HomeMy WebLinkAboutDP 87-20CONDITIONS OF APPROVAL ]DP 87-20 Danville Inn A. General The development shall be substantially as shown on the project drawings labeled "Danville Inn by Shilo Investments" as prepared by Stephen E. Harriman and Associates dated 7/20/87 and marked Exhibit "D" on file with the Planning Department except as modified by the revised site plan dated September 11, 1987, the revised building elew~tions which include brick or brick veneer on portions of the structure, and by the following conditions of approval. The developer shall pay any and all City and other related fees that the property may be subject to. These fees shall be based on the current fee schedule in effect at the time the relevant permit is secured. Notice should be taken specifically of the City's Transportation Improvement Program (TIP) fee and the drainage acreage fee as established by the Flood Control District. The developer shall comply with all requirements of the San Ramon Valley Fire Protection District and the San Ramon Valley Unified School District. If archeological materials are uncovered during any construction or pre-construction activities on the site, all ear~hwork within 100 feet of these materials shall be stopped until a professional archeologist certified by the Society of California Archeology and/or the Society of Professional Archeology has had an opportunity to evaluate the significance of the find and to suggest appropriate mitigation measures, if they are deemed necessary. Construction and grading operations shall be limited to weekdays (Mondays through Fridays) during the hours from 7:30 a.m. to 5:30 p.m., unless otherwise approved in writing by the City Engineer. Site Planning Ail lighting shall be installed in such a manner that glare is directed away from surrounding properties and righ~-of-way~. 8C Ce 2. The location of any pad mounted transformers shall be subject to approval by the Planning Department prior to the issuance of a building permit. Generally speaking, such transformers shall not be located between any street and the front of a building. Landscaping 1. A final landscaping plan shall be submitted for review and approval by the Planning Commission prior to the issuance of a building permit. 2. Ail plant material shall be served by an automatic underground irrigation system and maintained in a healthy growing condition. 3. Ail trees shall be a minimum of 15 gallon container size and properly staked except that 25% of the ground mounted trees, and 50% of any trees in roof planters shall be 24 inch and 36 inc]~ box varieties. Shrubs not used as ground cover shall be a minimum of 5 gallons is size. 4. Ail landscaped areas not covered by shrubs and trees shall be planted with live ground cover. 5. Roof planters shall be provided at the stepped ends of the building and along the west building elevation to include trees and shrubs. The exact location and design of the roof planters shall be subject to review and approval by the Planning Commission at the time of consideration of the final landscaping plan. 6. A retaining wall with bermed landscaping shall be provided adjacent to the parking stalls at the northeast corner of the site adjacent to Crow Canyon Place. 7. Berming up to 4 feet in height shall be provided adjacent to the building where feasible and in other landscaped areas as the size of the planters may permit. 8. Landscaping shall not obstruct sight distance at the driveway or within the parking lot. D. Architecture 1. Ail ducts, meters, air conditioning and/or any other mechanical equipment whether on the structure or on the ground shall be effectively screened from view with landscaping or materials architecturally compatible with the main structure(s). The highest point of any roof moun%ed equipmen% shall no% ex%end above equipment well. 2. Ail trash and refuse shall be contained within enclosures architecturally compatible with the main structure(s). Enclosure design shall include six (6) foot high masonry walls on three sides with steel framed gates and wood bolted to the gates. Gates will be self-closing and self-latching. Alternately trash collection areas may be included within the building provided that the area is completely enclosed, subject to review and approval by the Chief of Planning. The street number(s) of the building(s) shall be posted so as to be easily seen from the street at all times, day and night.. If signing for the development is desired, in addition to any signs approved as part of this application, a comprehensive sign program shall be submitted to the City for consideration under a separate application. Prior to the issuance of a building permit, samples of final colors and materials selected shall be submitted to the Planning Department for review and approval. E. Parking Ail parking spaces shall be striped and fronted by concrete curbs with sufficient areas provided beyond the ends of all parking spaces to accommodate the overhang of automobiles; except that areas under the building with no landscaping, and in front of the retaining wall at the northeast corner of the site shall have full size spaces with concrete wheel stops. 144 on site parking spaces shall be provided of which 49 spaces may be compact car spaces. Compact car spaces shall be clearly designated with appropriate pavement marking or signage. Compact spaces shall be 8 feet by 16 feet in size including allowable overhang. Prior to issuance of building permits, appropriate agreements and/or easements shall be recorded which provide for the following: Reciprocal ingress and egress through and between the hotel site and the entire Castle Construction Company parcel east of the hotel site; Enti%l~m~n% %o %he join% use of no less %hah 45 standard size parking spaces located on the Castle 10C Fe Construction Co. site. These spaces sha located immediately adjacent to the hotel site; and Ce Provision for joint maintenance of the access and parking facilities as may be appropriate. 5. Variance approVal is hereby granted as follows: ae Up to 45 spaces of the required parking for the hotel may be located off site pursuant to agreements and/or easements specified in condition E.4abow~; be Parking spaces on the adjacent Castle Construction Company site may be jointly used to satisfy the parking requirements of the hotel and the future commercial development; Ce Up to 49 compact car parking spaces may be constructed on the hotel site; de Aisle widths where only compact car spaces are served may be reduced to 24 feet; and Se Aisle widths serving standard size spaces may be reduced to 26 feet. Se Parking spaces shown within the loading/unloading and entry area shall not qualify as required parking for any purpose (handicapped, etc.) · A total of 45 off site parking zones shall be available for use at the time of occupancy of the hotel. Parking improvements may be interim in nature to include base material, asphalt paving and redwood headers until such time as the commercial site is developed. Grading me Any grading on adjacent properties will require written approval of those property owners affected. Areas undergoing grading, and all other construction activities shall be watered, or treated with other dust control measures to prevent dust. These measures shall be approved by the City Engineer and employed at all times as conditions warrant. The developer shall obtain an encroachment permit from 11 the Engineering Department prior to commencing any construction activities within any public right-of-way or easement. This shall include any encroachment permits that ]nay be required by the City of San Ramon. Ail street signing shall be installed by the developer as required by the City. This shall include, but is not necessarily limited to "Stop," "No Parking," "Not a Through Street," and street name signs. Traffic signs and parking restriction signs shall be approved by the Police Department. The developer shall keep adjoining public streets free and clean of project dirt, mud, materials and debris during the construction period, as is found necessary by the City Engineer. Handicapped ramps shall be provided and located as required by the City Engineer. 0 Any damage to street improvements now existing or done during construction on or adjacent to the subject property shall be repaired to the satisfaction of the city Engineer at full expense to the developer. This shall include slurry seal, overlay or street reconstruction if deemed warranted by the city Engineer. Crow Canyon Place shall be constructed as a 40 foot curb to curb street within a 60 foot right of way extending from its intersection with Fostoria Way to the north limit of the most northerly access to the hotel site. Improvements shall include curb and gutter and street lights on both sides of the street, and sidewalk across the site frontage. Intersection improvements at Fostoria Way shall be completed to include any required restriping south of Fostoria Way as determined by the City Engineer in consultation with the City of San Ramon. H. Infrastructure Water supply service shall be provided by the East Bay Municipal Utility District in accordance with the requirements of the District. Sewer disposal service shall be provided by the Central Contra Costa Sanitary District in accordance with the requirements of the District. Drainage facilities and easements shall be provided to the satisfaction of the City Engineer and/or the Chief 12C e 10. Engineer of the Contra Costa County Flood Control District. Ail storm water run-off shall be collected and conducted via an approved drainage method to the nearest approved downstream facility within the existing natural watershed area(s) of the site. Roof drains shall empty onto paved areas, concrete swales, other approved dissipating devices, or into a pipe. Concentrated drainage flows shall not be permitted to cross sidewalks or driveways. The developer shall comply with all relevant requirements of the Contra Costa County Flood Control District. The developer shall furnish proof to the City Engineer of the acquisition of all necessary rights of entry, permits and/or easements for the construction of off-site temporary or permanent road and drainage improvements. Ail new utilities required to serve the development shall be installed underground. Mitigate the impact of additional storm water runoff from this dew~lopment on San Ramon Creek by either of the following methods: a® Removing 1 cubic yard of channel excavation material from the inadequate portion of San Ramon Creek near Chaney Road for each 50 square feet of new impervious surface area created by the development. All excavating material shall be disposed of offsite by the developer at this cost. The site selection, land rights, and construction staking will be by the Flood Control District. OR, AT THE OPTION OF THE DEVELOPER, Contribute to the County Deficiency Development Fee Trust (Fund No. 812100-800) a drainage fee of $0.10 per square foot of new impervious surface area created by the development. Within 12 months of receipt of the contribution, the Flood Control District will use the monies to implement the subject improvements. The added impervious 13 surface area created by the development will be based on the Flood Control District's standard impervious surface area Ordinances 11. The developer shall submit improvement plans for Town review and pay all plan review fees. The plans shall provide for drainage of all areas of the site to their respective natural watershed areas, except as may be mutually agreed to by the Flood Control District and the City Engineer. Off-site drainage improvements and easements shall be provided as necessary to convey the water to a point of discharge acceptable to the city Engineer. I. Miscellaneous Off site driw~way and aisle improvements shall be made with full structural sections in order to provide access to all required parking spaces and to all access points into the hotel site. Sign approval is hereby granted as to location only. The size and design of the signs shall be subject to review and approval by the Design Review Board. Design Review Board review and approval of project signage proposed on the structure shall occur prior to issuance of any building permits for the hotel. Planning Department approval of plans and specifications shall give special attention to construction details to assure long term durability and appearance of the structure. Approved by the Town of Danville ~n Counci~l/~ October 19, 1987 S~Jr~ary of the Planning Co--ission p~ep5