HomeMy WebLinkAbout052-94RESOLUTION NO. 52-94
APPROVING DESIGN CONTRACT WITH BSI CONSULTANTS, INC. FOR
SAN RAMON VALLEY BOULEVARD IMPROVEMENTS,
PHASES IA2 lB, AND PHASE II
WHEREAS, the Town Council of the Town of Danville has approved the design and
construction of these projects in the 1992/93-1996/97 CIP; and
WHEREAS, sufficient funds have been allocated by the Town of Danville, CCTA
(Measure C), and the Charlotte Wood [)eveloper, to design and construct the proposed
improvements; and
WHERF~S, the Town of Danville has the responsibility to design such roadway
improvements, and desires to engage the services of a design consultant to prepare
plans, specifications, and cost estimates for said roadway improvements; and
WHEREAS, the design firm of BSI Consultants, Inc. is uniquely qualified by training and
experience to provide design services in connection with such roadway work; and
WHEREAS, such firm has presented the Town with a proposed Agreement setting forth
the terms and conditions under which it proposes to provide such services; now,
therefore, be it
RESOLVED, that the Town Council hereby authorizes the Town Manager to execute,
on behalf of the Town, a Design Contract with BSI Consultants, Inc., for the not to
exceed fee of $113,801, which includes a 10% contingency in the form as lodged with
the City Clerk, together with such changes as may hereafter become necessary, provided
such changes do not materially increase the obligations of the Town thereunder.
APPROVED by the Danville Town Council at a Regular Meeting held on April 19, 1994,
by the following vote:
AYES: Ritchey,
NOES: None
ABSTAINED: None
ABSENT: None
Greenberg, Doyle,
Shimansky, Waldo
IVIAYOR
APPROVED AS TO FORM:
~Z'ITY ATTORNEY
ATTEST:
CITY CLERK