Loading...
HomeMy WebLinkAboutASRDRB20200312 5.1 DESIGN REVIEW BOARD STAFF REPORT 5.1 TO: Design Review Board Members March 12, 2020 SUBJECT: Final Building Permit review for a previously approved Development Plan application (DEV19-0011) allowing a 2,506 square foot second-story addition, a façade remodel, and the creation of a public plaza area for the Clock Tower Building located at 301 Hartz Avenue PROJECT DESCRIPTION This development was previously reviewed by the Design Review Board on September 12 and 26, 2019. The project was approved by the Planning Commission on November 26, 2019. The projects condition of approval requires final review and approval by the Design Review Board prior to issuance of building permits. EVALUATION • The brick color was approved to be pinker in color as depicted on the project renderings, rather than red bricks as shown on the color board. The DRB should verify the final brick selection. • Verify seat wall brick selection. Should it match the building? • Review paver selection. • Review Corten roof material for the clock tower. • Review bike rack design, color and locations. Staff recommends the dark green color. • Review exterior lighting fixtures and placement. • Final plans should eliminate the proposed walkway extension into the Clocktower parking lot as the Town has determined it’s not necessary and doesn’t warrant the creation of 16 compact parking stalls to accommodate it. • Recommend replacement of the proposed shrubs Lor Chi (Ruby Fringe Flowers) with ornamental tree Cer Jap (Katbury Tree). This will frame the courtyard area. Clocktower Building Permit 2 March 12, 2020 • Add a street tree (Pyrus –Autumn) with decorative bricks to the left side of the building front elevation, just north of the underground vault in the sidewalk. RECOMMENDATION Approve Final Building Permit review for a previously approved Development Plan application (DEV19-0011) allowing a 2,506 square foot second-story addition, a façade remodel, and the creation of a public plaza area for the Clock Tower Building located at 301 Hartz Avenue. Prepared by: David Crompton Principal Planner Attachments: Architectural Plans Landscape Plans SHEET SCALE: JOB: 19-007 DATE: REVISIONS: N S NO. 4494 CFOE REN. T A T S N D G R E I S T R. E T E L E DR R E A R OFIAL R IN A C T I E C T C A M C H P E AP CE A R 09/30/20 CL O C K T O W E R B U I L D I N G 30 1 H A R T Z A V E DA N V I L L E C A 2520 CAMINO DIABLO WALNUT CREEK, CA 94597 P. (925) 941-6490 EMAIL: tc@campandcamp.com Planning & Landscape Architecture ...... 02.12.2019 05.09.2019 08.02.2019 09.11.2019 09.17.2019 02.03.2019 0 105 20 30 L-1.0 LAYOUT PLAN SHEET SCALE: JOB: 19-007 DATE: REVISIONS: N S NO. 4494 CFOE REN. T A T S N D G R E I S T R. E T E L E DR R E A R OFIAL R IN A C T I E C T C A M C H P E AP CE A R 09/30/20 CL O C K T O W E R B U I L D I N G 30 1 H A R T Z A V E DA N V I L L E C A 2520 CAMINO DIABLO WALNUT CREEK, CA 94597 P. (925) 941-6490 EMAIL: tc@campandcamp.com Planning & Landscape Architecture ...... 02.12.2019 05.09.2019 08.02.2019 09.11.2019 09.17.2019 02.03.2019 0 105 20 30 L-3.0 PLANTING PLAN