HomeMy WebLinkAbout60-85 BEFORE THE CITY COUNCIL Or' THE CI[Y OF DAHUILLE In the Matter of: ) --~ ) Granting Rezoning of Land) ORDINANCE NO. 60--85 from A-Z to P-1 and ) Amending the Zoning Map ) of the City ) > The City Council of the Clty of DanviIle DOES ORDAIN AS FOLLOUS: SECTION 1 _ Rezoninq "[hat the 146 acre parcel located on the south side of Camino Tassajara, approximately 1/2 mi].e west of Douchetry Road <Assessor's Parcel 217-020.-001) and sboun on the attached Exhibit B is rezoned from A--.2 to the P-Z zoning district_ Rezoning is based upon 'the approved Preliminary Development Plan for PUD 84--6, as conditioned by the requirements listed on Exhibit A_ SECTION 2_ Zoninq MaR- The zoning map of 'the City of Danville is amended accor-ding19. SECTION 3_ PubZicatio_n. The City Clerk shalI either a) have this ordinance published once within 1S days after' adoption in a newspaper of gener'al circulation of b) have a summary of this ordinance published twice in a newspaper of general circulation once five days before its adoption and again uithin 1S days after adoption_ SECTION 4. Effective Date This ordinance becomes effective 30 days after its adoption_ The foregoing ordinance was introduced at a meeting of the City Council of the City o'f Danville held on April 1S, 198S, and was adopted and ordered pubiished at a meeting of the Council held on May 6 , 1985, by the following vote: AVES: Lane, May, Schlend0rf NOES: McNeely ABSTAIN: Oftenhartz MAVOR ATTEST: ~I~ Ci_ERK ' ' . ~/' / EXHIBIT A CONDITIONS OF APPROVAL PREL. IHINAR¥ DEVELOPH£N! PLAN FOR PUD 84-6 1 . This approval is based upon the Preliminary Development Plan?Preliminary Grading Plan as submitted by the applicant or] February 4, ]985_ Any revision including site plans or architecture shall be submitted for review and approval of the Director of Planning_ The 'total number of residential units shall not exceed 171 units_ Final number of units uill be determined at final Development Plan stage 5_ The land uses and millimUm dimensional standards and requirements for [he principal and accessory structures on these lots shall be as follows: Frontyard ZO ft Sideyard 10 ft. building separation for t story units 15 ft_ building separation for 2 ~tory units Rearyard 20 ft_ <average) Residential building height shall not exceed 28 ft_ above cuerage grade_ Any deviation from these criteria or interpretation of standards shall be subject to the administrative reulew and approval of the Director of Planning_ 4_ The location of the major entrance road to the project shatI est~btish the major access poin~ to the area north of Camino Tassajara_ 5_ The developer shall install a stop sign at the intersection of the project's major entrance road with Camino l'assajara_ 6_ [he [ intersection of the major entrance road with the central loop road shall be a Minimum distance of 150 feet from Camino [assajara and include three-way stop traffic control_ 7_ Emergency vehicle access shall be provided from Camino Tessclara to the parking bays located at the northeast and northwest corners of the project. 8_ 811 private streets shall he designed consistent with the draft "Private Street Policy" prepared by the City of Canville_ 9 The roads which run east/west connecting the three loop roadways, shall haue a MiniMUM pavement width of i6 feet in each direction_ 10_ The Main entrance road into the project should prouide a MiniMUM pavement width of Z4 feet in each direction_ 11_ All private streets shall be signed for no parking_ Sidewalks shall he provided on one side of the street for each of the three loop roadways, and the ,ajar entrance road_ [he accent park on the eastern end of the site shall be designed to prouide for an average of 60 feet in width, similar to that proposed on the western end. 14_ The accent park/linear parkway SySteM should be continuous, connecting all three loop roadways_ four units should be deleted within the central loop roadway in order to provide for a third accent park_ 15. Rn accent park/visual corridor shaJl be provided frOM the Major project entrance off of Ca, inc [assajara, south to the hank of SycaMore Creek and the recreation ~rea _ 16. One unit should be deleted frOM each of the east and west sides of the Major entrance road. in order to provide for an increased street width and greater' unit setbacks from the Main entrance road. 17. R pedestrian bridge for access across SycaMore Creek should be provided in the area of the proposed recreation area. ta_ Rn all weather roadway surface 8-tO feet uide sha]! be prouided all along the northern side of the creek for Maintenance purposes. Rdequate turn arounds sh,~]l he provided_ 19. Open Space areas located north of lots adjacent to Camino fassajara (between the Camino Tassajara R_O.U_ and the proposed rear tot tines) shall be dedicated to the City as additional right of way for Camino Tassajara. 'this area shall be Maintained by the Maintenance district established for landscape ~aintenance of the CaMino [assajara corridor_ ._.. ZO. If 8 storm drain must cror~5 a lot, the minimum 5tortl drain easement width sha] 1 he ter, feet _ Ui der' easements will be required in .~ome cases ba-~ed on pipe size and depth_ Z1. The applicant shall comply with all requirements of tile P--1 district upon .submittal of the Final OevelopMen[ Plan for [he project. ZZ_ Architectural t r-eatment of dwelling units shall be consistent w'Lt.h standards ,set forth in tile Sycamore UaJley Specific Plan_ Specifically: o The use of white stucco fin/shes should be discouraged in favor of beige or "earthtone" col ors 23_ All exterior unit elevations shall be trimmed and detailed similar to front elevations_ Z4 _ All buildings adjacent to non-landscaped and non-irrigated open space shall be constructed with fire rotardent roofing_ ZS _ All air conditioners/condensers shall be ground mounted _ Approved spark arrestors shall be installed on each chimney used for fireplaces and he,;llng appliances in uhich solld or liquid fuel may be ui~ed_ Z7_ All recreation buildings, cabanas etc_ shall comply with San Ramon Dall. ey Fire Protection District Ordinance U4, supervised sprinkler requirements prior to occupancy_ 28 _ [he developer shall participate wl. th the City of Danville in formation of a regional open space system within the Sycamore Valley_ Dlti. mate ownership of such areas shall be determined upon recordation of final maps, prior- t.o issuance of building permits_ Open space areas shall be improved in accordance with East Bay Regional Park District Resolution Ha _ 1984-8-225 _ 29. Developer shall participate in an assessment district or other funding Mechanism for completion of all requirements contained in the Sycamore Ualley Specific Plan_ Requirements shall include but not be limited 'to: 1 Completion of Camino Tassajar'a_ 2 Completion of Diablo Road between Caf~i no fassajara and 1-680. _. J_ Completion of Sycamore Ualley Road. 4_ Completion of 1-680/Sycamore Ualley Road interchange or its assurance of completion through other funding sources_ Acquisition and Improvement of the 20 acre park site at Camino Tassajara and Sycamore Ualley Road_ Such participation shall be assured prior 'to issuance of any building permits for subdivision improvements or structures. Covenants, Conditions and Restrictions, Articles of Incorporation and By-Laws for a mandatory homeowners association shall be submitted for review by the City Attorney with the application for approval of a final Subdivision Map_ These documents shall provide for establishment, ownership, aud m~intenance of frontyard landscape for all units and Common Open Space_ 31_ The recreation facilities and landscape treatment along Camino Tassajara shall be be developed with the first phase of tile project_ -~ 3Z_ Plans for street lighting, signage and entry signage as required by the Specific Plan shall be submitted for review of the Director of Pl~rining_ This shall occur in conjunction ~ith final development plan submittal to assure compatibility with building mater-ials, colors and placement. These plans shall be in comfor'mance with the final landscape plan for Caminio Tassajara. Subdivision maps for the development of the area shall not be recorded until an ordinance adopting this rezoning has been finalized_ 34_ In accordance with Section 9Z-Z.006 of the City Ordinance Code, this project shall conform to the provisions of the City subdivision ordinance <Title 9)_ Any exceptions therefrom must be specifically listed in the conditional approval statement, attached to the Tentitive Hap. Dedicate a drainage easement on Sycamore Creek to Contra Costa County Flood Control District conforming to the adopted Floodway Plan. 36 Construct all drainage structures within the property conforming to the Sycamore Creek Floodway Plan, as amended in the Addendum to the 1981 E.I_R_ ~butter's r]ght. s of access along CaMino [assajara, except for the intersection areas, shall be relinquished. lhe relinquishment shall include the right of way returns of the affected subdzuisions Comply with all requiremerits of the San RaMon Ualley Fire Protection District with respect to eMergencv uehicle access and all fire code requirements_ Developer shall participate in funding the construction of new facilities, amount and extent of ,hich shall be deter,ined prior to final Map recordation_ CoMply with the requirements of the San RaMon ValleV gnified School OistrJct as specified in the SycaMore Ualley Specific Plan (see RddenduM to 19B1 E..I_R.). 40_ All proposed grading shall be carried out in accordance with "Grading and Erosion Control RequireMents" as set forth in the SycaMore Valley Specific Plan and recoMMendations contained in the Soil and Geologic Investigation prepared for the project by Terrasearch Inc_, dated May 1S, 1984_ Sewage disposal serving the project shall be provided by the Central Contra Costa Sanitary District. Mater supply serving the project sh.ll be bv the East Bay Municipal Utility District_ Based upon Mitigation Measures contained in the E_I_R_, applicant shall prepare and submit an acoustical study addressing noise Mitigation along the CaMino fassajara corridor, at time of Final Development Plan. 44. Storm drain facilities shall be designated to channel wa'ter into natural drainage ways_ Outfall lines should be designed to carry water from the edge of development areas to energy dissipators at nearby creekbeds in order to MiniMize erosion that will occur if outlets are placed at the tops of slopes_ Storm drains shall be placed in streets or open space corridors wherever possible and 'the plan shall be designed so that thJs can be accomplished without the pipes being excessively deep. 46_ Grading and land preparation ~hnuld be restricted to the period of Rpr'll 15 to October 1S to mznimize eroszon and desposition of sediments in Sycamore Creek.. All exposed erodable slopes resulting frOM grading actiuities should be hwdromulched or otherwise stabilized by project developers each wear bw October 15. Exceptions may be granted hW the Citw Engineer_ 47. The City will conduct an off-site noise study_ All who contribute to noise problems identified bw the study will be required to participate in an assessment district for provision of noise Mitigation measures_ Responsibilitw for such participation shall be limited to a period of time extending two years from recordation of final maps_ 48. Preliminary landscape plans shall be submitted in conjunction with the Final Development Plan_ Said plans shall. address all requirements contained in the P D submittal requirements and shall also include: o Frontward landscaping for all units including a minimum of two street trees per unit_ 49_ If archaeologic materials are uncovered during grading, trenching or other exc,]vation, earthwork __ within 100 feet of these Materia!:s shall be stopped until a professional archaeologist who is certified by the Society of California of Archaeology <SCA) and/or the Societw of Professional Archaeoloow <SOPA> has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation Measures, if they are deemed necessary. SO_ Applicant shall submit a color and materials pallcite for the proposed units for reuieu at time of Final Development Plan/Tentative Hap_ Sl_ The final development plan ~hall show utility line locations with respect to proposed trees_ Trees shall not be planted ouer [lt:ilify lines_ ®