Loading...
HomeMy WebLinkAbout84-85 BEFORE THE CITY COUNCIL OF THE CITY OF DANVILLE In the Matter of: ) ) Amending the approved ) ORDINANCE NO. 84-85 P-1 zoning of land and ) Amending the Zoning Map ) of the city ) The City Council of the City of Danville DOES ORDAIN AS FOLLOWS: SECTION 1. Rezoning. That the approved P-1 zoning for the 378.08 acre parcel located south of Camino Tassajara and west of Dougherty Road (Assessor's Parcels 217-040-004, 005, 015, 017, and 018) otherwise known as a portion of the Woodranch, and as shown on the attached Exhibit B is amended based upon the approved Preliminary Development Plan for PUD 85-7, as conditioned by the requirements listed on Exhibit A. SECTION 2. Zoninq Map. The zoning map of the City of Danville is amended accordingly. SECTION 3. Publication. The City Clerk shall either a) have this ordinance published once within 15 days after adoption in a newspaper of general circulation or b) have a summary of this ordinance published twice in a newspaper of general circulation once five day before its adoption and again within 15 days after adoption. SECTION 4. Effective Date. This ordinance becomes effective 30 days after its adoption. The foregoing ordinance was introduced at a meeting of the City Council of the City of Danville held on December 16, 1985, and was adopted and ordered published at a meeting of the Council held on January 6 , 198~, by the following vote: AYES: Kennett, Lane, McNeely, Schlendorf NOES: None ABSENT: None ABSTAIN: Offenhartz / .-~--~--- ' MAYOR ,~ ?' C!T'Y ~CLERK EXHIBIT A FINDINGS AND CONDITIONS OF APPROVAL REVISED TENTATIVE MAP 6155 PRELIMINARY AND FINAL DEVELOPMENT PLAN FOR PUD 85-7 FINDINGS The Planning Commission of the City of Danville make the following findings in support of the proposed Revised Tentative Map and Preliminary and Final Development Plan (MS 6155 and PUD 85-7). 1. The Revised Tentative Map and Final Development Plan together with the design and improvement of the proposed subdivision and consistent with the Sycamore Valley Specific Plan and the General Plan. 2. The proposed map together with the design and improvement of the proposed subdivision is consistent with the General Plan. 3. The site is physically suitable for the type and proposed density of development. 4. The design of the subdivision and the proposed improvements are not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. 5. The design of the subdivision and the type of improvements are not likely to cause serious public health problems. 6. The design of the subdivision and the type of improvements will not conflict with easements acquired by the public at large, for access through or use of property within the proposed subdivision. 7. An Environmental Impact Report was prepared for the Sycamore Valley Specific Plan and certified by Contra Costa County in 1981, and an addendum to the Draft E.I.R. was prepared and approved by the City of Dahviiie in 1985. -A1- CONDITIONS OF APPROVA?. 1. This approval is based upon a Revision to the approved Tentative Map for sUbdivision 6155 dated November 4, 1985; and the Preliminary and Final Development Plan for PUD 85-7 dated October 30, 1985. Any revision to these plans shall be submitted for the review of the Chief of Planning and City Engineer. 2. The total number of residential lots shall not exceed 144. 3. The land uses and minimum dimensional standards and requirements for the principal and accessing structures on these lots shall be as provided under the R-10 zoning district standards. Residential building height shall not exceed 28 feet above average grade. Any deviation from these criteria or interpretation of standards shall be subject to the administrative review and approval of the Chief of Planning. 4. For purposes of unit siting, the following criteria shall apply: a. On opposing corner lots, at least one unit shall be one story. b. The same unit plan or elevation shall not be located next to or directly across the street from each other. Possible exception may be granted tn the case of split level lots subject to the approval of the Chief of Plannina. c. Front yard setbacks shall be varied to create additional visual relief. d. Sideyard fencing shall be located so as to combine sideyard areas with frontyard to the greatest extent possible. e. On corner lots, the minimum street side - setback shall be 10 feet. ¢NOT~: Asterisk indicates conditions which must be satisfied prior to recordation of final made; ~) indicates standard conditions.) * 5. Architectural approval for plans submitted as part -- of the Final Development Plan is not granted with this approval. Plans including floor plans and elevations shall be submitted for Architectural Review and approval prior to issuance of grading permits or recordation of Final Maps. Revised plans shall incorporate but not be limited to the following design criteria= a. A minimum of five unit plans shall be submitted. Each unit shall have a minimum of three architectural elevations. b. All four exterior unit elevations shall be trimmed and detailed similar to front elevations. Trim material around doors and windows shall be a minimum 1 5/8" thickness. c. Red tile roofing shall be discouraged in favor of slate, grey or brown colored concrete tile with a dull finish. d. Some variation shall be included in the three rooflines proposed with each floor plan. e. White stucco finishes shall be avoided in favor of beige or earthtone colors. f. All air conditioners/condensers shall be ground mounted and screened from public view. g. ~pproved spark attestors shall be installed on each chimney used for fireplaces and appliances in which solid or liquid fuel may be used. h. If the City of Danville adopts an ordinance addressing requirements for fire retardant roofing on a Citywide basis prior to issuance of building permits for this project, then the developer shall comply with the requirements of that ordinance. 6. The limits of open space Parcel B shall be as shown on Exhibit I. 7. All grading within the areas designated as open space shall be at slopes no greater than 3:1. or as reviewed and aDDroved by the Chief of Planning and City Enqineer. -A3- 8. No direct access onto Doughstry Road shall be allowed for lots 87-101, 141, 142, 128, 129, 123 and 124. All access shall be on the interior subdivision streets. 9. Provide a pedestrian connection from the proposed recreation area (Parcel A) to the cul-de-sac at the end of "F" Street. 10. Provide for pedestrian access into open space areas at the end of "S" Street and "H# Street. 11. Recreational facilities on Parcel A shall be developed with the first phase of the project. 12. All trees to be planted including street trees and slope planting shall be minimum 15 gallon size. 13. If development of Phase III occurs prior to development of the property to the south, a temporary cul-de-sac shall be constructed at the southerly end of "B" Street in the vicinity of lots 122-124. (14). Landscape Working drawings for the Recreation Area (Parcel A) shall be submitted for review by the Chief of Planning prior to issuance of any building permits. 15. All recommendations contained in the Soil and Geologic Investigation prepared for the project by Harding Lawson Associates, dated October 31, 1984 shall be incorporated into the final design of the project. The soils engineer shall sign the final grading plan. (16). All recreation building, cabanas, etc. shall comply with San Ramon Valley Fire Protection District Ordinance #4 - Supervised Sprinkler Requirements, prior to occupancy. * 17. Developer shall participate in an assessment district or other funding mechanism for completion of all requirements contained in the Sycamore Valley Specific Plan pursuant to the approved Scope of Improvements as amended and adopted by the City Council on July 3, 1985. In addition, the developer shall participate in a Lighting and Landscaping Maintenance District to be formed in accordance with the Landscaping and Lighting Act of 1972. -A4 - * (18). Covenants, Conditions and Restrictions, Articles _ of Incorporation and By-laws for a mandatory homeowners association shall be prepared for the project. The City shall be made a third party beneficiary as to the sections of the CC&Rs which address any applicable conditions included in the project conditions of approval, and the following areas of concern.: A. Maintenance of private drainage systems, lot grading and landscaping, and subdrain areas. B. Prohibition of recreational vehicle parking. c. Town police shall be allowed to enforce municipal parking regulation on all public and private roadways. D. Construction of architectural additions and/or remodels, swimming pools and accessory structures of any kind shall require the approval of the HOA and the Town of Danville. E. A permanent maintenance agreeBent for all landscaping in common areas will be ~K~ulred from the HOA assuring regular Mintshanes including irrigation, fertilllation ~d w~ed - abatement. F. All E.V.A. 's and fire trails wASAArt ~ ar.m controlled My t. he H.0.A. oAdil be maAntaiAod ~v 4-hdl LI ~ A ~Jr llN, a,Ep e6 · ~ · · G. Drip irrigation systems aAouAd be cQ~dAderod where practical. As built. irrigation plane shall be provided to ~ #.0.A. get ell COBBOn iF&aS. H. C¢ & R's ~11 ~lude t~m City ~m a bdmdfJ. ciir'y of tad %raylAt. 11~ city ead~l be granted rivet bvt n~t t~m My ef enforclfiq rosy IMrovioloJo ommr~&Jmd &m tJi4 CC&Ro. &dditione to the CC · fl'& ~ qM s.o.&. c ,lozeot ,lu * s-, My be Mad Ot ~ aio?~_ Sm.d. lb- ~e & xnv C~"MIf I~&J&iq 14D 4~mm~mo4m~ _--"--,~*'., ram·if- t ~ ~ IIIt~IM 4iSd.&& N ~ ed~dmelttW t,i ~ City W mmw mm E,~ff &~ t4N'ldry · -&4k- I. Membership in the Association is mandatory for all lot owners in the subdivision. J. No antennas, microwave or satellite receiving diihes or other broadcasting or receiving devices shall be permitted. K. Flood Control District responsibility for maintenance of Sycamore Creek shall be limited to maintenance of drop structures, clearing of debris and sediments as necessary to maintain capacity and preventing future erosion from exceeding the limits of the flood plain. County Flood Control shall have the right of access over any private streets within the project. Prior to filing of a final subdivision map, =he City Attorney shall review the CC&Rs to assure that all applicable conditions of approval have been addressed. *(19). The developer shall comply with the requirements of the San Ramon Valley Unified School District as specified in the Sycamore Valley Specific Plan. Said compliance shall be verified in the form of a letter of understanding or agreement prior to issuance of grading permits or recordation of Final Maps. 20. The developer shall enter into an acceptable agreement with the City, addressing the disposition and improvement of lands designated as open space prior to issuance of grading permits or recordation of Final Maps for the project, whichever shall first occur. * 21. Within 30 days of the date of Planning Co~mission approval, the Tentative Map shall be revised to include Conditions 6, 7, 8. !3 and 22 and resubmitted to the City Engineer. 22. W4thtn 30 days of this approval. the applicant shall subm4t a revised Dhastna plan. Upon approval of a final map for Phase II, the developer shall 9&~S~: construct all public improvements (or as d!rected by the City ~ngineer) in Phases iiI zv/ -A6- (23). All interior subdivision streets shall be dedicated to the City of Danville and constructed to City public road standards, or to the satisfaction of the City Engineer. 24. All proposed grading shall be carried out in accordance with "Grading and Erosion Control Requirements" as set for in the Sycamore Valley Specific Plan and recommendations contained in the Soils and Geologic Investigation prepared for the project by Harding Lawson Associates, dated October 31, 1984. (25). In accordance with Section 92-2.006 of the City Ordinance Code, this project shall conform to the provisions of the City subdivision ordinance (Title 9). Any exceptions therefrom must be specifically listed in the conditional approval statement, attached to the Tentative Map. *(26). A current title report and copies of the recorded deeds of all parties having an interest in the property and, if necessary, copies of deeds for adjoining properties and easements, thereto, shall be submitted at the time of submission of the Final Subdivision Map for the City Engineer. *(27). Copies of the Final Map and improvement plans, indicating all lots, streets, and drainage facilities within the subdivision shall be submitted at 1" - 300 ft. scale, for City mapping purposes. *(28). Furnish proof to the City Engineer of the acquisition of all necessary rights of entry, permits and/or easements for the construction of off-site, temporary or permanent, road and drainage improvements. *(29). Submit improvement plans to the City Engineer for review; pay the plan review, inspection and applicable lighting fees. (30). Where soils or geologic conditions encountered in grading operations are different from that anticipated in the soil and geologic investigation report, or where such conditions warrant changes to the recommendations contained in the original soil investigation, a revised soil or geologic report shall be submitted for approval by the City Engineer. It shall be accompanied by an engineering and geological opinion as to the safety of the site from hazards of land slippage, erosion, settlement, and seismic activity. -A7- *(31). If grading is commenced prior to filing the Final Map, a surety or guarantee, as determined suitable by the City Engineer, shall be filed with the City of Danville to ensure restoration of the site to a stable and erosion resistant state if the project is terminated prematurely. *(32). Any grading on adjacent properties will require written approval of those property owners affected. *(33). All grading plans shall be accompanied by erosion control and revegetation plans. *(34). Dust control measures, as approved by the City Engineer shall be followed at all times during grading and construction operations. (35). Construction and grading opera=ions shall be limited to weekdays (Monday through Friday) and the hours from 7:00 A.M. to ~:00 P.M. unless approved in writing by the City Engineer. (36). Grading and land preparation shall be restricted to the period of April 15 to October 15 to minimize erosion and deposition of sediments in Sycamore Creek. All exposed erosive slopes resulting from grading activities should be hydromulched or otherwise stabilized by project developers each year by October 15. Exceptions may be granted by the City Engineer. (37). Any portion of the drainage system that conveys runoff from public streets shall be installed within a dedicated drainage easement, or public street. (3S). Storm drain facilities shall be designed to channel water into natural drainage ways. Outfall lines should be designed to carry water from the edge of developed areas to energy dissipators at nearby creekbeds in order to minimize erosion that will occur if outlets are placed at the top of slopes. (39). Storm drains shall be placed in streets or open space corridors wherever possible and the plan shall be designed so that this can be accomplished without th& pipes being excessively deep. (40). If a storm drain must cross a lot, or be in an easement between lots, the easement width shall be equal to or at least double the depth of the storm drain. -AS- (41). Provisions shall be made to protect the subdivision improvements from hillside runoff via interceptor ditches, grade terraces, or similar facilities within the development. (42). The developer shall keep adjoining public streets free and clean of project dirt, mud, materials, and debris during the construction period, as is found necessary by the City Engineer. (43). Handicapped ramps shall be provided as required by State of California Title 24, and by the City Engineer. * 44. Conduct a study of the impact this development will have on existing capacity of Sycamore Creek, both upstream and downstream. Construct off-site improvements on Sycamore Creek to mitigate any adverse impacts. Study to be reviewed by City staff and Flood Control staff. 45. Repair existing erosion along Sycamore Creek and as directed by Contra Costa Flood Control District. 46. Proposed drainage discharge points to Sycamore Creek shall be designed to conform with - requirements of Contra Costa County Flood Control and the City of Danville. 47. Comply with all requirements of the San Ramon Valley Fire Protection District with respect to emergency vehicle access and all fire code requirements. (48). Sewage disposal serving the project shall be provided by the Central Contra Costa Sanitary District. (49). Water supply serving the project shall be by the East Bay Municipal Utility District. (50). If archaeologic materials are uncovered during grading, trenching or other excavation, earthowrk within 100 feet of these materials shall be stopped until a professional archaeologist who is certified by the Society of California Archaeology (SCA) and/or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures, if they are deemed necessary. -A9- * 51. The applicant shall submit a list of proposed street names for review and approval prior to recordation of final maps. 52. Construction traffic shall be prohibited from using that segment of Camino TessaJars south of Diablo Road and north of Gatetree Drive. * 53. Working Jointly, Sycamore Valley developers shall prepare a day care plan addressing the potential location(s) for day care facilities within Sycamore Valley based upon individual project demographics and demand. The day care plan including a schedule for implementation shall be submitted for the review of the Chief of Planning prior to the recordation of Final Maps for the project. 54. The developer shall install a traffic signal at the intersection of "S" street and Camino TassaJara. 55. The effective date of the approval for the Final Development Plan and Revised Tentative Map shall be the effective date of the ordinance amending the Zoning Map of the City of Danville. 56. Developer shall construct the full width of "A" Street along the entire project frontage. "A" Street shall be completed prior to issuance of building permits for Phase II development. -A10- lp: pcrll12