HomeMy WebLinkAboutASRDRBFrancisGarciaArchitect-5.1TOWN OF DANVILLE
Consultant Evaluation Sheet | PROPOSAL
Permit-Ready Granny Unit Program
CONSULTANT/FIRM NAME:
Evaluation Criteria Max Points Rating
1.Demonstrated capacity (available staff,
subconsultants and time) to deliver the project on
time and under budget.
25
2.Did the consultant team demonstrate the ability
to flex their design style to accommodate client
and budget needs?
25
3.Project proposal demonstrates understanding of
the project and program objectives (Note:
Purpose of the program is to design accessory
dwelling units as a way of reducing costs)
15
4.Design experience relevant to the project (i.e.,
small accessory dwelling units)
15
5.References and past client satisfaction (i.e.,
responsiveness, design flexibility)
20
Total Points: 100
EVALUATOR PROJECT MANAGER
Print Name: Print Name:
Signature: Signature:
Date: Date:
Francis Garcia Architect
1
FRANCIS GARCIA
ARCHITECT
448 60TH STREET, OAKLAND CA 94609
925 984 9983 email francis.garcia@mac.com
w w w . F r a n c i s G a r c i a A r c h i t e c t . c o m
February 6, 2020
Town of Danville
510 La Gonda Way
Danviile CA 94526
Thank you for the opportunity to submit this proposal for the Town’s Permit Ready Granny
Unit Program. I look forward to helping the Town achieve its affordable housing goals.
I have designed many homes and accessory dwelling units in Danville since my first design in
1985. When designing new homes, I encourage my clients to also include an accessory dwelling
unit in the master plan so that one can be built at a later date without compromising the
overall design. I have heard many uses of the ADU’s from my clients over the years. When they
are young parents, it may serve as a playhouse for their young children. When the children
come back from college or are in their 20’s, it is an affordable place for them to have some
autonomy and still stay in town. When the grand parents get older, they can move in to the
ADU to be closer to assistance. One client wanted to have the ADU to rent out to help pay
property taxes when they retire. Another wanted to live in the ADU when they were elderly
and give the main house to their children. Overall it provides resiliency to the community by
allowing people to afford to stay in their main house and it assists in building stronger family
and community relationships which ultimately is the goal of good planning and architecture.
I am a sole proprietor so I will attend all the meetings myself and produce the design and the
drawings. I have managed as many as 20 other architects and designers and have been a
partner in an architectural firm. But due to the current technology, I am able to have an office
without staff. This provides flexibility to not limit the designs to the what the staff can
produce. Since I produce all the documents the drawings are more accurate. I can take on fewer
projects and have more competitive fees for what I provide due to not having the overhead of
communicating and training staff. It is also easier to be more responsive due to not needing to
schedule tasks with other assistants.
In addition to this cover letter, enclosed please find;
1. A portfolio of my residential projects.
2
2. A tentative schedule that follows the dates of the Preliminary Project Schedule in the
RFP.
3. A Proposal for Architectural Services that includes;
a. A cost breakdown for the Architectural, Structural and Title 24 services.
b. An organizational chart for the engineers.
c. Names and contact information for the engineers.
d. Names of the engineer’s project managers.
4. A Certificate of Insurance. I am not clear on what the Town’s indemnification
requirements are. The Sample Contract has a section titled “Liability of Members and
Employees of the Town” and another titled “Hold Harmless”. Neither of those sections
have wording that is objectionable and I can work with you to meet the Town’s
indemnification requirements.
5. A list of references.
Please call me if you need any additional information of if you have any questions.
Thanks,
Francis Garcia
1
FRANCIS GARCIA
ARCHITECT
448 60TH STREET, OAKLAND CA 94609
925 984 9983 email francis.garcia@mac.com
w w w . F r a n c i s G a r c i a A r c h i t e c t . c o m
February 6, 2020
Town of Danville
510 La Gonda Way
Danviile CA 94526
This is a tentative schedule to assist in planning of the design for 3 ADU plans. Many
factors affecting this schedule are beyond my control and may cause revisions to these
dates.
Wednesday 3/25/20 • Kick-Off Meeting with staff and Notice to Proceed with
Design.
Monday 3/30/20 • Architect completes conceptual floor plans.
Wednesday 4/2/20 • Town returns conceptual floor plans with comments.
Monday 4/6/20 • Architect completes the schematic floor plan.
Wednesday 4/8/20 • Town returns schematic floor plan with comments.
Monday 4/13/20 • Architect completes the schematic floor plans and elevations.
Wednesday 4/15/20 • Town returns schematic floor plans and elevations with
comments.
Monday 4/20/20 • Architect completes the revised schematic floor plans and
elevations
Wednesday 4/22/20 • Town returns schematic floor plans and elevations with
comments.
Monday 4/27/20 • Architect completes the design development floor plans and
elevations.
Tuesday 4/28/20 • Town returns design development floor plans and elevations
with any comments.
Thursday 4/30/20 • Presentation to Design Review Board 35% complete plans.
Monday 5/4/20 • Town and DRB comments.
Monday 5/6/20 • Engineer starts structural design and Title 24 calculations.
Monday 6/1/20 • 65% plans and preliminary structural design complete.
Monday 6/8/20 • Town comments.
Tuesday 6/23/20 • Structural plans complete.
Wednesday 6/24/20 • 90% plans and renderings complete.
Friday 7/17/20 • Town comments and final plan check.
Friday 8/7/20 • 100% plans complete.
Page 1 of 10
FRANCIS GARCIA ARCHITECT
448 60th Street, Oakland CA 94609 925 984 9983 info@francisgarciaarchitect .com
CONTRACT TO PERFORM ARCHITECTURAL SERVICES
Agreement made as of: February 6, 2020
Between the Owner: Town of Danville
510 La Gonda Way
Danville, CA 94526
And the Architect: Francis Garcia Architect
448 60th Street, Oakland CA 94609
Phone (925) 984-9983
info@francisgarciaarchitect.com
Architect’s California License # C19820
For the following project:
1. A collection of pre-approved detached ADU building plans for The Town of Danville’s Permit-
Ready Granny Unit Program, which offers downloadable building plans free-of-charge to the
public.
2. Detached accessory dwelling unit building plans for a 500-600 sq. ft. studio, a 600-850 sq. ft.
1 bedroom 1 bath unit and an 850-1000 sq. ft. 2 bedroom 1 ½ bath unit with a Craftsman
style, Mediterranean style and Contemporary style elevation for each of the three unit sizes.
3. All unit elevations shall be customizable to allow for variations in exterior materials as well as
door and window fenestration to express individual owner’s tastes and respect community
character.
4. All designs shall fully comply with the 2019 California residential Code, California Code of
regulations, Title 24, Part 2.5
Minimum Structural Design Criteria:
I. Design: Conventional Framing per CRC 2019
II. Lateral Force Resisting System: Light Frame (Wood) Walls Sheathed with Wood
structural Panels
III. Risk Category: II
IV. Seismic Design Category (SDC): D2
V. Soil Site Class: D
VI. Design Spectral Response Acceleration: SDS = 2.0 Max
VII. Ultimate Design wind Speed: 95 mph per CBC Fig 1609.3 (1)
Page 2 of 10
VIII. Wind Exposure Category: C
IX. Assume no Topographic Effects: Kzt =1.0
X. Roof Live Load: 20 PSF (Reducible based on Tributary Area)
XI. Floor Live Load: 40 PSF
XII. Roof Dead Load: 14 PSF (Includes Photovoltaic System of 1 PSF & Tile roof
material)
XIII. Exterior Wall Dead Load: 19 PSF (Assume 3-coat stucco)
XIV. Exterior Wall Deflection Limitation: H/360
5. Minimum Energy Compliance Design Criteria: State Title 24 Energy Compliance
documentation in all four primary orientations (north, south, east and west facing)
I. Climate Zone: 12
II. Exterior Wall Insulation: R-15
III. Attic Insulation: R-38
IV. Designed for both heating and cooling: 92 AFUE (Heating); 15 SEER (Cooling)
6. Foundation Design Criteria: Both a Shallow foundation design for building sites that do not
exceed a slope of 1 vertical to 3 Horizontal units. Design does not assume unstable soil or
expansive clay soil.
I. Soil Bearing Pressure: 1500 PSF (w/out Geotechnical Report)
II. Lateral Bearing Pressure:
1. 100 PCF (Shallow Foundation)
2. 200 PCF (Deep Foundation)
III. Foundation Depth Below Ground Surface: 24 inches Min
IV. Deep Foundation minimum depth:
1. 8’-0” Min total embed
2. 6’-0” Min embed into undisturbed soil.
7. Entry Porch Design Criteria: At least one elevation per floor plan shall include a design for an
attached covered entry. The minimum size of the front entry porch shall be six feet by six feet
(36 square feet minimum). The covered front entry porch shall be attached to the front
elevation of the ADU and be supported by a minimum of two columns that support the
projection of the porch from the ADU. The following minimum covered entry porch design
elements shall be included within the plan:
I. Ledger size and attachment details
II. Covered entry framing size, framing spacing and connection details
Page 3 of 10
III. Column size and isolated footing design including connection details
IV. Details of any architectural features of the covered porch, which may include
soffit detail, and any finish details and trim
8. Fire Resistive Construction Details: The proposed detached ADUs may be located within (4)
feet of a real or assumed property line on the rear or side elevation. Therefore, for each of the
proposed plan elevation, the rear and side elevation must comply with CRC Table R332.1 (1)
Fire Resistance Protection/Rating of Exterior Wall elements. The following minimum fire
protection details shall be included within the plans:
I. One-hour fire rated wall construction detail for each architectural style that
would comply with ASTM E119 or UL 263 testing
II. One-hour fire rated projection details on the underside of the projection for
each architectural plan style. Assume two-foot minimum fire separation
distance
III. Design elevation where the opening on the exterior fire walls shall not exceed
25% of the wall area
IV. Specifications and details of roofing material and roof sheathing that would
comply with a two-foot minimum fire separation distance
9. Fire Sprinkler Design Criteria: Provide a note on the plans that indicates that when fire
sprinklers are required, the fire sprinkler systems shall comply with the requirements for an
NFPA 13D Fire Sprinkler system.
4. Final Building Plans
The Architect will prepare one complete building plan set. Plans and specifications shall comply
with standard drawings and specifications of the Town of Danville and other agencies as
applicable. Final plan set to include:
I. Floor plan
II. Foundation plan
III. Sections (all necessary)
IV. External elevations (along with customizable options)
V. Renderings of exterior and internal features suitable for publication (all necessary)
VI. Suggested external and internal materials.
5. The Architect shall make available selected images of the Final Plan Sets, in digital format, to be
part of marketing collateral and materials that will be produced for the Permit-Ready Granny Unit
Program. The Architect shall provide nonexclusive and perpetual right or license for Town of
Danville to copy, use, modify, reuse, and sublicense any and all copyrights, design, and other
intellectual property embodied in the writings prepared by Consultant, and Consultant’s
subcontractors, under the Agreement. The Town of Danville may only use the plans for building
built within the bounds of the Town of Danville.
Page 4 of 10
The Owner and Architect agree as set forth below:
I SCOPE OF BASIC SERVICES
A The Architect’s basic services consist of the services described below:
1 OWNER COMUNICATION PHASE
(a) Project Initiation Meeting: Prior to development of conceptual plan sets: 2 hour
maximum meeting and 30 minutes maximum for emails and phone calls.
(b) Project Plan Review: 35%Plans (Design Review Board) 2 hour maximum meeting
and 30 minutes maximum for emails and phone calls.
(c) Project Plan Review: 65%Plans (if necessary) 2 hour maximum meeting and 30
minutes maximum for emails and phone calls.
(d) Any additional communication time will be billed at the hourly rate as an
additional service.
2 SCHEMATIC DESIGN PHASE
(a) Based on the mutually agreed program and construction budget requirements, the
Architect shall prepare for approval by the Owner, Schematic Design Sketches
consisting of the following:
(1) Up to 3 floor plan sketches of each of the studio, 1 bedroom and 2 bedroom
plans. Additional plans will be billed at the hourly rate as an additional service.
(2) Up to 3 exterior elevation sketches maximum for each of the 3 elevation styles
for each of the 3 plans. Additional elevations will be billed at the hourly rate as
an additional service.
(3) Schematic Design Phase services plans and elevations may be hand drawn at
the Architect’s discretion.
3 DESIGN DEVELOPMENT PHASE
(a) Based on the Schematic Design Sketches and up to adjustments authorized by the
Owner, the Architect shall prepare the following:
(1) Floor Plans with overall dimensions and notes
(2) All exterior elevations with finishes
(3) Reflected ceiling plan
(4) Basic electrical layout
(5) Building sections
(6) Schematic roof plan
(b) A maximum of 4 hours of revisions to the Design Development Documents. Any
additional time requested by the Town of Danville will be billed at the hourly rate
as an additional service.
4 PERMITS AND APPROVALS PHASE
(a) The Architect shall assist the Owner in applying for those permits and approvals
normally required by law for projects similar to the one for which the Architect’s
services are being engaged. This assistance shall consist of completing and
Page 5 of 10
submitting forms to the appropriate regulatory agencies having jurisdiction over the
construction documents, and other services normally provided by the Architect and
included in the scope of Basic Services of this Agreement.
5 CONSTRUCTION DOCUMENTS PHASE
(a) Based on the approved Design Development Documents, the Architect shall
prepare for approval by the Owner the drawings required to apply for a building
permit.
(b) The Architect shall provide services to coordinate with the Title 24 Energy
Consultant and Structural Engineer to complete documents typically required to
obtain a building permit.
(c) The mechanical system design is not part of this contract. Local practice is for the
mechanical system to be designed by the mechanical subcontractor selected by the
Owner or the Owner’s General Contractor, based upon calculations provided by
the Energy Code Compliance Consultant. The mechanical subcontractor will size
and specify equipment, provide duct layout and sizing, and locate registers as
directed by the General Contractor. If desired, a Mechanical Engineer will be hired
to produce more detailed mechanical plans. This work will be an additional
reimbursable expense.
6 COMPUTER MODELING & RENDERING PHASE
(a) A computer model exterior and interior of the home based on Design Development
Drawings. This model will be used to generate multiple 3-D views to aid in the
design process.
Page 6 of 10
FEE STRUCTURE
An initial retainer of $10,000 shall be made upon execution of this agreement and credited to the
Owner’s account at the final payment.
A.ARCHITECTURAL FEES ESTIMATE
1.Owner Communication Phase 1,650
2.Schematic Design Phase 7,920
3.Design Development Phase 7,920
4.Permits and Approvals Phase 1,200
5.Construction Documents Phase 13,200
6.Computer Modeling and Rendering Phase 4,000
SUBTOTAL ARCHITECTURAL FEES 35,890
REIMBURSABLE EXPENSES
Blueprinting and reprographic material 400
Structural Engineering 12,000
Title 24 Energy Documentation 3,000
DP Advanced Engineering, Inc.
(925) 516-3502 3361 Walnut Blvd Ste. 100 Brentwood CA 94513
Stuctural Engineering – $4000 per plan ($12,000 total)
(3) elevations per plan
Covered patio and deck on one elevation per plan
(2) foundation designs for all plans (shallow bearing and piers)
T24 - $1000 per plan ($3000 total)
(3) elevations
(4) orientations per plan/elevation
Key Personnel:
Justen Peek, P.E. (Principal Engineer)
Gabe Dal Porto, P.E. (Principal Engineer)
Thomas Schmaeling (Project Manager)
Nate Enriquez (Project Manager)
Eric Bennett (Sr. Lead Drafter)
Mitchell Reese (Sr. Lead Drafter)
Henry Castro (Project Drafter)
Eric Sickenberger (Field Technician)
Nancy Branson (Office Admin)
Jason Bennett (Mechanical Designer & T24)
SUBTOTAL REIMBURSABLE EXPENSES 15,400
Subtotal with 10% handling fee =16,940
TOTAL FEES 52,830
Fixed Fee
Fixed Fee
Fixed Fee
Fixed Fee
Fixed Fee
Fixed Fee
Page 7 of 10
II ADDITIONAL SERVICES
A The services in this section are not included in Basic Services, and they shall be paid for by
the Owner as provided in this Agreement. The Optional Additional Services shall only be
provided if authorized or confirmed in writing by the Owner. The Architect shall notify the
Owner prior to commencing any Contingent Additional Services. If the Owner deems that
any Contingent Additional Services are not required and the Owner indicates in writing
that all or part of the Contingent Additional Services are not required, the Architect shall
have no obligation to provide those services.
1 CONTINGENT ADDITIONAL SERVICES:
Revisions in drawings, specifications or other documents will be billed as an Additional
Service when such revisions are:
(a) inconsistent with approvals or instructions previously given by the Owner
including revisions made necessary by adjustments in the Owner's program or
project budget;
(b) required by the enactment or revision of codes, laws and regulations subsequent to
the preparation of such documents;
(c) requested by the Owner after the completion of the drawings.
III BASIC COMPENSATION
A Basic compensation is as follows:
1 Unless specifically agreed otherwise, fees for professional services are based on the
time charged to the project by professional, technical and administrative personnel.
The fees are computed by multiplying the below listed rates for each hour charged to
the project by that individual.
Classification Hourly Rate
Architect $ 220.00
Associate $ 110.00
Administrative $ 90.00
After one (1) year, the hourly rates may be revised. Any annual increases in the hourly
rates, will not exceed 10% of the rates listed.
The fees described above are based on the approximate square footage as described on
the first page of this contract. If the actual square footage increases, all fees, including
reimbursable expenses, are subject to a proportional increase without the Owner’s
prior approval.
2 Reimbursable Expenses
(a) Other project-related direct costs, including but not limited to the following items,
are billed as follows: The Architect’s direct cost plus 10 percent to cover
associated general and administrative expenses.
(1) Postage, freight and other shipping charges.
Page 8 of 10
(2) Transportation, lodging and subsistence expenses, when traveling away from
The Architect’s home offices.
(3) Rental or purchase of materials and equipment.
(4) Telephone calls.
(5) Subcontracts.
(6) Outside blueprinting and reprographic services.
B The Architect may submit invoices monthly but is not required to do so. Invoices are
payable upon receipt. Interest of one and one-half (l-l/2) percent per month will be payable
on any amounts not paid within 30 days from invoice date. After 45 days of non-payment,
the project will be placed on hold and will need to be rescheduled. There will be a
rescheduling fee of $500.
C Payment for the Architects’ services and Reimbursable Expenses shall be made monthly
upon presentation of the Architects’ statement of services rendered or expenses incurred.
A total accounting will be given upon request by the Client or at billing intervals.
IV GENERAL PROVISIONS
A This agreement is valid only if signed by the owner and returned, with the retainer, to the
Architect within two months from the date on the front page.
B Ownership of Instruments of Service:
1 All reports, drawings, specifications, computer files, field data, notes and other
documents and instruments prepared by the Architect as instruments of service shall
remain the property of the Architect. The Architect shall retain all common law,
statutory and other reserved rights, including the copyright thereto.
C Insurance:
1 The Architect is protected in California by Worker's Compensation Insurance (and/or
employer's liability insurance), for bodily injury consistent with statutory requirements,
and will furnish certificates thereof on request. The Architect also carry General
Liability, Automobile Liability and Errors and Omissions Liability Insurance. The
Architect's liability to Owner and third parties shall be limited to the proceeds which
are recovered from any such insurance and which are attributable to any claimed loss.
2 If the Owner requires additional insurance coverage, The Architect will procure that
insurance (if available) at the Owner's expense.
D Limitation of Liability:
1 To the fullest extent permitted by law, the total liability, in the aggregate, of the
Architect of Record, Francis Garcia Achitect, and the Architect’s officers, employees,
agents, and independent professional associates and consultants, and any of them, to
the Owner and anyone claiming by, through, or under the Owner, for any and all
injuries, claims, losses, expenses, or damages whatsoever arising out of or in any way
related to the Architect's services, the project, or this Agreement, including but not
limited to the tort liability or breach of contract or warranty, if any, of the Architect, the
Architect officers, partners, directors, employees, agents, and independent professional
Page 9 of 10
associates and consultants, or any of them, shall not exceed the total compensation
received by the Architect under this Agreement or the total amount of $25,000
whichever is greater.
2 The Architect shall not be held responsible or liable for claims that arise, directly or
indirectly, out of any of the following circumstances:
(a) Data that has been provided to The Architect by the Owner or the Owner's agents
is inaccurate, false, or materially misleading and The Architect has relied on the
data as a basis or input to its work.
(b) Third parties, including the Owner, the Owner's agents, suppliers, contractors, or
servants fail to assure that construction conforms to design.
E Indemnification:
1 The Owner shall indemnify and save harmless The Architect from and against all
claims, demands, causes of action, damages, costs, expenses, losses, or liabilities,
including reasonable attorney's fees, for injury or damage to any person or corporation
resulting directly or indirectly from the conduct of the Owner or its agents, servants,
suppliers, or contractors.
F Confidential Information:
1 Owner and The Architect acknowledge that either party may disclose both commercial
and technical proprietary, trade secret, or confidential information to the other prior to
or subsequent to the engagement of The Architect's services. Owner and The Architect
agree that each has an obligation to not disclose to third parties such information. The
Architect consider the terms of this document and all financial discussions confidential.
G Applicable Law:
1 In the event of any dispute between the Owner and The Architect with regard to The
Architect's services, the applicable law shall be that of the State of California.
H In providing opinions of probable construction cost, it is recognized that neither the Owner
nor the Architect has control over the costs of labor, equipment or materials, or over the
Contractor’s methods of determining prices or bidding. The opinion of probable
construction cost is based on the Architects reasonable professional judgment and
experience and does not constitute a warranty, expressed or implied, that the Contractor’s
bids or the negotiated price of the Work will not vary from the Owner’s budget or from any
opinion of probable cost prepared by the Architect.
I Claims, disputes or other matters in question between the parties to this Agreement arising
out of or relating to this Agreement or breach thereof shall be subject to and decided by
arbitration in accordance with the Construction Industry Arbitration Rules of the American
Arbitration Association currently in effect unless the parties mutually agree otherwise.
J II is understood and agreed that the Architect's Services under this Agreement do not
include project observation or review of the Contractor's performance or any other
construction phase services, and that such services will be provided for by the Client. The
Client assumes all responsibility for interpretation of the Contract Documents and for
construction observation, and the Client waives any claims against the Architect that may
Page 10 of 10
be in any way connected thereto. In addition, the Client agrees, to the fullest extent
permitted by law, to indemnify and hold harmless the Architect, its officers, directors,
employees and subconsultants (collectively, the Architect) against all damages, liabilities or
costs, including reasonable attorneys’ fees and defense costs, arising out of or in any way
connected with the performance of such services by other persons or entities and from any
and all claims arising from modifications, clarifications, interpretations, adjustments or
changes made to the Contract Documents to reflect changed field or other condition,
except for claims arising from the sole negligence or willful misconduct of the Architect. If
the Client requests in writing that the Architect provide any specific construction phase
services and if the Architect agrees in writing to provide such services, then they shall be
compensated for as Additional Services as provided in Section V.
K The Architect shall have the right to include representations of the design of the Projects,
including photographs of the exterior and interior, among the Architect’s promotional and
professional materials. The Architect's materials shall not include the Owner's confidential
or proprietary information, if the Owner has previously advised the Architect in writing of
the specific information considered by the Owner to be confidential or proprietary. The
Owner shall provide professional credit for the Architect on the construction sign and in
the promotional materials for the Project.
L The Architect and Architect’s consultants shall have no responsibility for the discovery,
presence, handling, removal or disposal of, or exposure of persons to, hazardous materials
in any form at the Project site, including but not limited to asbestos, asbestos, products,
polychlorinated biphenyl (PCB) or other toxic substances.
M Any terms or provision of this Agreement found to be invalid under any applicable statue
or rule of law shall be deemed omitted and the remainder of this Agreement shall remain
in full force and effect.
N This Agreement may be terminated by either party, for any reason upon seven days written
notice. This agreement represents the entire and integrated agreement between the Owner
and the Architect and supersedes all prior negotiations, representations or agreements,
either written or oral. This Agreement may be amended only by written instrument signed
by both Owner and Architect. In the event of termination, the Architect shall be
compensated for services performed prior to termination, together with Reimbursable
Expenses then due.
OWNER:
Accepted: Date:
ARCHITECT:
Accepted: Date:
1
FRANCIS GARCIA
ARCHITECT
448 60TH STREET, OAKLAND CA 94609
925 984 9983 email francis.garcia@mac.com
w w w . F r a n c i s G a r c i a A r c h i t e c t . c o m
February 6, 2020
Town of Danville
510 La Gonda Way
Danviile CA 94526
Here are some references of clients and consultants.
Brian & Rhonda Fuery, 13 Margaret Lane, Danville
(925) 457-3941 bfuery@uscmc.com
Shirin & Shahin Hedayat, 1750 Peters Ranch Drive, Danville
(925) 216-2930 shedayat@me.com
Jan & Greg Yonko, 121 Alamo Springs Drive, Alamo
(925) 890-3717 jsyonko@gmail.com
Pete & Pat Solvik, 2245 Caballo Ranchero Court, Diablo CA (they have since moved)
rs.compete@sigmapartne 1230-(925) 895
Lon Huffman & Kim Hensley, 191 Sonora Ave., Danville
lon@ljhuffman.com 5267-(925) 487
Rick & Patty Jefferies, 2222 Alameda Diablo, Diablo
Rick@randbequipment.net 0281-(510) 719
Mike Carvin, 280 Wayne Avenue, Alamo
(925) 820 4518 mikecarvin@comcast.net
Ed & Janet Dolinar, 100 Cañada Via, Diablo (they have since moved)
5546-(925) 216 eddolinar@sbcglobal.net
Wendi Zampino of Home Systems, 3404 Hall Lane, Lafayette Ca 94549
(925) 284-0380
wendi@designwithdetail.com
https://designwithdetail.com
Eric Fok of Praxis Design Group, Moraga CA
(925) 330-4445
eric@praxisdg.com
www.praxisdesigngroup.com
DOLINAR RESIDENCE