Loading...
HomeMy WebLinkAbout105-98 RESOLUTION NO. 105-98 ESTABLISHING A MASTER FEE SCHEDULE FOR USER AND COST RECOVERY FEES WHEREAS, the Town of Danville charges facility use fees for the rental and use of Town- owned and maintained facilities; and WHEREAS, the Town charges planning and engineering processing and permit fees for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, the Town Council has previously established such fees as part of the Danville Municipal Code, but now desires to establish such fees as part of the Master Fee Schedule through resolution; and WHEREAS, the Town Council conducted a public hearing to receive testimony regarding the proposed increases in user and cost recovery fees, notice of which hearing was provided as required by law; now, therefore be it RESOLVED, by the Danville Town Council that the Master Fee Schedule for user and cost recovery fees, as set forth in Exhibit 1 attached hereto, is hereby adopted. Any increased fees for the Community Development Department shall not go into effect for 60 days from adoption of this resolution. Until then, the existing fees shall remain in effect. APPROVED by the Danville Town Council at a regular meeting on July 7, 1998, by the following vote: AYES: Waldo, NOES: None ABSTAINED: None ABSENT: None Arnerich, Doyle, Greenberg, Shimansky MAYOR APPROVED AS TO FORM: CITY ATTORNEY ATTEST: CITY CLERK Town of Danville Master Fee Schedule CITY CLERK FEE FOR SERVICE Municipal Code Volume I Volume II Full Set Supplements Notary Public Photo copies Records Search Town Council Agenda Subscription Town Council Minutes Subscription Voter Registration Transcript $75.00 $75.00 $150.00 $25.00 year $10,00 signature $0.20 page $25.00 hour $30.00 year $60.00 year $7.50 each I Exhibit I to Resolution No. 105-98 POLICE SERVICE FEE FOR SERVICES Accident Reports Abandoned Vehicles Citation Alarm Response Fee A.B.C. Letter for One Day Sale Permit Booking Fee Reimbursement Disturbance Call-back DUI Reimbursement Fingerprinting In-house Processing One Day Alcohol Use Permit Photographs Storage Fee (vehicle) Towed Vehicle Release Verification Letter Verification Report Fee $25.00 each $103.00 $10.00 per alarm company, Danville customer $25.00 County Charge $60.00 per hour/officer for second or more calls Actual Costs not to exceed $1,000.00 $20.00 $75.00 $50.00 $25.00 $60.00 $25.00 $50°00 $25°00 $25.OO per day plus $1.50 per photo for processing per day (resident) (nonresident) 2 Exhibit 1 to Resolution No. 105-98 g6-~01 'oN uo!mIosoH o~ I l!q.rqx~I E papnpu! lou uoqo:.~. anoq/00'9 [ anoq/00' E I Jno~00'01 tuooH K~H anoq/00'91 anoq/00' E I .moq/00'01 uaO -moq/00'0 ~ -~noq/00' ~ £ ~noq/00' ~Z mooH :uoa.4 o~tmo:3 ,(gP/00'0~ZL ,(~P/00'0 £ S X~P/00' 0017 ~noq/00'06 ~oq/00'L9 moq/00'0g · moq/00'9 [ -moq/00' E I -moq/00'0 [ anoq/00'9 [ ~noq/00' £ [ anoq/00'0 I asn/00'~ osn/00' ~Z ~sn/00'~ ~noq/00'9 1 ~n°q/00'C [ an°q/00'0 [ ~noq/00'~;S; anoq/00'017 ~notl/00'0£ anoq/00'Z~17 anoq/00' [ £ anotE00' CZ anoq/00'Z~ asn/00'ZZ °sn/00'Z~ 2notE00' g 177 anoq/00' [ 17 anoq/00' 17 E ~sn/00'ZZ asn/00' ~;Z asn/00' ~;Z anoq/00'Z~ anoq/00'017 ~noq/00'gZ anoq/00'011 Jn°q/00'0g 'm°q/00'S ~ -~noq/00'0L s~noq 9/00'00S anoq/00'09 sanoq 9/00'0017 anoq/00'0S; sanoq 9/00'00E osn/OO'lTZ: asn/O0'17~ osn/OO'lTZ: anoWO O' 08 anoq/O O' 09 -~noq/O O' 1717 anoq/00'L17 anoq/00' [ 17 .inoq/00' E E uo!ssoouoD ~Ia~d ~ns!A olq~!O uoqol!xA ~u!pI!n8 ~l~gd II!H ~ieO uoqol!Z,A (sa!msdfl) tuooH $u!DoIAI IIuH u!eIAI iieH le!:~otuoiAi s ,tmaoloA LII!IIIIIHIIII .moq ZToIsH ~i.moH sanoq 9/olq o~moq& uoqo:t!xA mn!.xo:tIpnV IIuH ~ulloalAI u,,ao~L tuooH olq~!Cl '~IAI Iu!oaommo3 O:IHA.Hd lHoaduoN A dnoaO AI dnoa9 III dnoa9 sol~H ~!I!o~A aoopuI SHI.,LI"IIDVJ XiINIFIIAIIAIO3 (llqV S3HVd Outdoor Facility Rates Group Picnics Diablo Vista Park Oak Hill Park Osage Station Park Up to 50 Up to 150 Over 150 Sycamore Valley Park Upto50 Upto 150 Over 15 0 Family Picnics Osage Park Picnic Area Up to 20 Oak Hill Park Picnic Area Up to 20 Special Facilities Tennis Courts Hap Magee Ranch Park Meadow Sports Fields Baseball\Softball Soccer Lighting Litter and Special Maint. Groups using 15+/hrs. reservation time Groups using less than 15/ hrs. reservation time Non-resident Adult Soccer Non-resident Adult Base- ball/Softball Sports Camps Two-day Tournaments Miscellaneous Fees Facility Reservations/Permits Change Request UnschCduled rental use Late Request Cancellation Charge Less than 30 days Less than 60 days Group III Nonprofit 50.00/area 50.00/area 75.00/area 150.0 O/area 300.00/area 75.00/area 150.00/area 300.00/area Residents $ 35.00/area 35.00/area Group III Nonprofit $ 4.00/hour 250.00/use $ 9.5 O/hour 19.50/hour $12.00/hr, all groups 25.00/hr. all groups Sports Alliance $19.00/player 13.00/player 20.00/player 10.00/player 5.00/player 600.00/use Group IV Private Group V Commercial 125.00/area 125.00/area 100.00/area 150.00/area 300.00/area 100.00/area 150.00/area 300.00/area 175.00/area 175.00/area 150, 00/area 200.00/area 500.00/area 150.00/area 200.00/area 500.00/area Non-Residents 50.00/area Group IV Private 50.00/area Group V Commercial $ 4.00/hour 250.00/use $ 8.00/hour 250.00/use 11.00/hour 23.00/hour 14.00/hour 28.00/hour All Uses/Groups 10.00 each Twotimes hrly. rate 15.00 each lO0%ofrentalfee 50%ofrentalfee 4 Exhibit 1 to Resolution No. 105-98 Miscellaneous Fees Continued All Uses/Groups Facility Reservations/Permits Non-Resident Surcharge Insurance Security/Cleaning/Damage Deposit (Refundable) Oak Hill Park Building Veterans' Hall Town Meeting Hall Village Theatre Hap Magee Ranch Park (Full Facility) Hap Magee Ranch Park (Single Room) Hap Magee Ranch Park (Litter Deposit) Facility Attendants Attendant -Minimum 2 hrs. Attendant Over-time Theatre Technician Litter Removal Equipment P oA. System Slide Projector Overhead Projector Screen (Portable) Easel Tables Chairs Popcorn Machine Piano Portable Stage One day Two days One week Set-up/Transport Optional Power Amp Power Cable 10% As Required 50.O0/ea. 200.O0/ea. 400.O0/ea. 400.O0/ea. 400.O0/ea. 100.00/ca. 100.00/ca. 25.00/hour 37.50/hour 17.00/hour 25.00/hour 10.00/use 10.00/use 10.00/use 10.00/use 5.00/use 5.00 each 1.00 each 40.00/use 40.00/use 400.00/use 600.00/use 800.00/use 250.00/use 20.O0-50.O0/use lO.O0-30.O0/use 5 Exhibit 1 to Resolution No. 105-98 ENGINEERING SERVICES Map Check Improvement Plan Check Review of improvement plans street, drainage and landscaping work fOr Engineering Inspection Inspection of installation of street, drainage and landscaping improvements Street Lighting Operation of public street lighting system Encroachment Permit For work within the public fight of way Drainage Permit For work within drainage course any public or private Grading Plan Check Grading Permit FEE FOR SERVICE 2-10 lots - $1,425 + $135/1ot; >10 lots = $2,800 + $20/1ot 3.5% of projects <$50,000; 3.25% of projects >$50,000 & <$100,000; 3.0% of projects >$100,000; 5.5% of projects <$50,000; 5.25% of projects >$50,000 & <$100,000; 5.0% of projects >$100,000; One year operational cost + 10% $110 for projects <$2,000; 5.5% of construction cost for projects >$2,000 $110 for projects <$2,000; 5.5% of construction cost for projects >$2,000 Under 50 cy: $120 More than 50 cy: $60 + Percentage of Construction Cost + Volume Fee: Percentage of Construction Cost: $0 to $10,000 use 0.5%; $10,001 to $100,000 use 1.0%; $100,001 and greater use 1.5% Volume Fee: 50 to 1,000 ey: $0.60/100 cy ($60 min) 1,000 to 10,000 cy: $0o125/100 cy + $120 10,001 or greater: $0.40/100 cy + $660 Under 50 cy: $17. 51 to 100 cy: $25.50. 101 to 1,000 cy: $25.50 for 1't 100 cy plus $11,75 for each additional 100 cy 1001 to 10,000 cy: $142 for 1st 1000 cy plus $10.00 for each additional 1000 cy 10,001 to 100,000 cy: $242 for 1't 10,000 cy plus $45.50 for each additional 10,000 cy 100,001 cy or greater: $697 for 1~t 100,000 cy plus $25.50 for each additional 10,000 cy 6 Exhibit 1 to Resolution No. 105-98 Grading Inspection Finish Grading Inspection Finish grading inspection for a single family residential lot Debris/Clean-up Deposit A deposit shall be paid at permit issuance to assure the clean-up of the site and/or public right of way. This deposit shall be returned to the applicant if it can be determined at certification of occupancy that the site and surrounding areas have been restored to their clean and ultimately improved condition. NPDES (National Pollution Discharge Elimination System) Elimination of Drainage Runoff Pollutants Base Map Revision Revision of Town computerized base map Certificate of Correction/Amended Map Revises a recorded document Vacation of fight-of-way or easement process a request to abandon a public fight-of-way or easement Under 50 cy: $120 More than 50 cy: $60 + Percentage of Construction Cost + Volume Fee: Percentage of Construction Cost: $0 to $10,000 use 2.0%; $10,001 to $100,000 use 1.5%; $100,001 and greater use 1 Volume Fee: 50 to 1,000 cy: $6o00/100 cy ($60 min) 1,001 to 10,000 cy: $60.00 + $2.50/100 cy 10,001 or greater: $260.00 + $1.30/100 cy $50.00 $200 per acre Residential = $34000 Multi-residential = $140.00 Commercial = $285.00 $40.00 for each new or revised lot or parcel $115.00 per document $1,300 7 Exhibit 1 to Resolution No. 105-98 PLANNING SERVICES FEE FOR SERVICE Environmental Assessment Initial Study (Standard Negative Declaration) Initial Study (Mitigated Negative Declaration) Environmental Impact Report $115 $360 Report Cost + 33% for Town-administration of Environmental Impact Report Notice of Determination Negative Declaration $1,300 Environmental Impact Report $900 Notice of Exemption $50 (Note: These fees are set by Assembly Bill 3158, authorizing the County Clerk to collect fees for the Department of Fish and Game. The Town will retain $25.00 on each fee collected.) Certificate of Compliance (Subdivision or Zoning) $125 Development Plan Scenic Hillside $325 Major Ridgeline $950 Administrative (No Public Hearing) $325 (Note: This fee may be reduced to $125 by the Director of Development Services Department in cases of minor additions to residential or commercial structures.) Minor Development Plan (With Public Hearing) $1,000 Multi-Family Residential $2,075 + $80/unit Commercial, Office or Industrial $2,075 Land Use Permit Antenna/Satellite Dish $100 Temporary Land Use $115 Downtown Conditional Use $115 Child Care or Day Care Facility (8-14) $115 Child Care or Day Care Facility > 14) $325 Second Unit $325 Administrative Minor LUP (No Public Hearing) Commercial, Office or Industrial Residential Care Facility LUP/DP Combination $325 $960 $2,075 + $80/bed $360 8 Exhibit 1 to Resolution No. 105-98 Subdivision Major Subdivision (more than four lots) Minor Subdivision (four or fewer lots) Tentative Map Extension $2,075 + $110/lot (5-50dus) + $80/lot (51-250dus) + $30/lot (251 +dus) $1,410 $300 Rezoning Agricultural Residential Commercial, Office or Industrial $560 $3,465 $3,465 Planned Unit Development District Preliminary Development Plan Residential Commercial, Office or Industrial $2,075 + 110/lot (5-50dus) + $80/lot (51-250 dus) and $50/lot (250+ dus) $3,465 + $240/acre or portion Final Development Plan $1,410 (Note: If substantially the same as Preliminary Development Plan, this fee may be reduced 30% by the Director of Development Services Department.) Variance Administration $100 Non-administrative $350 Sign Review Administrative (no public hearing) Non-administrative (public hearing required) $115 $220 General Plan Amendment $3,465 + $110/ac (1-15 acres) + $80/ae (16-50 acres) and $50/ac (51+ acres) 9 Exhibit 1 to Resolution No. 105-98 Design Review Board Administrative (no public hearing) Non-Administrative (public hearing required) Agricultural Preserve Rezoning Contract Cancellation Lot Line Adjustment Time Extension Appeals Building Permit Plan Check Special Planning Studies Parcel Merger Archaeological Review Tree Removal Public Notice $100 $335 $950 $690 $360~ot $125 $200 $25 for all permits for valuations up to $15,000, thereafter $25/each $100,000 valuation or portion thereof, up to a maximum fee of $275 Cost + 33% $360/1ot $25 $25 (Note: Covers Town-cost of preparation and distribution of public hearing notices) A. For minor/administrative permits $50 For items requiring public hearing $100 deposit (with refund ofunspent balance or billing for amount expended beyond initial deposit to be handled through project conditions of approval) 10 Exhibit 1 to Resolution No. 105-98