HomeMy WebLinkAbout2003-19 EXHIBIT A
RESOLUTION NO. 2003-19
A RESOLUTION OF THE PLANNING COMMISSION OF
THE TOWN OF DANVILLE APPROVING A DEVELOPMENT PLAN
REQUEST TO ALLOW THE CONSTRUCTION OF THREE FIRST FLOOR
ADDITIONS TOTALING 649 +/- SQUARE FEET AND A SECOND FLOOR
315 +/- SQUARE FOOT ADDITION TO AN EXISTING SINGLE-FAMILY HOME
LOCATED IN A TOWN-IDENTIFIED MAJOR RIDGELINE AREA AND A
VARIANCE REQUEST TO ALLOW TWO OF THE GROUND FLOOR ADDITIONS
TO ENCROACH 7 +/- FEET AND 4 +/- FEET INTOTHE REAR YARD SETBACK
RESPECTIVELY AND TO ALLOW THE SECOND FLOOR ADDITION TO
EXTEND APPROXIMATELY 2 1/2 FEET INTO THE REAR YARD SETBACK
(APN: 197-130-024 -OBATA)
WHEREAS, Stan Nielson, representing Ken Obata and Kitling Sit, has requested approval
of a Development Plan application (DP 2003-06) and Variance application (VAR 2003-35) to
allow the construction of four additions totaling 964+/- square feet to an existing single-
family home located on a 2.14+/- acre site; and
WHEREAS, the subject site is located at 437 El Alamo and is further identified as Assessor's
Parcel Number 197-130-024; and
WHEREAS, the subject site is located within a Town-identified Major Ridgeline are and
requires approval of a Major Ridgeline Development Plan application prior to construction
of the project; and
WHEREAS, two of the ground floor additions are proposed to encroach 7 +/- feet and 4
+/- feet in to the rear yard setback respectively and to allow the second floor addition to
extend approximately 21/2 feet into the rear yard setback; and
WHEREAS, the Town of Danville R-100; Single Family Residential District Ordinance
requires approval of a Variance application prior to the construction of additions within the
setbacks; and
WHEREAS, the Plmming Commission did review the project at a noticed public hearing on
September 9, 2003; and
WHEREAS, the project has been found to be Categorically Exempt from the California
Environmental Quality Act (CEQA); and
WHEREAS, the public notice of this action was given in all respects as required by law;
and
WHEREAS, a staff report was submitted recommending that the Planning Commission
approve the request; and
WHEREAS, the Planning Commission did hear and consider all reports, recommendations,
and testimony submitted in writing and presented at the hearing; now, therefore, be it
RESOLVED that the Planning Commission of the Town of Danville approves
Development Plan request DP 2003-06 and variance request VAR 2003-35 per the
conditions contained herein, and makes the following findings in support of this action:
Development Plan:
The proposed project is consistent with the Town of Danville's 2010 General Plan.
2. The proposed siting and architecture of the new additions will not conflict with the
intent and purposes of the Scenic Hillside/major Ridgeline Ordinance in that
development will be achieved with minimal grading and will not adversely impact
predominate views of a Town-identified Scenic Hillside or Major Ridgeline area.
Variance:
Because of the following special circumstances applicable to this specific property,
strict application of the applicable zoning regulations would deprive the subject
property of rights enjoyed by others in the general vicinity and/or located in the
same zoning district:
The nook addition cannot be located on the west side due to the existing oak
tree.
The second story addition is flush with the existing house, which is already
located within the setback.
The new mechanical room cannot be placed on the east side of the existing
home, as it would be located too close to a steep downward slope, and would
not leave enough space around the house on that side to walk safely.
The proposed garden and family rooms are enclosures of an already existing
porch structure.
Ail proposed additions blend in with the architecture of the existing house.
PAGE 2 OF RESOLUTION NO. 2003-19
The neighboring parcels to the south are downslope from the residence,
reducing visibility of the existing home and proposed additions. Existing
mature trees and other heavy landscaping, add provide significant screening
as well.
CONDITIONS OF APPROVAL
Conditions of approval with an asterisk (,,,) in the left-hand column are standard project
conditions of approval.
Unless otherwise specified, the following conditions shall be complied with prior to the
issuance of a building permit for the project. Each item is subject to review and approval
by the Planning Division unless otherwise specified.
A, GENERAL
* 2.
This approval is for a Development Plan request (DP 2003-06) and Variance
request (VAR 2003-35) to allow the construction of four additions totaling 964
+/- square feet. The variance request is to allow two of the ground floor
additions to encroach 7 +/- feet and 4 +/- feet into the rear yard setback
respectively and to allow the second floor addition to extend approximately
21/2 feet into the rear yard setback~ Development shall be substantially as
shown on the project drawings as follows, except as may be modified by
conditions contained herein;
ao
Preliminary Development Plan, Site Plan, Floor Plans, Elevations,
Sections and Landscape Plans consisting of 7 sheets, as prepared by
Nielson Architects and dated August 25, 2003.
The applicant shall pay any and all Town and other related fees that the
property may be subject to. These fees shall be based on the current fee
schedule in effect at the time the relevant permits are secured, and shall be
paid prior to issuance of said permit and prior to any Town Council final
approval action. Notice should be taken specifically of the Town's
Transportation Improvement Program (TIP), Park Land In-lieu and Child
Care Facilities fees, Flood Control & Water Conservation District fees, and
Plan Checking and Inspection Fees, Benefit Districts and Density Increase
fees.
PAGE 3 OF RESOLUTION NO. 2003-19
Prior to the issuance of a grading or building permit, whichever occurs first,
the applicant shall reimburse the Town for notifying surrounding
neighboring residents of the public hearing~ The fee shall be $25.50 (34
notices X $0.75 per notice).
Prior to the issuance of grading or building permits, the applicant shall
submit written documentation that all requirements of the San Ramon Valley
Fire Protection District (SRVFPD) and the San Ramon Valley Unified School
District have been, or will be, met to the satisfaction of these respective
agencies.
In the event that subsurface archeological remains are discovered during any
construction or pre-construction activities on the site, all land alteration work
within 100 feet of the find shall be halted, the Town Planning Division
notified, and a professional archeologist, certified by the Society of California
Archeology and/or the Society of Professional Archeology, shall be notified.
Site work in this area shall not occur until the archeologist has had an
opportunity to evaluate the significance of the find and to outline
appropriate mitigation measures, if they are deemed necessary. If prehistoric
archaeological deposits are discovered during development of the site, local
Native American organizations shall be consulted and involved in making
resource management decisions.
Construction activity shall be restricted to the period between the weekday
hours of 7:30 a.m. to 5:30 p.m. (Mondays through Fridays), unless otherwise
approved in writing by the City Engineer for general construction activity
and the Chief Building Official for building construction activity. Prior to
any construction work on the site, including grading, the applicant shall
install a minimum 3' x 3' sign at the project entry which specifies the
allowable construction work days and hours, and lists the name and contact
person for the overall project manager and all contractors and sub-
contractors working on the job.
The applicant shall require their contractors and subcontractors to fit all
internal combustion engines with mufflers, which are in good condition, and
to locate stationary noise-generating equipment as far away from existing
residences as feasible.
A watering program which incorporates the use of a dust suppressant, and
which complies with Regulation 2 of the Bay Area Air Quality Management
PAGE 4 OF RESOLUTION NO. 2003-19
District shall be established and implemented for all on and off-site
construction activities. Equipment and human resources for watering all
exposed or disturbed soil surfaces shall be supplied on weekends and
holidays as well as workdays. Dust-producing activities shall be
discontinued during high wind periods.
Planning Division sign-off is required prior to final building inspection sign-
off by the Building Division.
SITE PLANNING
All lighting shall be installed in such a manner that lighting is generally
down directed and glare is directed away from surrounding properties and
rights-of-way.
LANDSCAPING
The applicant shall prepare a final landscape plan showing all existing and
proposed trees and shrubs subject to review and approval by the Planning
Division prior to issuance of a building permit. All existing trees and shrubs
on the site shall be preserved to the extent practical. Removal will be
allowed only upon prior written approval from the Planning Division.
Tree preservation guidelines shall be established by a tree survey/arborist
report performed for this site and shall be incorporated into the detailed site
development plans. The tree survey shall provide tree-specific preservation
measures for the existing 40" oak tree, which are to be retained within the
project. This shall include protection measures regarding appropriate
proximity of storage of construction materials to the tree. The
recommendations of this supplemental report shall be incorporated into the
final design and construction of the project.
Since site construction activity will occur in the direct vicinity of the on-site
protected 40" oak tree, a security deposit in the amount of the assessed value
of the tree, calculated pursuant to the Town's Tree Protection Ordinance,
shall be posted with the Town prior to the issuance of a grading permit or
building permit to maximize the probability that the affected tree will be
retained in good health. The applicant shall be required to secure an
appraisal of the condition and value of the tree. The appraisal shall be done
in accordance with the then current addition of the "Guide for Establishing
Values of Tree and Other Plants," by the Council of Tree and Landscape
PAGE 5 OF RESOLUTION NO. 2003-19
Appraisers under the auspices of the International Society of Arboriculture.
The appraisal shall be performed by a Certified Arborist, and shall be subject
to review and approval by the Chief of Planning. A tree preservation
agreement shall be prepared that outlines the intended and allowed use of
funds posted as a tree preservation security deposit. That portion of the
security deposit still held by the Town two full growing seasons after project
completion shall be returned upon verification that the tree covered by the
deposit is as healthy as can be provided for under the terms of the tree
preservation agreemenL
ARCHITECTURE
The street numbers for each building in the project shall be posted so as to be
easily seen from the street at all times, day and night by emergency service
personnel.
Materials and colors for the additions shall match the existing house. Any
proposed changes shall be submitted for review and approval by the Design
Review Board prior to the issuance of building permits for the project.
Final architectural elevations, details and revisions shall be submitted for
review and approval by the Planning Division prior to issuance of
building permits for the project.
A deed restriction shall be recorded requiring Town Planning Division
review and approval for any proposed repainting or re-roofing of the
exterior of the home.
GRADING
Any grading on adjacent properties will require prior written approval of
those property owners affected.
Stockpiles of debris, soil, sand or other materials that can be blown by the
wind shall be covered.
STREETS
All mud or dirt carried off the construction site onto adjacent streets shall be
swept each day. Water flushing of site debris or sediment or concrete
washing is expressly prohibited
PAGE 6 OF RESOLUTION NO. 2003-19
Any damage to street improvements now existing or done during
construction on or adjacent to the subject property shall be repaired to the
satisfaction of the City Engineer, at full expense to the applicant. This shall
include slurry seal, overlay or street reconstruction if deemed warranted by
the City Engineer.
INFRASTRUCTURE
Domestic water supply shall be from an existing public water system. Water
supply service shall be from the East Bay Municipal Utility District water
system in accordance with the requirements of District.
All wastewater shall be disposed into an existing sewer system. Sewer
disposal service shall be from the Central Contra Costa Sanitary District
sewer system in accordance with the requirements of the District.
Drainage facilities and easements shall be provided to the satisfaction of the
City Engineer and/or the Chief Engineer of the Contra Costa County Flood
Control & Water Conservation District.
All runoff from impervious surfaces shall be intercepted at the project
boundary and shall be collected and conducted via an approved drainage
method through the project to an approved storm drainage facility, as
determined by the City Engineer. Development which proposes to contribute
additional water to existing drainage systems shall be required to complete a
hydraulic study and make improvements to the system as required to handle
the expected ultimate peak water flow and to stabilize erosive banks that
could be impacted by additional storm water flow~
Roof drainage from structures shall be collected via a closed pipe and
conveyed to an approved storm drainage facility in the street curb. No
concentrated drainage shall be permitted to surface flow.
All street, drainage or grading improvement plans shall be prepared by a
licensed civil engineer.
MISCELLANEOUS
The project shall be constructed as approved. Minor modifications in the
design, but not the use, may be approved by staff. Any other change will
PAGE 7 OF RESOLUTION NO. 2003-19
require Planning Commission approval through the Development Plan
review process.
* 2.
As a part of the issuance of a demolition permit and/or building permit for
the project, the developer shall submit a recycling plan for building and
construction materials and the disposition of green waste generated from
land clearing on the site. Prior to obtaining framing inspection approval for
the project, the applicant/owner shall provide the Planning Division with
written documentation (e.g. receipts or records) indicating that waste
materials created from the demolition of existing buildings and the
construction of new buildings were/are being recycled according to their
recycling plan, or in an equivalent manner.
* 3.
The proposed project shall conform to the Town's Stormwater Management
and Discharge Control Ordinance (Ord. No. 94-19) and all applicable
construction and post-construction Best Management Practices (BMPs) for
the site~ For example, construction BMPs may include, but are not limited to:
the storage and handling of construction materials, street cleaning, proper
disposal of wastes and debris, painting, concrete operations, dewatering
operations, pavement operations, vehicle/equipment cleaning, maintenance
and fueling and stabilization of construction entrances. Training of
contractors on BMPs for construction activities is a requirement of this
permit. At the discretion of the City Engineer, a Storm Water Pollution
Prevention Plan (SWPPP) may be required for projects under five acres.
APPROVED by the Danville Planning Commission at a regular meeting on September 9,
2003 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Graham, Jameson, Legg, Moran, Storer, Combs, Condie
Lynn Osborn
Chairman
APPROVED AS TO FORM:
City Attorney /
PAGE 8 OF RESOLUTION NO. 2003-19