HomeMy WebLinkAbout121421 -04.2 Presentation
Town of Danville
Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Town of Danville
Town Council Study Session
December 14, 2021
FIRST UP
CONSULTANTS 2
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Fiber Optic Communications Master Plan
Project Purpose
Why Fiber Optic Communications?
✓Provides required bandwidth to handle all types of communication mediums
✓Provides high-speed, high-quality communication transmission over long distances
✓Improves cybersecurity capabilities –data signals are more difficult to intercept
✓Resistant to electromagnetic interference
✓Reliable and scalable communications network capabilities
✓“Future-proofs” network capacity to better-accommodate new technologies
and equipment
✓Cost effective implementation through utilization of existing traffic signal
communications infrastructure
✓Provides the backbone for “Smart City” initiatives and solutions
FIRST UP
CONSULTANTS 3
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Fiber Optic Communications Master Plan
Project Purpose
Build-out Goals
❑Provide fiber optic communications to Town Public Buildings
▪Town Offices
▪Veterans Memorial Building & Senior Center
▪Town Meeting Hall & Village Theatre
▪Danville Community Center & Library
▪Town Maintenance Service Center
▪Oak Hill Park Community Center
❑Provide fiber optic communications to Town Traffic Signals
▪Interconnecting all 60 traffic signals to a Central Traffic Management Center
(Town Offices)
FIRST UP
CONSULTANTS 4
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Fiber Optic Communications Master Plan
Development & Scope
Town of Danville Fiber Optic Communications Network Master Plan P a g e | 2
connect all the traffic signals to the Town’s Traffic Management Center (TMC) at Town’s Traffic Management Center (TMC) located at the Town Offices building and connect the fiber to various Town sites. The Town sites include Village Theatre/Town Meeting Hall (233/201 Front Street), Danville Community Center and Library (420 Front Street), Oak Hill Park Community Center (3005 Stone Valley Road), Town Service Center, (1000 Sherburne Hills Road), Veterans Memorial Building (400 Hartz Avenue), and Town Offices (500 La Gonda Way).
1.1. PLAN DEVELOPMENT PROCESS
The Plan was developed primarily based on an assessment of the Town’s existing traffic signal
communications infrastructure. The development of the plan process started with the overall vision
followed by the needs and gaps in existing system, resulting in the development of proposed fiber
communication network to satisfy the needs and close the gaps. Figure 1 provides and illustrates of this
process.
Figure 1: Plan Development Process
1.2. WHY FIBER OPTICS?
As the name suggests, fiber optic technology uses pulses of light to carry data along strands of glass or
plastic. Fiber optics can transfer more data at higher throughput over longer distances than copper
wire. Fiber optical communications has become the communications medium of choice for nearly all
types of agencies and carriers. Over many years of consistent reliability, fiber optics have become the
predominant choice for Ethernet backbone infrastructure, high-speed internet services, and general
data networking.
This section presents a high-level description of what is “fiber optics” and why it is the preferred
communications medium of choice.
Assess Existing
Communications
Infrastructure
Analysis of
Commnication
Bandwidth
Needs &
Requirements
Identify Gaps in
the
Infrastructure
for Fiber
Communications
High Level Plan
for Fiber Routing
& Facility
Connections
Recommending
Deployment
Options
FIRST UP
CONSULTANTS 5
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Fiber Optic Communications Master Plan
Development & Scope
Assessment of Communication Needs
❑Information Technology (IT)
▪Need for stable, reliable high-bandwidth communications to Town buildings
▪Improve Cybersecurity
❑Traffic Signal Infrastructure & Operations
▪Support interconnected traffic signal/traffic management system
▪Support traffic video detection/monitoring and emerging AV/CV technologies
❑Emergency & Public Safety
▪Support security/public safety communications and Police ALPR networks
❑Smart City Backbone Infrastructure
▪The Five Pillars –Smart Governance, Environment, IT/Communications,
Mobility and Health
FIRST UP
CONSULTANTS 6
Existing Infrastructure -Leveraging the Traffic Signal Network
FIRST UP
CONSULTANTS 7
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Fiber Optic Communications Master Plan
Proposed Network
❑Install 12-strand fiber optic cable to Public Buildings
▪Town Offices
▪Veterans Memorial Building & Senior Center
▪Town Meeting Hall & Village Theatre
▪Danville Community Center & Library
▪Town Maintenance Service Center
▪Oak Hill Park Community Center
❑Install 48 and 144-strand fiber optic cable between Traffic Signals
▪Interconnecting all 60 traffic signals and connecting to the Central Traffic
Management Center (Town Offices)
❑Fiber Optic Materials Summary
▪105,600 LF of Fiber Optic Cable
▪3,960 LF of 3” Conduit
▪60 Pull Boxes, Patch Panels and Splice Enclosures
FIRST UP
CONSULTANTS 8
FIRST UP
CONSULTANTS 9
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Fiber Optic Communications Master Plan
Deployment Strategy
Network Design & Construction Elements
❑Backbone Network: 48 and 144-strand fiber optic cable
❑Signal-to-Building: 12-strand fiber optic “pigtail” connections
❑Utilization of existing traffic signal interconnect cable conduit. Remove
existing copper wire and backfill with fiber optic cable
❑Installation of new conduit spurs from nearest signal cabinet to public
buildings
❑Installation of utility boxes and miscellaneous equipment
❑Engineering Design, Construction Management, Environmental Clearance
(if necessary), and Construction
FIRST UP
CONSULTANTS 10
Long Range Plan –Establishing a “Ring” Topology Network
FIRST UP
CONSULTANTS 11
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Fiber Optic Communications Master Plan
Preliminary Cost Estimates
Scenario Signalized
Intersections
Town
Buildings
Preliminary
Cost Estimate
1: Design -Build 60 6 $1,590,839
2: Design -Bid -Build 60 6 $2,983,908
FIRST UP
CONSULTANTS 12
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
Fiber Optic Communications Master Plan
Proposed Schedule
❑Winter 2022: Adopt Final Fiber Optic Communications
Master Plan
❑Spring/Summer 2022:Release Call for Bids (Design-Build)
❑Summer/Fall 2022: Award of Contract
❑Fall/Winter 2022/23: Construction
FIRST UP
CONSULTANTS 13
Town of Danville Fiber Optic Communications
Network Master Plan
DRAFT FINAL
Prepared for:
Town of Danville
QUESTIONS?