Loading...
HomeMy WebLinkAboutSummaryDRB20200227-4.1 4.1 Design Review Board Meeting Summary February 13, 2020 - DRAFT 1. CALL TO ORDER The regular meeting of the Danville Design Review Board was called to order at 5:30 p.m., at the Town Offices, 510 La Gonda Way, Danville, CA Board Attendance: Mark Belotz, Robert Combs, Afshan Hamid, Lou Palandrani, Chris Trujillo, Kevin Wong Absent: - Staff Attendance: David Crompton 2. PUBLIC COMMENTS – None 3. CHANGES TO THE ORDER OF THE AGENDA - None 4. ACTION ITEMS 4.1 Consider approval of the January 30, 2020 Meeting Notes – Approved 5. DESIGN REVIEW ITEMS 5.1 Consider approval of the final building permit plans for a previously approved Development Plan (DEV18-0016) pertaining to a new two story 2,604 square foot building located at 342 Railroad Avenue (D. Crompton). • DRB requested that the garbage enclosure be modified to include enough room for one additional roll-out garbage container. • DRB approved the final building plans subject to the above condition. 5.2 Consider recommending to the Planning Commission approval of a complete exterior remodel of an existing building located at 194 Diablo Road (D. Crompton). • Staff should ensure that the lighting in the rear ally area is adequate. • The ceramic tile façade at the upper parapet on the front elevation should wrap around to the left elevation to the rear of the front building (where the building has an off-set. 2 • Paint color for the side elevations of the building should match the grey of the proposed cement fiber board. 6. COMMUNICATIONS None 7. ADJOURNMENT - Meeting Adjourned at 5:55 PM