HomeMy WebLinkAbout2017-06ORDINANCE NO. 2017-06
ADDING A NEW SECTION 10-17 TO THE DANVILLE MUNICIPAL CODE
CREATING AN EXPEDITED PERMITTING PROCESS FOR ELECTRIC VEHICLE
CHARGING STATIONS
The Danville Town Council does ordain as follows:
SECTION 1. ADDING A NEW SECTION 10-17 TO THE DANVILLE MUNICIPAL
cnnF
A new Section 10-17 is hereby added to the Danville Municipal Code to read as follows:
10-17 ELECTRIC VEHICLE CHARGING STATIONS
10-17.1 Purpose
The purpose of this Section is to promote and encourage the use of electric vehicles by
creating an expedited, streamlined permitting process for electric vehicle charging
stations, as required by California Government Code Section 65850.7, while promoting
public health and safety and preventing specific adverse impacts in the installation and
use of such charging stations.
10-17.2 Definitions
For the purposes of this section, the following definitions shall apply:
a. "Electric vehicle charging station" or "charging station" means any level of electric
vehicle supply equipment station that is designed and built in compliance with
Article 625 of the California Electrical Code, as it reads on the effective date of this
Section, and delivers electricity from a source outside an electric vehicle into a plug-
in electric vehicle.
b. "Specific, adverse impact" means a significant, quantifiable, direct, and unavoidable
impact, based on objective, identified, and written public health or safety standards,
policies, or conditions as they existed on the date the application was deemed
complete.
C. "Electronic submittal" means the utilization of one or more of the following:
1. Electronic mail or email.
2. The internet.
3. Facsimile.
10-17.3 Expedited Permitting Process
Consistent with Government Code Section 65850.7, the Building Official shall implement
an expedited, streamlined permitting process for electric vehicle charging stations, and
adopt a checklist of all requirements which electric vehicle charging stations shall comply
with in order to be eligible for expedited review. The expedited, streamlined permitting
process and checklist may refer to the recommendations contained in the most current
version of the "Plug -In Electric Vehicle Infrastructure Permitting Checklist" of the "Zero -
Emission Vehicles in California: Community Readiness Guidebook" as published by the
Governor's Office of Planning and Research. The Town's adopted checklist shall be
published on the Town's website.
10-17.4 Permit Application Processing
a. Prior to submitting an application for processing, the applicant shall verify that the
installation of an electric vehicle charging station will not have specific, adverse
impact to public health and safety and building occupants. Verification by the
applicant includes, but is not limited to: electrical system capacity and loads.-
electrical
oads;electrical system wiring, bonding and overcurrent protection; building
infrastructure affected by charging station equipment and associated conduits; areas
of charging station equipment and vehicle parking.
b. A permit application that satisfies the information requirements in the Town's
adopted checklist shall be deemed complete and be promptly processed. Upon
confirmation by the Building Official that the permit application and supporting
documents meets the requirements of the Town's adopted checklist, and is
consistent with all applicable laws and health and safety standards, the Building
Official shall, consistent with Government Code Section 65850.7, approve the
application and issue all necessary permits. Such approval does not authorize an
applicant to energize or utilize the electric vehicle charging station until approval is
granted by the Town. If the Building Official determines that the permit application
is incomplete, he or she shall issue a written correction notice to the applicant,
detailing all deficiencies in the application and any additional information required
to be eligible for expedited permit issuance.
C. Consistent with Government Code Section 65850.7, the Building Official shall allow
for electronic submittal of permit applications covered by this Ordinance and
associated supporting documentations. In accepting such permit applications, the
Building Official shall also accept electronic signatures on all forms, applications,
and other documentation in lieu of a wet signature by any applicant.
PAGE 2 OF ORDINANCE NO. 2017-06
10-17.5 Technical Review
a. It is the intent of this section to encourage the installation of electric vehicle charging
stations by removing obstacles to permitting for charging stations so long as the
action does not supersede the Building Official's authority to address higher priority
life -safety situations. If the Building Official makes a finding based on substantial
evidence that the electric vehicle charging station could have a specific adverse
impact upon the publics health or safety, as defined in this chapter, the Town may
require the applicant to apply for a use permit.
b. In the technical review of a charging station, consistent with Government Code
Section 65850.7, the Building Official shall not condition the approval for any electric
vehicle charging station permit on the approval of such a system by an association,
as that term is defined by Civil Code Section 4080.
10-17.6 Electric Vehicle Charging Station Installation Requirements
a. Electric vehicle charging station equipment shall meet the requirements of the
California Electrical Code, the Society of Automotive Engineers, the National
Electrical Manufacturers Association, and accredited testing laboratories such as
Underwriters Laboratories, and rules of the Public Utilities Commission or a
Municipal Electric Utility Company regarding safety and reliability.
b. Installation of electric vehicle charging stations and associated wiring, bonding,
disconnecting means and overcurrent protective devices shall meet the
requirements of California Electrical Code Article 625 and all other applicable
provisions of the California Electrical Code.
C. Installation of electric vehicle charging stations shall be incorporated into the load
calculations of all new or existing electrical services and shall meet the requirements
of the California Electrical Code. Electric vehicle charging equipment shall be
considered a continuous load.
d. Anchorage of either floor -mounted or wall -mounted electric vehicle charging
stations shall meet the requirements of the California Building or Residential Code,
as applicable per occupancy, and the provisions of the manufacturer's installation
instructions. Mounting of charging stations shall not adversely affect building
elements.
SECTION 2. CODIFICATION. Section 1 of this ordinance shall be codified in the
Danville Municipal Code.
PAGE 3 OF ORDINANCE NO. 2017-06
SECTION 3. SEVERABILITY. If any section, subsection, sentence, clause, or phrase of
this ordinance is for any reason held to be invalid, such decision shall not affect the
validity of the remaining portions of the ordinance. The Danville Town Council hereby
declares that it would have adopted the ordinance, and each section, subsection, sentence,
clause, or phrase thereof, irrespective of the fact that one or more sections, subsections,
sentences, clauses or phrases was declared invalid.
SECTION 4. PUBLICATION AND EFFECTIVE DATE. The City Clerk shall have a
summary of this ordinance published twice in a newspaper of general circulation, once
within five (5) days before its adoption and once within fifteen (15) days after adoption.
This ordinance shall become effective 30 days after adoption.
The forgoing ordinance was introduced on September 5, 2017 and approved and adopted
by Danville Town Council at a regular meeting on September 19, 2017 by the following
vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Arnerich, Blackwell, Morgan, Stepper, Storer
None
None
None
CLERK'S CERTIFICATE
I, Marie Sunseri, City Clerk of the Town of Danville, hereby certify that the forgoing is a
true and accurate copy of Ordinance No. 2017-06 of said Town and that said ordinance
was published according to law.
Dated:
Town of Danville
PAGE 4 OF ORDINANCE NO. 2017-06