Loading...
HomeMy WebLinkAbout087-00RESOLUTION NO. 87-2000 ADOPTING THE 2000/2001 MASTER FEE SCHEDULE FOR USER AND COST RECOVERY FEES WHEREAS, the Town of Danville charges facility use fees for the rental and use of Town- owned and/or maintained facilities; and WHEREAS, the Town charges planning and engineering processing and permit fees for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, the Town charges City Clerk and Police processing fees for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, the Town Council has previously established such fees as part of the Danville Municipal Code as part of the Master Fee Schedule through resolution; and WHEREAS, the Town Council conducted a public hearing to receive testimony regarding the proposed increases in user and cost recovery fees, notice of which hearing was provided as required by law; now, therefore, be it RESOLVED, by the Danville Town Council that the Master Fee Schedule for user and cost recovery fees, as set forth in Exhibit 1 attached hereto, is hereby adopted. Any increased planning and engineering fees shall not go into effect for 60 days from adoption of this resolution. Until then, the existing fees shall remain in effect. APPROVED by the Danville Town Council at a regular meeting on June 20, 2000, by the following vote: AYES: Greenberg, Doyle, NOES: None ABSTAINED: None ABSENT: None Arnerich, Shimansky, Waldo MAYOR APPROVED AS TO FORM: CITY ATTORNEY ATTEST: Town of Danville Master Fee Schedule Adopted by the Danvjlle Town Council June 20, 2000 Effective July 1, 2000 Development Services Fees Effective August 21, 2000 Table of Contents CITY CLERK .................................................................................................................................... 1 Municipal Code ......................................................................................................................................................................................... Notary Public .............................................................................................................................................................................................l Photo copies ..............................................................................................................................................................................................1 Records Search ............................................................................................................................,. .............................................................1 Town Council Agenda Subscription .........................................................................................................................................................1 Town Council Minutes Subscription ........................................................................................................................................................1 Voter Registration Transcript ...................................................................................................................................................................1 Certified Copy ...........................................................................................................................................................................................1 FINANCE DEPARTMENT ................................................................................................................ 2 Town Financial Plan ..................................................................................................................................................................................2 Town Comprehensive Annual Financial Report .......................................................................................................................................2 Business License Name Listing .................................................................................................................................................................2 Business License Verification Letter .........................................................................................................................................................2 Returned Check .........................................................................................................................................................................................2 POLICE SERVICE ............................................................................................................................ 3 Accident Reports .......................................................................................................................................................................................3 Abandoned Vehicles Citation ....................................................................................................................................................................3 Alarm Response Fee ..................................................................................................................................................................................3 A.B.C. Letter for One Day Sale Permit .....................................................................................................................................................3 Booking Fee Reimbursement ....................................................................................................................................................................3 Disturbance Call-back ...............................................................................................................................................................................3 DUI Reimbursement .................................................................................................................................................................................3 Fingerprinting ............................................................................................................................................................................................3 In-house Processing ...................................................................................................................................................................................3 One Day Alcohol Use Permit ....................................................................................................................................................................3 Photographs ...............................................................................................................................................................................................3 Storage Fee (vehicle) .................................................................................................................................................................................3 Towed Vehicle Release .............................................................................................................................................................................3 Verification Letter .....................................................................................................................................................................................3 Verification Report Fee ................: ............................................................................................................................................................3 PARKS AND COMMUNITY FACILITIES .........................................................................................4 Indoor Facility Rates ..................................................................................................................................4 Community Center .....................................................................................................................................................................................4 Library .......................................................................................................................................................................................................4 Town Meeting Hall ....................................................................................................................................................................................4 Village Theatre ..........................................................................................................................................................................................4 Veterans' Memorial Hall ...........................................................................................................................................................................4 Oak Hill Park .............................................................................................................................................................................................4 Diablo Vista Park ......................................................................................................................................................................................4 Hap Magce Ranch Park .............................................................................................................................................................................4 Outdoor Facility Rates ...............................................................................................................................5 Group Picnics ............................................................................................................................................................................................5 Family Picnics ...........................................................................................................................................................................................5 Special Facilities ........................................................................................................................................................................................5 Sports Fields ..............................................................................................................................................................................................5 Groups using 15+hours reservation time ..................................................................................................................................................5 Table of Contents Groups using less than 15 hours reservation time ....................................................................................................................................5 Miscellaneous Fees ......................................................................................................................................6 Facility Reservations/Permits ....................................................................................................................................................................6 Facility Reservations/Permits ....................................................................................................................................................................6 Security/Cleaning/Damage Deposit (Refundable) ....................................................................................................................................6 Facility Attendants .....................................................................................................................................................................................6 Equipment ..................................................................................................................................................................................................6 Portable Stage (Mobile) ............................................................................................................................................................................7 ENGINEERING SERVICES ................................................................. ._ ............................................8 Map Check ..................................................................................................................................................: .............................................8 Improvement Plan Check ..........................................................: ...............................................................................................................8 Engineering Inspection ..............................................................................................................................................................................8 Street Lighting ...........................................................................................................................................................................................8 Encroachment Permit ................................................................................................................................................................................8 Drainage Permit .........................................................................................................................................................................................8 Grading Plan Check ...................................................................................................................................................................................8 Grading Permit ..........................................................................................................................................................................................8 Grading Inspection ....................................................................................................................................................................................9 Finish Grading Inspection .........................................................................................................................................................................9 Debris/Clean-up Deposit ...........................................................................................................................................................................9 NPDES ......................................................................................................................................................................................................9 Base Map Revision ....................................................................................................................................................................................9 Certificate of Correction/Amended Map ...................................................................................................................................................9 Vacation of right_of_way or easement .......................................................................................................................................................9 PLANNING SERVICES ..................................................................................................................10 Environmental Assessment ...................................................................................................................... 10 Environmental Impact Report ...................................................: .............................................................................................................10 Initial Study - Mitigated ...........................................................................................................................................................................10 Initial Study - Standard ............................................................................................................................................................................10 Notice of Determination ...........................................................................................................................10 Negative Declaration ...............................................................................................................................................................................10 Environmental Impact Report .................................................................................................................................................................10 Notice of Exemption ................................................................................................................................................................................10 Certificate of Compliance ........................................................................................................................10 Subdivision ..............................................................................................................................................................................................10 Zoning ......................................................................................................................................................................................................10 Development Plan .....................................................................................................................................10 Administrative .........................................................................................................................................................................................10 New Construction ....................................................................................................................................................................................10 Major Ridgeline .......................................................................................................................................................................................10 Minor Development Plan ........................................................................................................................................................................10 Multiple Family Residential ....................................................................................................................................................................10 Scenic Hillside .........................................................................................................................................................................................10 Land Use Permit .......................................................................................................................................11 Adrmnistrative .........................................................................................................................................................................................11 Commercial or Office ..............................................................................................................................................................................11 Day Care Facility .....................................................................................................................................................................................11 ii Table of Contents Day Care Facility .....................................................................................................................................................................................11 Home Occupation Permit ........................................................................................................................................................................11 Land Use Permit/Development ................................................................................................................ 11 Plan Combination ....................................................................................................................................................................................11 Light Industrial ........................................................................................................................................................................................11 Minor Land Use Permit ...........................................................................................................................................................................11 Residential Care Facility .........................................................................................................................................................................11 Second Unit .............................................................................................................................................................................................11 Temporary/Seasonal ................................................................................................................................................................................11 Wireless Communication ...................................................................................................~ ....................................................................11 Wireless Communication ........................................................................................................................................................................11 Subdivision ................................................................................................................................................11 Major Subdivision ...................................................................................................................................................................................11 Minor Subdivision ....................................................................................................................................................................................11 Tentative Map Extension ............................................................................................................~ ...........................................................11 Rezoning ....................................................................................................................................................11 Agricultural ..............................................................................................................................................................................................11 Residential ...............................................................................................................................................................................................11 Commercial, Office/Industrial .................................................................................................................................................................11 Planned Unit Development - Residential ................................................................................................ 12 Preliminary Development Plan ...............................................................................................................................................................12 Final Development Plan ..........................................................................................................................................................................12 Time Extension ........................................................................................................................................................................................12 Planned Unit Development - Commercial .............................................................................................. 12 Preliminary Development Plan ...............................................................................................................................................................12 Final Development Plan ..........................................................................................................................................................................12 Time Extension ........................................................................................................................................................................................12 Variance ....................................................................................................................................................12 Administrative .........................................................................................................................................................................................12 Non-administrative ..................................................................................................................................................................................12 Sign ............... ..............................................................................................................................................12 Administrative .........................................................................................................................................................................................12 Non-admimstrative ..................................................................................................................................................................................12 Master Sign Program ...............................................................................................................................................................................12 General Plan Amendment ........................................................................................................................ 12 Design Review Board (DRB) ................................................................................................................... 12 Administrative .........................................................................................................................................................................................12 Conceptual Review ..................................................................................................................................................................................12 Non-administrative ..................................................................................................................................................................................13 Sign review ..............................................................................................................................................................................................13 iii Table of Contents Tree Removal ......................................................................., ....................................................................13 Special Planning Studies ..........................................................................................................................13 Archaeological Review .............................................................................................................................13 Public Notice .............................................................................................................................................13 Preparation of Notification Map and Mailing List ..................................................................................................................................13 Mailouts ...................................................................................................................................................................................................13 Parcel Merger ...........................................................................................~ ...............................................13 Lot Line Adjustment ................................................................................................................................13 Extensions ..................................................................................................................................................13 Extension handled as an administrative action .......................................................................................................................................13 Extension handled as a non-administrative action ..................................................................................................................................13 Appeals ......................................................................................................................................................13 Appeal of Administrative Action ............................................................................................................................................................13 Appeal Planning Commission Action .....................................................................................................................................................13 Documents .................................................................................................................................................14 Standard Plan, Capital Improvement Program Document. Town of Danville Landscape and Irrigation Project Procedures and Standards .................................................................................................................................................................................................14 Townwide Trails Master Plan .................................................................................................................................................................14 General Plan ............................................................................................................................................................................................14 General Plan Map, Beautification Guidelines, Base Map, Specific Plan ..............................................................................................14 Zomng Map, Downtown Master Plan .....................................................................................................................................................14 Plan size copies sheet .............................................................................................................................................................................14 I BUILDING SERVICES ................................................................................................................... 15 Building Permit and Inspection ...............................................................................................................................................................15 Electrical Permit ......................................................................................................................................................................................15 Plumbing Permit ......................................................................................................................................................................................15 Mechamcal Permit ...................................................................................................................................................................................15 Swimrmng Pool, Spa or Hot Tub Permits ............................................................~ ..................................................................................15 Plan Review .............................................................................................................................................................................................15 Investigations ...........................................................................................................................................................................................15 iv CITY CLERK Town of Danville Master Fee Schedule FEE FOR SERVICE Municipal Code Volume I Volume II Full Set Supplements Notary Public Photo copies Records Search Town Council Agenda Subscription Town Council Minutes Subscription Voter Registration Transcript Certified Copy $75.00 $75.00 $150.00 $25.00/year $10.O0/signature $0.20/page $30.O0/hour $30.O0/year $60.O0/year $7.50 each $5.00 first page, $3.00 each additional page Town of Danville Master Fee Schedule FINANCE DEPARTMENT Town Financial Plan Town Comprehensive Annual Financial Report Business License Name Listing Business License Verification Letter Returned Check FEE FOR SERVICE $25,00 $25.00 $25.00 $25.00 $20.00 2 Town of Danville Master Fee Schedule POLICE SERVICE FEE FOR SERVICE Accident Reports Abandoned Vehicles Citation Alarm Response Fee A.B.C. Letter for One Day Sale Permit Booking Fee Reimbursement Disturbance Ca!l-back DUI Reimbursement Fingerprinting In-house Processing One Day Alcohol Use Permit Photographs Storage Fee (vehicle) Towed Vehicle Release Verification Letter Verification Report Fee $25.00 each $103.00 $10.00 per alarm company, Danville customer $25.00 County Charge $60.00 per hour/officer for second or more calls Actual Costs not to exceed $1,000.00 $20.00 $75.00 $50.00 $25.00 $60.00 $25.00 $50.00 $25.00 $25.00 per day plus $1.50 per photo for processing per day (resident) (nonresident) ToWn of Danville Master Fee Schedule PARKS AND COMMUNITY FACILITIES Indoor Facility Rates~ Community Center Valley Oak & Las Trampas Valley Oak Las Trampas Room Kitchen An & Craft Room Lounge Bandstand Town Green Library Mt. Diablo Room Town Meeting Hall Auditorium Kitchen Village Theatre Base Rate/6 hours Hourly Rate/2 hour minim'um Veterans' Memorial Hall Main Hail Meeting Room (Upstairs) Kitchen Oak Hill Park Building Kitchen FEE FOR SERVICE Grouo III Grouo IV Nonoro~t Private Groun V Commercial $88/hour $125/hour $158/hour $74/hour $105/hour $138/hour $32/hour $39/hour $45/hour $53/use $53/use $53/use $18/hour $24/hour $27/hour $18/hour $24/hour $27/hour $53/use $53/use $53/us e $131/use $131/use $184/use Diablo Vista Park Concession $35/hour $43/hour $49/hour $46/hour $63/hour $84/hour $25/use $25/use $25/use $315/6 hours $420/6 hours $525/6 hours $53/hour $63/hour $74/hour $58/hour $84/hour $116/hour $29/hour $42/hour $55/hour $53/use $53/use $53/use $36/hour $43/hour $50/hour $23/use $23/use $23/hour Hap Magee Ranch Park Swain House Front Room Parlor Kitchen Room # 1 or #2 Full Facility Hourly Daily Cottage Front Room Den Bay Room $24/hour $33/hour $44/hour $32/hour $42/hour $58/hour $11/hour $14/hour $17/hour $23/use $23/use $23/use $11/hour $14/hour $17/hour $53/hour $70/hour $95/hour $420/day $557/day $756/day $26/hour $37/hour $53/hour $11/hour $14/hour $17/hour $11/hour $14/hour $17/hour Kitchen not included 4 Town of Danville Master Fee Schedule Outdoor Facility Rates Group Picnics Diablo Vista Park Oak Hill Park Osage Station Park Up to 50 Up to 150 Over 150 Sycamore Valley Park Up to 50 Up to 150 Over 150 Groun III Nonnrofit $53/area $53/area $79/area $158/area $315/area $79/area $158/area $315/area Family Picnics Osage Park Picnic Area - Up to 20 Sycamore Valley Park Picnic Area - Up to 20 Oak Hill Park Picnic Area - Up to 20 Diablo Vista Park Picnic Area - Up to 20 Residents $37/area $37/area $37/area $37/area Special Facilities Tennis Courts Hap Magee Ranch Park Meadow Groun III Nonnrofit $4/hour $263/use Sports Fields Baseball/Sofiball Soccer Soccer/artificial tuff field Lighting Litter and Special Maintenance $1 O/hour $20/hour $100/hour $12/hour $26/hour Groups using 15+hours reservation time Groups using less than 15 hours reservation time Nonresident Adult Soccer Nonresident Adult Baseball/Softball Sports Camps Two-day Tournaments Snorts Alliance $19/player $13/player $20/player $1 O/player $5/player $600/use Groun IV Private $131/area $131/area $105/area $158/a/rea $315/area $105/area $158/area $315/area Groun IV Private $4/hour $263/use $14/hour $24/hour $100/hour $12/hour $26/hour Groun V Commercial $184/area $184/area $158/area $21 O/area $525/area $158/area $21 O/area $525/area Non-Residents $53/area $53/area $53/area $53/area Groun V Commercial $8/hour $263/use $19/hour $29/hour $100/hour $12/hour $26/hour 5 Town of Danville Master Fee Schedule Miscellaneous Fees All Uses/Groups Facility Reservations/Permits Change Request Unscheduled rental use Late Request Cancellation Charge Less than 30 days Less than 60 days Facility Reservations/Permits Non-Resident Surcharge Insurance Security/Cleaning/Damage Deposit (Refundable) Oak Hill Park Building Veterans' Hall Town Meeting Hall Community Center Village Theatre Hap Magee Ranch Park (Full Facility) Hap Magee Ranch Park (Single Room) Hap Magee Ranch Park (Litter Deposit) Facility Attendants Attendant - Minimum 2 hours. Attendant Overtime Theatre Technician Litter Removal $11/each Two times hourly rate $16/each $50 miramum 100% of rental fee 50% of rental fee 10% As Required plus $15 administration fee $53/ea. $210/ca. $420/ea. $420/ea $420/ea. $420/ea. $105/ca. $105/ea $26/hour $39/hour $18/hour $26/hour Equipment P.A. System Slide Projector Overhead Projector Screen (Portable) Easel Tables Chairs Popcorn Machine Piano 10 Umbrellas w/stands 2 Canopies 1 Portable Stage (4-4x8 sections w/steps) Portable Stage Section (Each 4x8 section w/steps) TV/VCR Table Top Lectern AV Cart Only Full Length Lectem (Community Center, Library, Town Meeting Hall only) $1 O/use $1 O/use $1 O/use $1 O/use $5/use $5/each $1/each $40/use $40/use $10/use $25/use $15 O/use $40/use $25/use $25/use $5/use $25/use Town of Danville Master Fee Schedule Miscellaneous Fees Additional Microphones with/without stands (Community Center only) Portable Hand-Held Microphone Sound Unit 250 Wooden Chairs White Board w/Markers (4 1/2' x 3') All Uses/Grouns $25/use $25/use $1/each $1 O/use Portable Stage (Mobile) One day Two days One week Set-up/Transport Optional Power Amp Power Cable $400/use $600/use $800/use $205/use $20-50/use $10-3 O/use Town of Danville Master Fee Schedule ENGINEERING SERVICES FEE FOR SERVICE Map Check Improvement Plan Check Review of improvement plans street, drainage and landscaping work Engineering Inspection Inspection of installation of street, drainage and landscaping improvements Street Lighting Operation of public street lighting system Encroachment Permit For work within the public right-of-way Drainage Permit For work within any public or private drainage course 2-10 lots - $1,539+ $146/lot; >10 lots - $3,024 + $22/lot 3.5% of project cost <$50,000; 3.25% of project cost >$50,000 & <$100,000; 3.0% of project cost >$100,000; 5.5% of project cost <$50,000; 5.25% of project cost >$50,000 & <$100,000; 5.0% of project cost >$100,000; One year operational cost + 10% $119 for projects <$2,000; 5.5% of construction cost for projects >$2,000 $119 for projects <$2,000; 5.5% of construction cost for projects >$2,000 Grading Plan Check Under 50 cy: $130. More than 50 cy: $65 + Percentage of Construction Cost + Volume Fee: Percentage of Construction Cost: $0 to $10,000 use 0.5%; $10,001 to $100,000 use 1.0%; $100,001 and greater use 1.5% Volume Fee: 50 to 1,000 cy: $0.65 per 100 cy 1,000 to 10,000 cy: $0.14 per 1 O0 cy + $130 (for soils report review) 10,001 or greater: $0.43 per 100 cy + $713 (for soils report review) Grading Permit Under 50 cy: $18.51 to 100 cy: $28. 101 to 1,000 cy: $28 for first 100 cy plus $13 for each additional 1 O0 cy 1001 to 10,000 cy: $154 for first 1000 cy plus $11 for each additional 1000 cy 10,001 to 100,000 cy: $262 for first 10,000 cy plus $49 for each additional 10,000 cy 100,001 cy or greater: $754 for first 100,000 cy plus $28 for each additional 10,000 cy 8 Town of Danville Master Fee Schedule ENGINEERING SERVICES Grading Inspection FEE FOR SERVICE Under 50 cy: $130 More than 50 cy: $65 + Percentage of Construction Cost + Volume Fee: Percentage of Construction Cost: $0 to $10,000 use 2.0%; $10,001 to $100,000 use 1.5%; $100,001 and greater use 1.0% Volume Fee: 50 to 1,000 cy: $6.48/100 cy 1,001 to 10,000 cy: $65 + $2.70/100 cy 10,001 or greater: $335 + $1.40/100 cy Finish Grading Inspection Finish grading inspection for a single family residential lot $54 Debris/Clean-up Deposit A deposit shall be paid at permit issuance to assure the clean-up of the site and/or public right-of-way. This deposit shall be returned to the applicant if it can be determined at certification of occupancy that the site and surrounding areas have been restored to their clean and ultimately improved condition. $216 per acre NPDES (National Pollution Discharge Elimination System) Elimination of Drainage Runoff Pollutants Inspection Residential $37 Multi-residential $151 Commercial $308 Base Map Revision Revision of Town computerized base map $45 for each new or revised lot or parcel Certificate of Correction/Amended Map Revises a recorded document $130 per document Vacation of right-of-way or easement Process a request to abandon a public right-of- way or easement $1,404 9 PLANNING SERVICES Environmental Assessment Environmental Impact Report Initial Study - Mitigated Negative Declaration Initial Study - Standard Negative Declaration Town of Danville Master Fee Schedule FEE1 DEPOSIT2 T&M Contract Amount T&M $500 $200 ADDITIONAL FEES/DEPOSITS Notice of Determination3 .Negative Declaration $1,300 Environmental Impact $900 Report Notice of Exemption $50 Certificate of Compliance Subdivision $150 Zoning $150 Development Plan Administrative4 (no public hearing) $400 New Construction Commercial, Office or - Light Industrial T&M Major Ridgeline $1750 Minor Development Plan (with public hearing) T&M Multiple Family T&M Residential Scenic Hillside Other 33% administrative surcharge above plus surcharge beyond contract amount $500 flat fee + $50/hour after ten hours $2,500 $1,250 $3,000 $1,250 T&M $500 Minimum base fee of $250 T&M is time and materials charge for staff time necessary to process the permit. Deposit amounts are set afthe assumed average cost to provide the service. If the cost to provide the service exceeds the deposit, the applicant will be billed the cost over run. If the cost to provide the service is less than the deposit, then the unused balance from the deposit will be refunded to the applicant. These fees are set by Assembly Bill 3158, authorizing the County Clerk to collect fees for the Department of Fish and Game. The Town and the County Clerk each retain $25.00 on each fee collected to cover processing expenses. This fee may be reduced to $200 by the Development Services Director in cases of minor additions to residential or commercial structures. 10 PLANNING SERVICES Land Use Permit Administratives (no public hearing) Commercial or Office Day Care Facility (8 to 14 occupants) Day Care Facility (>14 occupants) Home Occupation Permit Land Use Permit/Development Plan Combination6 Town Of Danville Master Fee Schedule FEEl DEPOSIT2 $350 T&M $1,250 $250 $750 $250 $375 Light Industrial T&M Minor Land Use Permit (with public hearing) $350 Residential Care Facility T&M Second Unit $500 Temporary/Seasonal $150 Wireless Communication Facilities - New Facility $2,500 Wireless Communication Facilities - Time Extension $200 Other T&M Subdivision Major Subdivision T&M Minor Subdivision (_< 4 lots/units) T&M Tentative Map Extension $150 ADDITIONAL FEES/DEPOSITS Rezoning Agricultural Residential Commercial, Office/Industrial $2,500 $3,000 $5OO LUP fee of $375 - DP fee per fee schedule Minimum base fee of $250 $2,500 $2,500 Plus $125/lot into initial deposit for lots 5-15; $75/1ot for lots 16-50 and $50/1ot for each lot beyond the 50th lot $750 T&M $2,500 T&M $2,500 This fee may be reduced to $175 by the Development Services Director for minor applications. Not applicable to LUP/DP combinations involving wireless communication facilities. 11 PLANNING SERVICES Planned Unit Development - Residential Preliminary Development Plan - Rezoning Final Development Plan Time Extension Planned Unit Development - Commercial Preliminary Development Plan - Rezoning Final Development Plan Time Extension Variance Administrative No n-ad m i n istrative Sign7 Administrative Non-administrative Master Sign Program General Plan Amendment Design Review Board (DRB) Administrative (no public hearing) Conceptual Review Town of Danville Master Fee Schedule FEE1 DEPOSIT: ADDITIONAL FEES/DEPOSITS T&M $2,500 T&M $1,500 $200 Plus $125/lot into initial deposit for lots 5-15/lots; $75/1ot for lots 16-50 and $50/lot for each lot beyond the 50th lot T&M $3,500 T&M $2,000 $200 Plus $250/acre into initial deposit 1 - 5 acres and $50/acre each acre beyond five acres $250 $500 $150 $300 $5OO T&M $3,500 Plus $250/acre into initial deposit 1 - 5 acres and $50/acre each acre beyond five acres $250 $150 Flat fee to be applied to fee paid for formal Application - maximum two DRB meetings Sign application fee covers costs for Design Review Board review. 12 PLANNING SERVICES Non-administrative (public hearing) Sign review Tree Removal Special Planning Studies Archaeological Review Public Notice Preparation of Notification Map and Mailing List Mailouts ParceiMerger Lot Line Adjustment FEE~ $450 $150 $50 $50 Town of Danville Master Fee Schedule $50 T&M $400/1ot $400/1ot DEPOSIT2 ADDITIONAL FEES/DEPOSITS Cost plus 33% administrative surcharge Extensions Extension handled as an $100 administrative action Extension handled as a $200 non-administrative action Appeals Appeal of Administrative $100 Action Appeal Planning $25 Commission Action Billing rate is $0.75 per mail piece 13 ToWn of Danville Master Fee Schedule PLANNING SERVICES Documents Standard Plan, Capital Improvement Program Document, Town of Danvi!!e Landscape and Irrigation Project Procedures and Standards FEE FOR SERVICE $15 Townwide Trails Master Plan $35 General Plan $20 General Plan Map, Beauti~cation Guidelines, $5 Base Map, Specific Plan Zoning Map, Downtown Master Plan Plan size copies sheet $10 $2 per sheet 14 BUILDING SERVICES FEE FOR SERVICE Building Permit and Inspection As required by Uniform Building Code See Table 1A from 1997 Uniform Building Code Electrical Permit As required by National Electrical Code 20% of building permit fee Plumbing Permit As required by Uniform Plumbing Code 17% of building permit fee Mechanical Permit As required by Uniform Mechanical Code 18% of building permit fee Swimming Pool, Spa or Hot Tub Permits As required by Uniform Swimming Pool, Spa and Hot Tub Code Equivalent to building permit plus any required electrical or plumbing permits Plan Review As required for any permit 65% of building permit fee Investigations As provided for in Uniform Administrative Code Equivalent of applicable permit 15