HomeMy WebLinkAbout2005-16RESOLUTION NO. 2005-16
A RESOLUTION OF THE PLANNING COMMISSION OF THE TOWN OF
DANVILLE APPROVING LAND USE PERMIT. REQUEST LUP 2005-05 ALLOWING
THE ESTABLISHMENT AND USE OF A WIRELESS COMMUNICATION
FACILITY LOCATED AT 156 DIABLO ROAD
(APN: 200-211-028 - METRO PCS)
WHEREAS, Metro PCS has requested approval of a Land Use Permit LUP 2005-05 to
allow the establishment and use of a wireless communication facility on a .62 acre site;
and
WHEREAS, the subject site is located at 156 Diablo Road, and is further identified as
Assessor's Parcel Number 200-211-028; and
WHEREAS, the Town of Danville Downtown Business District Ordinance and Wireless
Communication Facilities OrdinanCe require approval of a Land Use Permit prior to the
modification or use of a wireless communication facility; and
WHEREAS, the Planning Commission did review the project at a noticed public
hearing on May 24, 2005; and
WHEREAS, the project has been found to be Categorically Exempt from the
requirements of the California Environmental Quality Act (CEQA); and
WHEREAS, the public notice of this action was given in all respects as required by law;
and
WHEREAS, a staff report was submitted recommending that the Planning Commission
approve the request; and
WHEREAS, the Planning Commission did hear and consider all reports,
recommendations, and testimony submitted in writing and presented at the hearing;
now, therefore, be it
RESOLVED, that the Planning Commission of the Town of Danville approves Land
Use Permit request LUP 2005-05 per the conditions contained herein, and makes the
following findings in support of this action:
The proposed land use would not be detrimental to the health, safety, and
general welfare of the Town.
The land use will not adversely affect the orderly development of property
within the Town.
o
The land use will not adversely affect the preservation of property values and
the protection of the tax base within the Town.
The land use will not adversely affect the policies and goals as set by the
General Plan.
°
The land use will not create a nuisance and/or enforcement problem within
the neighborhood or community because the facility would be unmanned and
the installation of this facility would not generate a significant level of noise
and would allow a greater service area for wireless communication users who
live in the Town of Danville.
The land use will not encourage marginal development within the
neighborhood because the Wireless Communication Ordinance was designed
to preserve the unique visual character of the Town, and has set forth design
standards to regulate the type of facility which could be installed.
CONDITIONS OF APPROVAL
Unless otherwise specified, the following conditions shall be complied with prior to
the issuance of a building permit for the project. Each item is subject to review and
approval by the Planning Division unless otherwise specified.
This approval is for Land Use Permit request LUP 2005-05 authorizing the
establishment and use of a wireless communication facility co-locating with
existing communications facilities on the roof of the Mt. Diablo Bank Building.
The approved project includes three antennas and three equipment cabinets.
All equipment shall be screened from view either by the existing parapet wall
or mock roof tiles fabricated to match the existing Clay tiles. Except as may be
modified by conditions contained herein, development shall be substantially
as shown on the project drawings prepared by consisting of four sheets, and
dated received by the Planning Division on April 5, 2005.
°
The applicant shall pay or be subject to any and all applicable Town and other
related fees. These fees shall be based on the current fee schedule in effect at
the time the relevant permits are secured, and shall be paid prior to issuance
of said permit.
PAGE 2 OF RESOLUTION NO. 2005-16
o
10.
Prior to the issuance of a building permit, the applicant shall reimburse the
Town for notifying surrounding neighboring residents of the May 24, 2005
public hearing. The fee shall be $102.00 (136 notices X $0.75 per notice).
Prior to the issuance of a building permit, the applicant shall submit a written
report on compliance with the conditions of approval of this project for the
review and approval of the Planning Division. This report shall list each
condition of approval followed by a description of what the applicant has
provided as evidence of compliance with that condition. The applicant must
sign the report. The Town may reject the report if it is not comprehensive with
respect to the applicable conditions of approval.
The project shall be constructed as approved. Staff may approve minor
modifications in the design, but not the use. Any other change will require
Planning Commission approval through a separate Land Use Permit
applicant.
The applicant Shall obtain a building permit from the Town's Building
Division prior to installation of the equipment and antennas.
The applicant shall allow additional wireless communication companies to
collocate antenna equipment and antennas at this time, subject to review and
approval by the Planning Commission under a separate Land use Permit
and/or Development Plan application. The applicant and other wireless
carriers shall provide a mechanism for the construction and maintenance of
shared facilities and infrastructure and shall provide for equitable sharing of
costs. Construction of future facilities shall not interrupt or interfere with the
continuous operation of the applicant's facilities.
Any expansion or modification of the use shall be subject to review and
approval by the Planning Division under a separate Land Use application.
At any time during the effectiveness of this approval, the approval shall be
revocable for cause in accordance with section 30-4.12 of the Danville
Municipal Code, including failure to comply with these conditions of
approval if the permittee has caused or permitted any public nuisance in
connection with the use.
This Land Use Permit shall be valid for a time period of five years. Additional
time extensions, with a maximum period of five years per extension, may be
approved by the Chief of Planning, upon the receipt of a letter requesting the
PAGE 3 OF RESOLUTION NO. 2005-16
11.
12.
13.
extension by the applicant. Such extension shall be based on a determination
that the findings made for approval of the land are still valid. At the
discretion of the Chief of Planning, the extension request may be referred to
the Planning Commission for consideration and action.
All equipment associated with a wireless communication facility shall be
removed within 30 days of the discontinuation of the use and the site shall be
restored to its original preconstruction condition. Prior to installation of the
facility, the service provider shall submit to the Town a letter stating the
provider's agreement to remove the equipment within 30 days of
discontinued use of the facility. In addition, the service provider shall provide
the Town with a notice of intent to vacate a site a minimum of 30 days prior to
the vacation.
The roof panels shall match the texture and colors of the existing roof, subject
to review and approval by the Planning Division. The owner shall coordinate
a joint effort between new and existing wireless communication tenants to re-
tile the sections that are either inconsistent in color or overly uniform as to be
perceptible from the rest of the existing roof.
All equipment shall be completely screened from the view of surrounding
properties or otherwise not be generally perceptible.
APPROVED by the Danville Planning Commission at a regular meeting on May 24,
2005 by the following vote:
AYES:
NOES:
ABSTAIN: -
ABSENT: Graham
Combs,. Condie, Moran, Morgan, Nichols, Storer, Osborn
APPROVED AS TO FORM:
City Attorney
PAGE 4 OF RESOLUTION NO. 2005-16