HomeMy WebLinkAbout96-45 EXHIBIT A
RESOLUTION NO. 96-45
A RESOLUTION OF THE PLANNING COMMISSION OF THE TOWN OF DANVILLE
APPROVING THE PROPOSED DESIGN OF A BRIDGE TO BE CONSTRUCTED
ACROSS SYCAMORE CREEK WITHIN SUBDIVISION 7960
(APN: 207-061-024) o- MARl)ELL LLC
WHEREAS, Mardell LLC has requested approval of a bridge design for a 12 foot wide, 63
foot long bridge proposed to be constructed across Sycamore Creek within Subdivision
7960; and
WHEREAS, the subject site is located on the south side of Camino Tassajara, at 2410 Camino
Tassajara and is identified as Assessor's Parcel Number 207-061-024; and
WHEREAS, conditions of approval for the previously approved Preliminary Development
Plan - Rezoning and Final Development Plan - Major Subdivision (PUD 95-03, SD 7960 & DP
95-21) require approval of the bridge design for the bridge to be constructed within the
subject subdivision; and
WHEREAS, the Planning Commission did review the project at a noticed public hearing on
September 10, 1996; and
WHERKA_S, the public notice of this action was given in all respects as required by law; and
WHEREAS, a staff report was submitted recommending that Planning Commission approve
the request; and
WHEREAS, the Planning Commission did hear and consider all reports, recommendations,
and testimony submitted in writing and presented at the hearing; now, therefore, be it
RESOLVED that the Planning Commission of the Town of Danville approves the request for
approval of the bridge design per the conditions contained herein, and makes the following
findings in support of this action:
1. The proposed project is consistent with the Danville 2005 General Plan.
The proposed bridge design is consistent with requirements of the previously
approved Preliminary Development Plan - Rezoning and Final Development Plan -
PAGE 1 OF RESOLUTION NO. 96-45
Major Subdivision (PUD 95-03, SD 7960 & DP 95-21).
The proposed bridge design is compatible with existing and planned surrounding
residential development.
4. The proposed bridge design is compatible with the creek setting.
Based on the previously approved Mitigated Negative Declaration of Environmental
Significance and comments received, there is no substantial evidence before the
Town that the project will have a significant adverse effect on the environment.
CONDITIONS OF APPROVAL
Conditions of approval with an asterisk ("*") in the left-hand column are standard project
conditions of approval.
A. GENERAL
* 1.
This approval is for the architectural design of a bridge which is to be
constructed to cross Sycamore Creek at Lot 19 within Subdivision SD 7060.
Development shall be substantially as shown on the project drawings as
follows, except as may be modified by conditions contained herein:
Preliminary bridge design plans, consisting of two sheets, as prepared
by Excel Bridge Manufacturing and Mardell LLC and dated received
by the Planning Division on August 27, 1996.
The applicant shall pay or be subject to any and all Town and other related
fees that the property may be subject to. These fees shall be based on the
current fee schedule in effect at the time the relevant permits are secured, and
shall be paid prior to issuance of said permit.
Prior to the issuance of grading or building permits, the applicant shall submit
written documentation that all requirements of the San Ramon Valley Fire
Protection District, the Contra Costa County Flood Control and Water
Conservation District, the Army Corps of Engineers, the Depactment of Fish
and Game and the Regional Water Quality Control have been, or will be, met
to the satisfaction of these respective agencies as regards the design and
construction of the proposed bridge.
PAGE 2 OF RESOLUTION NO. 96-45
Construction activity shall be restricted to the period between the weekday
hours of 7:30 a.m. to 5:30 p.m. (Mondays through Fridays), unless otherwise
approved in writing by the City Engineer for general construction activity and
the Chief Building Official for building construction activity.
The applicant shall require their contractors and subcontractors to fit all
internal combustion engines with mufflers which are in good condition, and
to locate stationary noise-generating equipment as far-away from existing
residences as feasible.
All bridge improvements shall be in place prior to occupancy of any structure
in SD 7960.
10.
Development shall be completed in compliance with a detailed soils report
and the construction grading plans prepared for this project. The engineering
recommendations outlined in the project specific soils report shall be
incorporated into the design of this project. The report shall include specific
recommendations for foundation design of the proposed bridge abutment
and shall be subject to review and approval by the Town's Engineering and
Planning Divisions.
Where soils or geologic conditions encountered in grading operations are
different from that anticipated in the soil report, a revised soils report shall be
submitted for review and approval by the City Engineer. It shall be
accompanied by an engineering and geological opinion as to the safety of the
site from settlement and seismic activity.
All development shall take place in compliance with the Town Erosion
Control Ordinance (Ord. 91-25). Restrictions include limiting construction
primarily to the dry months of the year (May through October).
Ali grading activity shall address National Pollutant Discharge Elimination
System (NPDES) concerns. Specific measures to control sediment runoff,
construction pollution and other potential construction contamination shall
be addressed through the Erosion Control Plan (ECP) and Storm Water
Pollution Prevention Plan (SWPPP). A NPDES construction permit may be
required, as determined by the City Engineer.
PAGE 3 OF RESOLUTION NO. 96-45
APPROVED by the Danville Planning Commission at a Regular Meeting on September
1996, by the following vote:
AYES: Bowlby,
NOES: -
ABSTAINED: -
ABSENT: Jameson
APPROVED AS TO FORM:
Combs, Hunt, Moran,
Osborn, Murphy
Cfiairm'a'n~
City Attorney
Chief f~_p~nning
pdpz94
PAGE 4 OF RESOLUTION NO. 96-45