Loading...
HomeMy WebLinkAbout077-2012RESOLUTION NO. 77-2012 ADOPTING THE 2012 -2013 MASTER FEE SCHEDULE FOR USER AND COST RECOVERY FEES WHEREAS, the Town of Danville charges facility use fees for the rental and use of Town - owned and /or maintained facilities; and WHEREAS, the Town charges Planning, Engineering and Building processing and permit fees for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, the Town charges City Clerk, Finance and Police processing fees for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, the Town Council has previously established such fees as part of the Danville Municipal Code and the annual Master Fee Schedule through resolution; and WHEREAS, the Town Council conducted a public hearing to receive testimony regarding the proposed increase in user and cost recovery fees, notice of which hearing was provided as required by law; now, therefore, be it RESOLVED, by the Danville Town Council that the Master Fee Schedule for User and Cost Recovery Fees, as set forth in Exhibit 1 attached hereto, is hereby adopted. Any increased Planning, Engineering and Building fees shall not go into effect for 60 days from adoption of this resolution. Until then, the existing fees shall remain in effect. APPROVED by the Danville Town Council at a regular meeting on June 6, 2012, by the following vote: AYES: Andersen, Arnerich, Doyle, Stepper, Storer NOES: None ABSTAINEItone ABSENT: None 7, MAYOR APPROVED AS TO FORM: ATTEST: CITY ATTORNEY CITY CLERK Town of Danville Master Fee Schedule For User and Cost Recovery Fees Fiscal Year 2012 -2013 Ordinance No. 98 -06 Resolution 77 -2012 Adopted by the Danville Town Council June 6, 2012 Effective July 1, 2012 Development Services Fees Effective August 7, 2012 EXHIBIT 1 Table of Contents MISCELLANEOUS ....................................................................................................... ..............................1 PhotoCopies ................................................................................................................................................... ..............................1 RecordsSearch ................................................................................................................................................ ..............................1 PlanSize Copies ............................................................................................................................................. ..............................1 Off -Site Document Retrieval Fee .................................................................................................................. ..............................1 AdministrativeCitation Late Fee ........:........................................................................................................ ..............................1 HartzAvenue Banner Permit ....................................................................................................................... ..............................1 CITY CLERK ...................................................................................................................... ..............................1 MunicipalCode .............................................................................................................................................. ..............................1 NotaryPublic .................................................................................................................................................. ..............................1 CityClerk Certification .................................................................................................................................. ..............................1 CertifiedCopy ................................................................................................................................................ ..............................1 Recordson compact disk ............................................................................................................................... ..............................1 FINANCEDEPARTMENT ............................................................................................. ..............................1 TownFinancial Plan ...................................................................................................................................... ..............................1 Town Comprehensive Annual Financial Report ....................................................................................... ..............................1 BusinessLicense Name Listing .................................................................................................................... ..............................1 BusinessLicense Verification Letter ............................:............................................................................... ..............................1 ReturnedPayment Item ................................................................................................................................ ..............................1 Return edPayment Item (second time) ......................................................................................................... ..............................1 POLICESERVICE ............................................................................................................ ..............................2 Accident /Crime Reports.'.....".'. ... ...... ....... 2 AlarmResponse Fee ........................................................................................................... 2 A.B.C. Letter for One Day Sale Permit ....................................................................................................... ............................... 2 BookingFee Reimbursement ....................................................................................................................... ............................... 2 DisturbanceCall- back ................................:.................................................................................................. ................:.............. 2 Failureto Obey Sign / Marking .................................................................................................................... ............................... 2 Fingerprinting( Livescan) ............................................................................................................................. ............................... 2 Fingerprinting(ink and card) ...................................................................................................................... ............................... 2 OversizedVehicle .......................................................................................................................................... ............................... 2 RestrictedParking ......................................................................................................................................... ............................... 2 TowedVehicle Release .........................................................................................:....................................... ............................... 2 Trespasson Public Grounds ........................................................................................................................ ............................... 2 Non - Resident Child Seat Inspection ........................................................................................................... ............................... 2 DowntownEmployee Parking Permits ...................................................................................................... ............................... 2 DUI Emergency Response Reimbursement: ............................................................................................................................. 2 FeesAssessed by Outside Agencies: ......................................................................................................................................... 2 PARKS AND COMMUNITY FACILITIES ................................................................ ............................... 3 CommunityFacilities .................................................................................................................................... ............................... 3 DanvilleCommunity Center ....................................................................................................................... ............................... 3 Library..........................................................................................................................::................................ ............................... 3 TownMeeting Hall ....................................................................................................................................... ............................... 3 VillageTheatre ............................................................................................................................................... ............................... 3 VeteransMemorial Building ........................................................................................................................ ............................... 3 OakHill Park Community Center .............................................................................................................. ............................... 3 HapMagee Ranch Park ................................................................................................................................ ............................... 3 BaldwinElementary School ......................................................................................................................... ............................... 4 Table of Contents DiabloVista Middle School ......................................................................................................................... ............................... 4 LosCerros Middle School ............................................................................................................................ ............................... 4 MonteVista High School .............................................................................................................................. ............................... 4 San Ramon Valley High School ................................................... ............................... ParkFacilities ................................................................................................................................................. ............................... 4 GroupPicnics ................................................................................................................................................. ............................... 4 FamilyPicnics ................................................................................................................................................ ............................... 4 SportsFields / Courts .................................................................................:................................................... ............................... 4 Other............................................................................................................................................................... ............................... 4 MiscellaneousFees ........................................................................................................................................ ............................... 4 MiscellaneousFees ( cont.) ............................................................................................................................ ............................... 5 FacilityAttendants ........................................................................................................................................ ............................... 5 Equipment...................................................................................................................................................... ............................... 5 FacilityReservations /Permits ..................................................................................................................... ............................... 5 Soccer/ Lacrosse fields .................................................................................................................................. ............................... 5 Baseball/Softball fields ................................................................................................................................. ............................... 5 AdultSoccer ................................................................................................................................................... ............................... 5 EquipmentRemoval ..................................................................................................................................... ............................... 5 DEVELOPMENT SERVICES FEES ............................................................................... ..............................6 ENGINEERINGSERVICES .......................................................................................... ............................... 6 MapCheck ..................................................................................................................................................... ............................... 6 ImprovementPlan Check ............................................................................................................................. ............................... 6 EngineeringInspection ............................................................................... .............................:. StreetLighting ............................................................................................................................................... ...........................:... 6 EncroachmentPermit ................................................................................................................................... ............................... 6 ValetPermit .................................................................................................................................................... ............................... 6 Oversize /Wide load Permit ......................................................................................................................... ............................... 6 DrainagePermit ............................................... ............................... 6 ............................................................... ............................... GradingPlan Check ...................................................................................................................................... ............................... 6 GradingPermit .............................................................................................................................................. ............................... 6 GradingInspection ........................................................................................................................................ ............................... 7 FinishGrading Inspection .......................................................................................... ............................... Debris /Clean-up Deposit ............................................................................................................................. ............................... 7 NPDES............................................................................................................................................................ ............................... 7 StormWater Control Plan Review .............................................................................................................. ............................... 7 BaseMap Revision ........................................................................................................:............................... ............................... 7 Photography/ Filming Permit ...................................................................................................................... ............................... 7 Certificate of Correction or Amended Map ............................................................................................... .....:......................... 7 Vacation of Right -of -Way or Easement .......................................... ............................... PLANNING AND TRANSPORTATION SERVICES ............................................... ..............................8 EnvironmentalAssessment ......................................................................................................................... ............................... 8 Initial Study leading to standard Declaration of Environmental Significance (ND) ........................... ............................... 8 EnvironmentalImpact Report (EIR) ........................................................................................................... ............................... 8 Initial Study leading to Mitigated Negative Declaration of Environmental Significance (MND) ..... ............................... 8 Consultant prepared Mitigated Negative Declaration of Environmental Significance ....................... ............................... 8 Noticeof Exemption Projects ............................................................................... ............................... Noticeof Determination ............................................................................................................................... ............................... 8 Department of Fish & Game Notice of Determination Fee for ND or MND ........................................ ............................... 8 Department of Fish & Game Notice of Determination Fee for EIR ........................................................ ............................... 8 Notice of Determination for County Clerk and remainder to F &G ....................................................... ............................... 8 ii Table of Contents DevelopmentPlan ......................................................................................................................................... ............................... 8 Conceptualor Pre - submittal ........................................................................................................................ ............................... 8 Administrative............................................................................................................................................... ............................... 8 Public Hearing - Residential - Minor Projects ..... ............................... Public Hearing- Residential - Larger and /or More Complex Projects ................................................ ............................... 9 Public Hearing - Non- residential Minor Projects ..................................................................................... ............................... 9 Public Hearing - Non - residential - Larger and /or More Complex Projects ......................................... ............................... 9 Public Hearing - Scenic Hillside or Major Ridgeline - Minor Projects .................................................. ............................... 9 Public Hearing - Scenic Hillside or Major Ridgeline - Larger and /or More Complex Projects ........ ............................... 9 Public Hearing - Final Development Plan Processed with PUD Application ...................................... ............................... 9 Public Hearing - Final Development Plan Processed with PUD Application or as an Amendment ............................... 9 Second Dwelling Unit - Administrative - over 750 but under 1000 sq. ft ............................................ ............................... 9 Second Dwelling Unit - Public Hearing - over 1000 sq. ft ...................................................................... ............................... 9 TrafficStudy Review .................................................................................................................................... ............................... 9 LandUse Permit ............................................................................................................................................ ............................... 9 Temporary /Seasonal Use - Recurring Request /Event ........................................................................... ............................... 9 Temporary /Seasonal Use - Initial Request /Event .................................................................................. ............................... 9 Large Family Child Care Facility (8-14 children ....................................................................................... ............................... 9 Caretakermobile home ................................................................................................................................ .............................10 Minorproject without Public Hearing ....................................................................................................... .............................10 MinorItem with Public Hearing ................................................................................................................. .............................10 ChildCare Facility ( >14 children .............................................................................:.................................. .............................10 CongregateCare Facility .............................................................................................................................. .............................10 MajorItem with Public Hearing .................................................................................................................. .............................10 Telecommunication Permit requiring No Public Hearing ...................................................................... .............................10 Telecommunication Permit requiring Public Hearing ............................................................................. .............................10 Telecommunication - Permit Extension ..................................................................................................... .............................10 TrafficStudy Review .................................................................................................................................... .............................10 LUP combination with other permit ........................................................................................................... .............................10 Subdivision..................................................................................................................................................... .............................10 Major Subdivision - Smaller and /or Less Complex Projects .................................................................. .............................10 Major Subdivision - Larger and /or More Complex Projects .................................................................. .............................10 TrafficStudy Review .................................................................................................................................... .............................10 Minor Subdivision - Smaller and /or Less Complex Projects ................................................................. .............................10 Minor Subdivision - Larger and /or More Complex Projects ................................................................. .............................10 Time Extension for Major or Minor Subdivision ...................................................................................... .............................10 Rezoning......................................................................................................................................................... .....................:.......11 PUD - Rezoning - for Smaller and /or Less Complex Projects ............................................................... .............................11 PUD - Rezoning - for Larger and /or More Complex Projects ............................................................... .............................11 TrafficStudy Review .................................................................................................................................... .............................11 Rezoning - to standard Residential, Office, Industrial or Commercial Zoning Designation - Minor Project ...............11 Rezoning - to standard Residential, Office, Industrial or Commercial Zoning Designation - Larger and /or More ComplexProject ............................................................................................................................................. .............................11 Variance.......................................................................................................................................................... .............................11 Commercial or submitted in conjunction with other application .......................................................... .............................11 Single Family Residence Processed as Administrative Permit ............................................................... .............................11 PublicHearing ............................................................................................................................................... .............................11 Sign................. ............................... ............................................................................................................. .............................11 Freestanding sign (with or without Design Review Board Review) ...................................................... .............................11 Fee per each face copy change not requiring Design Review Board review ........................................ .............................11 New sign requiring Design Review Board review .....................................................:............................. .............................11 Master Sign Program < five tenant spaces ................................................................................................. .............................11 Master Sign Program > five tenant spaces ................................................................................................. .............................11 TemporaryPromotional Sign Permit ......................................................................................................... .............................11 GeneralPlan Amendment ............................................................................................................................ .............................12 111 Table of Contents GPAs - Land Use Designation Change Submitted with PUD- Rezoning .............................................. .............................12 GPAs - Land Use Designation Change Submitted as Stand -alone Application .................................. .............................12 .............................14 TrafficStudy Review .................................................................................................................................... .............................12 PlanReview .................................................................................................................................................... .............................14 GPAs Text Amendment ............................................................................................................................ ..........:..................12 FeesAssessed by other Agencies ................................................................................................................ .............................14 DesignReview Board ................................................................................................................................... .............................12 OtherInspections and Fees ..........:............:.................................................................................................. Conceptualor Pre submittal ........................................................................................................................ .............................12 Inspections outside of normal business hours Administrative............................................................................................................................................... .............................12 MinorCommercial ........................................................................................................................................ .............................12 New SFR Hillside (Scenic Hillside or Major Ridgeline) ........................................................................... .............................12 NewMFR < 5 units ....................................................................................................................................... .............................12 NewMFR > 5 units ................................................................... ............................... Office Commercial or Industrial ................................................................................................................ .............................12 TreeRemoval ................................................................................................................................................. .............................12 Residential...................................................................................................................................................... .............................12 Commercial.................................................................................................................................................... .............................12 SpecialPlanning Studies .............................................................................................................................. .............................12 StormWater Control Plan Review .............................................................................................................. .............................12 ParcelMerger ................................................................................................................................................. ......................:......12 LotLine Adjustment ..................................................................................................................................... .............................12 Miscellaneous................................................................................................................................................. .............................13 Time Extension - Administrative Action - no site check required ......................................................... .............................13 Time Extension - Administrative Action - site check & /or COA compliance review required ....... .............................13 Time Extension - Non - Administrative Action .......................................................................................... .............................13 Appeals........................................................................................................................................................... .............................13 Requestsfor Reconsideration ...................................................................................................................... .............................13 Archaeological review (Sonoma State Clearinghouse) ............................................................................ .............................13 Zoning Certificate Letter - Residential ....................................................................................................... .............................13 ZoningCertificate Letter - Commercial ..................................................................................................... .............................13 ZoningReview of Building Permit ............................................................................................................. .............................13 FileResearch .................................................................................................................................................. .............................13 LaserFicheFiles .............................................................................................................................................. .............................13 Nocharge ....................................................................................................................................................... .............................13 NewspaperAdvertising ............................................................................................................................... .............................13 Public Notice by Staff .................................................................................................................................... .............................13 Documents..................................................................................................................................................... .............................13 Capital Improvement Program Document, Town of Danville Landscape and Irrigation Project Procedures and Standards........................................................................................................................................................ .............................13 Town -wide Trails Master Plan ...............:.................................................................................................... .............................13 GeneralPlan ................................................................................................................................................... .............................13 General Plan Map, Beautification Guidelines, Base Map, Specific Plan ................................................ .............................13 Parks Recreation and Arts Strategic Plan .................................................................................................. .............................13 Zoning Map, Downtown Master Plan, Standard Plan ............................................................................. .............................13 Trafficand Engineering Survey .................................................................................................................. .............................13 AerialPhoto ................................................................................................................................................... .............................13 BUILDING SERVICES ................................................................................................... .............................14 BuildingPermits ............................................................................................................................................ .............................14 Swimming Pool, Spa or Hot Tub Permits .................................................................................................. .............................14 PlanReview .................................................................................................................................................... .............................14 Investigations...........................................................................................................................:..................... .............................14 FeesAssessed by other Agencies ................................................................................................................ .............................14 BuildingPermit Fee Table ............................................................................................................................ .............................14 OtherInspections and Fees ..........:............:.................................................................................................. .............................15 Inspections outside of normal business hours .......................................................................................... .............................15 iv Table of Contents ReinspectionFees .......................................................................................................................................... .............................15 Inspections for which no fee is specifically indicated .............................................................................. .............................15 Additional plan review required by changes, additions or revisions to plans ..................................... .............................15 Water Heater, Furnace, A/C Replacement ................................................................................................ .............................15 KitchenRemodel / Alteration ....................................................................................................................... .............................15 BathroomRemodel/ Alteration ................................................................................................................... .............................15 Powder Room Remodel/ Alteration ........................................................................................................... .............................15 NewIn- Ground Pool and /or Spa ............................................................................................................... .............................15 Pooland /or Spa Remodel ............................................................................................................................ .............................15 PoolDemolition Permit ...................:............................................................................................................ .............................15 Detached Storage Shed - with no trades ...........................................:........................................................ .............................15 Standard Residential Re -Roof Permit ......................................................................................................... .............................15 Furnace and A/C Replacement Permit ...................................................................................................... .............................15 PermitReactivation ....................................................................................................................................... .............................15 PhotovoltaicResidential ............................................................................................................................... .............................15 PhotovoltaicNon - Residential ...................................................................................................................... .............................15 GasShut -Off Device ...................................................................................................................................... .............................15 MinimumPermit fee ..................................................................................................................................... .............................15 Documentationfee ........................................................................................................................................ .............................15 Temporary Certificate of Occupancy ............................................:............................................................. .............................15 Penalty fee for work without requisite permit or unauthorized occupancy ......................................... .............................15 Requestfor Duplicate Plans ......................................................................................................................... .............................15 Residential Window Replacement Permit ........:........................................................................................ .............................15 BuildingPermit Pass Through Fees ............................................................................................................ .............................15 Strong Motion Instrumentation Program .................................................................................................. .............................15 Residential............................................................................................:......................................................... .............................15 Commercial.................................................................................................................................................... .............................15 CaliforniaBuilding Standards Fee .............................................................................................................. .............................15 BuildingPermit Valuation Table ................................................................................................................. .............................16 INDEX ................................................................................................................................ .............................18 v Town of Danville Master Fee Schedule MISCELLANEOUS Photo Copies Records Search Plan Size Copies Off -Site Document Retrieval Fee Administrative Citation Late Fee Hartz Avenue Banner Permit FEE FOR SERVICE $0.20 per sheet $47 per hour $2 per sheet $50 per document $25 $100 Any fee for billable services not listed in this fee schedule will be billed as the cost of time and materials. CITY CLERK Municipal Code Volume I Volume II Full Set Supplements Notary Public City Clerk Certification Certified Copy Records on compact disk FINANCE DEPARTMENT Town Financial Plan' Town Comprehensive Annual Financial Report' Business License Name Listing Business License Verification Letter Returned Payment Item Returned Payment Item (second time) Other Business License fees per Ordinance 93 -3 FEE FOR SERVICE $75 $75 $150 $25 /year $10 /signature $10 /document $5 first page, $3 each additional page $1 /compact disk FEE FOR SERVICE $25 $25 $25 $25 $25 $35 ' The Town Financial Plan and the Town Comprehensive Annual Financial Report are available on the Town's web site at www.danville.ca.gov 1 Town of Danville Master Fee Schedule POLICE SERVICE Accident/ Crime Reports Alarm Response Fee A.B.C. Letter for One Day Sale Permit Booking Fee Reimbursement Disturbance Call -back Failure to Obey Sign/ Marking Fingerprinting (Livescan) Fingerprinting (ink and card) Oversized Vehicle Restricted Parking Towed Vehicle Release Trespass on Public Grounds Non - Resident Child Seat Inspection Downtown Employee Parking Permits Zone 1 Zone 2 & 3 FEE FOR SERVICE $5 each No Fee — first offense $50 — second offense $150 — third offense $300 — thereafter $35 County Charge Charge $60 per hour /officer for second or more calls $45 $30 plus agency fee as required $10 per card $60 $45 $110 $25 No Charge $25 /year $50 /year DUI Emergency Response Reimbursement: Fees Assessed by Outside Agencies: Personnel Cost: Officer: $102.92/hr; $60.46 Overtime Sergeant: $116.53/hr; $69.90 Overtime Actual Cost to include but not limited to the following: Lab Costs to include: Urine Test Breath Test Blood Test Blood Withdrawal Services Toxicology Analysis to include: Acid/Neutral Drug Screen Basic Drug Screen Comprehensive Drug Screen Specialty Drug Screens Rush Analysis 2 tj Town of Danville :Master Fee Schedule PARKS AND COMMUNITY FACILITIES FEE FOR SERVICE Group III Group IV Group V Group VI Community Facilities Nonprofit Private Commercial Government Danville Community Center Valley Oak & Las Trampas $131/hour $195/hour $243/hour $66/hour Valley Oak $114/hour $166/hour $216/hour $56/hour Las Trampas Room $40/hour $52/hour $64/hour $20/hour Kitchen $66/hour $72/hour $74/hour $33/hour Art & Crafts Room $23/hour $34/hour $39/hour $12/hour Lounge $23/hour $34/hour $39/hour $12/hour Bandstand $66/hour $72/hour $74/hour $33/hour Town Green Hourly $44/hour $54/hour $65/hour $22/hour Town Green Daily $160 /use $206 /use $257 /use $80 /use Library Mt. Diablo Room $43/hour $60/hour $70/hour $22/hour Town Meeting Hall Auditorium $58/hour $84/hour $117/hour $29/hour Village Theatre Art Gallery $40/hour $52/hour $65/hour $20/hour Hourly Rate /2 hour min. $66/hour $84/hour $117/hour $33/hour Pre- Production/Load -in Rate $49/hour $65/hour $88/hour $25/hour Ticket Surcharge Actual Actual Actual Actual Veterans Memorial Building Main Hall (Small $55/hour $72/hour $96/hour $29/hour Main Hall (Medium) $68/hour $101/hour $130/hour $33/hour Main Hall (Large) $114/hour $166/hour $216/hour $57/hour Kitchen $66 /use $72 /use $74 /use $33 /use Classroom- Senior Wing $58/hour $84/hour $117/hour $29/hour Art & Crafts - Senior Wing. $23/hour $34/hour $39/hour $12/hour Conference Room $18/hour $23/hour $271hour $9/hour Oak Hill Park Community Center Banquet Room $114/hour $166/hour $216/hour $57/hour Room (Small) $23/hour $34/hour $43/hour $12/hour Rooms (Medium) $40/hour $52/hour $76/hour $20/hour Rooms (Large) $58/hour $84/hour $117/hour $29/hour Kitchen $66 /use $72 /use $74 /use $33 /use Large Grass Area Hourly $44/hour $54/hour $63/hour $22/hour Large Grass Area Daily $160 /use $207 /use $249 /use $80 /use Hap Magee Ranch Park Swain House Full Facility Hourly $69/hour $122/hour $153/hour $35/hour Full Facility Daily $607 /use $814 /use $1,044 /use $304 /use Cottage Front Room $32/hour $49/hour $74/hour $16/hour Conference Room $23/hour $34/hour $39/hour $12/hour Full Facility Hourly $69/hour $122/hour $153/hour $35/hour Full Facility Daily $607 /use $814 /use $1,044 /use $304 /use Magee House Full Facility Hourly $117/hour $127/hour $160/hour $59/hour Full Facility Daily $786 /use $1,011 /use $1,240 /use $393 /use tj Town of Danville Master Fee Schedule PARKS AND COMMUNITY FACILITIES FEE FOR SERVICE Community Facilities (con't) Meadow Meadow Hourly Meadow Daily Gazebo Town - Managed SRVUSD Facilities Baldwin Elementary School Multi -Use Room Diablo Vista Middle School Community Gym Facility Attendant Los Cerros Middle School Community Gym Facility Attendant Monte Vista High School Community Pool Lifeguard Tennis Courts A, B, C & D Tennis Courts E, F, G & H San Ramon Valley High School Tennis Courts Group III Group IV Group V Group VI Nonprofit Private Commercial Government $101/hour $123/hour $136/hour $51/hour $457 /use $503 /use $529 /use $223 /use $66 /use $72 /use $74 /use $33 /use N/A N/A $23/hour SRVUSD* SRVUSD* SRVUSD* SRVUSD* SRVUSD* SRVUSD* $24/hour $24/hour $23/hour N/A SRVUSD* $23/hour $24/hour N/A N/A $6/hour N/A SRVUSD* $20/hour $8/hour SRVUSD* SRVUSD* SRVUSD* $24/hour $23/hour SRVUSD* $20/hour $10/hour SRVUSD* SRVUSD* $19/hour $6/hour SRVUSD* N/A SRVUSD* SRVUSD* SRVUSD* *Rate based on the San Ramon Valley Unified School District Fees Park Facilities Group Picnics Diablo Vista Park, Hap Magee Ranch Park, Oak Hill Park, Osage Station Park, Sycamore Valley Park Up to 50 $96 /area $134 /area $199 /area $47 /area Up to 150 $172 /area $199 /area $265 /area $84 /area Over 150 $304 /area $398 /area $662 /area $148 /area Family Picnics Residents Non -Res. Up to 20 $45 /area $65 /area Sports Fields /Courts Tennis Courts $6/hour $8/hour $11 /hour $6/hour Bocce Ball Courts $10/hour $15/hour $23/hour $10/hour Baseball/Softball $10/hour $15/hour $23/hour $10/hour Baseball with Grass Infield $20/hour $30/hour $44/hour $20/hour Soccer $10/hour $15/hour $23/hour $10/hour Other Snack Shack (Sycamore Valley & Diablo Vista) $30/hour $43/hour $59/hour $29/hour Lighting $19/hour $21/hour $25/hour $18/hour Litter and Special Maintenance $44/hour $47/hour $53/hour $43/hour Miscellaneous Fees All Uses /Groups Security /Cleaning/Damage Deposit (Refundable) Community Facilities (including meadow & grass areas) $500 /ea. Group Picnics up to 150 $82 /ea. Group Picnics over 150 $124 /ea. Sports Fields $250 /ea. rd Town of Danville Master Fee Schedule PARKS AND COMMUNITY FACILITIES FEE FOR SERVICE Miscellaneous Fees (cont.) All Uses /Groups Facility Attendants Attendant - Minimum 2 hours. $24/hour Attendant Overtime $48/hour Box Office Attendant $24/hour Theatre Technician $24/hour Theatre Technician Overtime $48/hour Equipment $318 P.A. System - - $42/hour Overhead Projector $12 /use Screen (Portable) $12 /use Flip Chart $15 /use White Board w/Markers (4 %z' x 3') $12 /use Cocktail Tables $10 /use Wooden Chairs or White Ceremony Chars $3 /each Piano $50 /use Piano (weekend use) $100 /use Umbrellas w /stands $12 /use TV/DVD $27 /use Table Top Lectern $27 /use Full Length Lectern $31 /use Additional Microphones with/without stands $27 /use Portable Hand -held Microphone Sound Unit $27 /use Additional Sound Equipment (2 microphone /2 monitors) $100 /use Follow Spot (including operator) $36 /each Moving Lights - Theatre $26 /use Moving Lights — Theatre (weekend use) $50 /use Lighting Design Fee $500 /use Facility Reservations /Permits Photography/Filming Permit $318 Change Request $15 /each Unscheduled rental use Two times hourly rate Insurance Administration $17/booking Cancellation Charge $77 minimum Less than 30 days 100% of rental fee Less than 60 days 50% of rental fee Non - Resident Surcharge 25% Snorts Alliance Soccer/ Lacrosse fields $5.70/hour Baseball/ Softball fields $3.50/hour Adult Soccer $26.70/hour Equipment Removal $129/hour 5 Town of Danville Master Fee Schedule DEVELOPMENT SERVICES FEES ENGINEERING SERVICES Map Check FEE FOR SERVICE 2 -10 lots - $2,152 + $204/lot; >10 lots - $4,228 + $30 /lot Improvement Plan Check Review of improvement plans street, drainage and landscaping work Engineering Inspection Inspection of installation of street, drainage and landscaping improvements Street Lighting Operation of public street lighting system Encroachment Permit For work within the public right -of -way Valet Permit Oversize/ Wide load Permit Drainage Permit For work within any public or private drainage course Grading Plan Check Grading Permit 3.5% of project cost <= $50,000; 3.25% of project cost >$50,000 & <= $100,000; 3.0% of project cost >$I00,000; 5.5% of project cost <= $50,000; 5.25% of project cost >$50,000 & <= $100,000; 5.0% of project cost >$100,000; One year operational cost + 10% $166 for projects <= $2,000; 5.5% of construction cost for projects >$2,000 $ 166 $ 22 $166 for projects <= $2,000; 5.5% of construction cost for projects >$2,000 Under 50 cy: $181. More than 49 cy: $181 + Percentage of Construction Cost + Volume Fee: Percentage of Construction Cost: $0 to $10,000 use 0.5 %; $10,001 to $100,000 use 1.0 %; $100,001 and greater use 1.5% Volume Fee: 50 to 1,000 cy: $0.91 per 100 cy 1,001 to 10,000 cy: $0.19 per 100 cy + $181 (for soils report review) 10,001 or greater: $0.60 per 100 cy + $997 (for soils report review) Under 50 cy: $35. 50 to 100 cy: $56. 101 to 1,000 cy: $56 for first 100 cy plus $26 for each additional 100 cy 1001 to 10,000 cy: $294 for first 1000 cy plus $22 for each additional 1000 cy 10,001 to 100,000. cy: $491 for first 10,000 cy plus $100 for each additional 10,000 cy 100,001 cyorgreetw. $1,388 forfnst 100,000 cy plus $55 for each additional 10,000 cy C Town of Danville Master Fee Schedule ENGINEERING SERVICES Grading Inspection FEE FOR SERVICE Construction Cost + Volume Fee: Percentage of Construction Cost: $0 to $10,000 use 2.0 %; $10,001 to $100,000 use 1.5 %; $100,001 and greater use 1.0% Volume Fee: Under 50 cy: $181 More than 49 cy: $181 + percentage of 50 to 1,000 cy: $9 per 100 cy 1,001 to 10,000 cy: $91 + $4 per 100 cy 10,001 or greater: $468 + $2 perl00 cy Finish Grading Inspection Single family residential lot Commercial Project $76 $184 Debris /Clean -up Deposit A deposit shall be paid at permit issuance to assure the clean-up of the site and/or public right -of -way. This deposit shall be returned to the applicant if it can be determined at certification of occupancy that the site and surrounding areas have been restored to their clean and ultimately improved condition. $302 per acre NPDES (National Pollution Discharge Elimination System) Prevention of Drainage Runoff Pollutant Residential $51 Multi - residential $211 Commercial $430 Storm Water Control Plan Review Base Map Revision Revision of Town computerized base map Photography / Filming Permit Certificate of Correction or Amended Map Revises a recorded document Vacation of Right -of -Way or Easement Process a request to abandon a public right -of- way or easement Consultant Fee plus 33% $88 for each new or revised lot or parcel $ 318 $181 per document $1,963 7 Town of Danville Master Fee Schedule PLANNING AND FEEL ADDITIONAL FEES TRANSPORTATION SERVICES Environmental Assessment Initial Study leading to standard $1,200 Declaration 'of Environmental Significance (ND) Environmental Impact Report (EIR) Initial Study leading to Mitigated $1,800 Negative Declaration of Environmental Significance (MND) Consultant fee to prepare EIR plus 33% $120 hourly after 15 hours of staff work Consultant prepared Mitigated Negative Declaration of Environmental Significance Notice of Exemption Projects $50 Notice of Determination Department of Fish & Game Notice $2,044.00 of Determination Fee for ND or MND Department of Fish & Game Notice $2,839.25 of Determination Fee for EIR Notice of Determination for County $50 Clerk and remainder to F &G Development Plan Consultant fee to Prepare MND plus 33% $50 to County Clerk with Notice of Determination Conceptual or Pre- submittal $720 $120 hourly after 6 hours of staff work Administrative $480 -$960 Public Hearing - Residential - $4,080 Minor Projects $120 hourly after 34 hours of staff work 1 The fee is for staff time and materials necessary to process the permit. 2 Fee amounts are set at the assumed average cost to provide the service. If the cost to provide the service exceeds the fee, the applicant will be billed the cost overrun. 3 These fees are set by Assembly Bill 3158, authorizing the County Clerk to collect fees for the Department of Fish and Game. The County Clerk retains $25.00 on each fee collected to cover processing expenses 8 Town of Danville Master Fee Schedule PLANNING AND FEE' ADDITIONAL FEES TRANSPORTATION SERVICES Development Plan (cont.) Public Hearing - Residential - $6,120 $120 hourly after 51 hours of staff work Larger and/or More Complex Projects Public Hearing - Non - residential $4,080 Minor Projects $120 hourly after 34 hours of staff work Public Hearing - Non - residential - $6,120 Larger and/or More Complex Projects Public Hearing - Scenic Hillside or $4,080 Major Ridgeline - Minor Projects Public Hearing - Scenic Hillside or $6,120 Major Ridgeline - Larger and /or More Complex Projects $120 hourly after 51 hours of staff work $120 hourly after 34 hours of staff work $120 hourly after 51 hours of staff work Public Hearing - Final $1,080 Development Plan Processed with PUD Application Public Hearing - Final $4,080 Development Plan Processed with PUD Application or as an Amendment $120 hourly after 34 hours of staff work Second Dwelling Unit - $960 $120 hourly after 8 hours of staff work Administrative - over 750 but under 1000 sq. ft Second Dwelling Unit - Public $2,400 $120 hourly after 20 hours of staff work Hearing - over 1000 sq. ft Traffic Study Review $550 Per Review Land Use Permit Temporary /Seasonal Use - $120-$360. Recurring Request/ Event Temporary /Seasonal Use - Initial $240 -$480 Request /Event Large Family Child Care Facility (8- $1,440 14 children X Town of Danville Master Fee Schedule PLANNING AND FEE ADDITIONAL FEESZ TRANSPORTATION SERVICES Land Use Permit (cont.) Caretaker mobile home $960 Minor project without Public $360 -$720 Hearing Minor Item with Public Hearing $1,800 $120 hourly after 15 hours of staff work Child Care Facility ( >14 children $4,080 $120 hourly.after 33 hours of staff work Congregate Care Facility $4,080 $120 hourly after 33 hours of staff work Major Item with Public Hearing $7,920 $120 hourly after 66 hours of staff work Telecommunication Permit $2,640 $120 hourly after 22 hours of staff work requiring No Public Hearing Telecommunication Permit $4,080 $120 hourly after 33 hours of staff work requiring Public Hearing Telecommunication - Permit $720 Extension Traffic Study Review $280 per review after 2nd review LUP combination with other permit $480 Subdivision Major Subdivision -Smaller and /or $4,080 $120 hourly after 34 hours of staff work Less Complex Projects Major Subdivision - Larger and /or $6,120 $120 hourly after 51 hours of staff work More Complex Projects Traffic Study Review $775 Per Review Minor Subdivision - Smaller $4,080 $120 hourly after 34 hours of staff work and /or Less Complex Projects Minor Subdivision - Larger and/or $6,120 More Complex Projects $120 hourly after 51 hours of staff work Time Extension for Major or Minor $600 Subdivision [K Town of Danville Master Fee Schedule PLANNING AND FEE' ADDITIONAL FEES TRANSPORTATION SERVICES Rezoning PUD - Rezoning - for Smaller $5,280 $120 hourly after 44 hours of staff work and /or Less Complex Projects PUD - Rezoning - for Larger $7,920 $120 hourly after 66 hours of staff work and /or More Complex Projects Traffic Study Review $775 Per Review Rezoning - to standard Residential, Office, Industrial or Commercial Zoning Designation - Minor Project Rezoning - to standard Residential, Office, Industrial or Commercial Zoning Designation - Larger and /or More Complex Project Variance Commercial or submitted in conjunction with other application Single Family Residence Processed as Administrative Permit Public Hearing $4,080 $120 hourly after 33 hours of staff work $7,920 $120 hourly after 66 hours of staff work $360 -$720 $1,200 For projects appealed to/ or referred to Pl annin g Commission for action - $120 hourly after 10 hours of staff work $1,800 Sign Freestanding sign (with or without $480 Design Review Board Review) Fee per each face copy change not $180 requiring Design Review Board review New sign requiring Design Review $360 -$720 Board review Master Sign Program < five tenant $960 spaces Master Sign Program > five tenant $1,200 spaces Temporary Promotional Sign No charge Permit 11 Town of Danville Master Fee Schedule PLANNING AND FEE' ADDITIONAL FEESZ TRANSPORTATION SERVICES General Plan Amendment GPAs - Land Use Designation Change Submitted with PUD- Rezoning GPAs - Land Use Designation Change Submitted as Stand -alone Application Traffic Study Review GPAs - Text Amendment Design Review Board Conceptual or Pre submittal Administrative Minor Commercial New SFR Hillside (Scenic Hillside or Major Ridgeline) New MFR < 5 units New MFR > 5 units Office, Commercial or Industrial Tree Removal. Residential Commercial Special Planning Studies Storm Water Control Plan Review Parcel Merger Lot Line Adjustment $6,120 $120 hourly after 50 hours staff effort $9,600 $120 hourly after 80 hours staff effort $775 Per Review $4,080 $120 hourly after 33 hours staff effort $600 $480 -$960 $480 -$960 $2,400 $120 hourly after 20 hours of staff work $2,160 $120 hourly after 18 hours of staff work $2,880 $120 hourly after 24 hours of staff work $2,640 $120 hourly after 22 hours of staff work Cost fee plus 33% administrative fee Consultant fee plus 33% administrative fee $527/lot $527/lot 12 Town of Danville Master Fee Schedule PLANNING AND FEE' ADDITIONAL FEES TRANSPORTATION SERVICES Miscellaneous Time Extension - Administrative $360 Action - no site check required Time Extension - Administrative $720 Action - site check &/ or COA compliance review required Time Extension - Non- $960 Administrative Action Appeals $240 Requests for Reconsideration $960 Archaeological review (Sonoma $56 Pass through fee sent to Sonoma State State Clearinghouse) Zoning Certificate Letter - $600 Residential Zoning Certificate Letter - $960 Commercial Zoning Review of Building Permit $120 hourly after initial 2 hours of review File Research $120 per hour LaserFiche Files No charge Newspaper Advertising $120 plus newspaper publishing cost. Public Notice by Staff $0.83 per -piece plus $120 per mail -out Documents Fee Capital Improvement Program Document, Town of Danville' $21 Landscape and Irrigation Project Procedures and Standards Town -wide Trails Master Plan $49 General Plan $28 General Plan Map, Beautification Guidelines, Base Map, Specific Plan $7 Parks, Recreation and Arts Strategic Plan $45 Zoning Map, Downtown Master Plan, Standard Plan $14 Traffic and Engineering Survey $3 Aerial Photo Hard copy, up to 42 -in x 60 -in $14 Computer file on CD or E -mail $3 13 Town of Danville Master Fee Schedule BUILDING SERVICES FEE FOR SERVICE Building Permits Building Sub - permit and Inspection As required by California Building Code As permitted by the California Building Code Electrical Sub - permit As required by California Electrical Code Plumbing Sub - permit As required by California Plumbing Code Mechanical Sub - permit As required by California Mechanical Code Sw immin g Pool, Spa or Hot Tub Permits As required by Uniform Swimming Pool, Spa and Hot Tub Code 20% of building permit fee 17% of building permit fee 18% of building permit fee Equivalent to building permit plus any required electrical or plumbing permits Plan Review Structural and Architectural Plan Review Plumbing/Electrical/Mechanical Plan Review Master Plan Verification Review Planning Division — Plan Check Investigations 65% of building sub- permit fee 55% of structural/ architectural plan review 75% of the 65% plan review fee $150. Over $100,000 valuation, $300 Equivalent of applicable permit As provided for in the California Building Code Fees Assessed by other Agencies Building Permit Fee Table Total Valuation $1.00 to $500 $501 to $2,000 $2001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001 to $500,000 $500,001 to $1,000,000 $1,000,001 and up Actual Cost Fee $23.50 $23.50 for the first $500 plus $3.05 for each additional $100, or fraction thereof, to and including $2,000 $69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof, to and including $25,000 $391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000 $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof, to and including $1,000,000 $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof. 14 Town of Danville Master Fee Schedule BUILDING SERVICES Other Inspections and Fees Inspections outside of normal business hours Reinspection Fees Inspections for which no fee is specifically indicated Additional plan review required by changes, additions or revisions to plans Water Heater, Furnace, A/C Replacement Kitchen Remodel/ Alteration Bathroom Remodel / Alteration Powder Room Remodel / Alteration New In- Ground Pool and/or Spa Pool and /or Spa Remodel Pool Demolition Permit Detached Storage Shed - with no trades Standard Residential Re -Roof Permit Furnace and A/C Replacement Permit Permit Reactivation Photovoltaic Residential Photovoltaic Non - Residential Gas Shut -Off Device Minimum Permit fee Documentation fee Temporary Certificate of Occupancy Penalty fee for work without requisite permit or unauthorized occupancy Request for Duplicate Plans Residential Window Replacement Permit FEE FOR SERVICE $115 per hour' (4 hour minimum) $87 minimum' $87 minimum' $129 per hour' $87 /ea. (includes $10 documentation fee) $710 $520 $330 $750 (Master Plan only) . $590 $295 $275 (not to exceed 250 square feet) $275 $144 (includes $10 documentation fee) $67 plus $87 for each additional inspection $290 plus administration fee 1/3 of 1 %o of total valuation ($475 minimum) $87 (includes $10 documentation fee) $87 (includes $10 documentation fee) $10 $250 (commercial/industrial only) Determined by Chief Building Official not to exceed $1,000 $40 plus cost of copies $225 (13 windows or less) $325 (14 — 26 windows) $430 (27 or more) Building Permit Pass Through Fees Strong Motion Instrumentation Program Residential Commercial California Building Standards Fee 0.01% of valuation (minimum $0.50) 0.021% of valuation (minimum $0.50) $1 per $25,000 of total valuation ' Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Hot water heater and other minor permits may be charged less. 15 Town of Danville Master Fee Schedule Building Permit Valuation Table The unit costs are intended to comply with the definition of "valuation" in Section 223 of the 1997 Uniform Building CodeTM and thus include architectural, structural, electrical, plumbing and mechanical work, except as specifically listed below. The unit costs also include the contractor's profit, which should not be omitted. The determination of building permit fees for projects are based on valuation computed from these figures, which were approved on June 18, 2002 and increased by applying the Engineering News Record (ENR) San Francisco Area Building Cost Index History (1915 -2011) index from May 2011 to May 2012. Average Cost per Square Foot by Occupancy 8 Type Occupancy 8 Type New Remodel Occupancy 8 Type New Remodel Occupancy 8 Type New Remodel APARTMENT HOUSES: CONVALESCENT HOSPITALS: INDUSTRIAL PLANTS: Type 1 or II F.R. $176.29 $86.29 Type 1 or II F.R. $276.68 $134.64 Type 1 or II F.R. $113.09 $64.78 (Good) $217.05. $100.27 Type II: 1 -Hour $192.01 $96.93 Type 11:1 -Hour $78.73 $59.74 Type V- Masonry Type 111:1 -Hour $196.79 $96.38 Type II: N $72.34 $57.78 (or Type III) $143.90 $76.14 Type V:1 -Hour $185.46 $89.38 Type 111:1 -Hour $86.68 $59.84 (Good) $176.29 $84.76 DWELLINGS: Type III -N $81.70 $58.00 Type V Type V - Masonry $150.45 $89.90 Tilt -up $59.63 $54.02 Wood Frame $126.81 $75.98 (Good) $192.60 $88.76 Type V:1 -Hour $81.70 $59.46 (Good) $162.98 $81.28 Type V -Wood Frame $133.76 $80.56 Type V: N $74.75 $54.84 Type I Basmt/Garage $74.34 $38.50 (Good) $183.65 $86.35 JAILS: AUDITORIUMS: (Major Remodel) $118.56 Type 1 or II F.R. $316.24 $157.61 Type 1 or II F.R. $208.32 $98.46 Kitchen no structure $145.64 Type 111:1 -Hour $289.21 $150.30 Type II: 1 -Hour $150.86 $86.02 With structure $150.38 Type V:1 -Hour $216.87 $122.84 Type 11: N $142.70 $82.41 Bathrooms $145.64 LIBRARIES: Type 111:1 -Hour $158.62 $82.93 Basements: Type 1 or II F.R. $231.37 $117.34 Type III -N $150.45 $80.25 Semi - Finished $39.96 $37.95 Type II: 1 -Hour $169.33 $90.14 Type V: 1 -Hour $151.67 $82.66 (Good) $46.11 $40.40 Type II: N $161.00 $84.68 Type V: N $141.53 $79.99 Unfinished $29.01 $23.94 Type 111:1 -Hour $178.89 $90.49 BANKS: (Good) $35.18 $28.76 Type III -N $169.95 $82.94 Type 1 or II F.R. $294.37 $133.06 FIRE STATIONS: Type V: 1 -Hour $167.95 $89.31 Type II: 1 -Hour $216.87 $124.06 Type 1 or II F.R. $227.38 $116.00 Type V: N $161.00 $77.34 Type II: N $209.90 $119.96 Type 11:1 -Hour $149.66 $83.24 MEDICAL OFFICES: Type III: 1 -Hour $239.31 $123.68 Type II: N $141.12 $80.99 Type 1 or II F.R. $237.51 $129.28 Type III -N $230.79 $121.22 Type III: 1 -Hour $163.79 $83.51 Type 11:1 -Hour $183.26 $96.42 Type V:1 -Hour $216.87 $124.04 Type III -N $156.81 $80.01 Type II: N $174.14 $92.73 Type V: N $207.70 $113.37 Type V:1 -Hour $153.64 $81.93 Type 111:1 -Hour $198.76 $100.55 BOWLING ALLEYS: Type V: N $145.69 $80.06 Type III -N $185.06 $93.76 Type 11: 1 -Hour $101.37 $64.11 HOMES FOR THE ELDERLY: Type V:1 -Hour $179.28 $96.76 Type II: N $94.62 $59.59 Type 1 or II F.R. $206.11 $106.31 Type V: N $172.92 $91.89 Type 111:1 -Hour $110.30 $64.71 Type 11:1 -Hour $167.35 $82.99 OFFICES Type III -N $103.15 $61.44 Type II: N $160.22 $78.77 Type 1 or II F.R. $212.29 $111.52 Type V: 1 -Hour $74.34 $63.82 Type III: 1 -Hour $174.32 $83.27 Type II: 1 -Hour $142.12 $95.16 CHURCHES: Type III -N $156.81 $73.99 Type II: N $135.38 $88.84 Type 1 or II F.R. $197.17 $98.64 Type V:1 -Hour $168.34 $80.74 Type 111:1 -Hour $153.44 $93.34 Type II: 1 -Hour $148.08 $73.99 Type V: N $162.61 $77.68 Type III -N $146.71 $88.99 Type II: N $140.72 $68.57 HOSPITALS: Type V:1 -Hour $143.72 $92.23 Type III: 1 -Hour $161.00 $74.32 Type 1 or II F.R. $324.38 $156.30 Type V: N $135.38 $77.81 Type III -N $153.84 $68.73 Type 111:1 -Hour $268.54 $132.12 PRIVATE GARAGES: Type V:1 -Hour $150.45 $73.94 Type V:1 -Hour $256.20 $127.18 Wood Frame $48.31 $33.92 Type V: N $141.53 $64.05 HOTELS AND MOTELS: Masonry $54.45 $34.24 Type 1 or II F.R. $200.75 $95.27 Open Carports $33.01 $22.47 Type 111:1 -Hour $173.92 $88.38 Type III -N $165.76 $75.46 Type V: 1 -Hour $151.45 $85.07 1 Add 0.5% to total cost for each story over Type V: N $148.48 $70.70 three. 2 Deduct 20% for shell -only buildings. 16 Town of Danville Master Fee Schedule Occupancy & Type New Remodel PUBLIC BUILDINGS: New Remodel Type 1 or II F.R. $245.26 $130.35 Type 11:1 -Hour $198.76 $99.40 Type II: N $190.03 $95.72 Type 111:1 -Hour $206.32 $102.11 Type III -N $199.15 $95.39 Type V: 1 -Hour $188.82 $99.02 Type V: N $182.08 $92.06 PUBLIC GARAGES: $54.66 $37.36 Type I or II F.R. $97.18 $55.49 Type I or II open p $72.94 $51.73 Type 11: N $55.66 $49.25 Type III: 1 -Hour $73.54 $53.04 Type III -N $65.39 $49.53 Type V: 1 -Hour $66.98 $52.40 RESTAURANTS: Type III: 1 -Hour $193.60 $134.43 Type III -N $177.30 $130.09 Type V: 1 -Hour $177.30 $132.46 Type V: N $170.33 $127.81 1 Add 0.5% to total cost for each story over three. Occupancy & Type New Remodel Occupancy & Type New Remodel SCHOOLS: WAREHOUSES Type 1 or II F.R. $221.02 $132.49 Type 1 or II F.R. $98.19 $64.04 Type 11:1 -Hour $150.86 $104.64 Type II or V: 1 -Hr $58.23 $38.38 Type 111:1 -Hour $161.39 $104.65 Type II or V: N $54.66 $37.36 Type III -N $155.24 $91.63 Type 111:1 -Hour $65.98 $38.36 Type V:1 -Hour $151.28 $100.83 Type III -N $62.83 $35.77 Type V: N $144.33 $89.42 AIR CONDITIONING: SERVICE STATIONS: Commercial $8.35 Type II:N $133.56 $67.10 Residential $6.95 Type 111:1 -Hour $139.35 $70.27 SPRINKLER SYSTEM: $5.16 Type V: 1 -Hour $118.66 $67.00 MISCELLANY Canopies $55.66 $37.02 Deck/covered.porches $42.84 STORES: Retaining Wall Type 1 or II F.R. $163.79 $88.99 (less than 4') $73.77 Type 11:1 -Hour $100.17 $77.14 Retaining Wall Type II: N $97.99 $75.23 (4' and more)) $138.30 Type III: 1 -Hour $121.85 $76.74 Balcony $51.41 Type III -N $114.29 $89.13 Trellis /Arbor $25.70 Type V: 1 -Hour $102.58 $76.20 Type V: N $94.81 $73.43 THEATERS: Type 1 or II F.R. $218.25 $118.28 Type 111:1 -Hour $159.01 $93.29 Type III -N $151.45 $86.40 Type V: 1 -Hour $149.66 $91.47 Type V:N $141.53 $77.50 2 Deduct 11 % for mini - warehouses. 3 Cost determined by independent cost study. 17 Town of Danville Master Fee Schedule INDEX A.B.C. Letter for One Day Sale Permit 2 A/C Replacement Permit 15 Abandon a public right -of -way or easement? Accident/Crime Reports 2 Additional Sound Equipment 5 Administrative Citation Late Fee 1 Adult Soccer 5 Aerial Photo 13 Alarm Response Fee 2 Amended Map 7 Appeals 13 Archaeological review 13 Art & Crafts - Senior Wing 3 Art & Crafts Room 3 Attendant 5 Auditorium 3 Baldwin Elementary School 4 Bandstand 3 Banner Permit 1 Banquet Room 3 Base Map Revision 7 Baseball 5 Bathroom Remodel/Alteration 15 Beautification Guidelines 13 Booking Fee Reimbursement 2 Box Office Attendant 5 Building Permit Fee Table 14 Building Permit Investigations 14 Building Permit Valuation Table 16 Building Permits 14,15 Building Plan Review 14 BUILDING SERVICES 14 Business License Name Listing 1 Business License Verification Letter 1 California Building Standards Fee 15 Capital Improvement Program Document 13 Certificate of Correction 7 Certificate of Occupancy 15 Certified Copy 1 CITY CLERK 1 City Clerk Certification 1 Classroom - Senior Wing 3 Cocktail Tables 5 Community Pool 4 Computerized base map 7 Conference Room 3 Cottage 3 Danville Community Center 3 Debris /Clean-up Deposit 7 Design Review Board 12 Detached Storage Shed - with no trades 15 DEVELOPMENT AND TRANSPORTATION SERVICES 6 Development Plan 8 Diablo Vista Middle School 4 Diablo Vista Park 4 Disturbance Call -back 2 Documentation fee 15 Downtown Master. Plan 13 Drainage Permit 6 Drainage Runoff 7 DUI Emergency Response Reimbursement 2 Easement 7 Electrical Permit 14 Encroachment Permit 6 Engineering Inspection 6 ENGINEERING SERVICES 6 Environmental Assessment 8 Environmental Impact Report (EIR) 8 Equipment 5 Equipment Removal 5 Facility Attendants 5 Facility Reservations/Permits 5 Failure to Obey Sign/Marking 2 Family Picnics 4 File Research 13 FINANCE DEPARTMENT 1 Fingerprinting (ink and card) 2 Fingerprinting (Livescan) 2 Finish Grading Inspection 7 Flip Chart 5 Follow Spot (including operator) 5 Furnace and A/C Replacement Permit 15 Furnace Permit 15 Gas Shut -Off Device 15 General Plan 13 General Plan Amendment 12 Grading Inspection 7 Grading Permit 6 Grading Plan Check 6 Hap Magee Ranch Park 3,4 Hot Tub Permit 14 18 Improvement Plan Check 6 Initial Study 8 Inspections for which no fee is specifically 3 indicated 15 Inspections outside of normal business hours Insurance 5 Kitchen 3 Kitchen Remodel/Alteration 15 Lacrosse 5 Land Use Permit 9 Landscape and Irrigation Project Procedures 8 13 Large Grass Area Hourly 3 Las Trampas Room 3 Library 3 Lifeguard 4 Lighting Design Fee 5 Litter and Special Maintenance 4 Los Cerros Middle School 4 Lot Line Adjustment 12 Lounge 3 Magee House 3 Map Check 6 Meadow 4 Mechanical Permit 14 Microphones 5 Minimum Permit fee 15 Mitigated. Negative Declaration 8 Monte Vista High School 4 Moving Lights - Theatre 5 Mt. Diablo Room 3 Municipal Code 1 New In- Ground Pool and/or Spa 15 Newspaper Advertising 13 Non - Resident Child Seat Inspection 2 Notary Public 1 Notice of Determination 8 Notice of Exemption 8 NPDES 7 Oak Hill Park 3,4 Oak Hill Park Community Center 3 . Off-Site Document Retrieval Fee 1 Osage Station Park 4 Outdoor Facility Rates 4 Overhead Projector 5 Oversize/Wide load Permit 6 Oversized Vehicle 2 P.A. System 5 Parcel Merger 12 Parking Permits 2 PARKS AND COMMUNITY FACILITIES 3 Permit Reactivation 15 15 Photo Copies 1 Photography/Filming Permit 5,7 Photovoltaic Non - Residential 15 Photovoltaic Permit 15 Piano 5 Plan Size Copies 1 PLANNING SERVICES 8 Plumbing Permit 14 POLICE SERVICE 2 Pool and/or Spa Remodel 15 Pool Demolition Permit 15 Portable Hand -held Microphone Sound Unit 5 Powder Room Remodel/Alteration 15 Public Notice by Staff 13 Reconsideration 13 Recorded document 7 Records on compact disk 1 Records Search 1 Reinspection fees 15 Report of Building Record 15 Residential Window Replacement Permit 15 Restricted Parking 2 Returned Payment Item 1 Returned Payment Item (second time) 1 Rezoning 11 Screen (Portable) 5 Security /Cleaning/Damage Deposit 4 Sign 11 Snack Shack 4 Soccer 5 Softball 5 Spa Permit 14 Special Planning Studies 12 Specific Plan 13 Sports Fields /Courts 4 Standard Residential Re -Roof Permit 15 Street Lighting 6 Strong Motion Instrumentation Fee 15 Subdivision 10 Swain House 3 Swimming Pool Permit 14 Sycamore Valley Park 4 Table Top Lectern 5 Tennis Courts 4 Theatre Technician 5 Vacation of Right -of -Way 7 Time Extension 13 Valley Oak 3 Towed Vehicle Release 2 Valley Oak & Las Trampas 3 Town Comprehensive Annual Financial Variance 11 Report 1 Veterans Memorial Building 3 Town Financial Plan 1 Village Theater 3 Town Green 3 Water Heater Permit 15 Town Meeting Hall 3 Wooden Chairs 5 Town -wide Trails Master Plan 13 Work without requisite permit 15 Tree Removal 12 Zoning Certificate Letter - Commercial 13 Trespass on Public Grounds 2 Zoning Certificate Letter - Residential 13 TV/DVD 5 Zoning Map 13 Umbrellas w /stands 5 Zoning Review of Building Permit 13