HomeMy WebLinkAbout061-09
RESOLUTION NO. 61-2009
ADOPTING THE 2009-2010 MASTER FEE SCHEDULE
FOR USER AND COST RECOVERY FEES
WHEREAS, the Town of Danville charges facility use fees for the rental and use of Town-
owned and/ or maintained facilities; and
WHEREAS, the Town charges Planning, Engineering and Building processing and permit
fees for the purpose of recovering the reasonable costs of providing these services; and
WHEREAS, the Town charges City Clerk, Finance and Police processing fees for the
purpose of recovering the reasonable costs of providing these services; and
WHEREAS, the Town Council has previously established such fees as part of the Danville
Municipal Code and the annual Master Fee Schedule through resolution; and
WHEREAS, the Town Council conducted a public hearing to receive testimony regarding
the proposed increase in user and cost recovery fees, notice of which hearing was provided
as required by law; now, therefore, be it
RESOLVED, by the Danville Town Council thatthe Master Fee Schedule for User and Cost
Recovery Fees, as set forth in Exhibit 1 attached hereto, is hereby adopted. Any increased
Planning, Engineering and Building fees shall not go into effect for 60 days from adoption
of this resolution. Until then, the existing fees shall remain in effect.
APPROVED by the Danville Town Council at a regular meeting on June 2, 2009, by the
following vote:
AYES:
NOES:
ABSTAINED:
ABSENT:
Arnerich, Doyle, Andersen, Shimansky, Stepper
None
None
None
1l::?ir:;J~:
CITY ATTORNEY
,.
T own of Danville
Master Fee Schedule
For User and Cost Recovery Fees
Fiscal Year 2009-2010
Adopted by the Danville Town Council June 2, 2009
Effective July 1, 2009
Development Services Fees Effective August 3, 2009
Table of Contents
CITY CLERK.................................................................. ..................................................................................1
Municipal Code........ ................... .... .................... ............. ..... ..... ...... ..... ......... ... ............ .......... .......... ..... ....... ................. ...............1
Notary Public ........... ................. ................. ......... .... ............ ....... ..... ........ .... ........ ...... ............ ...... .......... ........... ...... .... ...................1
City Clerk Certification..................................................................................................................... ........................................... 1
Certified Copy..... ............ ...... ........... ......... .... ..... ..... ........ ..... ............. .......... .... ............... ...... ...... ...... ..... .......... .................. ........ ....1
Records on compact disk ............ ............... ......... ....................... ...... ............ ..................................... ..... .......... .... ........ ................1
FINAN CE DEPARTMENT ....................... ................. ........................... ........................................................1
Town Financial Plan.. .... ............. .... ........... ........... .... ..... ....... ....... .................. ........... ........................ ............ ..... ...... .....................1
Town Comprehensive Annual Financial Report ......................................................................................................................1
Business License Name Listing ............. ........ ... ..... ...... .... ........... ......... ...... .................. .......... .... ........ ..... ............ ............. ............1
Business License Verification Letter.. ......... .................... ..... ................... .................... ..... ........ .............. ....... .............................. 1
Returned Payment Item .............. .... ......... ......... ........ ....... ..... ....... .... .................. ..... .......... .......... ....... .... ..... ..... ............ ....... .........1
Returned Payment Item (second time) ......................................................................................................................................1
POLl CE S ER VI CE............................................................................................................................ ............... 2
Accident/ Crime Reports.................. ............. ...... ....................................... .... .......... ............................... ............. ............... ........ 2
Alarm Response Fee ................. ...................... ........ ........................... .......... ........... ............................ .......... ....... ..... .................... 2
A.B.C. Letter for One Day Sale Permit.......................................................................................................................................2
Booking Fee Reimbursement.. ........ .............. ......... .......... ........... ... ...... ......... ... .................. .... ...... .......... ..... ..... ............ ... .............2
Disturbance Call-back .. ........... ........... ........ ......... ............. ..... .... ............... ........ ............ ..... .............. ... .... ... ............. .... ....... ...........2
Failure to Obey Sign/Marking.. ........................................................................ .................................... ............................... .......2
Fingerprinting (Livescan) ....................................... ............ .......................................................................... ..... ........... ..... .......... 2
Fingerprinting (ink and card).......... ......... ......... ... .......... ........... ...... .................. ........... ................. ....... ....... ..... ...... .....................2
Oversized Vehicle........ .......................... .... .................................... ................................ ............. ......................... ......................... 2
Photographs. ... ........................... ... .......... .... ..... ...... .... .............. .... ........... ........ ...... .... ............. ................ ............... ..... ....................2
Restricted Parking............. .... ........... .... ..... .... ............ .... ...... ......... ...... ............ ..................................... .............. ........ .... .... ....... .....2
Towed Vehicle Release...... ........ .................... ...... ... ..................... ...... ............ ......... ........ .................... ......... ............. ....................2
Trespass on Public Grounds. ....... ................... ........ ............................................... ............. ................... ....................... ...............2
V erifica tion Letter......................................................................................................................... ................................................ 2
Non-Resident Child Seat Inspection......................................................................... .............................................. ................... 2
Parking Permits...... ...... ................ .......... ... .............. ...... ... ................... ............ .... ........... ........ .......................... .... ... .............. ........2
DUl Emergency Response Reimbursement: .............................................................................................................................2
PARKS AND COMMUNITY FACILITIES ............................................................................................... 3
Indoor Facilities..................................................................................................................... ........................................................ 3
Danville Community Center. ....... ...... ................... ................................................. ................................ ............ ............. ............ 3
Library... ............ ..... ... ..... ....... ........ ................... ........... ... ....................... ........... ... ...... ...... ...... ................. ............ .......... ....... .... .......3
Town Meeting Hall..... ........... ..................... ......... ......... ...... ......................... ...... ................. .................. ......... ............. ..... .............3
Village Theatre ................... .............................................................................. ....... ....................................................... ...............3
Veterans Memorial Building...................... .................................................. ........................................... .................................... 3
Oak Hill Park Community Center .............................................................................................................................................. 3
Hap Magee Ranch Park ............................................................................................................................................................... 3
Baldwin Elementary School....... ....................................................................... .......................... ................................................4
Diablo Vista Middle School..... ......................................................... ............................ ..... ......................................... .................4
Los Cerros Middle School. ................. ....................................... .............................. .................................... ......... ......... ...............4
Monte Vista High School. ................... .................................. .............................. ................... ................ .............................. ........ 4
Outdoor Facility Rates. ................................................ ........ ................................................. .............................................. .......... 4
Group Picnics ................................................................................................................................................................................ 4
Family Picnics.. ... ... ....................... ...... ........... ............ ............ ...................... ...... ........ ..... .......... ... .... .... .............. ............ ............. ... 4
Sports Fields/Courts ............. ........................................................ ............. ........ ....... ............ ..... ...... .................... ........................4
Other ............ ................. ..... ...... ............... .......................... ...... ..... ............. ... ..... ......... ........ ... ........ ................................... ... ........ .... 4
Table of Contents
Miscellaneous Fees ....... .......................................... ...... .............. ............. ..... ................... .... ............... .............. ... ........ .... .............4
Facility Attendants........ ........................ ...................... ........ .............. ....... ....... ................... ......... .... ......... ...... ........ ........ ......... ......5
Equipment..... ... ......... ............................ .......... ...... ...... ............ ................. .... ...... ....................... .... ........... ...... .... ................. ..........5
Facility Reservations/Permits........................................................................... .......................................................................... 5
Soccer/Lacrosse fields........................ ..... ..... ..... ...... ........ ................ ........... ..... ........... ........ .... ..... ................. ..... ... .............. .......... 5
Baseball/ Softball fields.......................................................................................................................... ...................................... 5
Adult Soccer .... .................. .... ...................... .................. ..... ................ ............. ...... ........ ........... ......... ........ .... ...... ...... .................... 5
Equipment Removal....... ........... ................. ... ... ... ..... .... ................ ....... ............. ..................... ............. .............. ...... ........... ...........5
DEVELOPMENT AND TRANSPORTATION SERVICES FEES .........................................................6
EN G INEERIN G S ER VI CES .................... .......... .................................................................................... .......6
Map Check .....................................................................................................................................................................................6
Improvement Plan Check ............................... ...... ...... .... ........ .......... .... ....... ...... ........ ..... ........... ...... ........ ...... ...... ........... ...... ... ....6
Engineering Inspection ............. ................. ......... ......... ....... ....... ............... ....... ....... .... .... ...... ............... ........ .... ........ .... ......... ... ....6
Street Lighting........................................................................................................................ ....................................................... 6
Encroachment Permit..... ..... .... ........ ......... ... ....... .... ...... ........................... ....... ....... ...... ................... ............. .... ...... .......... ..... ........6
Oversize/Wide load Permit ................ .............................. .................. .................................. ...... ................................. ............... 6
Drainage Permit ........ ........................ .... ................ ...... .............. ................. .... .... ..................... ............. .............. ...... ...... ...............6
Grading Plan Check.. ....... ... .......... ........ ..... ..... ...... ...... .............. ................ ..... ........ ................. ..... ................. ..... ...... ..... ...... .... ... ...6
Grading Permit........ ....... ......... ............ ..... ........ ..... .... ..... ..... ... ................... .... .... .... ...... ...... ........... ..... ............ .... .... ... ........... ..........6
Grading Inspection .. .... ............. ........ ..... ....... ..... ...... .... .......... .... ............................... .... .... ....... ......... .... .......... ........ ............ ..........7
Finish Grading Inspection ... ................... .......... ............................................... ..................... ........................................... ............7
Debris / Clean-up Deposit.... ....... ................................................................... ...................................... ................................... .....7
NPDES............................................................................................................................................................................................7
Base Map Revision.......... ................... ......... ...... ... ......... .... .... ........ .... ....... .............. ... ... ...... ....... .... ................... ............ ...... ...........7
Certificate of Correction or Amended Map ........................................................................................................................,..... 7
Vacation of Right-of~ W ay or Easement..... ........................................... .... ..... ..................... ............... ..... ......... ... ......... ...............7
PLANNING AND TRANSPORTATION SERVICES ............................................................................. 8
Environmental Assessment..... ... ..... ....... ..... ..... ...... ............................ ........ ................ ...... ............. ............. ....... .......... .... ..... ....... 8
Initial Study leading to standard Declaration of Environmental Significance (ND) ...........................................................8
Environmental Impact Report (EIR).............................................................. .................................................................... ......... 8
Initial Study leading to Mitigated Negative Declaration of Environmental Significance (MND).....................................8
Consultant prepared Mitigated Negative Declaration of Environmental Significance ......................................................8
Notice of Exemption Projects ...... ........ ................ .... ........ ..................... .................. ............ ..... .... ..................... ...... ............... ......8
Notice of Determination...... ................... ...................................... ......................................................... ......................................8
Department of Fish & Game Notice of Determination Fee for ND or MND ........................................................................ 8
Department of Fish & Game Notice of Determination Fee for EIR........................................................................................ 8
Development Plan .... ....... ...... ........ ........... ..... ..... ...................... .... ................ .......... ...... ... ............ ...................... ............ ...... .........8
Conceptual or Pre-submittal..... ............................................ .............................. ................... .......................................... ........... 8
Administrative.. .......... ... ....................... ... .... ....................... .............................. ..... .............. ....... ...................... .... ... .....................8
Public Hearing - Residential- Minor Projects..........................................................................................................................8
Public Hearing - Residential- Larger and/ or More Complex Projects................................................................................ 9
Public Hearing - Non-residential Minor Projects.....................................................................................................................9
Public Hearing - Non-residential-Larger and/ or More Complex Projects.........................................................................9
Public Hearing - Scenic Hillside or Major Ridgeline - Minor Projects ................................................................................. 9
Public Hearing - Scenic Hillside or Major Ridgeline - Larger and/ or More Complex Projects........................................ 9
Public Hearing - Final Development Plan Processed with PUD Application...................................................................... 9
Public Hearing - Final Development Plan Processed with PUD Application or as an Amendment................................ 9
Second Dwelling Unit - Administrative ....................................................................................................................................9
Second Dwelling Unit - Public Hearing ....................................................................:...............................................................9
Traffic Study Review. .................................... .............................. ........................ ........................... .............. ................... ........ ..... 9
Land Use Permit ................................ ................................................................................... ................................. .......................9
11
Table of Contents
Temporary jSeasonal Use - Recurring Request/Event ........................................................................................................... 9
Temporary jSeasonal Use - Initial RequestjEvent ..................................................................................................................9
Large Family Child Care Facility (8-14 children) .................................................................................................................... 9
Caretaker mobile home ........... ....... ..... ..... ... ......... ...... ........ ... ......... ...... ........... ... ............ ..... .... ........... ...... .... .... ... ...... ....... ..........10
Minor project without Public Hearing .....................................................................................................................................10
Minor Item with Public Hearing..... ........ .......... .... ............. ..... ........ ... .... ........... ...... ............. ..... ................. ........ .... ............... ....10
Child Care Facility (>14 children) ............................................................................................................................................10
Congregate Care Facility.. ........ ..... ............... .......... ..... ... ........ ...... ......... .... ..... ..... ... ....... ........... ......................... ............ .............10
Major Item with Public Hearing ...............................................................................................................................................10
Telecommunication Permit requiring no Public Hearing .....................................................................................................10
Telecommunication Permit requiring Public Hearing........ ........ .................. ... ....... ...................... ......... .............. ..................10
Telecommunication - Permit Extension. .... ....... .............. ..... .... ......... .... .... ........ ....... ......... ....... ...... ................... ...... ...... ....... ...10
Traffic Study Review....... ............. ....... ... ....... ....... ........ ...... ... ............... ........ ..... ... ...... ............... ......................................... ..... ...10
LUP combination with other permit ........................................................................................................................................10
Subdivision... ............. ...... ............. ..... ........ ....... ......... ......... ........... ........... ... .......... ............ .... ..... ....... ...... .............. ................ ... ...10
Major Subdivision - Smaller andj or Less Complex Projects ...............................................................................................10
Major Subdivision - Larger andj or More Complex Projects ...............................................................................................10
Traffic Study Review.............. ....... ................. ............. .............................. .......... ........... .................... .......... ......... ...... ............... 10
Minor Subdivision - Smaller andj or Less Complex Projects ...............................................................................................10
Minor Subdivision - Larger andj or More Complex Projects...............................................................................................10
Time Extension for Major or Minor Subdivision....................................................................................................................10
Rezoning...... ..... ................ .... ................... ... ........ ...... ..... ...... ............. .... ...... ..... ..... ...... ...... ........... ....... ............ ....... .... ... ........ .......11
PUD - Rezoning - for Smaller andj or Less Complex Projects.............................................................................................11
PUD - Rezoning - for Larger andj or More Complex Projects.............................................................................................11
Traffic Study Review.......... .............. ........ ............................. ......................................... .... ......... ...... .........................................11
Rezoning - to standard Residential, Office, Industrial or Commercial Zoning Designation - Minor Project................ 11
Rezoning - to standard Residential, Office, Industrial or Commercial Zoning Designation - Larger andj or More
Complex Project................................................ ...... ............................. .................. ........................................... .......................... 11
Variance............................. .... ...... ..... ..... ... ......... ..... ...... ..................... ....... ........... ........ ........ ..... .... ................... ..... .......................11
Administrative or submitted in conjunction with other application ...................................................................................11
Single Family Residence Processed as Administrative Permit.............................................................................................11
Public Hearing........................................... ....... ............................................................. ....... ............. ........ ........................... .......11
Sign... .................... ..................... ......... ... ..... ... .... ................ ...... ...... ..... ........ ........ ...... ......... ........ ....... .......... ... ..... ..................... .....11
Freestanding sign (with or without Design Review Board Review).................................................................................... 11
Fee per each face copy change not requiring Design Review Board review ......................................................................11
New sign requiring Design Review Board review .................................................................................................................11
Master Sign Program < five tenant spaces ..............................................................................................................................11
Master Sign Program> five tenant spaces ..............................................................................................................................11
Temporary Promotional Sign Permit..... .............. ...... ...................... ... ...... ..... ................... ........................... ......... .... ...............11
General Plan Amendment.. ..................................................................................................................... ............. .....................12
GPAs - Land Use Designation Change Submitted with PUD-Rezoning............................................................................12
GPAs _ Land Use Designation Change Submitted as Stand-alone Application................................................................ 12
Traffic Study Review................ ............. .................. ........................................ ...... .......... ......... .................................................. 12
GP As - Text Amendment .......................................................................................................................................................... 12
Design Review Board ....... ... ................................. ... ..... ................. .............. ............ ............... ...................... ...... ............ ............12
Conceptual or Pre-submittal.......................... .......................... ...... ...................................................................... ..................... 12
Administrative ......... ................................. ...... .... ...... .............. ... ..................... ..... ... ......... ..... ..... ..................... ... ...... ............ .......12
Minor Commercial.. ......... ... .............. ....... ......... ...... ..... ........ ..... ...... ................ ... ........... ........... ............. .... ....... ........ .............. .....12
New SFR Hillside (Scenic Hillside or Major Ridgeline) ........................................................................................................12
New MFR < 5 units.....................................................................................................................................................................12
New MFR > 5 units.....................................................................................................................................................................12
Office, Commercial or Industrial.. ........................ ....................................... ............... ................................. ............................. 12
Tree RemovaL...... ...... ............. ... ...... ............ .... ........... .................. ...... ... ..... .............. .... ... ............... ........................... .......... ........12
Residential .............................................................................................................................. ..................................................... 12
Commercial. ......... ... ............ ............ ..... ... ........... ........... ..... ........ .... ................ ... .... ......... .... ............. ... .................. ......... ........ .......12
Special Planning Studies.... ........... ............................................................... ..... ........... ....... ......................... ............... ...............12
III
Table of Contents
Parcel Merger ...... ..... .... ..... ........ ...................................... ......... .... .... ...... ... ......................... .... .......... ...................... ............ .........12
Lot Line Adjustment..................................................................................................................... .............................................. 12
Miscellaneous ... ........ ...... ..... ... ... ................... ............ .... ...................... ............ .... ....... .... ................. ...... ........... ............................13
Time Extension - Administrative Action - no site check required.......................................................................................13
Time Extension - Administrative Action - site check &/or COA compliance review required .....................................13
Time Extension - Non-Administrative Action .......................................................................................................................13
Appeals... ... ...... ....... ......... ................ ............ ........ .......... .......................... ........ .... ... ........ ..... .......... ........ ................ ........ ...... ........13
Requests for Reconsideration ........ ...... ........ ........ ........ ........ .... ............ .......... .... ....... ................... ................. ..... ..... ..... ..............13
Archaeological review (Sonoma State Clearinghouse)..........................................................................................................13
Zoning Certificate Letter - Residential... .... ...... .... .... ........ .......................... ............. .......... .................. .... .... ............. ................13
Zoning Certificate Letter - Commercial..... ...... ................ ................. ..... .... ................ ..... .......... .......... .... ....... ................... .......13
Zoning Review of Building Permit.... ...... ........ .... ............. ....... ...... ......... ......... ............. ... .... .......... .... ......... ......... ... ........... ... ... .13
File Research....... .............. ... .......... ....... ........ ............. ...... ......... .... ...................... ..... ...... ......... ...... ................... .......... ... ...............13
$110 per hour........... ....... .......... .............. .... ............ ... ...... ............. ........ .... .......... ..... ...... ........... ................. .... .................. .... ........13
Laser Fiche Electronic Files............................................................................................................................. ............................ 13
No charge..................... .................... .................. ....... ...... ........ ........................... .................... .......... .... ........ ..... .......... ............... ..13
Newspaper Advertising............ ....... .... ............ ..................... ......... .... ..... ................. .................... ........ ........... ....... ... ......... ...... ..13
Public Notice by Staff....... ........... ..... ................ ....... ....................... ...... .............. ........ .............. ...... ...... ........... ..... .............. ........ 13
Documents............. ............ ...... ..... ............. ...... ...... ........ .......... ............ .... ...... .... ...... ... .......... ..... .... ................... ... ..... ..... ...... ........14
Capital Improvement Program Document, Town of Danville Landscape and Irrigation Project Procedures and
Standards. ..... ......... ..... ... .... ......... .... ..... .......... .......... ...... .......................... ............ ..................... ..... ............. .......... .... ... ..... ...........14
Town-wide Trails Master Plan. .... ............... .......... ...... ............................ ..................... ........ ...... .... .... ....................... ......... .......14
General Plan............ ... ......... ............. .... ................... ...... ...................... ................... ...... .... .............. .... ....................... ......... .........14
General Plan Map, Beautification Guidelines, Base Map, Specific Plan .............................................................................14
Zoning Map, Downtown Master Plan, Standard Plan ..........................................................................................................14
Aerial Photo... ................... ............. ............... ...... ....... ...... .......... ........... ..... ........... ........... ...... ...... ........ .... .... ............ ..... ...............14
MI S CE L LANE 0 US............................................................................................................................... ....... .14
Photo Copies.............. .................................. ............. ...... ........ .... ........ ........ ......................... .... ...... ........... ...... ..... .............. .......... 14
Records Search ............. ........... ... ........................... ........... ...... .................... ............. .... ......... ..... ........... ...... ......... ..................... ...14
Plan Size Copies ........................ ..... ..... ............ ........ ... ...... ................. ...... ................. .............. .......... ...... .... ..... ....... ..... ................14
Off-Site Document Retrieval Fee... ......................... ........ ......... ..................................... ........................... ...... ..... ........ ...............14
Administrative Citation Late Fee..... ...... .................................................................... ...... .......... ... ................... .......... ...... ......... 14
Hartz Avenue Banner Permit........ ......... .... ................................................... ........ .............. .... .......... ......................... ... ........ .... 14
BUILD IN G S ER VI CES ......... ........... ........ ..... ........ ...... ................... ............................... ................. ........... ...15
Building Permits...... .................... ....... .... ............ ....... ..... ....... ...... ....................................... ...... .... ............. ......... ..... ..... ... ... ........15
Swimming Pool, Spa or Hot Tub Permits................................................................................................................................15
Plan Review... .......... .... ........ ...... ....... ........ ....... ........ ...... ... ........... ...... ...... ..................... ............ ...... ........... ........ ........ ........... .......15
Investigations .............................................................................................................................. ................................................ 15
Building Permit Fee Table.. ......... ......... ............................. ..................................... ............. ...... ............ ...... .......... .......... ..........15
Other Inspections and Fees.............. ................................ .......... ..... ....................................... .................... ..... ..... ..... ................. 16
Inspections outside of normal business hours (minimum charge - four hours) ................................................................16
Re-inspection fees are assessed under provisions of Section 108 of the 2007 CBC............................................................16
Inspections for which no fee is specifically indicated ............................................................................................................16
Additional plan review required by changes, additions or revisions to plans................................................................... 16
For use of outside consultants for plan checking and inspections, or both ........................................................................16
Expired Permit Notification and Extension ............................................................................................................................16
Water Heater, Furnace, AIC Replacement Permits...............................................................................................................16
Furnace and AIC Replacement Permit ...................................................................................................................................16
Permit Reactivation. ............... .......... .... .... .................. ........... ..... ....................... ..... .......... ............... ...... ........ ........ ..... ................16
Photovoltaic Residential.... ...... ..... ........... .... ...... ..... .... ... ......... ............ .... .......... ......... ..... .... ............ .... ...... ......... ..... ....... .... ........16
Photovoltaic Non-Residential... ..... ... ........ ...... .... ............ ....... ...................... .... ... ..... .................. ............ ........... ... ..... ,...............16
Gas Shut-Off Valves.............. ........ ......... ...... ................. ...................... ...... ........... ............. ........ ........ ....... ........ ........ ............... ...16
IV
Table of Contents
Minimum Permit fee ...................... ..................... ......................... ........ ...... ..................... .................................................... .......16
Documentation fee................. ............. ...................... ............... ....... ...... .................................................................. ....... ...... ... ....16
Temporary Certificate of Occupancy for commercial/industrial uses................................................................................ 16
Penalty fee for work without requisite permit........................................................................................................................16
Residential Report of Building Record ...... .... ..... ............... ..... .............. ...... ................. .................................. ........................ ..16
Building Permit Pass Through Fees .........................................................................................................................................16
Strong Motion Instrumentation Program ........ ........ ......... ..... .................................. .... .................. ....... ......... ................ ..........16
Residential........................................................................................................................ ........................................................... 16
Commercial.............. ........ .... ......................... ......... .................... ..... ............... .......... ........ ................ .............. ........................ ... ...16
California Building Standards Fee .. ........................ ................. .................. .... .... ...... ...... ................ ............ ................ .... ....... ...16
Building Permit Valuation Table ..............................................................................................................................................17
v
Town of Danville
Master Fee Schedule
CITY CLERK
Municipal Code
V olume I
V olume II
Full Set
Supplements
Notary Public
City Clerk Certification
Certified Copy
Records on compact disk
FINANCE DEPARTMENT
Town Financial PlanI
Town Comprehensive Annual Financial
ReportI
Business License Name Listing
Business License Verification Letter
Returned Payment Item
Returned Payment Item (second time)
Other Business License fees per Ordinance 93-3
FEE FOR SERVICE
$75
$75
$150
$25/year
$10/signature
$lO/document
$5 first page, $3 each additional page
$lIcompact disk
FEE FOR SERVICE
$25
$25
$25
$25
$25
$35
1 The Town Financial Plan and the Town Comprehensive Annual Financial Report are available on the Town's web site
at www.ci.danville.ca.us
1
Town of Danville
Master Fee Schedule
POLICE SERVICE
Accident/ Crime Reports
Alarm Response Fee
A.B.C. Letter for One Day Sale Permit
Booking Fee Reimbursement
Disturbance Call-back
Failure to Obey Sign/Marking
Fingerprinting (Livescan)
Fingerprinting (ink and card)
Oversized Vehicle
Photographs
Restricted Parking
Towed Vehicle Release
Trespass on Public Grounds
Verification Letter
Non-Resident Child Seat Inspection
Parking Permits
DUI Emergency Response Reimbursement:
Personnel Cost:
Officer: $84.79/hr
Sergeant: $96.37/hr
Lieutenant: $115.53/hr
FEE FOR SERVICE
$5 each
$10 per alarm company, Danville customer
$35
County Charge
$60 per hour/officer for second or more calls
$25
$30 plus agency fee as required
$10 per card
$50
$5 each
$25
$110
$25
$25
$10
$30
Actual costs as follows:
Lab Cost:
Breath Test: $75.00
Urine Test: $75.00
Blood Test: $75.00
Blood Withdrawal Services: $69.83
Toxicology Analysis:
AcidlNeutral Drug Screen: $110.00
Basic Drug Screen: $110.00
Comprehensive Drug Screen: $225.00
Specialty Drug Screens: $110.00
Rush Analysis: $200.00/ea
2
Town of Danville
Master Fee Schedule
PARKS AND COMMUNITY FACILITIES FEE FOR SERVICE
Group III Group IV Group V Group VI
Indoor Facilities Nonprofit Private Commercial Government
Danville Community Center
Valley Oak & Las Trampas $ 125/hour $186/hour $233/hour $63/hour
Valley Oak $109/hour $159/hour $207/hour $55/hour
Las Trampas Room $38/hour $49/hour $ 62/hour $19/hour
Kitchen $63/use $69/use $71/use $32/use
Art & Crafts Room $22/hour $33/hour $37/hour $ l1/hour
Lounge $22/hour $33/hour $37/hour $11/hour
Bandstand $63/hour $69/hour $71/hour $32/hour
Town Green Hourly $42/hour $51/hour $62/hour $21/hour
Town Green Daily $153/use $197/use $245/use $77 /use
Library
Mt. Diablo Room $41/hour $57/hour $67/hour $21/hour
Town Meeting Hall
Auditorium $55/hour $81/hour $112/hour $28/hour
Village Theatre
Hourly Rate/2 hour min. $63/hour $81/hour $112/hour $63/hour
Pre- ProductionlLoad- in Rate $47/hour $62/hour $84/hour $47/hour
Ticket Surcharge Actual Actual Actual Actual
Veterans Memorial Building
Main Hall $68/hour $109/hour $ 149/hour $34/hour
Meeting Room (Upstairs) $35/hour $55/hour $71/hour $18/hour
Kitchen $63/use $69/use $69/use $32/use
Oak Hill Park Community Center
Banquet Room $109/hour $159/hour $207/hour $55/hour
Room (A, B, or C) $22/hour $33/hour $37/hour $11/hour
Rooms (AIB or B/C) $38/hour $49/hour $63/hour $19/hour
Rooms (AIB/C) $55/hour $81/hour $112/hour $28/hour
Kitchen $63/use $69/use $71/use $32/use
Large Grass Area Hourly $42/hour $51/hour $60/hour $21/hour
Large Grass Area Daily $153/use $198/use $238/use $77 /use
Hap Magee Ranch Park
Swain House
Full Facility Hourly $66/hour $1 16/hour $147/hour $33/hour
Full Facility Daily $580/use $778/use $999/use $290/use
Cottage
Front Room $31/hour $47/hour $71/hour $16/hour
Conference Room $22/hour $33/hour $37/hour $ l1/hour
Magee House
Full Facility Hourly $112/hour $121 /hour $153/hour $56/hour
Full Facility Daily $752/use $967/use $1,186/use $376/use
Meadow
Meadow Hourly $97/hour $117/hour $130/hour $49/hour
Meadow Daily $437/use $481/use $506/use $219/use
3
Town of Danville
Master Fee Schedule
Group III Group IV Group V Group VI
Indoor Facility Rates (con't) Nonprofit Private Commercial Government
Baldwin Elementary School
Multi-Use Room SRVUSD SRVUSD SRVUSD SRVUSD
Diablo Vista Middle School
Community Gym SRVUSD SRVUSD SRVUSD SRVUSD
Facility Attendant $23/hour $23/hour $23/hour $23/hour
Los Cerros Middle School
Community Gym SRVUSD SRVUSD SRVUSD SRVUSD
Facility Attendant $23/hour $23/hour $23/hour $23/hour
Monte Vista High School
Community Pool SRVUSD SRVUSD SRVUSD SRVUSD
Lifeguard $ 19/hour $19/hour $19/hour $19/hour
Outdoor Facility Rates
Group Picnics
Diablo Vista Park, Hap Magee Ranch Park, Oak Hill Park, Osage Station Park, Sycamore Valley Park
Up to 50 $92/area $128/area $190/area $46/area
Up to 150 $ 165/area $190/area $253/area $ 83/area
Over 150 $291/area $380/area $633/area $ 146/area
Family Picnics
Up to 20
Sports Fields/Courts
Tennis Courts
Bocce Ball Courts
Baseball/Softball
Soccer
Other
Snack Shack (Sycamore Valley & Diablo
Vista)
Lighting
Litter and Special Maintenance
Miscellaneous Fees
Security/Cleaning/Damage Deposit (Refundable)
Danville Community Center
Group Picnics up to 150
Group Picnics over 150
Hap Magee Ranch Park (Full Facility)
Large Grass Area Litter Deposit (Hap Magee, Osage Station
Park, Oak Hill Park, Town Green)
Litter and Special Maintenance
Oak Hill Park Community Center
Town Meeting Hall
Veterans Memorial Building
Village Theatre
Residents
$43/area
$6/hour
$10/hour
$13/hour
$24/hour
$29/hour
$18/hour
$42/hour
4
Non-Res.
$62/area
$8/hour $10/hour
$15/hour $22/hour
$20/hour $25/hour
$31/hour $37/hour
$41/hour $56/hour
$20/hour $20/hour
$45/hour $45/hour
All Uses/Groups
$500/ea.
$80/ea
$120/ea
$500/ea.
$150/ea.
as noted above
$500/ea.
$500/ea
$500/ea.
$500/ea.
$6/hour
$10/hour
$13/hour
$24/hour
$29/hour
$18/hour
$42/hour
Miscellaneous Fees (cont.)
Facility Attendants
Attendant - Minimum 2 hours
Attendant Overtime
Box Office Attendant
Theatre Technician
Theatre Technician Overtime
Town of Danville
Master Fee Schedule
All Uses/Groups
$23/hour
$47/hour
$23/hour
$23/hour
$47/hour
Equipment
P.A. System
Overhead Projector
Screen (Portable)
Easel
Flip Chart
Cocktail Tables
Wooden Chairs
Ceremony Chairs
Piano
Umbrellas w/stands
1 Portable Stage (4 - 4x8 sections w/steps)
Portable Stage Section (1 - 4x8 section w/steps)
TVNCR
Lectern - Table Top
Lectern - Full Length (Community Centers,
Library, Town Meeting Hall only)
Additional Microphones with/without stands
(Community Centers only)
Portable Hand-held Microphone Sound Unit
Follow Spot (including operator)
White Board with Markers (41/2' x 3')
Facility Reservations/Permits
Change Request
Unscheduled rental use
Insurance Administration
Cancellation Charge
Less than 30 days
Less than 60 days
Non-Resident Surcharge
Box Office Surcharge
$41/use
$12/use
$12/use
$7/use
$15/use
$lO/use
$3/each
$3/each
$42/use
$12/use
$157/use
$42/use
$26/use
$26/use
$30/use
$26/use
$26/use
$35/each
$12/use
$15/each
Two times hourly rate
$16/booking
$75 minimum
100% of rental fee
50% ofrental fee
25%
Actual
Soccer/Lacrosse fields
Base ball / Softball fields
Adult Soccer
Equipment Removal
Sports Alliance
$5.45/hour
$3.35/hour
$25.50/hour
$125/hour
5
Town of Danville
Master Fee Schedule
DEVELOPMENT AND
TRANSPORTATION SERVICES FEES
ENGINEERING SERVICES
Map Check
Improvement Plan Check
Review of improvement plans street, drainage
and landscaping work
Engineering Inspection
Inspection of installation of street, drainage and
landscaping improvements
Street Lighting
Operation of public street lighting system
Encroachment Permit
For work within the public right-of-way
Oversize/Wide load Permit
Drainage Permit
For work within any public or private drainage
course
Grading Plan Check
Grading Permit
FEE FOR SERVICE
2-10 lots - $1,982 + $188/1ot
> 10 lots - $3,894 + $28/1 ot
3.5% of project cost <=$50,000
3.25% ofproject cost >$50,000 & <=$100,000
3.0% ofproject cost >$100,000
5.5% of project cost <=$50,000
5.25% of project cost >$50,000 & <=$100,000
5.0% of project cost >$100,000
One year operational cost + 10%
$153 for projects <=$2,000
5.5% of construction cost for projects >$2,000
$20
$153 for projects <=$2,000
5.5% of construction cost for projects >$2,000
Under 50 cy: $167 More than 49 cy: $167 +
Percentage of Construction Cost + Volume Fee
Percentage of Construction Cost:
$0 to $10,000 use 0.5%
$10,001 to $100,000 use 1.0%
$100,001 and greater use 1.5%
Volume Fee:
50 to 1,000 cy: $0.83 per 100 cy
1,001 to 10,000 cy: $0.17 per 100 cy +
$167 (for soils report review)
10,001 or greater: $0.56 per 100 cy +
$918 (for soils report review)
Under 50 cy: $33. 50 to 100 cy: $51
101 to 1,000 cy: $51 for first 100 cy plus
$24 for each additional 100 cy
1001 to 10,000 cy: $270 for first 1000 cy plus
$20 for each additional 1000 cy
10,001 to 100,000 cy: $452 for first 10,000 cy
plus $92 for each additional 10,000 cy
100,001 cy or greater: $1,278 for first 100,000 cy
plus $51 for each additional 10,000 cy
6
Town of Danville
Master Fee Schedule
ENGINEERING SERVICES
Grading Inspection
Finish Grading Inspection
Single family residential lot
Commercial Project
Debris/Clean-up Deposit
A deposit shall be paid at permit issuance to
assure the clean-up of the site and/or public
right-of-way. This deposit shall be returned to
the applicant if it can be determined at
certification of occupancy that the site and
surrounding areas have been restored to their
clean and ultimately improved condition.
NPDES
(National Pollution Discharge Elimination
System) Prevention of Drainage Runoff
Pollutant
Base Map Revision
Revision of Town computerized base map
Certificate of Correction or Amended Map
Revises a recorded document
Vacation of Right-of-Way or Easement
Process a request to abandon a public right-of-
way or easement
FEE FOR SERVICE
Under 50 cy: $167
More than 49 cy: $167 + Percentage of
Construction Cost + Volume Fee
Percentage of Construction Cost:
$0 to $10,000 use 2.0%
$10,001 to $100,000 use 1.5%
$100,001 and greater use 1.0%
Volume Fee:
50 to 1,000 cy: $8 per 100 cy
1,001 to 10,000 cy: $83 + $3 per 100 cy
10,001 or greater: $431 + $2 perlOO cy
$70
$169
$278 per acre
Residential $47
Multi-residential $195
Commercial $396
$83 for each new or revised lot or parcel
$167 per document
$1,808
7
Town of Danville
Master Fee Schedule
PLANNING AND
TRANSPORTATION SERVICES
FEEl
ADDITIONAL FEES2
Environmental Assessment
Initial Study leading to standard $1,100
Declaration of Environmental
Significance (ND)
Environmental Impact Report (EIR) Consultantfee to prepare EIR plus 33%
Initial Study leading to Mitigated $1,650
Negative Declaration of
Environmental Significance (MND)
Consultant prepared Mitigated
Negative Declaration of
Environmental Significance
Notice of Exemption Projects $50
Notice of Determination3
Department of Fish & Game Notice $1,850
of Determination Fee for ND or
MND
Department of Fish & Game Notice $2,250
of Determination Fee for EIR
Development Plan
Conceptual or Pre-submittal $660
Administrative
$440-$880
$3,740
Public Hearing - Residential -
Minor Projects
$110 hourly after 15 hours of staff work
Consultant fee to
Prepare MND plus 33%
$50 to County Clerk with Notice of
Determination
$50 to County Clerk with Notice of
Determination and remainder to F&G
$50 to County Clerk with Notice of
Determination and remainder to F&G
$110 hourly after 6 hours of staff work
$110 hourly after 34 hours of staff work
I The fee is for staff time and materials necessary to process the permit.
2 Fee amounts are set at the assumed average cost to provide the service. Ifthe cost to provide the service exceeds the fee, the
applicant wilI be bilIed the cost overrun.
3These fees are set by Assembly BilI 3158, authorizing the County Clerk to collect fees for the Department ofFish and Game. The
County Clerk retains $25 on each fee colIected to cover processing expenses.
8
Town of Danville
Master Fee Schedule
PLANNING AND FEEl ADDITIONAL FEES2
TRANSPORTATION SERVICES
Development Plan (cont.)
Public Hearing - Residential- $5,610
Larger and/ or More Complex
Projects
Public Hearing - Non-residential $3,740
Minor Projects
Public Hearing - Non-residential- $5,610
Larger and/ or More Complex
Projects
Public Hearing - Scenic Hillside or $3,740
Major Ridgeline - Minor Projects
Public Hearing - Scenic Hillside or $5,610
Major Ridgeline - Larger and/ or
More Complex Projects
Public Hearing - Final $990
Development Plan Processed with
PUD Application
Public Hearing - Final $3,740
Development Plan Processed with
PUD Application or as an
Amendment
Second Dwelling Unit - $880
Administrative
Second Dwelling Unit - Public $2,200
Hearing
Traffic Study Review $550
Land Use Permit
Temporary/Seasonal Use -
Recurring Request/Event
Temporary /Seasonal Use - Initial
Request/Event
Large Family Child Care Facility
(8-14 children)
$330
$550
$1,320
$110 hourly after 51 hours of staff work
$110 hourly after 34 hours of staff work
$110 hourly after 51 hours of staff work
$110 hourly after 34 hours of staff work
$110 hourly after 51 hours of staff work
$110 hourly after 34 hours of staff work
$110 hourly after 8 hours of staff work
$110 hourly after 20 hours of staff work
Per Review
9
Town of Danville
Master Fee Schedule
PLANNING AND FEEl ADDITIONAL FEES2
TRANSPORTATION SERVICES
Land Use Permit (cont.)
Caretaker mobile home
$880
$330-$660
Minor project without Public
Hearing
Minor Item with Public Hearing
Child Care Facility (>14 children)
Congregate Care Facility
Major Item with Public Hearing
$1,650
$3,630
$3,630
$7,260
$2,420
Telecommunication Permit
requiring no Public Hearing
Telecommunication Permit
requiring Public Hearing
$3,630
Telecommunication - Permit
Extension
$660
Traffic Study Review
LUP combination with other permit $440
Subdivision
Major Subdivision - Smaller and/ or $3,740
Less Complex Projects
Major Subdivision - Larger and/ or $5,610
More Complex Projects
Traffic Study Review $775
Minor Subdivision - Smaller $3,740
and/ or Less Complex Projects
Minor Subdivision - Larger and/ or $5,610
More Complex Projects
Time Extension for Major or Minor $550
Subdivision
10
$110 hourly after 15 hours of staff work
$110 hourly after 33 hours of staff work
$110 hourly after 33 hours of staff work
$110 hourly after 66 hours of staff work
$110 hourly after 22 hours of staff work
$110 hourly after 33 hours of staff work
$280 per review after 2nd review
$110 hourly after 34 hours of staff work
$110 hourly after 51 hours of staff work
Per Review
$110 hourly after 34 hours of staff work
$110 hourly after 51 hours of staff work
Town of Danville
Master Fee Schedule
FEEl ADDITIONAL FEES2
PLANNING AND
TRANSPORTATION SERVICES
Rezoning
PUD - Rezoning - for Smaller
and/ or Less Complex Projects
$4,840
PUD - Rezoning - for Larger $7,260
and/ or More Complex Projects
Traffic Study Review $775
Rezoning - to standard Residential, $3,630
Office, Industrial or Commercial
Zoning Designation - Minor Project
Rezoning - to standard Residential, $7,260
Office, Industrial or Commercial
Zoning Designation - Larger
and/ or More Complex Project
Variance
Administrative or submitted in $330-$660
conjunction with other application
Single Family Residence Processed $1,100
as Administrative Permit
Public Hearing $1,650
Sign
Freestanding sign (with or without $440
Design Review Board Review)
Fee per each face copy change not $165
requiring Design Review Board
reVIew
New sign requiring Design Review $330-$660
Board review
Master Sign Program < five tenant $880
spaces
M;lster Sign Program> five tenant $1,100
spaces
Temporary Promotional Sign No charge
Permit
11
$110 hourly after 44 hours of staff work
$110 hourly after 66 hours of staff work
Per Review
$110 hourly after 33 hours of staff work
$110 hourly after 66 hours of staff work
For projects appealed to/ or referred to
Planning Commission for action - $110
hourly after 10 hours of staff work
Town of Danville
Master Fee Schedule
PLANNING AND FEEl ADDITIONAL FEES2
TRANSPORTATION SERVICES
General Plan Amendment
GPAs - Land Use Designation
Change Submitted with PUD-
Rezoning
GPAs - Land Use Designation
Change Submitted as Stand-alone
Application
Traffic Study Review
GP As - Text Amendment
Design Review Board
Conceptual or Pre-submittal
Administrative
Minor Commercial
New SFR Hillside (Scenic Hillside
or Major Ridgeline)
New MFR < 5 units
New MFR > 5 units
Office, Commercial or Industrial
Tree Removal
Residential
Commercial
Special Planning Studies
Parcel Merger
Lot Line Adjustment
$5,500
$8,800
$775
$3,630
$550
$440-$880
$440-$880
$2,200
$1,980
$2,640
$2,420
$165
$440
$482/lot
$482/lot
12
$110 hourly after 50 hours staff effort
$110 hourly after 80 hours staff effort
Per Review
$110 hourly after 33 hours staff effort
$110 hourly after 20 hours of staff work
$110 hourly after 18 hours of staff work
$110 hourly after 24 hours of staff work
$110 hourly after 22 hours of staff work
Cost plus 33 % administrative surcharge
Town of Danville
Master Fee Schedule
PLANNING AND FEEl ADDITIONAL FEES2
TRANSPORTATION SERVICES
Miscellaneous
Time Extension - Administrative $330
Action - no site check required
Time Extension - Administrative $660
Action - site check &/ or COA
compliance review required
Time Extension - Non- $880
Administrative Action
Appeals
Requests for Reconsideration
Archaeological review (Sonoma
State Clearinghouse)
Zoning Certificate Letter -
Residential
Zoning Certificate Letter -
Commercial
$220
$880
$56
$550
$880
Zoning Review of Building Permit
File Research
LaserFiche Electronic Files
Newspaper Advertising
Public Notice by Staff
Pass through fee sent to Sonoma State
$110 hourly after initial 2 hours of
reVIew
$110 per hour
No charge
$110 plus newspaper publishing cost
$0.83 per-piece plus $110 per mail-out
13
Town of Danville
Master Fee Schedule
PLANNING AND TRANSPORTATION FEE FOR SERVICE
SERVICES
Documents
Capital Improvement Program Document, $19
Town of Danville Landscape and Irrigation
Project Procedures and Standards
Town-wide Trails Master Plan $45
General Plan $26
General Plan Map, Beautification $6
Guidelines, Base Map, Specific Plan
Zoning Map, Downtown Master Plan, $13
Standard Plan
Aerial Photo
Hard copy, up to 42-in x 60-in $13
Computer file on CD or E-mail $3
MISCELLANEOUS
Photo Copies
Records Search
Plan Size Copies
Off-Site Document Retrieval Fee
Administrative Citation Late Fee
Hartz Avenue Banner Permit
$0.20 per sheet
$47 per hour
$2 per sheet
$50 per document
$25
$100
Any fee for billable services not listed in this
fee schedule will be billed as the cost of time
and materials.
14
Town of Danville
Master Fee Schedule
FEE FOR SERVICE
BUILDING SERVICES
Building Permits
Building Sub-permit and Inspection
as required by California Building Code
Electrical Sub-permit
as required by California Electrical Code
Plumbing Sub-permit
as required by California Plumbing Code
Mechanical Sub-permit
as required by California Mechanical Code
Swimming Pool, Spa or Hot Tub Permits
as required by Uniform Swimming Pool, Spa
and Hot Tub Code
Plan Review
As required for any permit
Master Plan Verification Review
Planning Plan Check
Investigations
As provided for in the California Building Code
Building Permit Fee Table
Total Valuation
$1.00 to $500
$501 to $2,000
$2001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $500,000
$500,001 to $1,000,000
$1,000,001 and up
As permitted by the California Building Code
20% of building permit fee
17% of building permit fee
18% of building permit fee
Equivalent to building permit plus any required
electrical or plumbing permits
65% of building sub-permit fee plus any electrical,
plumbing, or mechanical sub-permit fees
75% of the 65% plan review fee
$25. Over $15,000 valuation, $25 + $25 per
$100,000 of valuation
Equivalent of applicable permit
Fee
$23.50
$23.50 for the first $500 plus $3.05 for each additional $100, or
fraction thereof, to and including $2,000
$69.25 for the first $2,000 plus $14.00 for each additional $1,000,
or fraction thereof, to and including $25,000
$391.25 for the first $25,000 plus $10.10 for each additional
$1,000, or fraction thereof, to and including $50,000
$643.75 for the first $50,000 plus $7.00 for each additional $1,000,
or fraction thereof, to and including $100,000
$993.75 for the first $100,000 plus $5.60 for each additional
$1,000, or fraction thereof, to and including $500,000
$3,233.75 for the first $500,000 plus $4.75 for each additional
$1,000, or fraction thereof, to and including $1,000,000
$5,608.75 for the first $1,000,000 plus $3.15 for each additional
$1,000 or fraction thereof.
15
Town of Danville
Master Fee Schedule
FEE FOR SERVICE
BUILDING SERVICES
Other Inspections and Fees
Inspections outside of normal business hours
(minimum charge - four hours)
Re-inspection fees are assessed under
provisions of Section 108 of the 2007 CBC
Inspections for which no fee is specifically
indicated
Additional plan review required by changes,
additions or revisions to plans
For use of outside consultants for plan
checking and inspections, or both
Expired Permit Notification and Extension
Water Heater, Furnace, AIC Replacement
Permits
Furnace and AI C Replacement Permit
Permit Reactivation
Photovoltaic Residential
Photovoltaic N on-Residential
Gas Shut-Off Valves
Minimum Permit fee
Documentation fee
Temporary Certificate of Occupancy for
commercial! industrial uses
Penalty fee for work without requisite permit
Residential Report of Building Record
Building Permit Pass Through Fees
Strong Motion Instrumentation Program
Residential
Commercial
California Building Standards Fee
$104 per hourI
$83 minimum I
$83 minimum I
$119 per houri
Actual costs2
$53
$83/ea. ($73 plus $10 documentation fee)
$140 ($130 plus $10 documentation fee)
$67 plus $83 for each additional inspection
$290 plus admin fee
One-half of 1 % of total valuation ($475 minimum)
$83 (effective July 1, 2009)
Includes $10 documentation fee
$73 plus documentation fee
$10
$350
Determined by Chief Building Official
not to exceed $1,000
$75
0.01 % of valuation (minimum $0.50)
0.021 % of valuation (minimum $0.50)
$1 per $25,000 of total valuation
I Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead,
equipment, hourly wages and fringe benefits of the employees involved. Hot water heater and other minor permits may be
charged less.
2 Actual costs include administrative and overhead costs.
16
Town of Danville
Master Fee Schedule
Building Permit Valuation Table
The unit costs are intended to comply with the defmition of "valuation" in Section 223 of the 1997 Uniform Building
Code⢠and thus include architectural, structural, electrical, plumbing and mechanical work, except as specifically listed
below. The unit costs also include the contractor's profit, which should not be omitted.
The determination of building permit fees for projects are based on valuation computed from these figures, which were
approved on June 18,2002 and increased by applying the Engineering News Record (ENR) San Francisco Area Building
Cost Index History (1915-2008) index from May 2008 to May 2009.
Average Cost per Square Foot by Occupancy & Type
Occupancy & Type New Remodel Occupancy & Type New Remodel Occupancy & Type New Remodel
APARTMENT HOUSES: CONVALESCENT HOTELS AND MOTELS:
Type 1 or II F.R.I $160.53 $78.57 Type 1 or II F.R.1 $251.94 $122.60 Type 1 or II F.R.1 $182.80 $86.75
(Good) $197.64 $91.30 Type II: 1-Hour $174.84 $88.26 Type III: 1-Hour $158.37 $80.48
Type V - Masonry Type III: 1-Hour $179.19 $87.76 Type III-N $150.94 $68.71
(or Type III) $131.03 $69.33 Type V: 1-Hour $168.88 $81.39 Type V: 1-Hour $137.91 $77.46
(Good) $160.53 $77.18 DWELLINGS: Type V: N $135.20 $64.38
Type V Type V - Masonry $137.00 $81.86 INDUSTRIAL PLANTS:
Wood Frame $115.47 $69.19 (Good) $175.38 $80.82 Type 1 or II F.R. $102.98 $58.99
(Good) $148.41 $74.01 Type V-Wood Frame $121.80 $73.36 Type II: 1-Hour $71.69 $54.40
Type I BasmUGarage $67.69 $35.06 . (Good) $167.23 $78.632 Type II: N $65.87 $52.61
AUDITORIUMS: Kitchen no structure $132.62 Type III: 1-Hour $78.93 $54.49
Type 1 or II F.R. $189.69 $89.66 With structure $136.93 Type III-N $74.39 $52.81
Type II: 1-Hour $137.37 $78.33 Basements: Tilt-up $54.30 $49.19
Type II: N $129.94 $75.04 Semi-Finished $36.39 $34.56 Type V: 1-Hour $74.39 $54.14
Type III: 1-Hour $144.44 $75.51 (Good) $41.99 $36.79 Type V: N $68.07 $49.94
Type III-N $137.00 $73.07 Unfinished $26.42 $21.80 JAILS:
Type V: 1-Hour $138.11 $75.27 (Good) $32.03 $26.19 Type 1 or II F.R. $287.96 $143.52
Type V: N $128.87 $72.84 FIRE STATIONS: Type III: 1-Hour $263.35 $136.86
BANKS: Type 1 or II F.R. $207.05 $105.63 Type V: 1-Hour $197.48 $111.86
Type 1 or II FR. $268.05 $121.16 Type II: 1-Hour $136.28 $75.80 LIBRARIES:
Type II: 1-Hour $197.48 $112.97 Type II: N $128.50 $73.75 Type 1 or II F.R. $210.68 $106.85
Type II: N $191.13 $109.23 Type III: 1-Hour $149.14 $76.04 Type II: 1-Hour $154.19 $82.08
Type III: 1-Hour $217.91 $112.62 Type III-N $142.79 $72.86 Type II: N $146.60 $77.11
Type III-N $210.15 $110.38 Type V: 1-Hour $139.90 $74.60 Type III: 1-Hour $162.89 $82.40
Type V: 1-Hour $197.48 $112.95 Type V: N $132.66 $72.90 Type III-N $154.75 $75.52
Type V: N $189.13 $103.23 HOMES FOR THE ELDERLY: Type V: 1-Hour $152.93 $81.32
BOWLING ALLEYS: Type 1 or II F.R. $187.68 $96.80 Type V: N $146.60 $70.42
Type II: 1-Hour $92.31 $58.38 Type II: 1-Hour $152.39 $75.57 MEDICAL OFFICES:
Type II: N $86.16 $54.26 Type II: N $145.89 $71.73 Type 1 or II F.R.1 $216.27 $117.72
Type III: 1-Hour $100.44 $58.92 Type III: 1-Hour $158.73 $75.82 Type II: 1-Hour $166.87 $87.80
Type III-N $93.93 $55.95 Type III-N $142.79 $67.37 Type II: N $158.57 $84.44
Type V: 1-Hour $67.69 $58.11 Type V: 1-Hour $153.29 $73.52 Type III: 1-Hour $180.99 $91.56
CHURCHES: Type V: N $148.07 $70.73 Type III-N $168.51 $85.38
Type 1 or II F.R. $179.54 $89.82 HOSPITALS: Type V: 1-Hour $163.25 $88.11
Type II: 1-Hour $134.84 $67.37 Type 1 or II F.R.1 $295.37 $142.32 Type V: N $157.46 $83.67
Type II: N $128.14 $62.44 Type III: 1-Hour $244.53 $120.31 OFFICES3:
Type III: 1-Hour $146.60 $67.67 Type V: 1-Hour $233.29 $115.81 Type 1 or II F.R. $193.31 $101.55
Type III-N $140.08 $62.58 Type II: 1-Hour $129.41 $86.65
Type V: 1-Hour $137.00 $67.33 Type II: N $123.27 $80.90
Type V: N $128.87 $58.32 Type III: 1-Hour $139.72 $84.99
Type III-N $133.59 $81.03
Type V: 1-Hour $130.87 $83.98
Type V: N $123.27 $70.85
I Add 0.5% to total cost for each story over 2 Remodel valuation as determined by the
three. Chief Building Official. 3 Deduct 20% for shell-only buildings.
17
Town of Danville
Master Fee Schedule
Occupancy & Type New Remodel Occupancy & Type New Remodel Occupancy & Type New Remodel
PRIVATE GARAGES: Type 1 or II F.R. $201.26 $120.64 WAREHOUSES2:
Wood Frame $43. 99 $30.89 Type II: 1-Hour $137.37 $95.28 Type 1 or II F.R. $89.41 $58.31
Masonry $49.58 $31.18 Type III: 1-Hour $146.96 $95.29 Type II or V: 1-Hr $53.02 $34.95
Open Carports $30.06 $20.46 Type III-N $141.36 $83.44 Type II or V: N $49.77 $34.02
PUBLIC BUILDINGS: Type V: 1-Hour $137.75 $91.81 Type III: 1-Hour $60.08 $34.93
Type 1 or II F.R1 $223.33 $118.69 Type V: N $131.42 $81.42 Type III-N $57.21 $32.57
Type II: 1-Hour $180.99 $90.51 SERVICE STATIONS: AIR CONDITIONING:
Type II: N $173.04 $87.16 Type II:N $121.62 $61.10 Commercial $7.60
Type III: 1-Hour $187.87 $92.98 Type 1I1:1-Hour $126.89 $63.99 Residential $6.33
Type III-N $181.34 $86.86 Type V: 1-Hour $108.05 $61.01 SPRINKLER SYSTM: $4.70
Type V: 1-Hour $171.94 $90.17 Canopies $50.68 $33.71 MISCELLANy3
Type V: N $165.80 $83.83 STORES: Deck $39.01
PUBLIC GARAGES: Type 1 or II F.R1 $149.14 $81.03 Retaining Wall
Type I or II F.RI $88.49 $50.53 Type II: 1-Hour $91.21 $70.24 (less than 4') $67.17
Type I or II open p $66.42 $47.10 Type II: N $89.23 $68.50 Retaining Wall
Type II: N $50.68 $44.85 Type III: 1-Hour $110.95 $69.88 (4' and more)) $125.93
Type III: 1-Hour $66.96 $48.30 Type III-N $104.07 $81.16 Balcony $46.81
Type III-N $59.54 $45.10 Type V: 1-Hour $93.41 $69.39 Trellis/Arbor/
Type V: 1-Hour $60.99 $47.71 Type V: N $86.33 $66.86 covered porches $23.40
RESTAURANTS: THEATERS:
Type III: 1-Hour $176.29 $122.41 Type 1 or II F.R. $198.73 $107.70
Type III-N $161.45 $118.46 Type III: 1-Hour $144.79 $84.95
Type V: 1-Hour $161.45 $120.62 Type III-N $137.91 $78.67
Type V: N $155.10 $116.38 Type V: 1-Hour $136.28 $83.29
SCHOOLS: Type V:N $128.87 $70.57
2 Deduct 11 % for mini-warehouses.
] Add 0.5% to total cost for each story over 3 Cost determined by independent cost
three. study.
18
INDEX
A.B.C. Letter for One Day Sale Permit 2 DEVELOPMENT AND
AlC Replacement Permit 16 TRANSPORTATION SERVICES 6
Abandon a public right-of-way or easement 7 Development Plan 8
Accident/Crime Reports 2 Conceptual 8
Administrative Citation Late Fee 14 Pre-submittal 8
Adult Soccer 5 Public Hearing - Final Development Plan
Aerial Photo 14 Processed with PUD Application 9
Alarm Response Fee 2 Public Hearing - Final Development Plan
Amended Map 7 Processed with PUD Application or as an
Appeals 13 Amendment 9
Archaeological review 13 Public Hearing - Residential - Larger
Art & Crafts Room 3 and/or More Complex Projects 9
Attendant 5 Public Hearing - Residential - Minor 8
Auditorium 3 Public Hearing - Scenic Hillside or Major
Baldwin Elementary School 4 Ridgeline - Larger and/or More Complex
Bandstand 3 Projects 9
Banner Permit 14 Public Hearing - Scenic Hillside or Major
Base Map Revision 7 Ridgeline - Minor Projects 9
Baseball 5 Public Hearing-Non-residentallminor 9
Beautification Guidelines 14 Public Hearing-Non-residential Complex 9
Booking Fee Reimbursement 2 Second Dwelling Unit - Administrative 9
Box Office 5 Second Dwelling Unit - Public Hearing 9
Box Office Attendant 5 Traffic Study Review 9
Building Permit Fee Table 15 Diablo Vista Middle School 4
Building Permit Investigations 15 Diablo Vista Park 4
Building Permit Valuation Table 17 Disturbance Call-back 2
Building Permits 15 Downtown Master Plan 14
Building Plan Review 15 Drainage Permit 6
BUILDING SERVICES 15 Drainage Runoff 7
Business License Name Listing 1 DUI Emergency Response Reimbursement 2
Business License Verification Letter 1 Easel 5
California Building Standards Fee 16 Easement 7
Capital Improvement Program Document 14 Electrical Permit 15
Ceremony Chairs 5 Encroachment Permit 6
Certificate of Correction 7 Engineering Inspection 6
Certificate of Occupancy 16 ENGINEERING SERVICES 6
Certified Copy 1 Environmental Assessment 8
CITY CLERK 1 Environmental Impact Report (EIR) 8
City Clerk Certification 1 Equipment 5
Cocktail Tables 5 Equipment Removal 5
Computerized base map 7 Expired Permit Notification and Extension 16
Cottage 3 Facility Attendants 5
Danville Community Center 3 Facility Reservations/Permits 5
Debris/Clean-up Deposit 7 Failure to Obey Sign/Marking 2
Department ofFish & Game Notice of Family Picnics 4
Determination Fee 8 File Research 13
Design Review Board 12 FINANCE DEPARTMENT 1
19
Fingerprinting (ink and card)
Fingerprinting (Livescan)
Finish Grading Inspection
Flip Chart
Furnace Permit
Gas Shut-Off Valve Permit
General Plan
General Plan Amendment
Grading Inspection
Grading Permit
Grading Plan Check
Hap Magee Ranch Park
Hot Tub Permit
Improvement Plan Check
Initial Study
Inspections and Fees
Insurance
Kitchen
Lacrosse
Land Use Permit
Caretaker mobile home
Child Care Facility (> 14 children)
Congregate Care Facility
Large Family Child Care Facility (8-14
children)
Major Item with Public Hearing
Minor Item with Public Hearing
Minor project without Public Hearing
Telecommunication - Permit Extension
Telecommunication Permit requiring No
Public Hearing
Telecommunication Permit requiring
Public Hearing
Temporary/Seasonal Use - Initial
Request/Event
Temporary/Seasonal Use - Recurring
Request/Event
Traffic Study Review
with other permit
Landscape and Irrigation Project Procedures
Las Trampas Room
Lectern
Library
Los Cerros Middle School
Lot Line Adjustment
Lounge
Magee House
Map Check
Meadow
2
2
7
5
16
16
14
12
7
6
6
3,4
15
6
8
16
5
3
5
9
10
10
10
Mechanical Permit 15
Microphones 5
Mitigated Negative Declaration 8
Monte Vista High School 4
Mt. Diablo Room 3
Municipal Code 1
Newspaper Advertising 13
Non-Resident Child Seat Inspection 2
Notary Public 1
Notice of Determination 8
Notice of Exemption 8
NPDES 7
Oak Hill Park 3,4
Oak Hill Park Community Center 3
Off-Site Document Retrieval Fee 14
Osage Station Park 4
Outdoor Facility Rates 4
Overhead Projector 5
Oversize/Wide load Permit 6
Oversized Vehicle 2
P.A. System 5
Parcel Merger 12
Parking Permits 2
PARKS AND COMMUNITY FACILITIES 3
9 Permit Reactivation 16
10 Photo Copies 14
10 Photographs 2
10 Photovoltaic Permit 16
10 Piano 5
Plan Size Copies 14
10 PLANNING SERVICES 8
Plumbing Permit 15
10 POLICE SERVICE 2
Portable Stage 5
9 Public Notice by Staff 13
Reconsideration 13
9 recorded document 7
10 Records on compact disk 1
10 Records Search 14
14 Reinspection fees 16
3 Report of Building Record 16
5 Restricted Parking 2
3 Returned Payment Item 1
4 Returned Payment Item (second time) 1
12 Rezoning 11
3 PUD - Rezoning - for Larger and/or More
3 Complex Projects 11
6 PUD - Rezoning - for Smaller and/or Less
3 Complex Projects 11
70
Standard Residential, Office, Industrial or Sycamore Valley Park 4
Commercial Zoning Designation - Larger Theatre Technician 5
and/or More Complex Project 11 Time Extension 13
Standard Residential, Office, Industrial or Towed Vehicle Release 2
Commercial Zoning Designation - Minor Town Comprehensive Annual Financial
Project 11 Report 1
Traffic Study Review 11 Town Financial Plan 1
Screen (Portable) 5 Town Green 3
Security/CleaninglDamage Deposit 4 Town Meeting Hall 3,4
Sign 11 Town-wide Trails Master Plan 14
Snack Shack 4 Tree Removal 12
Soccer 5 Trespass on Public Grounds 2
Softball 5 TVNCR 5
Spa Permit 15 Umbrellas w/stands 5
Special Planning Studies. 12 Vacation of Right-of-Way 7
Specific Plan 14 Valley Oak 3
Sports Fields/Courts 4 Valley Oak & Las Trampas 3
Street Lighting 6 Variance 11
Strong Motion Instrumentation Fee 16 Administrative 11
Subdivision 10 Public Hearing 11
Major Subdivision - Larger and/or More Single Family Residence Processed as
Complex Projects 10 Administrative Permit 11
Major Subdivision - Smaller and/or Less Verification Letter 2
Complex Projects 10 Veterans Memorial Building 3,4
Minor Subdivision - Larger and/or More Village Theater 3,4
Complex Projects 10 Water Heater Permit 16
Minor Subdivision - Smaller and/or Less White Board 5
Complex Projects 10 Wooden Chairs 5
Time Extension for Major or Minor Work without requisite permit 16
Subdivision 10 Zoning Certificate Letter - Commercial 13
Traffic Study Review 10 Zoning Certificate Letter - Residential 13
Swain House 3 Zoning Map 14
Swimming Pool Permit 15 Zoning Review of Building Permit 13
71