospect Ave. CS Vana Vari Massage and Body Works Personal Services 19 Front St. Rose Garden Status Business Name Business Type Address NB Face Reality Personal Service 730 Camino Ramon Ste. 200 CS The Yellow Chilli at Danville Restaurant 710 Camino Ramon Tassajara Crossings Status Business Name Business Type Address CS MJ Sushi Restaurant 3468 Camino Tassajara \ 2 The Livery Status Business Name Business Type Address C Whimsy Kids Children’s Clothing 814 Sycamore Valley Rd. Town & Country Status Business Name Business Type Address NB Silver and Gold Coin and Jewelry Consignment Shop 109F Town and Country Dr. Other Status Business Name Business Type Address CS Nature’s Whisper Healing Arts Personal Service 913 San Ramon Valley Blvd. Ste. 280 CODE ENFORCMENT ACTIVITY 2021 The chart below summarizes the code enforcement activity for the 2021 calendar year. 2021 Summary: All Code Enforcement Cases Case Type Case Status Subtotal by Type # Initiated by Resident % Initiated by Resident Open Closed Building 1 57 58 52 90% Encroachment 0 31 31 30 97% Fence 0 14 14 14 100% Home Occupation 1 2 3 3 100% Noise 0 29 29 28 97% Other 3 97 100 91 91% Screening 0 20 20 19 95% Sign 1 8 9 9 100% Smoking 0 2 2 2 100% Tree 0 20 20 19 95% Zoning 0 7 7 7 100% Subtotal by Status: 6 287 293 274 97% Total Cases 1/1/21 – 12/31/21: PLANNING COMMISSION AND DESIGN REVIEW BOARD - 2022 File #Type Name Address Description Status PUD19-0001 Residential Misson 14 Lot 2570 Camino Tassajara Planned Unit Development (P- 1) Rezoning and Major Subdivision to subdivide a 19.43-acre site to create 14 single-family residential lots Staff Review DEV21-0005 Residential Borel/Trumark 3020 Fostoria Way Development Plan application to construct 158 townhouse units on a seven-acre site Preliminary Application DEV21-0003 Commercial Diablo Road Self- Storage Building 344 DiabloRoad Development Plan to redevelop the property with a new 22,847 square foot self- storage building. Design Review Board Review DEV21-0004 Commercial Primo's Remodel & Outdoor Seating 298 Hartz Avenue Remodel of the building façade and construction of metal awnings providing for long-term outdoor seating. Design Review Board Review DEV20-0012 Residential VIAM Danville LLC Loyal Dragon Place Architecural approval for four single family residences associated with a previously approved subdivision Approved by Planning Commission, Required Design Review Board Final Review DEV21-0013 Mixed Use Fazloah Poursohi 600 Hartz Avenue 37 residential condominium units and 3,920 square foot commercial mixed use re- development Design Review Board Review DEV21-0006 Residential GMMR, LLC 375 & 359 West El Pintado Development Plan request for the develoment of a 54-unit senior condominium project Design Review Board Review DEV18-0016 Commercial Fitch Office Building 342 Railroad Ave Renovation of an existing 988 square foot historic building and the construction of a new 2,604 square foot two-story building at the rear of the site Under Construction DEV21-0012 Commercial 212 Front Street Building 212 Front Street Development Plan request to construct a 3,400 square foot building on a 3,712 square foot site. Design Review Board Review DEV21-0010 Residential Magee Preserve South side of Diablo and Blackhawk Roads Revised Final Development Plan for the previously approved 69-lot Magee Preserve development. The proposed revisions include updates to the previously approved architectural plans. Approved DEV18-0020 Commercial Mixed Use Building 198 Diablo Road Construction of an approximately 10,600 square foot two-story mixed-use building Approved PUD10-0004 Residential Magee Preserve South side Diablo & Blackhawk Road Planned Unit Development (P- 1) Rezoning and 69 lot subdivision Grading Underway DEV21-0015 Residential NG/Tan Residence 1288 Lawrence Road Development Plan request for a new 3,979 square foot single-story single-family residence on a 3.2 acre site. Design Review Board Review MS852-2021 Residential 932 La Gonda Way Minor Subdivision 932 La Gonda Way Minor Subdivision request allowing the subdivision of an existing 2.6-acre parcel into four single-family residential lots. Approved DEV20-0011 Residential Haven Development 134 El Dorado Development Plan for a five lot subdivision and architectural plans for the five residences Under Construction SUB20-0001 Residential The Address Company 1485 Lawrence Road Subdivision to divide a 4.4- acre parcel into five lots Under Construction SUB851-2020 Residential Haven Development 1475 Lawrence Road Subdivision of a 5-acre parcel into four lots Under Construction DEV19-0024 Residential Chevron Car Wash 400 Diablo Road Construction of a new 798 square foot drive-through car wash, a 372 square foot expansion of an existing convenience store Building Permit Review DEV19-0011 Commercial ClockTower Addition & Exterior Remodel 301 Hartz Ave Construction of a 2,677+/- square foot second-story addition, complete building façade remodel, and landscape improvements, and development of a new public plaza. Under Construction MS851-2022 Residential Brooks Urban Lot Split 2850 Camino Tassajara a Urban Lot Split pursuant to State Law SB 9 to subdivide an existing 36,625 square foot single-family residential parcel into two residential lots. MS852-2022 Residential Azar Urban Lot Split 2860 Camino Tassajara a Urban Lot Split pursuant to State Law SB 9 to subdivide an existing 51,124 square foot single-family residential parcel into two residential lots. HERITAGE RESOURCE COMMISSION REPORT AND SUMMARY - 2022 ➢ Public Outreach Sub-Committee: The Heritage Resource Commission formed a public outreach sub-committee to review ways of enhancing public awareness of the Town’s history and historic preservation program. The committee’s first effort has been to create a program to raise awareness through the installation and promotion of informational bronze plaques. To date, 16 plaques have been installed on Town Heritage Resources. ➢ Historic Survey Sub-Committee – The Heritage Resource Commission formed a sub- committee to review and recommend updates to the Town’s Survey of Historic Properties. The sub-committee’s work has included identifying additional structures that may have historic significance, evaluating properties currently listed on the Town’s Identified Potential Resources survey for possible inclusion on the Town Heritage Resource Survey, and the review of the existing structures on the Town’s Historic Survey for possible designation as a Town Heritage Resource. The Heritage Resource Commission is also involved with the adaptation of the PocketSights App. creating a mobile, informational walking tour of historic resources in the downtown area. The Heritage Resource Commission are involved with the following developments which involve heritage resources: ➢ 342 Railroad Avenue – DEV18-0016; Todd Fitch is the owner and Barry & Winn Architects are the applicant. This project approval allowed the construction of a new two-story 2,635 square foot building to the rear of the existing 988 square foot historic building on the site. The project would also include minor restoration improvements to the historic building. Project status: Under Construction.