Loading...
HomeMy WebLinkAboutLUP 88-09EXHIBIT A FINDINGS & CONDITIONS OF APPROVAL LUP 88-9 1465 Harlan Drive Greenbrook Elementary School (APN: 218-140-011 ptn.) Findinqs The proposed development is in conformance with the General Plan. The proposed use is an accessory support structure to an existing child care facility and, as such, helps satisfy an identified community need, as referenced in the General Plan. The proposed development is in conformance with all applicable zoning requirements. The proposed development will not adversely impact adjacent residential development. .Conditions of Approval A. General The development of the 225 ± square foot bathroom building shall be substantially as shown on the project drawings labeled "Proposed Restroom at Greenbrook School For S.R.V.C.C.A.", prepared by Brian Manning Associates and dated and received by the Planning Department on July 15, 1988. The developer/operator shall pay any and all City and other related fees that the property may be subject to. These fees shall be based on the current fee schedule in effect at the time the relevant permit is secured. Prior to the issuance of building permits, the developer shall submit written documentation that all requirements of the San Ramon Valley Fire Protection District have been met. Construction and grading operations shall be limited to weekdays (Mondays through Fridays) during the hours from 7:30 a.m. to 5:30 p.m., unless otherwise approved in writing by the City Engineer. If determined necessary by the city Engineer, the project developer shall provide security fencing around the construction site during construction of the project. lC e Be Ce Do Except as may be expressly modified by these conditions, operation of the existing 60-child two-building child care facility shall remain subject ot the Conditions of Approval established for LUP 88-9. Site Planning Ail new project lighting shall be installed in such a manner that glare is directed away from surrounding properties and rights-of-way. Landscaping A revised landscape plan shall be submitted for review and approval by the Planning Department prior to the issuance of a building permit for the bathroom. The plan shall detail revised planting proposed in vicinity of the new structure and changes, if any, proposed to the existing raised wooden decking. Ail plant material shall be served by an automatic underground irrigation system and maintained in a healthy growing condition. Architecture Ail ducts, meters, air conditioning and/or any other mechanical equipment, whether on the structure or on the ground, shall be effectively screened from view with landscaping or materials architecturally compatible with the main structure(s). The street numbers of the two portable buildings shall be posted so as to be easily seen from the street at all times, day and night. Samples of final colors and materials selected shall be as detained on the plans referenced in Item A.1 and shall be submitted to the Planning Department for final review and approval. Grading Areas undergoing grading shall be watered, or treated with other dust control measures to prevent dust. These measures shall be approved by the Chief Building official and employed at all times as conditions warrant. 2C Fe Streets The developer/operator shall keep adjoining public streets free and clean of project dirt, mud, materials and debris during the construction period, as is found necessary by the City Engineer. The developer/operator shall repair any deficiencies in the existing curb and gutter to the satisfaction of the City Engineer (see Condition #10.A. of LUP 85-9) prior to occupancy of the restroom. The existing "No-Parking" area along the entry driveway situated northeast of the two portables shall be repainted prior to issuance of a building permit. The existing "Do Not Enter" sign along Harlan Drive shall be repainted prior to issuance of a building permit. Infrastructure Roof drains shall empty onto paved areas, concrete swales, other approved dissipating devices, or into a pipe. Concentrated drainage flows shall not be permitted to cross sidewalks or driveways. Existing drainage problems at the northeast corner of the easterly portable shall be corrected prior to the issuance of a building permit. Ail utilities required to serve the new structure shall be installed underground. APPROVED BY THE TOWN OF DANVILLE PLANNING COMMISSION ON July 25, 1988 Principal~ner 3C akgel Date