HomeMy WebLinkAbout2001-16RESOLUTION NO. 2001-16
A RESOLUTION OF THE PLANNING COMMISSION APPROVING DEVELOPMENT
PLAN REQUEST DP 2001-03 TO ALLOW THE CONSTRUCTION OF
A 6,224 +/- SQUARE FOOT RESIDENCE WITH AN ATTACHED
1,273 +/- SQUARE FOOT GARAGE
(APN: 197-161-078 --- KARMONT)
WHEREAS, Karmont Development has requested approval of a Development Plan request (DP
2001-03) to allow the construction of a 6,224 +/- square foot home with a 1,273 +/- square foot
attached garage on a 1.96 +/- acre parcel; and
WHEREAS, the subject site is located at 250 Piedmont Lane and is further identified as
Assessor's Parcel Number 197-161-078; and
WHEREAS, the Conditions of Approval for previously approved Major Subdivision SD 8099
require that the lots created by that subdivision be subject to approval of a Development Plan
application consistent with the Town's Scenic Hillside and Major Ridgeline Ordinance and
remm to the Planning Commission for final review and approval; and
WHEREAS, the Planning Commission did review the project at a noticed public hearing on
May 8, 2001; and
WHEREAS, the public notice of this action was given in all respects as required by law; and
WHEREAS, a staff report was submitted recommending that Plam~ing Commission approve the
request; and
WHEREAS, the Planning Commission did hear and consider all reports, recommendations, and
testimony submitted in writing and presented at the hearing; now, therefore, be it
RESOLVED that the Planning Commission of the Town of Danville approve Development Plan
request DP 2001-03 per the conditions contained herein, and makes the following findings in
support of this action:
The proposed siting and architecture of the new residence will not conflict with the intent
and purposes of Ordinance 29-84 ("Scenic Hillside and Major Ridgeline Development"),
in that development will be achieved with minimal grading and will not adversely impact
predominate views of a Town-identified Scenic Hillside or Major Ridgeline area.
2. The proposed project is consistent with the Danville 2010 General Plan.
3. The design of the proposed single-family residence is in substantial conformance with
the applicable zoning regulations.
CONDITIONS OF APPROVAL
Conditions of approval with an asterisk ("*") in the left-hand column are standard project
conditions of approval.
Unless otherwise specified, the following conditions shall be complied with prior to the issuance
of a Building Permit for the project. Each item is subject to review and approval by the Planning
Division unless otherwise specified.
A. GENERAL
This approval is for a Development Plan request (DP 2001-03) to allow the
construction of a 6,224 +/- square foot two-story single family home and a 1,273
+/- square foot attached garage on a parcel subject to review under the Town's
Scenic Hillside/Major Ridgeline ordinance. Development shall be substantially
as shown on the project drawings as follows, except as may be modified by
conditions contained herein;
Preliminary Development Plan, Site Plan, Elevations, Architectural Plans
and Floor Plans consisting of seven sheets, as prepared by Steven
Kubitschek Residential Design, dated received by the Planning Division
on April 5, 2001.
Preliminary Landscape Plan, consisting of one sheet, as prepared by Camp
& Camp Associates, entitled Lot 6, Subdivision 8099, Danville, CA, and
dated received by the Planning Division on April 5, 2001.
Grading and Drainage Plan, consisting of one sheet, as prepared by David
Evans and Associates, and dated received by the Planning Division on
April 5, 2001.
PAGE 1 OF RESOLUTION NO. 2001-16
The applicant shall pay any and all Town and other related fees that the property
may be subject to. These fees shall be based on the current fee schedule in effect
at the time the relevant permits are secured, and shall be paid prior to issuance of
said permit. Notice should be taken specifically of the Town's Transportation
Improvement ProgTam (TIP), Tri Valley Transportation Development (TVTD),
South Contra Costa Regional Transportation, Park Land In-lieu and Child Care
Facilities, Flood Control & Water Conservation District (Drainage Areas and
Mitigation), Plan Checking and Inspection fees.
Prior to the issuance of a grading or building permit, whichever occurs first, the
applicant shall reimburse the Town for notifying surrounding neighboring
residents of the two public hearings. The fee shall be $283.50 (189 notices X
$0.75 per notice X 2 notices).
Prior to the issuance of grading or building permits, the applicant shall submit
written documentation that all requirements of the San Ramon Valley Fire
Protection District (SRVFPD) and the San Ramon Valley Unified School District
have been, or will be, met to the satisfaction of these respective agencies.
In the event that subsurface archeological remains are discovered during any
construction or pre-construction activities on the site, all land alteration work
within 100 feet of the find shall be halted, the Town Planning Division notified,
and a professional archeologist, certified by the Society of California Archeology
and/or the Society of Professional Archeology, shall be notified. Site work in this
area shall not occur until the archeologist has had an opportunity to evaluate the
significance of the find and to outline appropriate mitigation measures, if they are
deemed necessary. If prehistoric archaeological deposits are discovered during
development of the site, local Native American organizations shall be consulted
and involved in making resource management decisions.
Construction activity shall be restricted to the period between the weekday hours
of 7:30 a.m. to 5:30 p.m. (Mondays through Fridays), unless otherwise approved
in writing by the City Engineer for general construction activity and the Chief
Building Official for building construction activity.
The applicant shall require their contractors and subcontractors to fit all internal
combustion engines with mufflers, which are in good condition, and to locate
stationary noise-generating equipment as far away from existing residences as
feasible.
8. Ail physical improvements shall be in place prior to occupancy of the home.
PAGE 2 OF RESOLUTION NO. 2001-16
B. SITE PLANNING
* 1.
All lighting shall be installed in such a manner that lighting is generally down
directed and glare is directed away from surrounding properties and
rights-of-way.
Fencing on the parcel shall be limited to open wire fences with natural wood
colored posts unless otherwise approved by the Planning Division.
C. LANDSCAPING
* 1.
All trees shall be a minimum of 15-gallon container size. All trees shall be
properly staked. All remaining shrubs used in the project, which are not used as
ground cover, shall be a minimum of five gallons in size.
All existing trees on the site shall be preserved and tree preservation measures
during construction shall be utilized. Removal will be allowed only upon prior
written approval from the Planning Division.
If site construction activity occurs in direct vicinity of the on-site and off-site
protected trees, a security deposit in the amount of the assessed value of the
tree(s) shall be posted with the Town prior to the issuance of a grading permit or
building permit in compliance with the Town's Tree Protection Ordinance to
assure the preservation of the trees. The applicant shall be required to secure an
appraisal of the condition and value of all affected trees. The appraisal shall be
done in accordance with the then cun'ent addition of the "Guide for Establishing
Values of Tree and Other Plants," by the Council of Tree and Landscape
Appraisers under the auspices of the International Society of Arboriculture. The
appraisal shall be performed by a Certified Arborist, and shall be subject to
review and approval by the Chief of Planning. The security deposit shall be
returned upon verification of the health of the trees following two full growing
seasons after project completion.
D. ARCHITECTURE
The colors and materials approved for the project are as follows: Natural finish
wood shingles for the body, Kelly Moore "AC66 Zaire" for the trim, windows
and eaves, and Elk Presidential Composition Shingles "Weatherwood" for the
roof material. The material board for this project will be on file in the Planning
Division. Any changes to the project materials shall be subject to review and
PAGE 3 OF RESOLUTION NO. 2001-16
approval by the Design Review Board.
* 2.
The street numbers for each structure in the project shall be posted so as to be
easily seen from the street at all times, day and night.
E. GRADING
* 1.
Any grading on adjacent properties will require prior written approval of those
property owners affected.
At least one week prior to commencement of grading, the applicant shall post the
site and mail to the owners of property within 300 feet of the exterior boundary of
the project site, to the homeowner associations of nearby residential projects and
to the Town of Danville Development Services Department, a notice that
construction work will commence. The notice shall include a list of contact
persons with name, title, phone number, construction hours and days of work
operation (which are limited to Monday-Friday) and area of responsibility. The
person responsible for maintaining the list shall be included. The list shall be kept
current at all times and shall consist of persons with authority to initiate corrective
action in their area of responsibility. The names of individuals responsible for
dust, noise and litter control shall be expressly identified in the notice. A copy of
this list shall be posted at the entrance of Piedmont Lane off E1 Pintado Road and
at the northern end of Piedmont Lane facing the Alamo residence.
Development shall be completed in compliance with a detailed soils report and
the construction grading plans prepared for this project. The engineering
recommendations outlined in the project specific soils report shall be incorporated
into the design of this project. The report shall include specific recommendations
for foundation design of the proposed buildings and shall be subject to review and
approval by the Town's Engineering and Planning Divisions.
Where soils or geologic conditions encountered in grading operations are
different from that anticipated in the soil report, a revised soils report shall be
submitted for review and approval by the City Engineer. It shall be accompanied
by an engineering and geological opinion as to the safety of the site from
settlement and seismic activity.
All development shall take place in compliance with the Town Erosion Control
Ordinance (Ord. 91-25). Restrictions include limiting construction primarily to
the dry months of the year (May through October) and, if construction does occur
during the rainy season, the developer shall submit an Erosion Control Plan to the
PAGE 4 OF RESOLUTION NO. 2001-16
City Engineer for review and approval. This plan shall incorporate erosion
control devices such as, the use of sediment traps, silt fencing, pad berming and
other techniques to minimize erosion.
All new development shall be consistent with modern design for resistance to
seismic forces. All new development shall be in accordance with the Uniform
Building Code and Town of Danville Ordinances.
All cut and fill areas shall be appropriately designed to minimize the effects of
ground shaking and settlement.
Stockpiles of debris, soil, sand or other materials that can be blown by the wind
shall be covered.
If toxic or contaminated soil is encountered during construction, all construction
activity in that area shall cease until the appropriate action is determined and
implemented. The concentrations, extent of the contamination and mitigation
shall be determined by the Contra Costa County Health Department. Suitable
disposal and/or treatment of any contaminated soil shall meet all federal state and
local regulations. If deemed appropriate by the Health Department, the applicant
shall make provisions for immediate containment of the materials. Runoff from
any contaminated soil shall not be allowed to enter any drainage facility, inlet or
creek.
10.
All grading activity shall address National Pollutant Discharge Elimination
System (NPDES) concerns. Specific measures to control sediment runoff,
construction pollution and other potential construction contamination shall be
addressed through the Erosion Control Plan (ECP) and Storm Water Pollution
Prevention Plan (SWPPP). An NPDES construction permit may be required, as
determined by the City Engineer.
STREETS
All mud or dirt carried off the construction site onto adjacent streets shall be
swept each day. Water flushing of site debris or sediment or concrete washing is
expressly prohibited.
Any damage to street improvements now existing or done during construction on
or adjacent to the subject property shall be repaired to the satisfaction of the City
Engineer, at full expense to the applicant. This shall include slurry seal, overlay
or street reconstruction if deemed warranted by the City Engineer.
PAGE 5 OF RESOLUTION NO. 2001-16
G. INFRASTRUCTURE
Domestic water supply shall be from an existing public water system. Water
supply service shall be from the East Bay Municipal Utility District (EBMUD)
water system in accordance with the requirements of EBMUD.
* 2.
All wastewater shall be disposed into an existing sewer system. Sewer disposal
service shall be from the Central Contra Costa Sanitary District (CCCSD) sewer
system in accordance with the requirements of CCCSD.
* 3.
Ali runoff from impervious surfaces shall be intercepted at the project boundary
and shall be collected and conducted via an approved drainage method through
the project to an approved storm drainage facility, as determined by the City
Engineer. Development which proposes to contribute additional water to existing
drainage system shall be required to complete a hydraulic study and make
improvements to the system as required to handle the expected ultimate peak
water flow and to stabilize erosive banks that could be impacted by additional
storm water flow.
Roof drainage from structures shall be collected via a closed pipe and conveyed
onto an approved storm drainage structure on the new private road located at the
north property line. No concentrated drainage shall be permitted to surface flow
across sidewalks, streets or private property.
If a storm drain must cross a lot, or be in an easement between lots, the easement
shall be equal to or at least double the depth of the storm drain.
The applicant shall furnish proof to the City Engineer of the acquisition of all
necessary rights of entry, permits and/or easements for the construction of off-site
temporary or permanent road and drainage improvements.
* 7.
Electrical, gas, telephone, and cable TV services, shall be provided underground
in accordance with the Town policies and existing ordinances. Ali utilities shall
be located and provided within public utility easements, sited to meet utility
company standards, or in public streets.
* 8. All new utilities required to serve the development shall be installedunderground.
* 9.
All street, drainage or grading improvement plans shall be prepared by a licensed
civil engineer.
PAGE 6 OF RESOLUTION NO. 2001-16
H. MISCELLANEOUS
* 1. The project shall be constructed as approved. Minor modifications in the design,
but not the use, may be approved by staff. Any other change will require Planning
Convnission approval through the Development Plan review process.
* 2. Use of a private gated entrance is expressly prohibited.
3. This project is subject to all conditions of approval identified in SD 8099.
APPROVED by the Danville Planning Commission at a Regular Meeting on May 8, 2001 by
the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
~Osborn, Condie, Jameson, Legg, Moran, and Storer
-Combs
APPROVED AS TO FORM:
Ahief~~g
f:\planning\applications\DP\Dp2001-03kResolution2001-03.doc