HomeMy WebLinkAbout097-89 RESOLUTION NO. 97-89
APPROVING THE PHASING PLAN, COST ESTIMATE AND
ADDITIVE ALTERNATES FOR SYCAMORE VALLEY PARK SITE
WHEREAS, on June 5, 1989, Town Council approved Resolution No. 72-
89 approving a Modified Masterplan for the Sycamore Valley Park
Site; and
WHEREAS, a revised phasing plan, cost estimate and additive
alternates have been developed for the Modified Masterplan; and
WHEREAS, the development of the Masterplan is dependent upon land
exchanges with the San Ramon Valley Unified School District and the
Zion Fellowship:
NOW, THEREFORE, BE IT RESOLVED that the Danville Town Council
hereby:
1. Adopts the phasing plan and cost estimate for Sycamore Valley
Park Site as outlined in Attachment C; and
2. Approves the roadway and parking lighting, 75-person group
picnic area and the walkway lighting in section of park
adjacent to Camino Tassajara as additive alternates to be bid
in Phase I; and
3. Directs staff to continue negotiations for land exchanges with
San Ramon Valley Unified School District and Zion Fellowship.
PASSED, APPROVED AND ADOPTED this 17th day of July, 1989, by the
following vote:
AYES: GREENBERG, JAGGER, LANE, RITCHEY & SCHLENDORF
NOES: NONE
ABSENT: NONE
NON ,
ATTEST: MAYOR f
CLERK
APPROV/E-D A .>~ "]~ORM: ........ ~
/.,-j.6~ TOWN ATTOK~FEY ......
/
I'
&
- o ·
' SYCAMORE ¥ALLEY PARX SITE** ,~==) 7-7-~CH ~v7'- C__
°'- N~TERPLAN COST EiT[NATE. PI-IASE !
JUNE lg, 1989 (REYZSED PER COUNCZL NEEI'ZNG ~IUN£ B, lgBg)
~/k-~ ON CONSTRUCTION BUDGET OF $2,602,600
1Hd Item ~escr~pttons '. ~uanttt,v Unlt Cost lte:n Tote1
BASIC CO,UNITY PARK AREA* . o
Includes clearing, grading,
drainage, turf, irrigation,
trees, and walkways. $5.4 Acres $ 60,000.* $ Q24,000.
SPORTS ~EA B~IC $ZT£ WORK
Clearing, gradlnO, and
drainage only, ~2.? Acres 2g,000. 368.300.
SPORTS AREA DEYELOPHENT**
Turf and Irrigation only
for 3 soccer fields and
4 baseball fields ,1.1 Acres 35,000, 385,000.
thI~ROSEEDING OF UND£VELOPEO '
SPORTS AREA ' 2.9 Acres S,000. 34,500,
BACKSTOPS AT BASEBALL F~ELDS
AND SOCCER GOALS Allow -.. 57,000.
NA%N PA3,K ROADWAY
Quantity and cost represent
1/2 of development. The
other 1/2 is part of
required school development
- and shall be funded by'the
School District, $$0 L.F. 150. i04,000.
11ATURALTRANSIT%ON ZONE
Area between redeveloped park
and natural open space area, 3 Acres 30,000. 90,000.
4
POND DEVELOPMENT
Ragfading of portions of the
pond and construction of vter
structure and everfle~ to
enhance ana improve pond's
appearance and function. Allow --- SO,000.
PLAY AREA - A11 ow --- 45,000.
TOT LOT " A1 low -.. 30,000..
o
~sterplan Cost Esttmte ---'-- - '*
June 5, 1989
Page 2
81d Item Descriptions Quantity Unit Cost Item Total
PARK FURNITURE
lncludes one half of
the benches, picnic
tables, erinking fountain,
signs, etc. Allow --- $ 17,500.
1 RESTROOM BUILDING Allow --- 75,000.
WAUO~AY LIGHTING IN SECTION
OF PARK ADJACENT TO CANINO'
TASSA~ARA Allow --- 40,000.
· OADWAYAND PARKING LIGHTING Allow --- 22,000,
?S-PERSON GROUP PICNIC AREA Allow --- 20,000.
RUSTIC FENCING ALONG CAMINO
TASSAJARA A11 ow --- 25,000,
UTILITY SERVIC£ TO PARK
Cost approximate at this
time and represents half
of utility service,
School District to pay
remaining half of utility
service to site. Allow -'- liD,000.
SPORTSFIELD LIGHTING
2 Baseball fields and
I soccer field. Allow --- 220,000.
Subtotal= $2,$27,300.
10% Contingency= 262,730.
' Total: $2,890,030.
Includes first phase turflng and lrrigatlon of areas designated for future
development, i.e. play area, tennis courts, etc,
~* Phase Z Turf and Irrigation - Includes 2 little league and 2 senior high
fields, 2 standard size soccer fields (210 ft. x 330 it,) and 2 s~tller size
soccer fields (~80. it, x 300 ft.)
~OTE: Construction of ~ark in phases will result in a slightly higheroverall -
cost, aue mostly to ruffing ana installat(on of irrigation in areas
aestanatea for future ~aclllty aevelo~nent, i.e. Dlay areas tenn(s '
courts, ~asket~all courts, etc., aria hyUroseealn§ of two (21 unaevelo~ed
future s~orts fie)as.
A
&
'- $YC~ORE VALLEY PARK SITE
J4ASTERPLAN COST ESTZNATE, PHASE Z! .....
_6.~E 5, Zg80 __~.~_~__
o.-
Btd Item Descriptions Ouanttt.v. Untt Cost Item Total
SPORTS J~EA
Completion of turf and
trrlgatlon at re~tntng ..
full-sized soccer field '
and little league Tteld, ' 2.9 Acres $ 3S,000. $ lOl,600.
SPORTS ARF. A DEVELOPMENT*
Walks, Fencing, and
bleachers Allow --- 300,000.
SECONDARY ROAD AD3ACENT
TO CHURCH 100 L.F. 160. ' 48,000.
PARX FURNITURE
Remaining 50~ Allow --- 12,$00.
PAVED SPORTS COURTS
Baskethal I, etc. Allow ---- 60,000.
SPORTS COURT COVER Allow --- 250,000.
IPAR COURSE AND TRAIL Allow --- 30,000,
2 LXGHTED TENNIS COURTS Allow --- 75,000.
TURF B069. AHPHITHEATER
Includes concrete seat
steps and paved stage
area. _ A11 ow --- 380, ODD.
1 RESTROOH BUILDING Allow --- . 75,000.
TRAIL STAGING AREA
Includes 20-space
truck/frei let parklng
lot, IS-space car
parking lot, roadway,
hltchtng area, and
potable water. Allow --- ~$,000.
I
d&
~te~lan Cost ~.st~te
~une 5, 1989
Page 2
lid lt~ Descrlotlons Ouantlty Unit Cost Ttem Total
~EMA]NING WALKLWAY LIGHTING' ' Allow --- $ 40,000.
Subto t~l: $! ,257,400.
[0% Contingency: t25,74o.
Total: $!,383,140..
* Includes fencing, walks, and bleachers for five ($} baseball fields and four
(E) soccer fields, and backstop and soccer goals for baseball field and
soccer pitch develope~ in Phase II.
NOTE: Construction of ~ark ~n ~hases will result in a slightly hi;her overal!
cost, Uue mostly to ~urflng anO installation of Irrigation in areas
~esl;nate~ for future faclllty Ueveloomen~ i,e. olay areas, tennis
courts, ~asketbal) courts; etc. an~ hyorosee~ln;of two (2) unuevelo~ed
future sDorts flelUs.