Loading...
HomeMy WebLinkAboutSD 6878 EXHIBIT A FINDINGS AND CONDITIONS OF AP FINAL DEVELOPMENT PLAN PUD TASSAJARA VILLAGE SHOPPING CENTER - P~ FINDINGS The Planning Commission of the Town of Dan as follows in support of the Final Developl The proposed development is consisten General Plan and the Preliminary Deve covering the site, as approved by the November 6, 1986 through adoption of The proposed development will constit environment of sustained desirability will be in harmony with the character neighborhood and community. The proposed development will mitigat and drainage impacts through the assu improvements in a manner acceptable t The previously certified EIR prepared Road Area General Plan Amendment Stud potential impacts associated with dev Tassajara Ranch, satisfying the requi California Environmental Quality Act, following specific findings. Contra Costa County adopted find Environmental Impact Report thro Board of Supervisors Resolution Commission Resolution 47-1984 (S served to establish mitigation m associated with the development Ce Pursuant to those mitigation mea studies related to soils and geo have been completed identifying measures which will be incorpora project, and Use of the prior EIR as a "Progr appropriate based on the followi (1) feasible mitigation measures developed in the EIR for the Dou lC PROVAL 38-8 RCEL B SD 6878 ~ille hereby finds nent Plan: ~ with the Danville lopment Plan Town Council on Drdinance 99. ~te a commercial and stability, and of the surrounding off site traffic ~ance of off-site the Town. for the Dougherty f fully discussed ~lopment of the ~ements of the based on the ings regarding the ~gh adoption of the 35/133 and Planning R), (which jointly ~asures for impacts 9f the project), and sures, additional logy, and traffic specific mitigations ted into the am EIR" is ng: and alternatives ~herty Road Area General Plan Amendment Study hav (2) subsequent changes in the pr reduction of residential dwellin retention of a greater section o an open channel, have been made related impacts, (3) there has n changes with respect to the circ which the project was initially require important revisions of t (4) no new information of substa the project has become available an additional or supplemental EI CONDITIONS OF APPROVAL Unless other wise specified, the followinq C complied with prior to the issuance of a Fin Final Building Permits. Each item is subjec approval by the Planninq Department unless o General Provisions This Final Development Plan appr 142,695± square foot neighborhoo covering the 13.1+ acre property Parcel B of SD 6878. Developmen substantially as shown on the pr follow, except as may be modifie contained herein; a. Project Drawings (Preliminar Site Plan, Preliminary Grading P Elevations, Rendered Elevations, Details, Sections, Sign Program, Details) consisting of 22 sheets Hammarberg, Herman & Johnson Arcl dated received by the Planning D 14, 1988. b. Revised Project Drawings (She. PR-6, PR-9, PR-10, PR-13, PR-14 prepared by Hammarberg, Herman & Inc., and dated received by the October 5, 1988. The developer shall pay any and related fees that the property These fees shall be based on the schedule in effect at the time are secured. ~ been incorporated; oject, including a ~ units, to allow f Tassajara Creek as to lessen project 9t been substantial ~mstances under reviewed which would ne prior EIR; and ntial importance to which would require R. Dnditions shall be ~1 Gradinq Permit or ~ to review and therwise specified. Dval is for a shopping center identified as shall be ~ject drawings as by conditions ~ Landscape Plans, Lan, Architectural Store Front and Landscape , prepared by ~itects, Inc., and ~partment September ~ts PR-3, PR-5, PR-15) also Johnson Architects, ?lanning Department ~11 Town and other ~y be subject to. current fee %e relevant permits Prior to the issuance of grading permits, the developer shall subl documentation that all requireme Valley Fire Protection District Valley Unified School District h met to the satisfaction of these agencies. The Fire District's i this project are summarized in p letter of September 30, 1988. To an acceptable water supply systel protection, the number and locat to be established for this proje conform to the Hydrant Location Fire District dated October 6, 1 established at the perimeter of individually tied to the adjoini mains to become public hydrants. established in the interior of t placed along one or two private but no interior hydrant shall be than 15' from the private fire 1 fed. Each A.F.E.S. (automatic f system - sprinklers) developed f shall be fed from an individual/ extension tied directly to a pub above described water supply sys with an alternative system if de by the Fire District. Ail costs incurred to develop th system shall be paid by the deve If archeological materials are u construction or pre-construction site, all earthwork within 100 f materials shall be stopped, the Department notified, and a profe archeologist, certified by the S Archeology and/or the Society of Archeology, shall be notified. area shall not occur until the a an opportunity to evaluate the s find and to outline appropriate if they are deemed necessary. Construction and grading operati construction materials, and warm and/or construction equipment sh weekdays (Monday through Fridays from 7:30 a.m. to 5:30 p.m., unl aDDroved in writing by the City If the developer intends to cons phases, then the first submittal permits shall be accompanied by 3C or building nit written ~ts of the San Ramon ~nd the San Ramon ~ve been or will be, respective ~itial comments on ~rt within their assure provision of n for fire ion of fire hydrants pt shall generally Plan prepared by the 388° Hydrants ~he project shall be ng public water Hydrants Ne center may be fir·line extensions, located further in· by which it is 2re extinguisher )r this project ~edicated fire line lic water main. The rem may be required termined acceptable is fire protection loper. ncovered during any activities on the ~et of these town Planning ssional ~ciety of California Professional ~ite work in this rcheologist has had ignificance of the mitigation measures, ~ns and delivery of ing up of grading ~11 be limited to ) during the hours ess otherwise Engineer. truct the project in for building an overall phasing Be plan. This plan shall address o to be installed in conjunction w erosion control for undeveloped and phasing of project grading. shall be subject to the review a City Engineer and Chief of Plann Except as provided for within th approval, land use regulations p property shall be as provided un outlined in the R-B/S-2; Retail i Control Combining District of th. Site Planning/Site Activities Exterior lighting shall be of a ~ so as not to cause glare onto ad or public streets. Lighting use~ hours shall be adequate to provi~ needs. Wall lighting around the the buildings in this project sh provide "wash" security lighting shall be submitted to the Chief. review and approval at the build stage. Lighting fixtures within shall not exceed 30 feet in heigl height, exterior landscape or bu be subject to review and approva Review Board prior to the issuan, permits. The location and screening of an~ transformers shall be subject to' by the Planning Department prior a building permit. The developel written documentation from PG&E location, design, and landscape provided to the transformers is agency. Shopping cart storage shall be p detailed on the site plans cited #A.l.a. and b. above. Final loc~ storage shall be submitted for r, of the Chief of Planning prior t, building permit. All carts shall regular intervals throughout the avoid accumulation within parkin, storage within the parking areas business of the respective busin, storage shall not be Dermitted, occur along the front elevations 4C ff-site improvements ith each phase, ~ortions of the site The phasing plan id approval of the ing. ~se conditions of ~rtaining to this ~er PUD 86-3 and as Business/Sign ~ Zoning Ordinance. ~esign and placement oining properties after daylight ~e for security entire perimeter of ~11 be supplied to Photometrics )f Planning for lng permit submittal the parking area qt. The number, [lding lights shall by the Design ~e of building pad mounted review and approval to the issuance of ~ shall submit ~hat the general screening and access ~cceptable to that ~ovided as generally in Condition ~tion for cart ~view and approval issuance of a be collected at business day to ~ areas. Cart after close of ~sses utilizing cart )ut rather shall of the affected 0 buildings or inside said buildin, Trash compactors and refuse cont~ limited to the number and general the site plans cited in Conditiol above. The design of the enclos~ the dimensional criteria deemed ~ affected disposal collection age] incorporate the use of concrete ~ mechanical pick-up service. The shall covenant through a recorda] satisfactory to the Town of Danw responsible for facilitating the access to the trash containers b~ collection company. This may in~ owner, or owner's contractors, ce containers in locations where re~ be possible. In the event that can only be remedied by changes then these changes will be made expense. Heavy truck traffic (tractor tra shall be scheduled from 7:00 A.M Monday through Friday to the gre~ possible. Truck deliveries shal~ necessary to avoid queing of tru~ proxfmity to the site. Use of trash compactors on site ~ the hours of 9:00 A.M. to 6:00 P Outdoor storage of supplies, pal~ (outside of approved refuse cont~ other materials is specifically i The precise location, layout and ~iners shall be locations shown on #A.1. a. & b. res shall reflect ~cceptable by the icy, and shall ~prons to facilitate property owner )le document Llle, to be ongoing proper ~ the local refuse ilude having the )nsolidate refuse ~use collection will )roblems arise that Ln improvements, it the owner's ~ler) to the site to 3:00 P.M. on ~test extent . be scheduled as ~ks on or in close ~hall be limited to M. ~ttes, refuse ~iner locations) and )rohibited. vehicular access/parking for the proposed ~ecycling center shall be subject to separate revSew and approval at the administrative level as part,of the review of the Project Landscape and Irrigation Plan submittal. As part of this revigw, the developer shall provide for consideration 9 written description of the nature of the~operation and its hours of operation and staffing ~evels. A litter collection and sweeping~program shall be established and shall be continuously maintained to prevent accumulation of litter o]~ and off site. The site, including the various buil(|ings, parking areas and landscaping areas, shall be ~aintained in proper condition at all times and shall be free of litter 5C 10. 11. 12. 13. 14. 15. 16. and graffiti. This shall be ass execution of a maintenance agree~ purpose, acceptable to the Town. shall permit the Town to have ne, maintenance undertaken at the ex property owner of record if necel Sweeping and cleaning of parking limited to 7:00 A.M. to noon, Mol Provision for short-term parking deliveries shall be made along of Shops B and Shops D (one spac~ The precise location, identifica these loading spaces shall be approval as part of the Project Irrigation Plan submittal. Pavement treatment for the cross locations), loading zones at dri~ and paving of the southern porti. driveway off of Camino Tassajara uniform material and design and ~ review and approval as part of tl and Irrigation Plan submittal. ' encouraged to design handicap pal the same materials to allow join~ areas as pedestrian access point The driveway at Tassajara Ranch i narrowed or a center planter med supplied to better define drive. to narrow the view corridor from the Market Loading Zone Area. The developer's Civil Engineer sl project striping plan which deta striped and signed as "No- Parkil Zone/Fire Lane". The plan shall review and approval by the San R Protection District and the City Areas proposed for development a seating shall be subject to revi the Planning Department prior to establishment. The review shall limited to, consideration of sea and relationship to surrounding store fronts. The developer, or his appointed 6C ]red through nent for this This agreement ~essary site Dense of the ~sary. areas shall be ~day through Friday. for step van ~e north elevation for each area)° ion and design of ~ject to review and Landscape and ~alk areas (21 ;eways (3 locations) )n of the main shall be of a ~hall be subject to ~e Project Landscape Fhe developer is eking spaces with usage of these .rive shall be [an shall be ~isle movements and this street into ]all develop a ils areas to be ~g Tow Away be subject to ~mon Valley Fire Engineer. outside restaurant ~w and approval by their include, but not sing count, layout pedestrian areas and ~epresentative, Co shall work closely with the Planl provide all information required monitoring of each tenant occupal regards tenant space location, g~ tenant use. This information si allow the center's numerical pari be calculated on an ongoing basi: the center shall be regulated as conformance with the City's nume requirements. Each half of the the center into east and west ha driveway) must stand on its own supplying on-site parking. Landscaping Project Landscape and Irrigation planting shown at 1"=20' scale) . for review and approval by the P! The plans shall include common n~ materials and shall indicate the plant materials will achieve wit] period of time. The plans shall licensed landscape architect. A Plan for the installation of pro~ shall also be submitted for revi~ part of this submittal. The Town shall retain a qualifie~ licensed landscape architect at developer to aid the Town's revi landscape and irrigation drawing~ incurred for this review shall b~ employer . Upon completion of landscape ins~ plant material and irrigation, a] of building occupancy, the licen~ architect for the project shall the Town certifying that all lan installed per the approved Proje~ Irrigation Plans. Q Ail landscaped areas adjacent to include berming and fast growing provide a vertical canopy) in or( screening of the buildings. Tra~ provided in all areas where trel Ail trellises shall be substanti using minimum 6" by 6" posts and detailed design of these structu] 7C %ing Department to to allow the ~cy in the center as Joss lease space and hall be supplied to ting requirements to ~. Tenant mix in necessary to assure ~ical parking ~enter (separating Lves along the main Ln terms of Plans (with ~hall be submitted anning Department. .mes of all plant size that various lin a five year be signed by a Landscape Phasing ect landscaping ~w and approval as third party ~he expense of the ~w of construction Expenses paid by the allation including, ~d prior to issuance ~ed landscape ~ubmit a letter to ~scaping has been ~t Landscape and buildings shall trees (which ~er to provide .ling vines shall be .ises are proposed. ~lly constructed beams. The ~es shall be subject 0 10. 11. to review and approval by the De prior to construction. Where tr may come in contact with shoppin protection shall be provided aro posts. Working drawings of these shall be resubmitted to the DesJ review and approval. Ail project landscaping shall bE underground irrigation systems. Ail trees shall be a minimum of size and shall be double-staked. ground cover shall be a minimum size. Project landscaping shall sign Review Board ~llis support posts ~ carts, additional ~nd the base of trellis structures 'n Review Board for served by automatic 15 gallon container Shrubs not used as )f 5 gallons in include use of specimen trees (24" box minimum ~ize) at project entry areas, pedistrian amenity ~reas, and other local areas of the project. / All landscaping areas not covere~ by shrubs and trees shall be planted with live~ground cover or lawn. A landscaped setback of 30 feet along the project's Crow Canyon Tassajara frontages. This lands reduced in width to 20' where pa~ roadways. In these areas of redl setback, a retaining wall shall berming of landscaping to minimi parking areas as seen from the s~ location, length, design, height the retaining walls shall be sub' approval as part of the Project Irrigation Plan submittal. Lands project's Crow Canyon Road and C~ frontages shall be consistent wi~ along Camino Tassajara within thc Specific Plan Area. A landscape maintenance easement established along the property's and Camino Tassajara frontages. participate in a 1972 Act Landsc~ Maintenance district. A detailed pedestrian circulatio~ submitted as part of the Project Irrigation Plan submittal. The ~ section details of the pathway s5 pedestrian walkway lightin~ Dlan ~hall be provided ~oad and Camino ~aped area may be ?king areas abut the Iced landscape )e provided to allow e the view of ~reet. The and materials of ect to review and ,andscape and ~aping of the ~mino Tassajara ~h the landscaping Sycamore Valley shall be Crow Canyon Road This area shall ~pe and Lighting plan shall be Landscape and ~lan shall include 'stem and a detailed 12. Signs established at entrances t identification purposes and thro for directional information shal review and approval under a sepa Permit. 13. Handicapped ramps and access as 24, State of California, shall b Handicapped parking stalls shall signed and shall be distributed the project with their location to review and approval as part o Landscape and Irrigation Plan su 14. The entry trellises at the two n entry driveways and at the weste shall be designed with heavy woo of a design theme complimentary trellises used elsewhere in the trellis designs shall be subject approval by the Planning Departm Project Landscape and Irrigation 15. Landscaping treatment along the shall be of an intensity, planti general design which is compatib for development by surrounding p treatment at the southwest and s the project shall be provided in efforts of the multiple family r to the south to provide a coordi statement along Tassajara View D Architecture Ail ducts, meters, air condition mechanical equipment shall be ef from view with landscaping or ma architecturally compatible with Any deviations or additions to t architectural plans cited in Con above may, at the discretion of Planning, be referred back to th Board for consideration and appr the "Pad" structure shall be sub approval by the Design Review Bo consistent with the design theme rest of the center. Prior to the issuance of buildin. of final colors and materials se 9C o the project for ughout the project 1 be subject to rate Sign Review required by Title e provided. be appropriately svenly throughout and design subject f the Project bmittal. ~rtherly project fly entry driveway den members and be to that of the project. The to review and ~nt as part of the Plan submittal. property frontages ng palette and le with that planned ~ojects. Special Dutheast corners of concert with the ~sidential project hated entry wive. lng and/or any other fectively screened ~erials the main structures. he approved ~ition #A.1. a. & b. the Chief of ~ Design Review ~val. The design of iect to review and ~rd and shall be developed for the permits, samples Lected for all e structures shall be submitted to Department for review and approv Roof materials used in this proj A/B materials. No antennas, microwave or satell or other broadcasting or receivi permitted on the roof of any str ground mounted equipment shall b according to Town requirements. method of screening of such grou shall be submitted for review an Planning Department prior to ins The street number of all structu this center shall be posted so a from the street at all times, da The following refinements/modifi made to the shopping center's Si outlined on Sheet PR-16 of the P cited in Condition #A.1. Siqn A - The number and loc Type A-1 and Type A-2 signs review and approval by the otherwise authorized by the illuminated Type A-1 signs a maximum of 30% of the ten Sign A signs (10% +/- of th minimum of 10% of the tenan A signs shall use Type A-3 total tenant spaces). Siqn B & Sign C - Perimeter depth of sign protrusion fr exterior wall surfaces shal these types of signs. Sign D - A maximum of 50% o Sign B or C signs may utili sign (25% +/- of the total The project developer shall City's satisfaction the man design standards for the st materials used for the awni be assured. Sign D signs (awning-type s back-lit nor illuminated fr 10C the Planning sct shall be Class ite receiving dishes ng devices shall be ~cture. Any such ~ visually screened The location and nd mounted equipment ~ approval by the hallation. res developed in s to be easily seen ~ and night. ~ations shall be Program, which is ~oject Drawings ation of illuminated shall be subject to 2ity. Unless City, use of shall be limited to ant spaces using e total tenants). A t spaces using Sign ~igns (5% +/- of the trim detail and Dm the receiving be uniform for the tenants using ce the awning-type tenant spaces). document to the her that tight ~ucture and 3g-type signs will [gn) shall not be pm an external source from above the sign. signs shall be limited to w! "forest green" awning mater~ No concurrent use of Sign C shall be made by an individ~ Sign E - The maximum area o~ be 5 square feet. Sign E signs shall be double The minimum clearance below be 7'6" Sign E signs shall have uni~ General Comments - Unless otherw~ the Planning Department, all sig] minimum setback of 18" from indi~ - The project developer shall applicable sign program cri~ individual tenant lease. - The project architect's "sit must be secured for each ini occupancy. A single sign fabricator sh~ the respective types of sig] developer shall prepare deti fabrication specifications i sign, which shall be submit' approval by the Planning De] uniformity in the productio] Parkinq Ail parking spaces shall be doubl provided with wheel stops unless concrete curbs, in which case be provided beyond the ends of al accommodate the overhang of auto] Compact and handicap car spaces: designated with appropriate pave] signage. Ail landscape islands and tree w~ bordered by 4 inch raised concre' 4. Minimum parking dimensions shall Standard spaces shall be a l 19 feet with up to a 2 foot permitted; llC Lettering on these lite letters on a ~al. and Sign D signs lal tenant. these signs shall faced. Sign E signs shall ~orm edging details. Lse authorized by is shall maintain a ridual lease lines. incorporate the 2eria into each 'n-off" on all signs .tial tenant ill be utilized for is or the project ~iled sign ~or each type of ~ed for review and )artment, to assure of the signs. e striped and they are fronted by ~ficient areas shall L1 parking spaces to sobiles. ~hall be clearly sent marking and/or ~lls shall be ~e curb. be as follows: sinimum of 9 feet by parking overhang be Compact spaces shall be a m 16 feet with up to a 1.5 fo permitted; Ce Aisle widths for perpendicu a minimum of 20 feet; Aisle widths for parking sh width of 18 feet for one-wa minimum width of 20 feet fo drive-aisles. so A maximum of 30% of the pro may be sized for compact ca The parking area at the southeas project shall be designated and "employee only" parking area. e The parking and driveway surfaci concrete paving. The City Engin project's soils endineer's struc design. The developer shall, at make tests of the soil over whic base is to be constructed and fu reports to the City Engineer. T engineer shall determine a preli design of the road bed. After r been completed, the developer sh performed to determine the final bed. The concrete bases of light stan parking areas shall be architect (exposed aggregate or approved a Gradinq A Grading and Drainage Plan shal shall be submitted for review an City Engineer. Calculations (hy prepared by the developer for re Engineer to determine the sizing Development shall be completed i detailed soils report and the co plans prepared for this project. shall contain specific recommend foundation design of the structu The engineering recommendations project ~pecific soils report sh 12C inimum of 8 feet by ot overhang lar parking shall be all be a minimum y drive-aisles and a r two-way · ct parking spaces iS. t corner of the signed for use as an ng shall be asphalt ser shall review the tural pavement his sole expense, n the surfacing and rnish the test ne developer's soils minary structural ~ugh grading has ~11 have soil tests design of the road ~ards at the center arally finished lternate finish). be prepared and approval by the ~raulic) shall ~iew by the City of drainage lines. n compliance with a nstruction grading The soils report ~tions for wes in this center. ~utlined in the ~11 be incorporated Go into the design of this project. Areas undergoing grading, and al activities shall be watered, or dust control measures to prevent measures shall be approved by th employed at all times as conditi Where soils or geologic conditio grading operations are different anticipated in the soils report, conditions warrant changes to th contained in the original report report shall be submitted for apl Engineer. It shall be accompani and geological opinion as to the from hazards of erosion, settlem activity. Within 30 days of the effective the developer shall post a suret determined suitable by the City restoration of the site to a sta resistant state if the project i prematurely. Dust control measures, as approv Engineer shall be followed at al grading and construction operati Grading and land preparation sha the period of April 15 to Octobe erosion and deposition of sedime erosive sloped resulting from gr shall be hydromulched or otherwi project developers each year by Exceptions may be granted by the o The soils engineer shall sign th plans. Streets The developer shall obtain an en from the Town Engineering Depart commencing any construction acti public right-of-way or easement. Ail street signing shall be inst developer as required by the Tow include, but is not necessarily "No Parking", and street name si 13C other construction ~reated with other dust. These ~ City Engineer and Dns warrant. ns encountered in from that or where such recommendations a revised soils ~roval by the Town ~d by an engineering safety of the site ~nt and seismic ~ate of this permit, f or guarantee, as Engineer, to ensure ole and erosion ~ terminated ~d by the Town times during DRS. ll be restricted to 15 to minimize hts. Ail exposed ~ding activities ~e stabilized by Dctober 15. City Engineer. final grading ~roachment permit ment prior to vities within any alled by the n. This shall limited to "Stop", ~ns. Traffic signs o Se and parking restriction signs sh review and approval by the Polic The developer shall keep adjoini free and clear of project dirt, debris during the construction p necessary by the city Engineer. be responsible for corrective me to the Town of Danville. Const shall be supplied as required by if determined necessary, to prov This development shall be provid effective circulation system for pedestrians. These facilities s installed to the satisfaction of and shall be separated from vehi wherever possible. Any damage to existing public st resulting from project construct repaired to the satisfaction of full expense to the developer° all be subject to e Department. ng public streets mud, materials and eriod, as is found The developer shall asures at no expense ruction fencing the city Engineer ide public safety. ed with a safe and bicycles and hall be designed and the City Engineer cular traffic reet improvements ion shall be the City Engineer at The developer shall also be responsible for correction of any existing frontage deficiencies along the~subject property's frontage. This shall include s~urry seal, overlay or street reconstruction if dee~ed warranted by the City Engineer. / All improvements within the public right-of-way, including curb, gutter, sidewal~s, driveways, paving and utilities, shall be construqted in accordance with approved standards and/or ~lans and shall comply with the standards established in Title 9 of the City Code. At the time Pro~ect Improvement Plans are submitted, the developer shall supply to the city Engineer an up-to-date~Title Report for the subject property. ~ Conditions of this approval requ traffic mitigation fee to be use of certain roadway improvements Danville, the City of San Ramon portions of Contra Costa County, intent of maintaining a minimum traffic condition. Prior to the building permits, the developer update to the TJKM traffic study level of service 'D' traffic cot maintained at all locations wit~ traffic improvements are to be cited traffic mitigation fees. service is exceeded at the loca 14C ire the payment of a d for construction within the Town of and unincorporated with the specific level of service 'D' issuance of shall prepare an to determine if the dition will be in Danville where lnded by the above If this level of ions described above, no further building permi~ until the necessary programmed i~ completed or financially assured. at his option accelerate payment mitigation fees in order to prov the necessary funding to constru, The developer shall participate Road Extension Fee Benefit Area City's Joint Exercise of Powers County dated February 10, 1987 a actions in furtherance thereof. to Town the unpaid portions of ti fees prior to the issuance of bu developer shall pay the Fee Bene~ effect at the time of issuance o~ permit and said fees shall be de separate account entitled "Crow Extension-Area of Benefit" (Acco 076-000.000-003.019) for transfe reimbursement to Blackhawk. If the amount of the reimburseme Canyon Extension Fee Benefit Are beyond $1920, the $5377 average increased by an amount equal to reimbursement fee over $1920. The remaining portion of the fee the County shall be used for otb related improvements within the and San Ramon and the County, and drainage costs associated wi the Bettencourt curve. The developer's civil engineer s expected truck length and turnir use the private streets (fire ec garbage or moving trucks, etc.) radii accordingly and submit th~ criteria to the City Engineer as building permit submittal. Infrastructure Water supply service for this provided by the East Bay Munici~ in accordance with the requirem~ Sewer disposal service for this Drovided by the Central Contra District in accordance with District. 15C ~s shall be issued lprovement is The developer may of the traffic .de the Town with :t the payment. Ln the Crow Canyon in accordance with ~greement with %d any subsequent Applicant shall pay ~e Fee Benefit Area [lding permits. The ~it Area fees in any building osited into a ~anyon Road unt No. r to County and nt to the Crow ~ is increased dwelling unit fee is the increase of the after transfer to sr circulation- ~ities of Danville cluding the grading th realignment of hall develop the g radius criteria to uipment, delivery, and design the curb s data and design part of the bdivision shall be ~al Utility District ~nts of the District. subdivision shall be losta Sanitary r~quirements of the 10. 11. 12. Drainage facilities serving this maintenance thereof, and easemen to the satisfaction of the city Chief Engineer of the Contra Cos Control District. Ail storm water run-off shall be conducted via an approved draina nearest approved downstream faci Off-site drainage flows shall be project boundary via an approved facility, or as approved by the Roof drains shall empty onto pay swales, other approved dissipati a pipe. Concentrated drainage flows shal to cross sidewalks or driveways Any portion of the drainage sys' runoff from public streets shall a dedicated drainage easement, ¢ If a storm drain must cross the minimum storm drain easement wi~ feet. Wider easements shall be direction of the City Engineer due to size and/or depth. The developer shall comply with requirements of the Contra Costs Control District. Written docu~ supplied to the Town to verify requirements have been, or will satisfaction of the District. The developer shall furnish proc Engineer of the acquisition of ~ of entry, permits and/or easemer construction of off-site tempor~ and drainage improvements. Ele¢ telephone, and Cable TV services underground in accordance with existing ordinances. All utili and provided within public utilJ to meet utility company standar¢ streets. In accordance with Section 92.2( Ordinance Code, this project sh~ provisions of the City Subdivis 16C subdivision, ts shall be provided Engineer and/or the ta County Flood collected and ge method to the lity. intercepted at the storm drain Town. ed areas, concrete ng devices, or into 1 not be permitted em that conveys be installed within r public street. property, the th shall be ten provided at the f deemed necessary all relevant County Flood ,entation shall be .hat the District's be, met to the ~f to the City 11 necessary rights ~ts for the .ry or permanent road :trical, gas, I, shall be provided ~he city policies and ~ies shall be located .ty easements, sited Is, or in public ~06 of the City Lll conform to the on Ordinance (Title Je 9). Any exceptions therefrom mu: listed in the conditions of apprl herein. 13. The developer shall be responsibl installation of street light sta] luminaries with the design, spac~ intensity and locations subject City Engineer. 14. Storm drains shall be placed in space corridors whenever possibl be designed so that this can be the pipes being excessively deep 15. Prior to filing the Final Map, t furnish the Town Engineer with 1 and Central Contra Costa Sanitar that the Districts have agreed t furnish water service and sewer to each of the dwelling units in Drainage The developer shall be responsib facilities required to the neare downstream drainage facility. Ail closed conduit drainage syst designed with self-cleaning flow less than 2 feet per second). The public's responsibility for drainage facilities shall begin accepting public street drainage serving only commercial site are public facilities. Miscellaneous The Town will contract with a qu party" for the purpose of condu¢ review and appraisal of the Fins Geotechnical Report for this pfc this review shall be borne by tb be based on time and materials ~ administrative fee. The develop Town all necessary data to facil prior to the recordation of the the issuance of grading permits. will be comDleted within 3 week~ data, at which time the develop~ engineer shall address all comm~ 17C ~t specifically be )val as contained Le for the ]dards and Lng height, lighting 2o approval by the ~treets or open and the plan shall ~ccomplished without Le Developer shall ~tters from EBMUD f District stating D respectively service respectively this project. for any off-site adequate ~ms shall be velocities (not maintenance of ~t the first inlet storm drains not acceptable as alified "third ting an independent 1 Soils and ject. The cost of e applicant and will lus a 1% er shall provide the itate this review initial Final Map or The initial review of submittal of the r and his soils nts and re-submit the complete package for final r, with the final review, the devel. Engineer shall make any necessar· Project Grading Plan which resulI party review. The developer shall make provisi, need for daycare facilities genel project by one or more of the fo through setting aside a suitable development of daycare facilitie: fee to be used towards construct facilities; 3) participate in established for the overall Tass~ (SD 6878) as determined acceptab Department, or 4) other alter~ to the Town of Danville. If the to pay a fee, the Town shall be ~view. Concurrent ~per's Civil changes on the from the third )ns to address the fated by this [lowing: 1) site for the ~; 2) payment of a Lon of daycare mitigation package ~jara Ranch project [e to the Planning ~atives acceptable developer chooses %otified of the developer's intent in writing an the fee shall be set by the Town Council within 120 days of the receipt of the letter. All physical improvements shall ~e in place prior to occupancy of any structure in thD project. If occupancy within the project is requested to occur in phases, all physical improvem required to be in place prior to for items specifically excluded Construction-Phases Occupancy P1 Planning Department. No structu until the adjoining area is fini accessible, provided with all re services and amenities, and appr from remaining additional const~ The project shall be constructe~ modifications in the design, but approved by Staff. Any other c~ Planning Commission approval th~ Plan review process. Based upon mitigation measures ¢ Dougherty Road General Plan Amer developer shall prepare and sub~ study addressing noise mitigatic Road for review and approval by prior to the issuance of buildir developer shall comply with the contained in any such noise anal snts shall be occupancy except in a an approved by the re shall be occupied shed, safe, ~sonable expected opriately separated ~ction activity. as approved. Minor not the use, may be ~nge will require ough the Development ontained in the dment Study EIR, the it an acoustical n along Crow Canyon the City Engineer g permits. The recommendations ysis. Any water well, cathodic protection well, or exploratory boring shown on the~may, that is known to exist, is proposed, or is lo~ated during the 18C course of field operations, must~be property destroyed, backfilled, or maintained in accordance with applicable groundwater protection ordinances. The Health Services Department or Contra Costa County should be contacted (415/D71-4200) for additional information. I Unless specifically modified by approval, the subject project sh to the conditions established fo 6878 (City Council Resolution 9- attention should be made to the from that approval document; F.7 Tassajara improvements), F.8 (re Road improvement), F.9 (regardin turnouts), H.3 (requiring prepar study addressing traffic signali buildout of SD 6878), H.4 (regar at Camino Tassajara and Crow Can (regarding development of an Als protection plan). conditions of this approval may developer to install public imp~ neither the developer, nor the q rights to allow the improvements Developer shall be responsible ~ the necessary easements either t negotiations or by entering int¢ the Town and assume all respons~ acquisition pursuant to the Towr condemnation. Such acquisitions prior to the developer's submitt map. All costs associated with APPROVED BY PLANNING COMMISSION ON OCTOBER 10, 1988 Kevi~ailey, Principal Planner pkgpl2 these conditions of all remain subject r PUD 86-3 and SD 87). Particular following conditions (regarding Camino ~arding Crow Canyon g provision of bus ation of a traffic zation needs at full ~ing signalization ~on Road), and H.8 mo Creek Watershed require the ~ovements on land 'own, has easement to be installed on or acquisition of hrough private ~ an agreement with bilities for ~'s authority for shall be commenced .al of any final such acquisition shall be borne by the developerj Except at points of approved driveway access, abutter's rights of access alon~ Crow Canyon Road, Camino Tassajara, Tassajara RanCh Drive and Tassajara View Drive shall be r~linquished by way of recordation of a deed prior to ~he issuance of building permits. The relinquishment shall include the right of way returns of the~affected project. THE TOWN OF DANVILLE Date 19C