Loading...
HomeMy WebLinkAbout061-09 RESOLUTION NO. 61-2009 ADOPTING THE 2009-2010 MASTER FEE SCHEDULE FOR USER AND COST RECOVERY FEES WHEREAS, the Town of Danville charges facility use fees for the rental and use of Town- owned and/ or maintained facilities; and WHEREAS, the Town charges Planning, Engineering and Building processing and permit fees for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, the Town charges City Clerk, Finance and Police processing fees for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, the Town Council has previously established such fees as part of the Danville Municipal Code and the annual Master Fee Schedule through resolution; and WHEREAS, the Town Council conducted a public hearing to receive testimony regarding the proposed increase in user and cost recovery fees, notice of which hearing was provided as required by law; now, therefore, be it RESOLVED, by the Danville Town Council thatthe Master Fee Schedule for User and Cost Recovery Fees, as set forth in Exhibit 1 attached hereto, is hereby adopted. Any increased Planning, Engineering and Building fees shall not go into effect for 60 days from adoption of this resolution. Until then, the existing fees shall remain in effect. APPROVED by the Danville Town Council at a regular meeting on June 2, 2009, by the following vote: AYES: NOES: ABSTAINED: ABSENT: Arnerich, Doyle, Andersen, Shimansky, Stepper None None None 1l::?ir:;J~: CITY ATTORNEY ,. T own of Danville Master Fee Schedule For User and Cost Recovery Fees Fiscal Year 2009-2010 Adopted by the Danville Town Council June 2, 2009 Effective July 1, 2009 Development Services Fees Effective August 3, 2009 Table of Contents CITY CLERK.................................................................. ..................................................................................1 Municipal Code........ ................... .... .................... ............. ..... ..... ...... ..... ......... ... ............ .......... .......... ..... ....... ................. ...............1 Notary Public ........... ................. ................. ......... .... ............ ....... ..... ........ .... ........ ...... ............ ...... .......... ........... ...... .... ...................1 City Clerk Certification..................................................................................................................... ........................................... 1 Certified Copy..... ............ ...... ........... ......... .... ..... ..... ........ ..... ............. .......... .... ............... ...... ...... ...... ..... .......... .................. ........ ....1 Records on compact disk ............ ............... ......... ....................... ...... ............ ..................................... ..... .......... .... ........ ................1 FINAN CE DEPARTMENT ....................... ................. ........................... ........................................................1 Town Financial Plan.. .... ............. .... ........... ........... .... ..... ....... ....... .................. ........... ........................ ............ ..... ...... .....................1 Town Comprehensive Annual Financial Report ......................................................................................................................1 Business License Name Listing ............. ........ ... ..... ...... .... ........... ......... ...... .................. .......... .... ........ ..... ............ ............. ............1 Business License Verification Letter.. ......... .................... ..... ................... .................... ..... ........ .............. ....... .............................. 1 Returned Payment Item .............. .... ......... ......... ........ ....... ..... ....... .... .................. ..... .......... .......... ....... .... ..... ..... ............ ....... .........1 Returned Payment Item (second time) ......................................................................................................................................1 POLl CE S ER VI CE............................................................................................................................ ............... 2 Accident/ Crime Reports.................. ............. ...... ....................................... .... .......... ............................... ............. ............... ........ 2 Alarm Response Fee ................. ...................... ........ ........................... .......... ........... ............................ .......... ....... ..... .................... 2 A.B.C. Letter for One Day Sale Permit.......................................................................................................................................2 Booking Fee Reimbursement.. ........ .............. ......... .......... ........... ... ...... ......... ... .................. .... ...... .......... ..... ..... ............ ... .............2 Disturbance Call-back .. ........... ........... ........ ......... ............. ..... .... ............... ........ ............ ..... .............. ... .... ... ............. .... ....... ...........2 Failure to Obey Sign/Marking.. ........................................................................ .................................... ............................... .......2 Fingerprinting (Livescan) ....................................... ............ .......................................................................... ..... ........... ..... .......... 2 Fingerprinting (ink and card).......... ......... ......... ... .......... ........... ...... .................. ........... ................. ....... ....... ..... ...... .....................2 Oversized Vehicle........ .......................... .... .................................... ................................ ............. ......................... ......................... 2 Photographs. ... ........................... ... .......... .... ..... ...... .... .............. .... ........... ........ ...... .... ............. ................ ............... ..... ....................2 Restricted Parking............. .... ........... .... ..... .... ............ .... ...... ......... ...... ............ ..................................... .............. ........ .... .... ....... .....2 Towed Vehicle Release...... ........ .................... ...... ... ..................... ...... ............ ......... ........ .................... ......... ............. ....................2 Trespass on Public Grounds. ....... ................... ........ ............................................... ............. ................... ....................... ...............2 V erifica tion Letter......................................................................................................................... ................................................ 2 Non-Resident Child Seat Inspection......................................................................... .............................................. ................... 2 Parking Permits...... ...... ................ .......... ... .............. ...... ... ................... ............ .... ........... ........ .......................... .... ... .............. ........2 DUl Emergency Response Reimbursement: .............................................................................................................................2 PARKS AND COMMUNITY FACILITIES ............................................................................................... 3 Indoor Facilities..................................................................................................................... ........................................................ 3 Danville Community Center. ....... ...... ................... ................................................. ................................ ............ ............. ............ 3 Library... ............ ..... ... ..... ....... ........ ................... ........... ... ....................... ........... ... ...... ...... ...... ................. ............ .......... ....... .... .......3 Town Meeting Hall..... ........... ..................... ......... ......... ...... ......................... ...... ................. .................. ......... ............. ..... .............3 Village Theatre ................... .............................................................................. ....... ....................................................... ...............3 Veterans Memorial Building...................... .................................................. ........................................... .................................... 3 Oak Hill Park Community Center .............................................................................................................................................. 3 Hap Magee Ranch Park ............................................................................................................................................................... 3 Baldwin Elementary School....... ....................................................................... .......................... ................................................4 Diablo Vista Middle School..... ......................................................... ............................ ..... ......................................... .................4 Los Cerros Middle School. ................. ....................................... .............................. .................................... ......... ......... ...............4 Monte Vista High School. ................... .................................. .............................. ................... ................ .............................. ........ 4 Outdoor Facility Rates. ................................................ ........ ................................................. .............................................. .......... 4 Group Picnics ................................................................................................................................................................................ 4 Family Picnics.. ... ... ....................... ...... ........... ............ ............ ...................... ...... ........ ..... .......... ... .... .... .............. ............ ............. ... 4 Sports Fields/Courts ............. ........................................................ ............. ........ ....... ............ ..... ...... .................... ........................4 Other ............ ................. ..... ...... ............... .......................... ...... ..... ............. ... ..... ......... ........ ... ........ ................................... ... ........ .... 4 Table of Contents Miscellaneous Fees ....... .......................................... ...... .............. ............. ..... ................... .... ............... .............. ... ........ .... .............4 Facility Attendants........ ........................ ...................... ........ .............. ....... ....... ................... ......... .... ......... ...... ........ ........ ......... ......5 Equipment..... ... ......... ............................ .......... ...... ...... ............ ................. .... ...... ....................... .... ........... ...... .... ................. ..........5 Facility Reservations/Permits........................................................................... .......................................................................... 5 Soccer/Lacrosse fields........................ ..... ..... ..... ...... ........ ................ ........... ..... ........... ........ .... ..... ................. ..... ... .............. .......... 5 Baseball/ Softball fields.......................................................................................................................... ...................................... 5 Adult Soccer .... .................. .... ...................... .................. ..... ................ ............. ...... ........ ........... ......... ........ .... ...... ...... .................... 5 Equipment Removal....... ........... ................. ... ... ... ..... .... ................ ....... ............. ..................... ............. .............. ...... ........... ...........5 DEVELOPMENT AND TRANSPORTATION SERVICES FEES .........................................................6 EN G INEERIN G S ER VI CES .................... .......... .................................................................................... .......6 Map Check .....................................................................................................................................................................................6 Improvement Plan Check ............................... ...... ...... .... ........ .......... .... ....... ...... ........ ..... ........... ...... ........ ...... ...... ........... ...... ... ....6 Engineering Inspection ............. ................. ......... ......... ....... ....... ............... ....... ....... .... .... ...... ............... ........ .... ........ .... ......... ... ....6 Street Lighting........................................................................................................................ ....................................................... 6 Encroachment Permit..... ..... .... ........ ......... ... ....... .... ...... ........................... ....... ....... ...... ................... ............. .... ...... .......... ..... ........6 Oversize/Wide load Permit ................ .............................. .................. .................................. ...... ................................. ............... 6 Drainage Permit ........ ........................ .... ................ ...... .............. ................. .... .... ..................... ............. .............. ...... ...... ...............6 Grading Plan Check.. ....... ... .......... ........ ..... ..... ...... ...... .............. ................ ..... ........ ................. ..... ................. ..... ...... ..... ...... .... ... ...6 Grading Permit........ ....... ......... ............ ..... ........ ..... .... ..... ..... ... ................... .... .... .... ...... ...... ........... ..... ............ .... .... ... ........... ..........6 Grading Inspection .. .... ............. ........ ..... ....... ..... ...... .... .......... .... ............................... .... .... ....... ......... .... .......... ........ ............ ..........7 Finish Grading Inspection ... ................... .......... ............................................... ..................... ........................................... ............7 Debris / Clean-up Deposit.... ....... ................................................................... ...................................... ................................... .....7 NPDES............................................................................................................................................................................................7 Base Map Revision.......... ................... ......... ...... ... ......... .... .... ........ .... ....... .............. ... ... ...... ....... .... ................... ............ ...... ...........7 Certificate of Correction or Amended Map ........................................................................................................................,..... 7 Vacation of Right-of~ W ay or Easement..... ........................................... .... ..... ..................... ............... ..... ......... ... ......... ...............7 PLANNING AND TRANSPORTATION SERVICES ............................................................................. 8 Environmental Assessment..... ... ..... ....... ..... ..... ...... ............................ ........ ................ ...... ............. ............. ....... .......... .... ..... ....... 8 Initial Study leading to standard Declaration of Environmental Significance (ND) ...........................................................8 Environmental Impact Report (EIR).............................................................. .................................................................... ......... 8 Initial Study leading to Mitigated Negative Declaration of Environmental Significance (MND).....................................8 Consultant prepared Mitigated Negative Declaration of Environmental Significance ......................................................8 Notice of Exemption Projects ...... ........ ................ .... ........ ..................... .................. ............ ..... .... ..................... ...... ............... ......8 Notice of Determination...... ................... ...................................... ......................................................... ......................................8 Department of Fish & Game Notice of Determination Fee for ND or MND ........................................................................ 8 Department of Fish & Game Notice of Determination Fee for EIR........................................................................................ 8 Development Plan .... ....... ...... ........ ........... ..... ..... ...................... .... ................ .......... ...... ... ............ ...................... ............ ...... .........8 Conceptual or Pre-submittal..... ............................................ .............................. ................... .......................................... ........... 8 Administrative.. .......... ... ....................... ... .... ....................... .............................. ..... .............. ....... ...................... .... ... .....................8 Public Hearing - Residential- Minor Projects..........................................................................................................................8 Public Hearing - Residential- Larger and/ or More Complex Projects................................................................................ 9 Public Hearing - Non-residential Minor Projects.....................................................................................................................9 Public Hearing - Non-residential-Larger and/ or More Complex Projects.........................................................................9 Public Hearing - Scenic Hillside or Major Ridgeline - Minor Projects ................................................................................. 9 Public Hearing - Scenic Hillside or Major Ridgeline - Larger and/ or More Complex Projects........................................ 9 Public Hearing - Final Development Plan Processed with PUD Application...................................................................... 9 Public Hearing - Final Development Plan Processed with PUD Application or as an Amendment................................ 9 Second Dwelling Unit - Administrative ....................................................................................................................................9 Second Dwelling Unit - Public Hearing ....................................................................:...............................................................9 Traffic Study Review. .................................... .............................. ........................ ........................... .............. ................... ........ ..... 9 Land Use Permit ................................ ................................................................................... ................................. .......................9 11 Table of Contents Temporary jSeasonal Use - Recurring Request/Event ........................................................................................................... 9 Temporary jSeasonal Use - Initial RequestjEvent ..................................................................................................................9 Large Family Child Care Facility (8-14 children) .................................................................................................................... 9 Caretaker mobile home ........... ....... ..... ..... ... ......... ...... ........ ... ......... ...... ........... ... ............ ..... .... ........... ...... .... .... ... ...... ....... ..........10 Minor project without Public Hearing .....................................................................................................................................10 Minor Item with Public Hearing..... ........ .......... .... ............. ..... ........ ... .... ........... ...... ............. ..... ................. ........ .... ............... ....10 Child Care Facility (>14 children) ............................................................................................................................................10 Congregate Care Facility.. ........ ..... ............... .......... ..... ... ........ ...... ......... .... ..... ..... ... ....... ........... ......................... ............ .............10 Major Item with Public Hearing ...............................................................................................................................................10 Telecommunication Permit requiring no Public Hearing .....................................................................................................10 Telecommunication Permit requiring Public Hearing........ ........ .................. ... ....... ...................... ......... .............. ..................10 Telecommunication - Permit Extension. .... ....... .............. ..... .... ......... .... .... ........ ....... ......... ....... ...... ................... ...... ...... ....... ...10 Traffic Study Review....... ............. ....... ... ....... ....... ........ ...... ... ............... ........ ..... ... ...... ............... ......................................... ..... ...10 LUP combination with other permit ........................................................................................................................................10 Subdivision... ............. ...... ............. ..... ........ ....... ......... ......... ........... ........... ... .......... ............ .... ..... ....... ...... .............. ................ ... ...10 Major Subdivision - Smaller andj or Less Complex Projects ...............................................................................................10 Major Subdivision - Larger andj or More Complex Projects ...............................................................................................10 Traffic Study Review.............. ....... ................. ............. .............................. .......... ........... .................... .......... ......... ...... ............... 10 Minor Subdivision - Smaller andj or Less Complex Projects ...............................................................................................10 Minor Subdivision - Larger andj or More Complex Projects...............................................................................................10 Time Extension for Major or Minor Subdivision....................................................................................................................10 Rezoning...... ..... ................ .... ................... ... ........ ...... ..... ...... ............. .... ...... ..... ..... ...... ...... ........... ....... ............ ....... .... ... ........ .......11 PUD - Rezoning - for Smaller andj or Less Complex Projects.............................................................................................11 PUD - Rezoning - for Larger andj or More Complex Projects.............................................................................................11 Traffic Study Review.......... .............. ........ ............................. ......................................... .... ......... ...... .........................................11 Rezoning - to standard Residential, Office, Industrial or Commercial Zoning Designation - Minor Project................ 11 Rezoning - to standard Residential, Office, Industrial or Commercial Zoning Designation - Larger andj or More Complex Project................................................ ...... ............................. .................. ........................................... .......................... 11 Variance............................. .... ...... ..... ..... ... ......... ..... ...... ..................... ....... ........... ........ ........ ..... .... ................... ..... .......................11 Administrative or submitted in conjunction with other application ...................................................................................11 Single Family Residence Processed as Administrative Permit.............................................................................................11 Public Hearing........................................... ....... ............................................................. ....... ............. ........ ........................... .......11 Sign... .................... ..................... ......... ... ..... ... .... ................ ...... ...... ..... ........ ........ ...... ......... ........ ....... .......... ... ..... ..................... .....11 Freestanding sign (with or without Design Review Board Review).................................................................................... 11 Fee per each face copy change not requiring Design Review Board review ......................................................................11 New sign requiring Design Review Board review .................................................................................................................11 Master Sign Program < five tenant spaces ..............................................................................................................................11 Master Sign Program> five tenant spaces ..............................................................................................................................11 Temporary Promotional Sign Permit..... .............. ...... ...................... ... ...... ..... ................... ........................... ......... .... ...............11 General Plan Amendment.. ..................................................................................................................... ............. .....................12 GPAs - Land Use Designation Change Submitted with PUD-Rezoning............................................................................12 GPAs _ Land Use Designation Change Submitted as Stand-alone Application................................................................ 12 Traffic Study Review................ ............. .................. ........................................ ...... .......... ......... .................................................. 12 GP As - Text Amendment .......................................................................................................................................................... 12 Design Review Board ....... ... ................................. ... ..... ................. .............. ............ ............... ...................... ...... ............ ............12 Conceptual or Pre-submittal.......................... .......................... ...... ...................................................................... ..................... 12 Administrative ......... ................................. ...... .... ...... .............. ... ..................... ..... ... ......... ..... ..... ..................... ... ...... ............ .......12 Minor Commercial.. ......... ... .............. ....... ......... ...... ..... ........ ..... ...... ................ ... ........... ........... ............. .... ....... ........ .............. .....12 New SFR Hillside (Scenic Hillside or Major Ridgeline) ........................................................................................................12 New MFR < 5 units.....................................................................................................................................................................12 New MFR > 5 units.....................................................................................................................................................................12 Office, Commercial or Industrial.. ........................ ....................................... ............... ................................. ............................. 12 Tree RemovaL...... ...... ............. ... ...... ............ .... ........... .................. ...... ... ..... .............. .... ... ............... ........................... .......... ........12 Residential .............................................................................................................................. ..................................................... 12 Commercial. ......... ... ............ ............ ..... ... ........... ........... ..... ........ .... ................ ... .... ......... .... ............. ... .................. ......... ........ .......12 Special Planning Studies.... ........... ............................................................... ..... ........... ....... ......................... ............... ...............12 III Table of Contents Parcel Merger ...... ..... .... ..... ........ ...................................... ......... .... .... ...... ... ......................... .... .......... ...................... ............ .........12 Lot Line Adjustment..................................................................................................................... .............................................. 12 Miscellaneous ... ........ ...... ..... ... ... ................... ............ .... ...................... ............ .... ....... .... ................. ...... ........... ............................13 Time Extension - Administrative Action - no site check required.......................................................................................13 Time Extension - Administrative Action - site check &/or COA compliance review required .....................................13 Time Extension - Non-Administrative Action .......................................................................................................................13 Appeals... ... ...... ....... ......... ................ ............ ........ .......... .......................... ........ .... ... ........ ..... .......... ........ ................ ........ ...... ........13 Requests for Reconsideration ........ ...... ........ ........ ........ ........ .... ............ .......... .... ....... ................... ................. ..... ..... ..... ..............13 Archaeological review (Sonoma State Clearinghouse)..........................................................................................................13 Zoning Certificate Letter - Residential... .... ...... .... .... ........ .......................... ............. .......... .................. .... .... ............. ................13 Zoning Certificate Letter - Commercial..... ...... ................ ................. ..... .... ................ ..... .......... .......... .... ....... ................... .......13 Zoning Review of Building Permit.... ...... ........ .... ............. ....... ...... ......... ......... ............. ... .... .......... .... ......... ......... ... ........... ... ... .13 File Research....... .............. ... .......... ....... ........ ............. ...... ......... .... ...................... ..... ...... ......... ...... ................... .......... ... ...............13 $110 per hour........... ....... .......... .............. .... ............ ... ...... ............. ........ .... .......... ..... ...... ........... ................. .... .................. .... ........13 Laser Fiche Electronic Files............................................................................................................................. ............................ 13 No charge..................... .................... .................. ....... ...... ........ ........................... .................... .......... .... ........ ..... .......... ............... ..13 Newspaper Advertising............ ....... .... ............ ..................... ......... .... ..... ................. .................... ........ ........... ....... ... ......... ...... ..13 Public Notice by Staff....... ........... ..... ................ ....... ....................... ...... .............. ........ .............. ...... ...... ........... ..... .............. ........ 13 Documents............. ............ ...... ..... ............. ...... ...... ........ .......... ............ .... ...... .... ...... ... .......... ..... .... ................... ... ..... ..... ...... ........14 Capital Improvement Program Document, Town of Danville Landscape and Irrigation Project Procedures and Standards. ..... ......... ..... ... .... ......... .... ..... .......... .......... ...... .......................... ............ ..................... ..... ............. .......... .... ... ..... ...........14 Town-wide Trails Master Plan. .... ............... .......... ...... ............................ ..................... ........ ...... .... .... ....................... ......... .......14 General Plan............ ... ......... ............. .... ................... ...... ...................... ................... ...... .... .............. .... ....................... ......... .........14 General Plan Map, Beautification Guidelines, Base Map, Specific Plan .............................................................................14 Zoning Map, Downtown Master Plan, Standard Plan ..........................................................................................................14 Aerial Photo... ................... ............. ............... ...... ....... ...... .......... ........... ..... ........... ........... ...... ...... ........ .... .... ............ ..... ...............14 MI S CE L LANE 0 US............................................................................................................................... ....... .14 Photo Copies.............. .................................. ............. ...... ........ .... ........ ........ ......................... .... ...... ........... ...... ..... .............. .......... 14 Records Search ............. ........... ... ........................... ........... ...... .................... ............. .... ......... ..... ........... ...... ......... ..................... ...14 Plan Size Copies ........................ ..... ..... ............ ........ ... ...... ................. ...... ................. .............. .......... ...... .... ..... ....... ..... ................14 Off-Site Document Retrieval Fee... ......................... ........ ......... ..................................... ........................... ...... ..... ........ ...............14 Administrative Citation Late Fee..... ...... .................................................................... ...... .......... ... ................... .......... ...... ......... 14 Hartz Avenue Banner Permit........ ......... .... ................................................... ........ .............. .... .......... ......................... ... ........ .... 14 BUILD IN G S ER VI CES ......... ........... ........ ..... ........ ...... ................... ............................... ................. ........... ...15 Building Permits...... .................... ....... .... ............ ....... ..... ....... ...... ....................................... ...... .... ............. ......... ..... ..... ... ... ........15 Swimming Pool, Spa or Hot Tub Permits................................................................................................................................15 Plan Review... .......... .... ........ ...... ....... ........ ....... ........ ...... ... ........... ...... ...... ..................... ............ ...... ........... ........ ........ ........... .......15 Investigations .............................................................................................................................. ................................................ 15 Building Permit Fee Table.. ......... ......... ............................. ..................................... ............. ...... ............ ...... .......... .......... ..........15 Other Inspections and Fees.............. ................................ .......... ..... ....................................... .................... ..... ..... ..... ................. 16 Inspections outside of normal business hours (minimum charge - four hours) ................................................................16 Re-inspection fees are assessed under provisions of Section 108 of the 2007 CBC............................................................16 Inspections for which no fee is specifically indicated ............................................................................................................16 Additional plan review required by changes, additions or revisions to plans................................................................... 16 For use of outside consultants for plan checking and inspections, or both ........................................................................16 Expired Permit Notification and Extension ............................................................................................................................16 Water Heater, Furnace, AIC Replacement Permits...............................................................................................................16 Furnace and AIC Replacement Permit ...................................................................................................................................16 Permit Reactivation. ............... .......... .... .... .................. ........... ..... ....................... ..... .......... ............... ...... ........ ........ ..... ................16 Photovoltaic Residential.... ...... ..... ........... .... ...... ..... .... ... ......... ............ .... .......... ......... ..... .... ............ .... ...... ......... ..... ....... .... ........16 Photovoltaic Non-Residential... ..... ... ........ ...... .... ............ ....... ...................... .... ... ..... .................. ............ ........... ... ..... ,...............16 Gas Shut-Off Valves.............. ........ ......... ...... ................. ...................... ...... ........... ............. ........ ........ ....... ........ ........ ............... ...16 IV Table of Contents Minimum Permit fee ...................... ..................... ......................... ........ ...... ..................... .................................................... .......16 Documentation fee................. ............. ...................... ............... ....... ...... .................................................................. ....... ...... ... ....16 Temporary Certificate of Occupancy for commercial/industrial uses................................................................................ 16 Penalty fee for work without requisite permit........................................................................................................................16 Residential Report of Building Record ...... .... ..... ............... ..... .............. ...... ................. .................................. ........................ ..16 Building Permit Pass Through Fees .........................................................................................................................................16 Strong Motion Instrumentation Program ........ ........ ......... ..... .................................. .... .................. ....... ......... ................ ..........16 Residential........................................................................................................................ ........................................................... 16 Commercial.............. ........ .... ......................... ......... .................... ..... ............... .......... ........ ................ .............. ........................ ... ...16 California Building Standards Fee .. ........................ ................. .................. .... .... ...... ...... ................ ............ ................ .... ....... ...16 Building Permit Valuation Table ..............................................................................................................................................17 v Town of Danville Master Fee Schedule CITY CLERK Municipal Code V olume I V olume II Full Set Supplements Notary Public City Clerk Certification Certified Copy Records on compact disk FINANCE DEPARTMENT Town Financial PlanI Town Comprehensive Annual Financial ReportI Business License Name Listing Business License Verification Letter Returned Payment Item Returned Payment Item (second time) Other Business License fees per Ordinance 93-3 FEE FOR SERVICE $75 $75 $150 $25/year $10/signature $lO/document $5 first page, $3 each additional page $lIcompact disk FEE FOR SERVICE $25 $25 $25 $25 $25 $35 1 The Town Financial Plan and the Town Comprehensive Annual Financial Report are available on the Town's web site at www.ci.danville.ca.us 1 Town of Danville Master Fee Schedule POLICE SERVICE Accident/ Crime Reports Alarm Response Fee A.B.C. Letter for One Day Sale Permit Booking Fee Reimbursement Disturbance Call-back Failure to Obey Sign/Marking Fingerprinting (Livescan) Fingerprinting (ink and card) Oversized Vehicle Photographs Restricted Parking Towed Vehicle Release Trespass on Public Grounds Verification Letter Non-Resident Child Seat Inspection Parking Permits DUI Emergency Response Reimbursement: Personnel Cost: Officer: $84.79/hr Sergeant: $96.37/hr Lieutenant: $115.53/hr FEE FOR SERVICE $5 each $10 per alarm company, Danville customer $35 County Charge $60 per hour/officer for second or more calls $25 $30 plus agency fee as required $10 per card $50 $5 each $25 $110 $25 $25 $10 $30 Actual costs as follows: Lab Cost: Breath Test: $75.00 Urine Test: $75.00 Blood Test: $75.00 Blood Withdrawal Services: $69.83 Toxicology Analysis: AcidlNeutral Drug Screen: $110.00 Basic Drug Screen: $110.00 Comprehensive Drug Screen: $225.00 Specialty Drug Screens: $110.00 Rush Analysis: $200.00/ea 2 Town of Danville Master Fee Schedule PARKS AND COMMUNITY FACILITIES FEE FOR SERVICE Group III Group IV Group V Group VI Indoor Facilities Nonprofit Private Commercial Government Danville Community Center Valley Oak & Las Trampas $ 125/hour $186/hour $233/hour $63/hour Valley Oak $109/hour $159/hour $207/hour $55/hour Las Trampas Room $38/hour $49/hour $ 62/hour $19/hour Kitchen $63/use $69/use $71/use $32/use Art & Crafts Room $22/hour $33/hour $37/hour $ l1/hour Lounge $22/hour $33/hour $37/hour $11/hour Bandstand $63/hour $69/hour $71/hour $32/hour Town Green Hourly $42/hour $51/hour $62/hour $21/hour Town Green Daily $153/use $197/use $245/use $77 /use Library Mt. Diablo Room $41/hour $57/hour $67/hour $21/hour Town Meeting Hall Auditorium $55/hour $81/hour $112/hour $28/hour Village Theatre Hourly Rate/2 hour min. $63/hour $81/hour $112/hour $63/hour Pre- ProductionlLoad- in Rate $47/hour $62/hour $84/hour $47/hour Ticket Surcharge Actual Actual Actual Actual Veterans Memorial Building Main Hall $68/hour $109/hour $ 149/hour $34/hour Meeting Room (Upstairs) $35/hour $55/hour $71/hour $18/hour Kitchen $63/use $69/use $69/use $32/use Oak Hill Park Community Center Banquet Room $109/hour $159/hour $207/hour $55/hour Room (A, B, or C) $22/hour $33/hour $37/hour $11/hour Rooms (AIB or B/C) $38/hour $49/hour $63/hour $19/hour Rooms (AIB/C) $55/hour $81/hour $112/hour $28/hour Kitchen $63/use $69/use $71/use $32/use Large Grass Area Hourly $42/hour $51/hour $60/hour $21/hour Large Grass Area Daily $153/use $198/use $238/use $77 /use Hap Magee Ranch Park Swain House Full Facility Hourly $66/hour $1 16/hour $147/hour $33/hour Full Facility Daily $580/use $778/use $999/use $290/use Cottage Front Room $31/hour $47/hour $71/hour $16/hour Conference Room $22/hour $33/hour $37/hour $ l1/hour Magee House Full Facility Hourly $112/hour $121 /hour $153/hour $56/hour Full Facility Daily $752/use $967/use $1,186/use $376/use Meadow Meadow Hourly $97/hour $117/hour $130/hour $49/hour Meadow Daily $437/use $481/use $506/use $219/use 3 Town of Danville Master Fee Schedule Group III Group IV Group V Group VI Indoor Facility Rates (con't) Nonprofit Private Commercial Government Baldwin Elementary School Multi-Use Room SRVUSD SRVUSD SRVUSD SRVUSD Diablo Vista Middle School Community Gym SRVUSD SRVUSD SRVUSD SRVUSD Facility Attendant $23/hour $23/hour $23/hour $23/hour Los Cerros Middle School Community Gym SRVUSD SRVUSD SRVUSD SRVUSD Facility Attendant $23/hour $23/hour $23/hour $23/hour Monte Vista High School Community Pool SRVUSD SRVUSD SRVUSD SRVUSD Lifeguard $ 19/hour $19/hour $19/hour $19/hour Outdoor Facility Rates Group Picnics Diablo Vista Park, Hap Magee Ranch Park, Oak Hill Park, Osage Station Park, Sycamore Valley Park Up to 50 $92/area $128/area $190/area $46/area Up to 150 $ 165/area $190/area $253/area $ 83/area Over 150 $291/area $380/area $633/area $ 146/area Family Picnics Up to 20 Sports Fields/Courts Tennis Courts Bocce Ball Courts Baseball/Softball Soccer Other Snack Shack (Sycamore Valley & Diablo Vista) Lighting Litter and Special Maintenance Miscellaneous Fees Security/Cleaning/Damage Deposit (Refundable) Danville Community Center Group Picnics up to 150 Group Picnics over 150 Hap Magee Ranch Park (Full Facility) Large Grass Area Litter Deposit (Hap Magee, Osage Station Park, Oak Hill Park, Town Green) Litter and Special Maintenance Oak Hill Park Community Center Town Meeting Hall Veterans Memorial Building Village Theatre Residents $43/area $6/hour $10/hour $13/hour $24/hour $29/hour $18/hour $42/hour 4 Non-Res. $62/area $8/hour $10/hour $15/hour $22/hour $20/hour $25/hour $31/hour $37/hour $41/hour $56/hour $20/hour $20/hour $45/hour $45/hour All Uses/Groups $500/ea. $80/ea $120/ea $500/ea. $150/ea. as noted above $500/ea. $500/ea $500/ea. $500/ea. $6/hour $10/hour $13/hour $24/hour $29/hour $18/hour $42/hour Miscellaneous Fees (cont.) Facility Attendants Attendant - Minimum 2 hours Attendant Overtime Box Office Attendant Theatre Technician Theatre Technician Overtime Town of Danville Master Fee Schedule All Uses/Groups $23/hour $47/hour $23/hour $23/hour $47/hour Equipment P.A. System Overhead Projector Screen (Portable) Easel Flip Chart Cocktail Tables Wooden Chairs Ceremony Chairs Piano Umbrellas w/stands 1 Portable Stage (4 - 4x8 sections w/steps) Portable Stage Section (1 - 4x8 section w/steps) TVNCR Lectern - Table Top Lectern - Full Length (Community Centers, Library, Town Meeting Hall only) Additional Microphones with/without stands (Community Centers only) Portable Hand-held Microphone Sound Unit Follow Spot (including operator) White Board with Markers (41/2' x 3') Facility Reservations/Permits Change Request Unscheduled rental use Insurance Administration Cancellation Charge Less than 30 days Less than 60 days Non-Resident Surcharge Box Office Surcharge $41/use $12/use $12/use $7/use $15/use $lO/use $3/each $3/each $42/use $12/use $157/use $42/use $26/use $26/use $30/use $26/use $26/use $35/each $12/use $15/each Two times hourly rate $16/booking $75 minimum 100% of rental fee 50% ofrental fee 25% Actual Soccer/Lacrosse fields Base ball / Softball fields Adult Soccer Equipment Removal Sports Alliance $5.45/hour $3.35/hour $25.50/hour $125/hour 5 Town of Danville Master Fee Schedule DEVELOPMENT AND TRANSPORTATION SERVICES FEES ENGINEERING SERVICES Map Check Improvement Plan Check Review of improvement plans street, drainage and landscaping work Engineering Inspection Inspection of installation of street, drainage and landscaping improvements Street Lighting Operation of public street lighting system Encroachment Permit For work within the public right-of-way Oversize/Wide load Permit Drainage Permit For work within any public or private drainage course Grading Plan Check Grading Permit FEE FOR SERVICE 2-10 lots - $1,982 + $188/1ot > 10 lots - $3,894 + $28/1 ot 3.5% of project cost <=$50,000 3.25% ofproject cost >$50,000 & <=$100,000 3.0% ofproject cost >$100,000 5.5% of project cost <=$50,000 5.25% of project cost >$50,000 & <=$100,000 5.0% of project cost >$100,000 One year operational cost + 10% $153 for projects <=$2,000 5.5% of construction cost for projects >$2,000 $20 $153 for projects <=$2,000 5.5% of construction cost for projects >$2,000 Under 50 cy: $167 More than 49 cy: $167 + Percentage of Construction Cost + Volume Fee Percentage of Construction Cost: $0 to $10,000 use 0.5% $10,001 to $100,000 use 1.0% $100,001 and greater use 1.5% Volume Fee: 50 to 1,000 cy: $0.83 per 100 cy 1,001 to 10,000 cy: $0.17 per 100 cy + $167 (for soils report review) 10,001 or greater: $0.56 per 100 cy + $918 (for soils report review) Under 50 cy: $33. 50 to 100 cy: $51 101 to 1,000 cy: $51 for first 100 cy plus $24 for each additional 100 cy 1001 to 10,000 cy: $270 for first 1000 cy plus $20 for each additional 1000 cy 10,001 to 100,000 cy: $452 for first 10,000 cy plus $92 for each additional 10,000 cy 100,001 cy or greater: $1,278 for first 100,000 cy plus $51 for each additional 10,000 cy 6 Town of Danville Master Fee Schedule ENGINEERING SERVICES Grading Inspection Finish Grading Inspection Single family residential lot Commercial Project Debris/Clean-up Deposit A deposit shall be paid at permit issuance to assure the clean-up of the site and/or public right-of-way. This deposit shall be returned to the applicant if it can be determined at certification of occupancy that the site and surrounding areas have been restored to their clean and ultimately improved condition. NPDES (National Pollution Discharge Elimination System) Prevention of Drainage Runoff Pollutant Base Map Revision Revision of Town computerized base map Certificate of Correction or Amended Map Revises a recorded document Vacation of Right-of-Way or Easement Process a request to abandon a public right-of- way or easement FEE FOR SERVICE Under 50 cy: $167 More than 49 cy: $167 + Percentage of Construction Cost + Volume Fee Percentage of Construction Cost: $0 to $10,000 use 2.0% $10,001 to $100,000 use 1.5% $100,001 and greater use 1.0% Volume Fee: 50 to 1,000 cy: $8 per 100 cy 1,001 to 10,000 cy: $83 + $3 per 100 cy 10,001 or greater: $431 + $2 perlOO cy $70 $169 $278 per acre Residential $47 Multi-residential $195 Commercial $396 $83 for each new or revised lot or parcel $167 per document $1,808 7 Town of Danville Master Fee Schedule PLANNING AND TRANSPORTATION SERVICES FEEl ADDITIONAL FEES2 Environmental Assessment Initial Study leading to standard $1,100 Declaration of Environmental Significance (ND) Environmental Impact Report (EIR) Consultantfee to prepare EIR plus 33% Initial Study leading to Mitigated $1,650 Negative Declaration of Environmental Significance (MND) Consultant prepared Mitigated Negative Declaration of Environmental Significance Notice of Exemption Projects $50 Notice of Determination3 Department of Fish & Game Notice $1,850 of Determination Fee for ND or MND Department of Fish & Game Notice $2,250 of Determination Fee for EIR Development Plan Conceptual or Pre-submittal $660 Administrative $440-$880 $3,740 Public Hearing - Residential - Minor Projects $110 hourly after 15 hours of staff work Consultant fee to Prepare MND plus 33% $50 to County Clerk with Notice of Determination $50 to County Clerk with Notice of Determination and remainder to F&G $50 to County Clerk with Notice of Determination and remainder to F&G $110 hourly after 6 hours of staff work $110 hourly after 34 hours of staff work I The fee is for staff time and materials necessary to process the permit. 2 Fee amounts are set at the assumed average cost to provide the service. Ifthe cost to provide the service exceeds the fee, the applicant wilI be bilIed the cost overrun. 3These fees are set by Assembly BilI 3158, authorizing the County Clerk to collect fees for the Department ofFish and Game. The County Clerk retains $25 on each fee colIected to cover processing expenses. 8 Town of Danville Master Fee Schedule PLANNING AND FEEl ADDITIONAL FEES2 TRANSPORTATION SERVICES Development Plan (cont.) Public Hearing - Residential- $5,610 Larger and/ or More Complex Projects Public Hearing - Non-residential $3,740 Minor Projects Public Hearing - Non-residential- $5,610 Larger and/ or More Complex Projects Public Hearing - Scenic Hillside or $3,740 Major Ridgeline - Minor Projects Public Hearing - Scenic Hillside or $5,610 Major Ridgeline - Larger and/ or More Complex Projects Public Hearing - Final $990 Development Plan Processed with PUD Application Public Hearing - Final $3,740 Development Plan Processed with PUD Application or as an Amendment Second Dwelling Unit - $880 Administrative Second Dwelling Unit - Public $2,200 Hearing Traffic Study Review $550 Land Use Permit Temporary/Seasonal Use - Recurring Request/Event Temporary /Seasonal Use - Initial Request/Event Large Family Child Care Facility (8-14 children) $330 $550 $1,320 $110 hourly after 51 hours of staff work $110 hourly after 34 hours of staff work $110 hourly after 51 hours of staff work $110 hourly after 34 hours of staff work $110 hourly after 51 hours of staff work $110 hourly after 34 hours of staff work $110 hourly after 8 hours of staff work $110 hourly after 20 hours of staff work Per Review 9 Town of Danville Master Fee Schedule PLANNING AND FEEl ADDITIONAL FEES2 TRANSPORTATION SERVICES Land Use Permit (cont.) Caretaker mobile home $880 $330-$660 Minor project without Public Hearing Minor Item with Public Hearing Child Care Facility (>14 children) Congregate Care Facility Major Item with Public Hearing $1,650 $3,630 $3,630 $7,260 $2,420 Telecommunication Permit requiring no Public Hearing Telecommunication Permit requiring Public Hearing $3,630 Telecommunication - Permit Extension $660 Traffic Study Review LUP combination with other permit $440 Subdivision Major Subdivision - Smaller and/ or $3,740 Less Complex Projects Major Subdivision - Larger and/ or $5,610 More Complex Projects Traffic Study Review $775 Minor Subdivision - Smaller $3,740 and/ or Less Complex Projects Minor Subdivision - Larger and/ or $5,610 More Complex Projects Time Extension for Major or Minor $550 Subdivision 10 $110 hourly after 15 hours of staff work $110 hourly after 33 hours of staff work $110 hourly after 33 hours of staff work $110 hourly after 66 hours of staff work $110 hourly after 22 hours of staff work $110 hourly after 33 hours of staff work $280 per review after 2nd review $110 hourly after 34 hours of staff work $110 hourly after 51 hours of staff work Per Review $110 hourly after 34 hours of staff work $110 hourly after 51 hours of staff work Town of Danville Master Fee Schedule FEEl ADDITIONAL FEES2 PLANNING AND TRANSPORTATION SERVICES Rezoning PUD - Rezoning - for Smaller and/ or Less Complex Projects $4,840 PUD - Rezoning - for Larger $7,260 and/ or More Complex Projects Traffic Study Review $775 Rezoning - to standard Residential, $3,630 Office, Industrial or Commercial Zoning Designation - Minor Project Rezoning - to standard Residential, $7,260 Office, Industrial or Commercial Zoning Designation - Larger and/ or More Complex Project Variance Administrative or submitted in $330-$660 conjunction with other application Single Family Residence Processed $1,100 as Administrative Permit Public Hearing $1,650 Sign Freestanding sign (with or without $440 Design Review Board Review) Fee per each face copy change not $165 requiring Design Review Board reVIew New sign requiring Design Review $330-$660 Board review Master Sign Program < five tenant $880 spaces M;lster Sign Program> five tenant $1,100 spaces Temporary Promotional Sign No charge Permit 11 $110 hourly after 44 hours of staff work $110 hourly after 66 hours of staff work Per Review $110 hourly after 33 hours of staff work $110 hourly after 66 hours of staff work For projects appealed to/ or referred to Planning Commission for action - $110 hourly after 10 hours of staff work Town of Danville Master Fee Schedule PLANNING AND FEEl ADDITIONAL FEES2 TRANSPORTATION SERVICES General Plan Amendment GPAs - Land Use Designation Change Submitted with PUD- Rezoning GPAs - Land Use Designation Change Submitted as Stand-alone Application Traffic Study Review GP As - Text Amendment Design Review Board Conceptual or Pre-submittal Administrative Minor Commercial New SFR Hillside (Scenic Hillside or Major Ridgeline) New MFR < 5 units New MFR > 5 units Office, Commercial or Industrial Tree Removal Residential Commercial Special Planning Studies Parcel Merger Lot Line Adjustment $5,500 $8,800 $775 $3,630 $550 $440-$880 $440-$880 $2,200 $1,980 $2,640 $2,420 $165 $440 $482/lot $482/lot 12 $110 hourly after 50 hours staff effort $110 hourly after 80 hours staff effort Per Review $110 hourly after 33 hours staff effort $110 hourly after 20 hours of staff work $110 hourly after 18 hours of staff work $110 hourly after 24 hours of staff work $110 hourly after 22 hours of staff work Cost plus 33 % administrative surcharge Town of Danville Master Fee Schedule PLANNING AND FEEl ADDITIONAL FEES2 TRANSPORTATION SERVICES Miscellaneous Time Extension - Administrative $330 Action - no site check required Time Extension - Administrative $660 Action - site check &/ or COA compliance review required Time Extension - Non- $880 Administrative Action Appeals Requests for Reconsideration Archaeological review (Sonoma State Clearinghouse) Zoning Certificate Letter - Residential Zoning Certificate Letter - Commercial $220 $880 $56 $550 $880 Zoning Review of Building Permit File Research LaserFiche Electronic Files Newspaper Advertising Public Notice by Staff Pass through fee sent to Sonoma State $110 hourly after initial 2 hours of reVIew $110 per hour No charge $110 plus newspaper publishing cost $0.83 per-piece plus $110 per mail-out 13 Town of Danville Master Fee Schedule PLANNING AND TRANSPORTATION FEE FOR SERVICE SERVICES Documents Capital Improvement Program Document, $19 Town of Danville Landscape and Irrigation Project Procedures and Standards Town-wide Trails Master Plan $45 General Plan $26 General Plan Map, Beautification $6 Guidelines, Base Map, Specific Plan Zoning Map, Downtown Master Plan, $13 Standard Plan Aerial Photo Hard copy, up to 42-in x 60-in $13 Computer file on CD or E-mail $3 MISCELLANEOUS Photo Copies Records Search Plan Size Copies Off-Site Document Retrieval Fee Administrative Citation Late Fee Hartz Avenue Banner Permit $0.20 per sheet $47 per hour $2 per sheet $50 per document $25 $100 Any fee for billable services not listed in this fee schedule will be billed as the cost of time and materials. 14 Town of Danville Master Fee Schedule FEE FOR SERVICE BUILDING SERVICES Building Permits Building Sub-permit and Inspection as required by California Building Code Electrical Sub-permit as required by California Electrical Code Plumbing Sub-permit as required by California Plumbing Code Mechanical Sub-permit as required by California Mechanical Code Swimming Pool, Spa or Hot Tub Permits as required by Uniform Swimming Pool, Spa and Hot Tub Code Plan Review As required for any permit Master Plan Verification Review Planning Plan Check Investigations As provided for in the California Building Code Building Permit Fee Table Total Valuation $1.00 to $500 $501 to $2,000 $2001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001 to $500,000 $500,001 to $1,000,000 $1,000,001 and up As permitted by the California Building Code 20% of building permit fee 17% of building permit fee 18% of building permit fee Equivalent to building permit plus any required electrical or plumbing permits 65% of building sub-permit fee plus any electrical, plumbing, or mechanical sub-permit fees 75% of the 65% plan review fee $25. Over $15,000 valuation, $25 + $25 per $100,000 of valuation Equivalent of applicable permit Fee $23.50 $23.50 for the first $500 plus $3.05 for each additional $100, or fraction thereof, to and including $2,000 $69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof, to and including $25,000 $391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000 $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof, to and including $1,000,000 $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof. 15 Town of Danville Master Fee Schedule FEE FOR SERVICE BUILDING SERVICES Other Inspections and Fees Inspections outside of normal business hours (minimum charge - four hours) Re-inspection fees are assessed under provisions of Section 108 of the 2007 CBC Inspections for which no fee is specifically indicated Additional plan review required by changes, additions or revisions to plans For use of outside consultants for plan checking and inspections, or both Expired Permit Notification and Extension Water Heater, Furnace, AIC Replacement Permits Furnace and AI C Replacement Permit Permit Reactivation Photovoltaic Residential Photovoltaic N on-Residential Gas Shut-Off Valves Minimum Permit fee Documentation fee Temporary Certificate of Occupancy for commercial! industrial uses Penalty fee for work without requisite permit Residential Report of Building Record Building Permit Pass Through Fees Strong Motion Instrumentation Program Residential Commercial California Building Standards Fee $104 per hourI $83 minimum I $83 minimum I $119 per houri Actual costs2 $53 $83/ea. ($73 plus $10 documentation fee) $140 ($130 plus $10 documentation fee) $67 plus $83 for each additional inspection $290 plus admin fee One-half of 1 % of total valuation ($475 minimum) $83 (effective July 1, 2009) Includes $10 documentation fee $73 plus documentation fee $10 $350 Determined by Chief Building Official not to exceed $1,000 $75 0.01 % of valuation (minimum $0.50) 0.021 % of valuation (minimum $0.50) $1 per $25,000 of total valuation I Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Hot water heater and other minor permits may be charged less. 2 Actual costs include administrative and overhead costs. 16 Town of Danville Master Fee Schedule Building Permit Valuation Table The unit costs are intended to comply with the defmition of "valuation" in Section 223 of the 1997 Uniform Building Codeā„¢ and thus include architectural, structural, electrical, plumbing and mechanical work, except as specifically listed below. The unit costs also include the contractor's profit, which should not be omitted. The determination of building permit fees for projects are based on valuation computed from these figures, which were approved on June 18,2002 and increased by applying the Engineering News Record (ENR) San Francisco Area Building Cost Index History (1915-2008) index from May 2008 to May 2009. Average Cost per Square Foot by Occupancy & Type Occupancy & Type New Remodel Occupancy & Type New Remodel Occupancy & Type New Remodel APARTMENT HOUSES: CONVALESCENT HOTELS AND MOTELS: Type 1 or II F.R.I $160.53 $78.57 Type 1 or II F.R.1 $251.94 $122.60 Type 1 or II F.R.1 $182.80 $86.75 (Good) $197.64 $91.30 Type II: 1-Hour $174.84 $88.26 Type III: 1-Hour $158.37 $80.48 Type V - Masonry Type III: 1-Hour $179.19 $87.76 Type III-N $150.94 $68.71 (or Type III) $131.03 $69.33 Type V: 1-Hour $168.88 $81.39 Type V: 1-Hour $137.91 $77.46 (Good) $160.53 $77.18 DWELLINGS: Type V: N $135.20 $64.38 Type V Type V - Masonry $137.00 $81.86 INDUSTRIAL PLANTS: Wood Frame $115.47 $69.19 (Good) $175.38 $80.82 Type 1 or II F.R. $102.98 $58.99 (Good) $148.41 $74.01 Type V-Wood Frame $121.80 $73.36 Type II: 1-Hour $71.69 $54.40 Type I BasmUGarage $67.69 $35.06 . (Good) $167.23 $78.632 Type II: N $65.87 $52.61 AUDITORIUMS: Kitchen no structure $132.62 Type III: 1-Hour $78.93 $54.49 Type 1 or II F.R. $189.69 $89.66 With structure $136.93 Type III-N $74.39 $52.81 Type II: 1-Hour $137.37 $78.33 Basements: Tilt-up $54.30 $49.19 Type II: N $129.94 $75.04 Semi-Finished $36.39 $34.56 Type V: 1-Hour $74.39 $54.14 Type III: 1-Hour $144.44 $75.51 (Good) $41.99 $36.79 Type V: N $68.07 $49.94 Type III-N $137.00 $73.07 Unfinished $26.42 $21.80 JAILS: Type V: 1-Hour $138.11 $75.27 (Good) $32.03 $26.19 Type 1 or II F.R. $287.96 $143.52 Type V: N $128.87 $72.84 FIRE STATIONS: Type III: 1-Hour $263.35 $136.86 BANKS: Type 1 or II F.R. $207.05 $105.63 Type V: 1-Hour $197.48 $111.86 Type 1 or II FR. $268.05 $121.16 Type II: 1-Hour $136.28 $75.80 LIBRARIES: Type II: 1-Hour $197.48 $112.97 Type II: N $128.50 $73.75 Type 1 or II F.R. $210.68 $106.85 Type II: N $191.13 $109.23 Type III: 1-Hour $149.14 $76.04 Type II: 1-Hour $154.19 $82.08 Type III: 1-Hour $217.91 $112.62 Type III-N $142.79 $72.86 Type II: N $146.60 $77.11 Type III-N $210.15 $110.38 Type V: 1-Hour $139.90 $74.60 Type III: 1-Hour $162.89 $82.40 Type V: 1-Hour $197.48 $112.95 Type V: N $132.66 $72.90 Type III-N $154.75 $75.52 Type V: N $189.13 $103.23 HOMES FOR THE ELDERLY: Type V: 1-Hour $152.93 $81.32 BOWLING ALLEYS: Type 1 or II F.R. $187.68 $96.80 Type V: N $146.60 $70.42 Type II: 1-Hour $92.31 $58.38 Type II: 1-Hour $152.39 $75.57 MEDICAL OFFICES: Type II: N $86.16 $54.26 Type II: N $145.89 $71.73 Type 1 or II F.R.1 $216.27 $117.72 Type III: 1-Hour $100.44 $58.92 Type III: 1-Hour $158.73 $75.82 Type II: 1-Hour $166.87 $87.80 Type III-N $93.93 $55.95 Type III-N $142.79 $67.37 Type II: N $158.57 $84.44 Type V: 1-Hour $67.69 $58.11 Type V: 1-Hour $153.29 $73.52 Type III: 1-Hour $180.99 $91.56 CHURCHES: Type V: N $148.07 $70.73 Type III-N $168.51 $85.38 Type 1 or II F.R. $179.54 $89.82 HOSPITALS: Type V: 1-Hour $163.25 $88.11 Type II: 1-Hour $134.84 $67.37 Type 1 or II F.R.1 $295.37 $142.32 Type V: N $157.46 $83.67 Type II: N $128.14 $62.44 Type III: 1-Hour $244.53 $120.31 OFFICES3: Type III: 1-Hour $146.60 $67.67 Type V: 1-Hour $233.29 $115.81 Type 1 or II F.R. $193.31 $101.55 Type III-N $140.08 $62.58 Type II: 1-Hour $129.41 $86.65 Type V: 1-Hour $137.00 $67.33 Type II: N $123.27 $80.90 Type V: N $128.87 $58.32 Type III: 1-Hour $139.72 $84.99 Type III-N $133.59 $81.03 Type V: 1-Hour $130.87 $83.98 Type V: N $123.27 $70.85 I Add 0.5% to total cost for each story over 2 Remodel valuation as determined by the three. Chief Building Official. 3 Deduct 20% for shell-only buildings. 17 Town of Danville Master Fee Schedule Occupancy & Type New Remodel Occupancy & Type New Remodel Occupancy & Type New Remodel PRIVATE GARAGES: Type 1 or II F.R. $201.26 $120.64 WAREHOUSES2: Wood Frame $43. 99 $30.89 Type II: 1-Hour $137.37 $95.28 Type 1 or II F.R. $89.41 $58.31 Masonry $49.58 $31.18 Type III: 1-Hour $146.96 $95.29 Type II or V: 1-Hr $53.02 $34.95 Open Carports $30.06 $20.46 Type III-N $141.36 $83.44 Type II or V: N $49.77 $34.02 PUBLIC BUILDINGS: Type V: 1-Hour $137.75 $91.81 Type III: 1-Hour $60.08 $34.93 Type 1 or II F.R1 $223.33 $118.69 Type V: N $131.42 $81.42 Type III-N $57.21 $32.57 Type II: 1-Hour $180.99 $90.51 SERVICE STATIONS: AIR CONDITIONING: Type II: N $173.04 $87.16 Type II:N $121.62 $61.10 Commercial $7.60 Type III: 1-Hour $187.87 $92.98 Type 1I1:1-Hour $126.89 $63.99 Residential $6.33 Type III-N $181.34 $86.86 Type V: 1-Hour $108.05 $61.01 SPRINKLER SYSTM: $4.70 Type V: 1-Hour $171.94 $90.17 Canopies $50.68 $33.71 MISCELLANy3 Type V: N $165.80 $83.83 STORES: Deck $39.01 PUBLIC GARAGES: Type 1 or II F.R1 $149.14 $81.03 Retaining Wall Type I or II F.RI $88.49 $50.53 Type II: 1-Hour $91.21 $70.24 (less than 4') $67.17 Type I or II open p $66.42 $47.10 Type II: N $89.23 $68.50 Retaining Wall Type II: N $50.68 $44.85 Type III: 1-Hour $110.95 $69.88 (4' and more)) $125.93 Type III: 1-Hour $66.96 $48.30 Type III-N $104.07 $81.16 Balcony $46.81 Type III-N $59.54 $45.10 Type V: 1-Hour $93.41 $69.39 Trellis/Arbor/ Type V: 1-Hour $60.99 $47.71 Type V: N $86.33 $66.86 covered porches $23.40 RESTAURANTS: THEATERS: Type III: 1-Hour $176.29 $122.41 Type 1 or II F.R. $198.73 $107.70 Type III-N $161.45 $118.46 Type III: 1-Hour $144.79 $84.95 Type V: 1-Hour $161.45 $120.62 Type III-N $137.91 $78.67 Type V: N $155.10 $116.38 Type V: 1-Hour $136.28 $83.29 SCHOOLS: Type V:N $128.87 $70.57 2 Deduct 11 % for mini-warehouses. ] Add 0.5% to total cost for each story over 3 Cost determined by independent cost three. study. 18 INDEX A.B.C. Letter for One Day Sale Permit 2 DEVELOPMENT AND AlC Replacement Permit 16 TRANSPORTATION SERVICES 6 Abandon a public right-of-way or easement 7 Development Plan 8 Accident/Crime Reports 2 Conceptual 8 Administrative Citation Late Fee 14 Pre-submittal 8 Adult Soccer 5 Public Hearing - Final Development Plan Aerial Photo 14 Processed with PUD Application 9 Alarm Response Fee 2 Public Hearing - Final Development Plan Amended Map 7 Processed with PUD Application or as an Appeals 13 Amendment 9 Archaeological review 13 Public Hearing - Residential - Larger Art & Crafts Room 3 and/or More Complex Projects 9 Attendant 5 Public Hearing - Residential - Minor 8 Auditorium 3 Public Hearing - Scenic Hillside or Major Baldwin Elementary School 4 Ridgeline - Larger and/or More Complex Bandstand 3 Projects 9 Banner Permit 14 Public Hearing - Scenic Hillside or Major Base Map Revision 7 Ridgeline - Minor Projects 9 Baseball 5 Public Hearing-Non-residentallminor 9 Beautification Guidelines 14 Public Hearing-Non-residential Complex 9 Booking Fee Reimbursement 2 Second Dwelling Unit - Administrative 9 Box Office 5 Second Dwelling Unit - Public Hearing 9 Box Office Attendant 5 Traffic Study Review 9 Building Permit Fee Table 15 Diablo Vista Middle School 4 Building Permit Investigations 15 Diablo Vista Park 4 Building Permit Valuation Table 17 Disturbance Call-back 2 Building Permits 15 Downtown Master Plan 14 Building Plan Review 15 Drainage Permit 6 BUILDING SERVICES 15 Drainage Runoff 7 Business License Name Listing 1 DUI Emergency Response Reimbursement 2 Business License Verification Letter 1 Easel 5 California Building Standards Fee 16 Easement 7 Capital Improvement Program Document 14 Electrical Permit 15 Ceremony Chairs 5 Encroachment Permit 6 Certificate of Correction 7 Engineering Inspection 6 Certificate of Occupancy 16 ENGINEERING SERVICES 6 Certified Copy 1 Environmental Assessment 8 CITY CLERK 1 Environmental Impact Report (EIR) 8 City Clerk Certification 1 Equipment 5 Cocktail Tables 5 Equipment Removal 5 Computerized base map 7 Expired Permit Notification and Extension 16 Cottage 3 Facility Attendants 5 Danville Community Center 3 Facility Reservations/Permits 5 Debris/Clean-up Deposit 7 Failure to Obey Sign/Marking 2 Department ofFish & Game Notice of Family Picnics 4 Determination Fee 8 File Research 13 Design Review Board 12 FINANCE DEPARTMENT 1 19 Fingerprinting (ink and card) Fingerprinting (Livescan) Finish Grading Inspection Flip Chart Furnace Permit Gas Shut-Off Valve Permit General Plan General Plan Amendment Grading Inspection Grading Permit Grading Plan Check Hap Magee Ranch Park Hot Tub Permit Improvement Plan Check Initial Study Inspections and Fees Insurance Kitchen Lacrosse Land Use Permit Caretaker mobile home Child Care Facility (> 14 children) Congregate Care Facility Large Family Child Care Facility (8-14 children) Major Item with Public Hearing Minor Item with Public Hearing Minor project without Public Hearing Telecommunication - Permit Extension Telecommunication Permit requiring No Public Hearing Telecommunication Permit requiring Public Hearing Temporary/Seasonal Use - Initial Request/Event Temporary/Seasonal Use - Recurring Request/Event Traffic Study Review with other permit Landscape and Irrigation Project Procedures Las Trampas Room Lectern Library Los Cerros Middle School Lot Line Adjustment Lounge Magee House Map Check Meadow 2 2 7 5 16 16 14 12 7 6 6 3,4 15 6 8 16 5 3 5 9 10 10 10 Mechanical Permit 15 Microphones 5 Mitigated Negative Declaration 8 Monte Vista High School 4 Mt. Diablo Room 3 Municipal Code 1 Newspaper Advertising 13 Non-Resident Child Seat Inspection 2 Notary Public 1 Notice of Determination 8 Notice of Exemption 8 NPDES 7 Oak Hill Park 3,4 Oak Hill Park Community Center 3 Off-Site Document Retrieval Fee 14 Osage Station Park 4 Outdoor Facility Rates 4 Overhead Projector 5 Oversize/Wide load Permit 6 Oversized Vehicle 2 P.A. System 5 Parcel Merger 12 Parking Permits 2 PARKS AND COMMUNITY FACILITIES 3 9 Permit Reactivation 16 10 Photo Copies 14 10 Photographs 2 10 Photovoltaic Permit 16 10 Piano 5 Plan Size Copies 14 10 PLANNING SERVICES 8 Plumbing Permit 15 10 POLICE SERVICE 2 Portable Stage 5 9 Public Notice by Staff 13 Reconsideration 13 9 recorded document 7 10 Records on compact disk 1 10 Records Search 14 14 Reinspection fees 16 3 Report of Building Record 16 5 Restricted Parking 2 3 Returned Payment Item 1 4 Returned Payment Item (second time) 1 12 Rezoning 11 3 PUD - Rezoning - for Larger and/or More 3 Complex Projects 11 6 PUD - Rezoning - for Smaller and/or Less 3 Complex Projects 11 70 Standard Residential, Office, Industrial or Sycamore Valley Park 4 Commercial Zoning Designation - Larger Theatre Technician 5 and/or More Complex Project 11 Time Extension 13 Standard Residential, Office, Industrial or Towed Vehicle Release 2 Commercial Zoning Designation - Minor Town Comprehensive Annual Financial Project 11 Report 1 Traffic Study Review 11 Town Financial Plan 1 Screen (Portable) 5 Town Green 3 Security/CleaninglDamage Deposit 4 Town Meeting Hall 3,4 Sign 11 Town-wide Trails Master Plan 14 Snack Shack 4 Tree Removal 12 Soccer 5 Trespass on Public Grounds 2 Softball 5 TVNCR 5 Spa Permit 15 Umbrellas w/stands 5 Special Planning Studies. 12 Vacation of Right-of-Way 7 Specific Plan 14 Valley Oak 3 Sports Fields/Courts 4 Valley Oak & Las Trampas 3 Street Lighting 6 Variance 11 Strong Motion Instrumentation Fee 16 Administrative 11 Subdivision 10 Public Hearing 11 Major Subdivision - Larger and/or More Single Family Residence Processed as Complex Projects 10 Administrative Permit 11 Major Subdivision - Smaller and/or Less Verification Letter 2 Complex Projects 10 Veterans Memorial Building 3,4 Minor Subdivision - Larger and/or More Village Theater 3,4 Complex Projects 10 Water Heater Permit 16 Minor Subdivision - Smaller and/or Less White Board 5 Complex Projects 10 Wooden Chairs 5 Time Extension for Major or Minor Work without requisite permit 16 Subdivision 10 Zoning Certificate Letter - Commercial 13 Traffic Study Review 10 Zoning Certificate Letter - Residential 13 Swain House 3 Zoning Map 14 Swimming Pool Permit 15 Zoning Review of Building Permit 13 71