Loading...
HomeMy WebLinkAbout029-86D LE RESOLUTION NO. 29-86 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DANVILLE APPROVING FINAL MAP AND SUBDIVISION AGREEMENT FOR SUBDIVISION 6661 - MEADOW CREEK, PHASES I & II The following documents were presented for Council approval this date: A Final Map of Subdivision 6661 - Meadow Creek, Phases I & II, said map having been certified by the proper officials; A Subdivision Agreement with Olympia Properties, subdivider, whereby said subdivider agrees to complete all improvements as required in said Subdivision Agreement within one year from the date of said agreement. Said documents were accompanied by: I . Security to guarantee the completion of road and drainage improvements as required by Title 9 of the City Ordinance Code, as follows: A. Cash deposit in the amount of $6,496.34 made by Olympia Properties. Be Additional security in the form of corporate surety bond dated April 7, 1986 and issued by National Indemnity Company, in the amount of $643,137.66 for faithful performance and $324,817.00 for labor and materials. II. Letter of credit in the sum of $45,000.00 issued by Wells Fargo Bank, N.A. with Olympia Properties as principal to cover the cost incurred by the Sycamore Valley Assessment District in providing a temporary project entrance, temporary channelization and partial installation of a traffic light (mainly the installation of traffic signal conduits at the intersection of Camino Tassajara and A Street. The cost is summarized as follows: a) Installation of blank conduit $20,000.00 b) Transition pavement removal of striping $25,000.00 TOTAL 510LaGonda Way ·Danville, Cali~rnia 94526 $45,000.00 (415) 820-6337 It's understood that these funds will be used to reimburse the Assessment District and the remainder reimbursed to the developer. IV. The recordation of the Final Map shall occur only after: a) The agreement for maintenance purposes between the Flood Control District and Olympia Properties is approved by both parties and the City of Danville. b) Compliance with the requirements of the San Ramon Valley Unified School District as specified in the Sycamore Valley Specific Plan. Said compliance shall be verified in the form of a letter of understanding or agreement prior to recordation of Final Map. c) An agreement with the City, East Bay Regional Park and Olympia Properties addressing the disposition and improvement of lands designated as open space is approved by all parties. d) Fish & Game permit approval. Should this not occur within 45 days from the date of adoption of this Resolution, the City will rescind the approval of the Final Map. NOW THEREFORE BE IT RESOLVED that said subdivision, together with the provisions for its design and improvement, is determined to be consistent with the City's general and specific plans; BE IT FURTHER RESOLVED that said Parcel Map is approved and this Council does not accept or reject on behalf of the public any of the streets, paths, or easements shown thereon as dedicated to public use. BE IT FURTHER RESOLVED that said Subdivision Agreement is also approved. PASSED, APPROVED AND ADOPTED this 10thday of April, 1986, by the following vote: AYES: Kennett, Lane, McNeely, Schlendorf NOES: None ABSTAIN: None ABSENT: 0ffenhartz ATTEST: Mayor / ADMINISTRATIVE STAFF REPORT TO: Mayor and City Council April 10, 1986 SUBJECT: Approval of the Final Map and Subdivision Agreement for Subdivision 6661 - Meadow Creek Phases I & II BACKGROUND The subject Final Map creates 109 dwelling units on approximately 146 acres of land in Sycamore Valley. The project involves the development of approximately 30 acres of land north of Sycamore Creek and south of Camino Tassajara, with the balance of the property proposed as open space. The Tentative Map was approved by the Planning Commission on September 23, 1985. Key items which have been included in this Final Map are: bonding for a traffic signal on Camino Tassajara Parkway; dedication of all required easements; Key items not included in this Final Map, but will be approved at a later date, are as follows: · i i School District acceptance Flood Control maintenance agreement EBRPD acceptance of open space Fish and Game permit All other conditions of approval for this project have been completed as required. RECOMMENDED ACTION(S) It is recommended that the City Council adopt Resolution No. 29-86 approving the Final Map and Subdivision Agreement for Subdivision 6661. COST IMPACT None Prepared by: Mark Nothaft Associate Civil Engineer Attachments: Exhibit A - Project Location Map Exhibit B - Planning Commission Staff Report, 9/23/85 Exhibit C - Planning Commission Summary of Actions, 9/23/85 I,-- ~I.LI O~- o. oo PUD 84-6 EXHIBIT A FINDINGS AND CONDITIONS OF APPROVAL TENTATIVE MAP 6661 FINAL DEVELOPMENT PLAN FOR PUD 84-6 Findings The Planning Commission of the City of Danville make the following findings in support of the proposed Tentative Map and Final Development Plan (Subdivision 6661 and PUD 84-6)· · The Tentative Map and Final development Plan together with the design and improvement of the proposed subdivision are consistent with the Sycamore Valley Specific Plan and the General Plan. · The Final Development Plan is consistent with Ordinance No. 60-85, granting rezoning of the property to P-1 based upon the approved Preliminary Development Plan. · The site is physically suitable for the type and proposed density of development. · The design of the subdivision and the proposed improvements are not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat· 0 The design of the subdivision an the type of improvements are not likely to cause serious public health problems· · The design of the subdivision and the type of improvements will not conflict with easements acquired by the public at large, for access through or use of property within the proposed subdivision. 0 An Environmental Impact Report was prepared for the Sycamore Valley Specific Plan and Certified by Contra Costa county in 1981, and an addendum to that EIR was prepared and approved by the city of Danville in 1985. · Approximately 61 dwelling units are available within the 1850 dwelling unit maximum stipulated by the Sycamore Valley Specific Plan, which may be allocated ton one or more areas. Further, such action may occur without reducing the number of units allocated to any of the other residential properties within the Specific Plan Area. -A1- 9. That theMeadow Creek project represents an outstanding design including the architecture and/or site plan. 10. That the Meadow Creek project is consistent with the direction and goals of the City of Danville's adopted General Plan Housing Element· 11. That the anticipated sales prices for the proposed dwelling units may enable the project developer to qualify a portion of said units for bond financing under Contra Costa County's Home Mortgage Finance Program· 12. That approval of the project will enable the developer to preserve additional open space land beyond that which is shown on the Specific Plan Map and the City's General Plan. Conditions of Approval ® This approval is based upon the Tentative Map and Preliminary Grading Plan for Subdivision 6661, and the Final Development Plan for PUD 84-6. Any revisions to these plans including site plans or architecture shall be submitted for review of the Chief of Planning and City Engineer. 2· The total number of residential units not shall exceed 171. · The land uses and minimum dimensional standards and requirements for the principal and accessory structures on these lots shall be as follows: Frontyard 20 ft. Sideyard 10 ft. building separation for 1 story units 15 ft. building separation for 2 story units Rearyard 20 ft. (average) Unit locations shall be as shown on the Site Plan for the Final Development Plan with respect to frontyard setbacks and unit mix. Residential building height shall not exceed 28 ft. above average grade. Any deviation from these criteria or interpretation of standards shall be subject to the administrative review and approval of the Chief of Planning. (NOTE: Asterisk indicates conditions which must be satisfied prior to recordation of final maps; () indicates standard conditions of approval.) -A2 - · C5~ · (6) . · · Approval of the Preliminary Architecture as submitted as part of the Final Development Plan including colors and material, is hereby granted· The following items shall be incorporated into the architectural working drawings for the project: Ae Siding material shown on exterior elevations shall be natural wood or lap siding· The use of hardboard siding is not permitted. Be C· Trellises as shown on the streetscape elevations submitted, shall be constructed by the developer as part of each unit· Approved spark attestors shall be installed on each chimney used for fireplaces and heating appliances in which solid or liquid fuel is used. De All four exterior unit elevations shall be trimmed and detailed similar to front elevations. Trim material around doors and windows shall be a minimum 1 5/8 inch thickness. Ee All air conditioners/condensers shall be ground mounted and screened from public view. Pc If the City of Danville adopts an ordinance addressing requirements for fire retardant roofing on the Citywide basis Drior to issuance of buildina permits for this Droject. then the developer shall comply with the requirements of that ordinance· Preliminary Landscape Plans as submitted are generally in accordance with the Camino Tassajara Streetscape Recommendations. Preliminary Plans shall be resubmitted within 30 days of Planning Commission approval for review by the Chief of Planning, and shall be revised to include all information addressed in Exhibit B. Upon approval of a Preliminary Landscape plan, Landscape Working Drawings shall be submitted for review by the Chief of Planning prior to issuance of any building permits. All acoustical recommendations contained in the report prepared for the project by Edward L. Pack and Associates inc., dated June 7, 1985, shall be incorporated into the final design and construction of the project· All recommendations contained in the Soil and Geologic Investigation prepared for the project by Tetras·arch, Inc., dated May 15, 1984, shall be incorporated into the final design and construction of the project· The soils engineer shall sign the final grading plan. -A3 - (9). All recreation buildings, Cabanas, etc. shall comply with San Ramon valley Fire Protection District Ordinance #4, Supervised Sprinkler Requirements, prior to occupancy. 10. The recreation facilities and landscape treatment along Camino Tassajara shall be developed with each appropriate phase of project development, subject to the review of the Chief of Plannina. (11). The developer shall enter into an acceptable agreement with the City. addressing the disposition and improvement of lands designated as open space prior to issuance of gradinq Dermits or recordation of Final Maps for the proiect. whichever shall first occur. 12. Boundaries of the open space area shall be as shown on Exhibit 1. The southerly edge of the flood control channel should form the northern boundary of the open space area. 13. A 50 foot wide public access easement shall be offered for dedication to the City contiguous to the south side of the Flood Control easement along Sycamore Creek. 14. Developer shall participate in an assessment district of other funding mechanism for completion of all requirements contained in the Sycamore Valley Specific Plan pursuant to the approved scope of improvements as amended and adopted by the City Council on July 3, 1985. In addition, the developer shall participate in a Lighting and Landscaping Maintenance District to be formed in accordance with the Landscaping and Lighting Act of 1972. (15). Convenants, Condition and Restrictions, Articles of Incorporation and By-Laws for a mandatory homeowners association shall be prepared for the project. The City shall be made a third party beneficiary as to the sections of the CC&R's which address any applicable conditions included in the project conditions of approval. and the following areas of concern: A. Maintenance of private drainage systems, lot grading and landscaping. and subdrain systems; B. Prohibition of recreational vehicle parking; C. Town police shall be allowed to enforce municipal parking regulation on all public and private roadways; D. Construction of swimming pools and/or accessory structures of any kind shall require the approval of the HOA and the Town of Danville; -A4 - E. A permanent maintenance agreement for all landscaping in common areas will be required from the HOA assuring regular maintenance including irrigation, fertilization and weed abatement/ F. All E.V.S. ts and fire trails within the area controlled by the HOA shall be maintained by the HDA/ G. Drip irrigation systems should be considered where practical. As built irrigation plans shall be provided to the HOA for all common areas/ H. CC&Rts shall include the City as a beneficiary of the agreement. The City shall be granted the right but not the duty of enforcing any Drovisions contained in the CC&Rs. Additions to the CC&Rs by the HDA consistent with the original CC&Rs may be made at the discretion of the HOA. Any changes Derraining to Conditions of ApDroval imDosed upon the proiect shall be submitted to the City for review by the City Attorneyl and I. Membership in the association is mandatory for all lot owners in the subdivision. J. No antennas, microwave or satellite receiving dishes or other broadcasting or receiving devices shall be permitted. K. Flood Control District responsibility for maintenance of Sycamore Creek shall be limited to maintenance of drop structures, clearing of debris and sediments as necessary to maintain capacity and preventing future erosion from exceeding the limits of the flood plain. County Flood Control shall have the right of access over any private streets within the project. Prior to filing of a final subdivision map, the City Attorney shall review the CC&Rs to assure that all applicable conditions of approval have been addressed. L. Open wire fencing shall be used in all rearyard areas which abutt common open space, and in sideyard and rearyard areas which traverse 2:1 of 3:1 slopes. (16). The developer shall comply with the requiremnts of the San Ramon Valley Unified School District as specified in the Sycamore Valley Specific Plan. Said compliance shall be verified in the form of a letter of understanding or agreement prior to issuance of grading permits or recordation of Final Maps. -A5- 17. 18. 19. 20. 21. 22. 23. Within 30 days of the date of Planning Commission approval, the Tentative Map shall be revised to include the following items and resubmitted to the City Engineer: A. Designate all parcels with either number or letter designation; include common area and open space; B. Revise typical half section of loop connector street to show 16 foot width from face to face of curb; Co Revise "B" Street width to 30 feet north of intersection with loop connector streets "C" and IIEH ! Do Add sidewalk on one side to Streets "C" and "E"; and E. Delete lot numbers 36 and 154 and relocate these two units elsewhere within the project in order to provide for adequate setback from Sycamore Creek. All proposed grading shall be carried out in accordance with "Grading and Erosion Control Requirements" as set forth in the Sycamore Valley Specific Plan and recommendations contained in the soil and Geologic Investigation prepared for the project by Tetras.tach, Inc., dated May 15, 1984. The street "A" intersection with Camino Tassajara shall be constructed with the first phase of development. This shall be the main access point for the development. Portions of Street"B" and Streets "C" and "E" shall also be constructed as necessary to serve Phases I and III. The EVA's shall be constructed, but should not be used for normal vehicular access. The intersection of Street "A" with existing Camino Tassajara shall be designed with temporary left turn channelization, acceleration and decel.ration lanes and appropriate traffic controls. The location of Street"A" shall establish the major access point to the area north of Camino Tassajara. Private street design shall conform to the City's Private Street Policy. All private streets shall be signed for no parking fire lane. -A6- 24. For all street intersections and along curved portions of the street alignment, proper sight distance shall be maintained. This provision shall be enforced by including in the CC&Rts requirements regarding setback for fencing and standards for landscape trimming along street frontage. (25). In accordance with Section 92-2.006 of the City Ordinance Code, this project shall conform to the provision of the City subdivision ordinance (Title 9). Any exceptions thereform must be specifically listed in the conditional approval statement, attached to the Tentative Map. *(26). A current title report and copies of the recorded deeds to all parties having an interest in the proDertv and, if necessary, copies of deeds for adjoining properties and easements, thereto, shall be submitted at the time of submission of the Final Subdivision Map for the City Engineer. (27). Copies of the Final Map and improvement plans, indicating all lots, streets, and drainage facilities within the subdivision shall be submitted at 1" = 300 ft. scale, for City mapping purposes. *(28). Furnish proof to the City Engineer of the acquisition of all necessary rights of entry, permits and/or easements for the construction of off-site, temporary of permanent, road and drainage improvements. (29). Submit improvement plans to the City Engineer for review; pay the plan review, inspection and applicable lighting fees. (30). Where soil or geologic conditions encountered in grading operations are different form that anticipated i the soil and geologic investigation report, or where such conditions warrant changes to the recommendations contained in the original soil investigation, a revised soils or geologic report shall be submitted for approval by the City Engineer. It shall be accompanied by an engineering and geological opinion as to the safety of the site from hazards of land slippage, erosion settlement, and seismic activity. *(31). If grading is commenced prior to filing the Final Map, a surety or guarantee, as determined suitable by the City Engineer, shall be filed with the City of Danville to ensure restoration of the site to a stable and erosion resistant state if the project is terminated prematurely. -A7 - *(32). Any grading on adjacent properties will require written approval of those property owners affected. *(33). All grading plans shall be accompanied by erosion control and revegetation plans. (34). Dust control measures, as approved by the City Engineer shall be followed at all times during grading and construction operations. (35). Construction and grading operations shall be limited to weekdays (Mondays through Friday) and the hours from 7:30 a.m. to 5:30 p.m. unless approved in writing by the City Engineer. (36). Grading and land preparation shall be restricted to the period of April 15 to October 15 to minimize erosion and deposition of sediments in Sycamore Creek. All exposed erosive slopes resulting from grading activities should be hydromulched or otherwise stablilized by project developers each year by October 15. Exceptions may be granted by the City Engineer. (37). Any portion of the drainage system that conveys runoff from public streets shall be installed within a dedicated drainage easement, or public street. (38). Storm drain facilities shall be designed to channel water into natural drainage ways. Outfall lines should be designed to carry water from the edge of developed areas to energy dissipators at nearby creekbeds in order to minimize erosion that will occur if outlets are placed at the opts of slopes. (39). Storm drains shall be placed in streets or open space corridors wherever possible and the plan shall be designed so that this can be accomplished without the pipes being excessively deep. (40). If a storm drain must cross a lot, or be in an easement between lots, the easement width shall be equal to or at least double the depth of the storm drain. (41). Provisions shall be made to protect the subdivision improvements from hillside runoff via interceptor ditches, grade terraces, or similar facilities within the development. 42. All dwelling units having driveways less than 23 feet in length shall be equipped with roll up garage doors. -AS- *(43). Convey to the City, by offer of dedication all necessary right-of-way on Camino Tassajara as required for planned parkway. (44). Abutter's right of access along Camino Tassajara except for the intersection areas, shall be relinquished. (45). The developer shall keep adjoining public streets free and clean of project dirt, mud materials, and debris during the construction period, as is found necessary by the City Engineer. (46). Handicapped ramps shall be provided as required by state of CaliforniaTitle 24, and by the City Engineer. 47. Dedicate a drainage easement on Sycamore Creek to Contra Costa Flood Control District conforming to the adopted Floodway Plan. The southernmost 50 feet of that easement shall also be dedicated to the City of Danville for public trail access purposes. 48. Construct all drainage structures within the property conforming to the Sycamore Creek Floodway Plan, as amended in the Addendum to the 1981 EIR. 49. An allweather roadway surface twelve feet wide shall be provided on a twenty foot wide bench all along the creek for maintenance purposes unless otherwise specified by Flood Control. Adequate turn-arounds shall be provided. * 50. Conduct a study of the impact this development will have on existing capacity of Sycamore Creek, both upstream and downstream. construct off-site improvements on Sycamore Creek to mitigate any adverse impacts. Study to be reviewed by City staff and Flood Control staff. 51. Repair existing erosion along Sycamroe Creek and as directed by Contra Costa Flood Control District. 52. Proposed drainage discharge points to Sycamore Creek shall be designed to conform with requirements of Contra Costa County Flood Control and the City of Danville. 53. Comply with all requirements of the San Ramon Valley Fire Protection District with respect to emerging vehicle access and all fire code requirements. (54). Sewage disposal serving the project shall be provided by the Central Contra Costa Sanitary District. (55). Water supply serving the project ghall be by the Eagt Bay Municipal Utility District. -A9 - (56). If archaeologic materials are uncovered during grading, trenching or other excavation, earthwork within 100 feet of these materials shall be stopped until a professional archaeologist who is certified by the Society of California of Archaeology (SCA) and/or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures, if they are deemed necessary. 57. * 58. The applicant shall submit a list of proposed street names for review and approval prior to recordation of final maps. Working jointly. Sycamore Valley developers shall prepare a day care plan addressin~ the potential location(s) for day care facilities within Sycamore Valley based upon individual project demoqraphics and demand. The day care plan including a schedule for implementation shall be submitted for the review of the Chief of Planning prior to the recordation of Final Maps for the project. 59. The developer shall install a traffic signal at the intersection of the major project entrance road with Camino Tassajara. Developer shall guarantee 100 percent of the signal cost through a cash deposit or letter of credit. Upon issuance of 75 percent of the building permits, the City Engineer and Chief of Planning shall determine any reimbursement to be made to a maximum of 50 Dercent of the total signal cost. 60. Construction traffic shall be prohibited from using that segment of Camino Tassaiara south of Diablo Road and north of Gatetree Drive. -A10- PLANNING COMMISSION MEETIN Date: September 23', 1985 PUBLIC HEARING: NOTICE PUBLISHED IN NEWSPAPER YES X Yes NO NOTICES MAILED TO PROPERTY OWNERS WITHIN 300 FEET Yes ITEM: RECOMMENDATION: LOCATION: APN: ACREAGE/SQ. FT.: Olympia Properties, Tentative Map for Subdivision 6661, Final Development Plan for PUD 84-7 Recommend approval of Tentative Map for Subdivision 6661 and Final Development Plan for PUD 84-6 subject to Findings and Conditions of Approval shown on Exhibit A. South side of Camino Tassajara approximately 1/2 mile west of Dougherty Road 217-020-001 146 acres PROPOSAL: OWNER: Tentative Map and Final Development Plan approval for 171 paired single family dwelling units Lawrence Myers AGENT: James C. Ghielmetti, Olympia Properties PREVIOUS ACTION: EIR: Preliminary Development Plan approval and adoption of Ordinance No. 60-85 establishing P-1 zoning by the City Council on May 6, 1985 Sycamore Valley Specific Plan EIR and Addendum GENERAL PLAN: ZONING: Single Family-Medium Density, 3-5 dwelling units per acre; Single Family-Low Density 1-3 dwelling units per acre and General Open Space P-1 LAND USE: Vacant PROJECT DESCRIPTION Olympia Properties is requesting Final Development Plan and Tentative Map approval to develop 171 dwelling units on approximately 146 acres of land in Sycamore Valley. The project which is known as Meadow Creek would involve the development of approximately 30 acres of land north of Sycamore Creek and south of Camino Tassajara, with the balance of the property proposed as open space. In February and March, 1985, the Planning Commission considered a request by Olympia Properties for approval of a Preliminary Development Development Plan for PUD 84-6 which included 188 dwelling units and rezoning of the property from A-2 to P-1. On March 25, 1985, the Planning Commission acted to deny the application primarily on the basis that the proposed density of the project exceeded that which could be developed under the Sycamore Valley Specific Plan. The applicant subsequently filed an appeal of the decision with the City Council. On April 15, 1985, the City Council considered the appeal with testimony provided by members of the Planning Commission and the applicant. The Council acted to uphold the appeal, but reduced the total number of dwelling units which could be developed on the site to within the maximum density allowed by the Specific Plan. On May 6, 1985, the City Council adopted Ordinance No. 60-85 approving the Preliminary Development Plan for PUD 84-6 subject to Findings and Conditions of Approval, and establishing the P-1 zoning for the site. The current proposal is for consideration of a Final Development Plan for PUD 84-6 as the final step in the Plannned District rezoning process and Tentative Map approval for Subdivision 6661. The development concept includes "paired" or duplex units on lots ranging in size from approximately 3300-6000 square feet. The units are paired in a combination of elevations which combine one and two story elements. Recreational facilities including a pool, clubhouse, tennis court, passive play area and a pedestrian foot bridge across Sycamore Creek are also proposed. Approximately 110 acres of open space is provided in the area south of Sycamore Creek, which comprises the upper more scenic portion or the property. The architecture proposed is consistent with the design guidelines contained in the Specific Plan, and the Preliminary Development Plan approval. Unit sizes will range from 960 to 1560 square feet. There are a total of eight different elevations proposed in connection with four units. Additional -1- J variation is achieved through a total of five different pairing schemes. The design of the dwelling units is very good. Elevations are aesthetically pleasing and the units are designed to be efficient, minimize visual intrusion into rear yard areas and offer a good degree of privacy. The proposed design also allows for development of a unit type which will be unique within the Specific Plan area, thereby, further expanding the variety of housing types available for future buyers. The preliminary landscape plans submitted as part of the Final Development Plan indicate that the developer will install frontyard landscaping with each of the units in addition to entrance treatment, frontage treatment along Camino Tassajara and the design of the project recreation area. These plans are generally in accordance with the Camino Tassajara Streetscape Design Recommendations. However, more specific information is required, particularly with regard to specific selection of plant material. For this reason, staff is recommending that the preliminary landscape plans be revised and resubmitted for final approval. The applicant is proposing to construct two separate drop structures within Sycamore Creek as required by the Sycamore Creek Floodway Plan and Contra Costa County Flood Control. Flood Control has further requested that two of the units, numbers 36 and 154 be relocated elsewhere within the project in order to allow for adequate setback from Sycamore Creek. GENERAL PLAN AND ZONING The entire project site is contained within the Sycamore Valley Specific Plan Area. The City of Danville's General Plan has designated the project site for a combination of residential and open space uses. The area of the site north of Sycamore Creek is designated as single Family Medium Density, 3-5 DU/acre. The area south of Sycamore Creek includes approximately 16 acres designated as Single Family Low Density, 1-3 DU/acre. The balance of the area south of Sycamore Creek is designated as General Open Space. Current Zoning for the entire property is Planned District, P-1. Specific Plan Conformity and Implementation On June 23, 1981, the Contra Costa County Board of Supervisor adopted the Sycamore Valley Specific Plan. The Specific Plan is intended to implement the General Plan, providing standards and criteria which transform broad General Plan policies into more detailed specifications for future developments. Subsequently the plan was adopted by the Danville City Council upon incorporation. The Specific Plan is divided into a total of 7 sub areas, based upon geography and ownership patterns within the Valley. -2- Meadow Creek is located within Sub Area C, including areas C-1 and C-2. Unit ranges are also designated to provide a correlation between the Specific Plan and the City's General Plan land use categories. On July 3, 1985, the City Council amended the Sycamore Valley Specific Plan in order to add the proposed Scope of Improvements for the Assessment District to be formed for the purpose of financing the various public improvements required by the plan. on August 5, 1985, the City Council adopted Resolution No. 61-85 approving the Boundary Map for Assessment District No. 1985-1, Sycamore Valley. Olympia Properties has been a willing participant in the formation of the Sycamore Valley Assessment District, and will formally join the Assessment District upon approval of the Final Development Plan and Tentative Map. Environmental Status CEQA requirements relative to the proposed project have been addressed in the Environmental Impact Report prepared for the Sycamore Valley Specific Plan, certified in 1981, and the EIR addendum prepared and approved in January, 1985. CONCLUSION Staff has reviewed the Final Development Plan for PUD 84-6 and the Tentative Map for Subdivision 6661. Both plans are consistent with the P-1 Zoning District and Preliminary Development Plan approved for PUD 84-6, the Sycamore Valley Specific Plan, and the City of Danville General Plan. The developer is a willing participant in the formation of Assessment District No. 1985-1, Sycamore Valley, to finance the various public improvements required by the Specific Plan. Additional information relevant to the requirements for the preliminary landscape plan should be prepared and resubmitted for further review. RECOMMENDATIONS Recommend approval of the Final Development Plan for PUD 84-6 and the Tentative Map for Subdivision 6661 subject to the Findings and Condition of Approval as shown on Exhibit A. Attachments Exhibit A - Findings and Conditions of Approval Exhibit B - Preliminary Landscape Plan Review Exhibit C - Agency Comments Exhibit D - Tentative Map for Subdivision 6661 Exhibit E - Final DeveloDment Plan for PUD 84-6 Exhibit F - Architectural Submittal Exhibit G - Preliminary Landscape Plans -3- EVE ','L^,,l'St-; '"C CITY OF DANVILLE PLANNING COMMISSION September 23, 1985 SAN RAMON VALLEY SCHOOL DISTRICT BOARD ROOM 699 Old Orchard Drive, Danville 7:30 P.M. . APPROVAL OF SUMMARY OF ACTION from September 9,1985 Planning Commission meeting. The September 9, 1985 Summary of Action was approved with the amendment'of Condition 13.e of the Navlet's project. AYES: Kennett, Wickline, Vilhauer, Wright, Greenberg, Hendricks, Hirsch. CONTINUED PUBLIC HEARINGS: . OLYMPIA PROPERTIES (Applicant) LAURENCE MEYERS (Owner): This is a request for consideration of Final Development Plan approval for PUD 84-6 and the Tentative Map approval for Subdivision 6661 to accomodate 171 attached duet dwelling units on 146 acres of property located on the south side of Camino Tassajara approximately one-half mile west of Dough.try Road. (APN 217-620-001) A brief presentation was made by staff. Mr. Jim Ghielmetti, representing Olympia Properties, discussed various conditions of approval noting that Condition # 11 was acceptable, Condition # 42 should be reduced from 25 ft. to 20 ft. and suggested language for applicants' participation in cost of signalization (Condition # 59. Mr. Ghielmetti also expressed his reservations relative to language contained in Condition 58 regarding the preparation of a day care plan. Commissioner Kennett addressed Mr. Ghielmetti's concern of the day care plan condition; he suggested new language and sited the need to plan for daycare facilities at the present time. Commissioner Hendricks suggested the names of Carla Nelson and Virginia Jouris as good sources of help on the day care issue. She also noted that Mr. Ghielmetti and other developers within the Sycamore Valley should take care in selecting building materials for aesthetic value as well as durability. Commissioner Wickline reiterated the need for fire retardant roofing. Chairman Hirsch discussed the need for adequate emergency vehicle access. Commissioner Greenberg complimented the applicant on the project. · PLANNING COMMISSION ACTION Commissioner Vilhauer made the following motion: Approved the Final Development Plan for PUD 84-6 and the Tentative Map for Subdivision 6661 subject to the Findings and Conditions of Approval as amended (attached). AYES: Kennett, Wickline, Vilhauer, Hirsch, Hendricks, Greenberg. NOES: ABSTENTIONS: Wright PONDEROSA HOMES (Owner and Applicant): This is a request for consideration of a Final Development Plan approval for PUD 84-7 and Tentative Map approval of Subdivision 6562 to accomodate 148 single family homes on 38.08 acres of property located south of Camino Tassajara and west of Dougherty Road. (APN 217-040-004). Staff made a brief presentation. Commissioner Wright had questions regarding Condition 16 c. and 46. Commissioner Kennett requested that the standard conditions previously discussed in the other Sycamore Valley developments should be incorporated into this report. Mr. Len Fryer, representing Ponderosa Homes, addressed the Commission and expressed agreement with the Staff report and the Conditions of Approval as presented. PLANNING COMMISSION ACTION Commissioner Greenberg made the following motion: Approve the Final Development Plan for PUD 84-7 and the revised Tentative Map for Subdivision 6155 subject to the Findings and Conditions of Approval as amended (attached). AYES: Kennett, Wickline, Vilhauer, Hirsch, Hendricks, Greenberg, Wright NEW PUBLIC HEARINGS · BLACKHAWK CORPORATION (Owner & Applicant): This is a reguest for consideration of Final Development Plan approval for PUD 84-5 and Tentative Map approval for Subdivision 6196 to accomodate 210 dwelling units on 137 acres of property located on the north and south sides of Camino Tassajara, east of Sycamore Valley Road (APN 202-100-022, 207-050-007). Staff presented a detailed description of the project. Mr. Dave Johnson (applicant) made a brief presentation and addressed several conditions that he felt were in question. Mr. Robert Athey, attorney representing Mr. Robert Walton, addressed the Commission during the public hearing. Mr. Athey stated that it appears that access through the Blackhawk property is no longer available to the adjoining residents. Mr. Athey said it was agreed upon in the past that access through Blackhawk's property would be provided to the Waltoh's and Bailey's property at such time that Blackhawk developed their property. Mr. Athey presented to the Commission a document entitled "Access Control Circulation Plan - Sycamore Valley Specific Plan Area" adopted by the San Ramon Valley Area Planning Commission April 21, 1982. Mr. Walton and Mr. Bailey both addressed their concerns to the Commission regarding their access· Commissioner Kennett suggested that the matter be discussed by staff along with the City Attorney for resolution and that the other areas of concern should be discussed. Following discussion of several conditions of approval the Chairman suggested that staff review the circulation plan and continue the hearing of this matter. Commissioner Kennett moved that this item be continued to the September 30, 1985 special Planning Commission meeting. AYES: Kennett, Wickline, Vilhauer, Hirsch, Hendricks, Greenberg. ABSTENTIONS: Wright Prepared by: Katherine Renquist Planning Secretary