HomeMy WebLinkAbout042120-08.1DEVELOPMENT SERVICES REPORT Town Council Meeting
April 21, 2020
FIRST UP
CONSULTANTS
DEVELOPMENT
SERVICES DEPARTMENT
•Building: Permit Processing, Plan
Review, Inspections Services
•Engineering: Design and construction
of public infrastructure
•Transportation: Ensuring safe and
efficient travel for all modes
•Planning: Current & Advance Planning
2
FIRST UP
CONSULTANTS 3
During the COVID-19 Shelter-in-Place
WORKING REMOTELY
PREPARATION
Weekend prior: procuring technology resources, staffing strategies
WEEK 1: SHELTER-IN-PLACE
•Implementing social distancing measures
•Accelerating online permit processes
WEEK 2: TRANSITION
•Continued (remote) service delivery
•Staff re-deployment, work plans and reporting
WEEK 3: UPDATED HEALTH ORDER
•Responding to public inquiries and concerns
•Health order enforcement (construction activities)
WEEK 4 & BEYOND: NEW NORMAL
FIRST UP
CONSULTANTS 4
PREPARATION
Weekend prior: procuring technology resources, staffing strategies
WEEK 1: SHELTER-IN-PLACE
•Implementing social distancing measures
•Accelerating online permit processes
WEEK 2: TRANSITION
•Continued (remote) service delivery
•Staff re-deployment, work plans and reporting
WEEK 3: UPDATED HEALTH ORDER
•Responding to public inquiries and concerns
•Health order enforcement (construction activities)
WEEK 4 & BEYOND: NEW NORMAL
During the COVID-19 Shelter-in-Place
WORKING REMOTELY
Nearly empty Town Offices, with most employees working remotely
FIRST UP
CONSULTANTS
BUILDING DIVISION FY 2019-20
Through 3rd Quarter
5
FIRST UP
CONSULTANTS
ONLINE PERMIT CENTER
6
www.danville.ca.gov/CAP
FIRST UP
CONSULTANTS
ONLINE PERMIT CENTER
7
www.danville.ca.gov/CAP
Note: All permit types
will be accepted and
process. However, only
permits for essential
projects will be issued
until the Shelter-in-
Place order is lifted.
FIRST UP
CONSULTANTS
VIDEO INSTRUCTION (UNDERWAY)
8
FIRST UP
CONSULTANTS
BUILDING PERMIT ACTIVITY
9
FY 2019-20 | Through 3rd Quarter
Through
Q3
FIRST UP
CONSULTANTS
BUILDING INSPECTION ACTIVITY
10
FY 2019-20 | Through 3rd Quarter
Number does not reflect
inspections conducted in
response to Health Order
complaints or concerns
FIRST UP
CONSULTANTS
BUILDING INSPECTION ACTIVITY
11
Bringing construction activity to a “habitable” state during Shelter-in-Place
Health Order Compliant Remodel
(image displayed with authorization by homeowner)
FIRST UP
CONSULTANTS
HEALTH ORDER VIOLATIONS
12
Through April 16, 2020
Updated Health Order
(issued March 31, 2020)
FIRST UP
CONSULTANTS
HEALTH ORDER VIOLATIONS
13
Community Response -Building and Police Partnership
Handled by Building
Inspection & Code
Enforcement
*Closure Rate = 100%
CODE ENFORCEMENT FY 2019-20
Through 3rd Quarter
FIRST UP
CONSULTANTS
CODE ENFORCEMENT ACTIVITY
15
FY 2019-20 | Through 3rd Quarter
Case Type
Case Status Subtotal
by Type
# Initiated by
Resident
% Initiated by
Resident
Open Closed
Building 6 28 34 33 97%
Encroachment 1 40 41 35 85%
Home Occupation 1 1 2 1 50%
Noise 0 12 12 12 100%
Other 1 57 58 58 100%
Screening 1 26 27 27 100%
Sign 0 10 10 7 70%
Smoking 0 0 0 0 100%
Tree 0 3 3 3 100%
Zoning 1 5 6 6 100%
Subtotal by Status: 11 182 193 182 90%
Total Cases
FIRST UP
CONSULTANTS
ENGINEERING DIVISION FY 2019-20
Through 3rd Quarter
16
FIRST UP
CONSULTANTS
ENCROACHMENT PERMIT ACTIVITY
17
FY 2019-20 | Through 3rd Quarter
Thru
Q3
FIRST UP
CONSULTANTS
ENCROACHMENT PERMIT ACTIVITY
18
FY 2019-20 | Through 3rd Quarter
Thru
Q3
FIRST UP
CONSULTANTS
2020 SLURRY SEAL PROJECT
Project Design 100% Complete, Ready to Bid
19
Slurry Seal: Thin asphalt overlay that fills small
cracks and imperfections. More importantly, it
prevents infiltration of water which is the most
frequent cause of pavement failure.
FIRST UP
CONSULTANTS
PARK & RIDE EXPANSION
Project Design 100% Complete
20
FIRST UP
CONSULTANTS
SAN RAMON VALLEY BOULEVARD IMPROVEMENTS
Project Design 100% Complete
21
FIRST UP
CONSULTANTS
LA GONDA BRIDGE REPLACEMENT
Grant Funded Project, Design Underway
22
TRANSPORTATION DIVISION FY 2019-20
Through Third Quarter
FIRST UP
CONSULTANTS
RECTANGULAR RAPID FLASHING BEACONS
24
Replacements: Downtown, Eastside, and Iron Horse Trail Crossings
FIRST UP
CONSULTANTS
RECTANGULAR RAPID FLASHING BEACONS
25
Replacements: Downtown, Eastside, and Iron Horse Trail Crossings
FIRST UP
CONSULTANTS 26
DIABLO ROAD
BICYCLE SAFETY
IMPROVEMENTS
1.Close all Class II (bike lane)
gaps, where roadway width
allows
2.Install safety enhancements,
including:
•Wider bike lanes, where
roadway width allows
•“Bicycle boxes” (priority
staging areas)
•Green high visibility markings
•Green shared lane markings,
where bike lanes infeasible
•Buffer zones * Secured CCEAC recommendation
for $125,000 TDA grant award
FIRST UP
CONSULTANTS
BIKE MASTER PLAN
27
FIRST UP
CONSULTANTS
TRAFFIC SIGNAL CONTROLLER UPGRADE (PHASE 1)
28
Sycamore Valley Road, Camino Tassajara and Crow Canyon Road (25 controllers)
PLANNING DIVISION FY 2019-20
Through Third Quarter
FIRST UP
CONSULTANTS
CURRENT PLANNING ACTIVITY
30
FY 2019-20 | Through 3rd Quarter
Thru Q3
FIRST UP
CONSULTANTS 31
“When it comes to housing,
California’s system of almost
pure local control hasn’t
worked.”
~ State Senator Scott Wiener
(D –San Francisco)
Author of Senate Bill 50
FIRST UP
CONSULTANTS 32
Housing Concepts Watch List Status
Housing Preservation
Rent control, tenant protections,
relocation assistance
AB 1481 (Bonta)
AB 1482 (Chiu)
AB 36 (Bloom)
SB 18 (Skinner)
Inactive
Signed into law
Inactive
Signed into law
Housing Production
Permit streamlining, removing
“barriers” to development (i.e.,
stringent parking standards),
reducing impact fees
AB 68 (Ting)
AB 69 (Ting)
SB 13 (Wieckowski)
SB 50 (Wiener)
AB 1483 (Grayson)
AB 1484 (Grayson)
SB 330 (Skinner)
AB 1485 (Wicks/Quirk)
AB 1706 (Quirk)
AB 1486 (Ting)
Signed into law
Two-year bill
Signed into law
Two-year bill
Signed into law
Inactive
Signed into law
Signed into law
Two-year bill
Signed into law
Housing Funding
Regional Housing Authority, voter-
approved taxes and bonds
AB 1487 (Chiu)
AB 11 (Chiu)
SB 5 (Beall/McGuire)
ACA 1 (Beall/McGuire)
Signed into law
Two-year bill
Vetoed
Inactive
2019 LEGISLATIVE SESSION
Bills Introduced: 2,625
Housing Related: 200+
Watch List: 18-20
Chaptered: 9
FIRST UP
CONSULTANTS 33
Development Streamlining (SB 330)
•Public hearing limitations (maximum 5)
•Approval timeframe limitations (120 to 90 days)
•Freezes fees and requirements at time of pre-
application submittal
•Prohibits moratoriums, rezoning, density reductions
(below January 2018 levels)
More Accessory Dwelling Units (AB 881)
•Allowable in any residential district
•Multiple ADUs on one lot
•Reduced setbacks (4 feet, side and rear)
•No requirements for parking or owner-occupancy
WHAT NEW LEGISLATION
MEANS FOR DANVILLE
FIRST UP
CONSULTANTS 34
PERMIT-READY GRANNY UNIT
PROGRAM (GRANT FUNDED)
Free, Downloadable,
Permit-Ready Plans
•3 sizes: Studio, 1-Bed/1 Bath, 2-
Bed/1.5 Bath
•3 styles: Mediterranean,
Craftsman, Contemporary
•Pre-approved (structural,
electrical, energy, etc.).
•Expedited permit process.
FIRST UP
CONSULTANTS 35
PERMIT-READY GRANNY UNIT
PROGRAM TIMELINE
Month Activity
January 2020 Release RFP/Q for design services
February -March 2020 Review proposals, select designer(s), negotiate contract
March –May 2020 ADU Plans: Conceptual design (35% plans)
May -July 2020 ADU Plans: Working drawings (90% plans)
August 2020 Program Launch
FIRST UP
CONSULTANTS 36
REGIONAL
PLANNING MOVES
FORWARD
Plan Bay Area 2050
A long-range plan for the 9-county
San Francisco Bay Area. Undertaken
by the Bay Area Association of
Governments (ABAG).
Outlines growth and investment
strategies, including:
•Transportation
•Housing
•Economic
•Environmental
FIRST UP
CONSULTANTS
THANK YOU Questions
& Answers
37