HomeMy WebLinkAboutSummaryDRB20200227-4.1
4.1
Design Review Board
Meeting Summary
February 13, 2020 - DRAFT
1. CALL TO ORDER
The regular meeting of the Danville Design Review Board was called to order at 5:30
p.m., at the Town Offices, 510 La Gonda Way, Danville, CA
Board Attendance: Mark Belotz, Robert Combs, Afshan Hamid, Lou Palandrani,
Chris Trujillo, Kevin Wong
Absent: -
Staff Attendance: David Crompton
2. PUBLIC COMMENTS – None
3. CHANGES TO THE ORDER OF THE AGENDA - None
4. ACTION ITEMS
4.1 Consider approval of the January 30, 2020 Meeting Notes – Approved
5. DESIGN REVIEW ITEMS
5.1 Consider approval of the final building permit plans for a previously approved
Development Plan (DEV18-0016) pertaining to a new two story 2,604 square
foot building located at 342 Railroad Avenue (D. Crompton).
• DRB requested that the garbage enclosure be modified to include enough
room for one additional roll-out garbage container.
• DRB approved the final building plans subject to the above condition.
5.2 Consider recommending to the Planning Commission approval of a complete
exterior remodel of an existing building located at 194 Diablo Road (D.
Crompton).
• Staff should ensure that the lighting in the rear ally area is adequate.
• The ceramic tile façade at the upper parapet on the front elevation should
wrap around to the left elevation to the rear of the front building (where
the building has an off-set.
2
• Paint color for the side elevations of the building should match the grey
of the proposed cement fiber board.
6. COMMUNICATIONS
None
7. ADJOURNMENT - Meeting Adjourned at 5:55 PM